{{#Wiki_filter:May 13, 2008 LICENSEE: Southern Nuclear Operating Company, Inc.
{{#Wiki_filter:May 13, 2008 LICENSEE:       Southern Nuclear Operating Company, Inc.
FACILITY: Vogtle Electric Generating Plant, Units 1 and 2  
FACILITY:       Vogtle Electric Generating Plant, Units 1 and 2


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF TELEPHONE CONFERENCE CALL HELD ON APRIL 17, 2008, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND SOUTHERN NUCLEAR OPERATING COMPANY, INC., CONCERNING REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory and representatives of Southern Nuclear Operating Company, Inc., held a telephone conference call on April 17, 2008, to discuss and clarify the staff's request for additional information (RAI) concerning the Vogtle Electric Generating Plant, Units 1 and 2, license renewal application. The telephone conference call was useful in clarifying the intent of the staff's RAIs.  
OF TELEPHONE CONFERENCE CALL HELD ON APRIL 17, 2008, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND SOUTHERN NUCLEAR OPERATING COMPANY, INC., CONCERNING REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory and representatives of Southern Nuclear Operating Company, Inc., held a telephone conference call on April 17, 2008, to discuss and clarify the staffs request for additional information (RAI) concerning the Vogtle Electric Generating Plant, Units 1 and 2, license renewal application. The telephone conference call was useful in clarifying the intent of the staffs RAIs. provides a listing of the participants. Enclosure 2 contains a summary of the discussions and a listing of the RAIs discussed with the applicant, including a brief description on the status of the items.
The applicant had an opportunity to comment on this summary.
                                              /RA/
Donnie J. Ashley, Sr. Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425


Enclosure 1 provides a listing of the participants. Enclosure 2 contains a summary of the discussions and a listing of the RAIs discussed with the applicant, including a brief description on the status of the items.
==Enclosures:==
 
The applicant had an opportunity to comment on this summary.
      /RA/  Donnie J. Ashley, Sr. Project Manager      Projects Branch 1 Division of License Renewal      Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425


==Enclosures:==
As stated cc w/encls: See next page
As stated cc w/encls: See next page


ML081290027 OFFICE LA:DLR PM:RPB1:DLR BC:RPB1:DLR NAME IKing DAshley LLund DATE 5/   9   /08 5/   9   /08 5/   13   /08 TELEPHONE CONFERENCE CALL VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS APRIL 17, 2008 PARTICIPANTS AFFILIATIONS Donnie Ashle y U.S. Nuclear Re gulator y Commission (NRC) Edward Smith NRCChalmer M yer Southern Nuclear O peratin g Com p an y, Inc Louis Bohn SNOC
ML081290027 OFFICE       LA:DLR                 PM:RPB1:DLR         BC:RPB1:DLR NAME         IKing                 DAshley             LLund DATE         5/ 9 /08               5/ 9 /08             5/ 13 /08


ENCLOSURE 1
TELEPHONE CONFERENCE CALL VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS APRIL 17, 2008 PARTICIPANTS                          AFFILIATIONS Donnie Ashley                          U.S. Nuclear Regulatory Commission (NRC)
Edward Smith                          NRC Chalmer Myer                          Southern Nuclear Operating Company, Inc Louis Bohn                            SNOC ENCLOSURE 1


==SUMMARY==
==SUMMARY==
OF TELEPHONE CONFERENCE VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION APRIL 17, 2008  
OF TELEPHONE CONFERENCE VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION APRIL 17, 2008 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Southern Nuclear Operating Company, Inc., held a telephone conference call on April 17, 2008, to discuss and clarify the applicants responses to previous requests for additional information (RAI) concerning the Vogtle Electric Generating Plant (VEGP), Units 1 and 2, license renewal application (LRA).
 
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Southern Nuclear Operating Company, Inc., held a telephone conference call on April 17, 2008, to discuss and clarify the applicant's responses to previous requests for additional information (RAI) concerning the Vogtle Electric Generating Plant (VEGP), Units 1 and 2, license renewal application (LRA).  
 
These questions are focused on the scoping and screening section of the LRA.
These questions are focused on the scoping and screening section of the LRA.
In RAI 2.3.3.20-4, we requested that the applicant provide additional information explaining which tank vents on the LRA drawings do or do not have the tank vent screen component that is listed as item 36 in LRA Table 2.3.3.20. The applicant's response stated that "...Since the vents for both tanks provide the same function, it is assumed that screen covers were installed on the diesel fuel day tank vents as well.We will accept this response by stating that there are screen vents on the diesel fuel day tanks - thereby committing the applicant to having an aging management review for them. If it turns out that there are no screens, then the applicant should advise us and we will modify the response.  
In RAI 2.3.3.20-4, we requested that the applicant provide additional information explaining which tank vents on the LRA drawings do or do not have the tank vent screen component that is listed as item 36 in LRA Table 2.3.3.20. The applicants response stated that ...Since the vents for both tanks provide the same function, it is assumed that screen covers were installed on the diesel fuel day tank vents as well. We will accept this response by stating that there are screen vents on the diesel fuel day tanks - thereby committing the applicant to having an aging management review for them. If it turns out that there are no screens, then the applicant should advise us and we will modify the response.
In RAI 2.3.3.23-3, we requested that the applicant provide additional information to verify that the continuation of pipeline 097-2 from LRA drawings 1X4LD179-2 and 2X4LD179-2 had been made to the correct drawings and locations and to provide the drawings. The applicant stated that the pipeline continues to P&ID AX4DB124-2 and shows the point where the license renewal boundary ends at the Auxiliary Building to Radwaste Transfer Tunnel Boundary. The applicant further stated that 1X4LD179-2 and 2X4LD179-2 ...should have been revised to include the Auxiliary Building to Radwaste Transfer Tunnel Boundary for clarity. Since X4LD179-2 and 2X4LD179-2 were not revised to show the boundary and AX4DB124-2 was not provided for our review, we are unable to confirm that there are no new component types within the boundary for which the drawing was not provided. The applicant confirmed that there are no new component types within the boundary discussed.
In RAI2.3.4.4, we requested additional information justifying the boundary locations for line 153-10" at HV5103. The applicants response referred to 1302-153-10" and 1302-010-10".
There is some confusion regarding which line is being referred to. We can find no 1302-153-10". According to drawing 1(2)X4LD161-1, the line from HV5103 is 1305-153-10."
The applicant stated that 1302-153-10" was mislabeled and should have been 1305-153-10".
Enclosure 2


In RAI 2.3.3.23-3, we requested that the applicant provide additional information to verify that the continuation of pipeline 097-2 from LRA drawings 1X4LD179-2 and 2X4LD179-2 had been made to the correct drawings and locations and to provide the drawings. The applicant stated that the pipeline continues to P&ID AX4DB124-2 and shows the point where the  license renewal boundary ends at the Auxiliary Building to Radwaste Transfer Tunnel Boundary. The applicant further stated that 1X4LD179-2 and 2X4LD179-2 "...should have been revised to include the Auxiliary Building to Radwaste Transfer Tunnel Boundary for clarity."  Since X4LD179-2 and 2X4LD179-2 were not revised to show the boundary and AX4DB124-2 was not provided for our review, we are unable to confirm that there are no new component types within the boundary for which the drawing was not provided. The applicant confirmed that there are no new component types within the boundary discussed.
Letter to Southern Nuclear from D. Ashley, dated May 13, 2008 DISTRIBUTION:
In RAI2.3.4.4, we requested additional information justifying the boundary locations for  line 153-10" at HV5103. The applicant's response referred to 1302-153-10" and 1302-010-10". There is some confusion regarding which line is being referred to. We can find no 1302-153-10". According to drawing 1(2)X4LD161-1, the line from HV5103 is 1305-153-10."  The applicant stated that 1302-153-10" was mislabeled and should have been 1305-153-10".
 
Enclosure 2 Letter to Southern Nuclear from D. Ashley, dated May 13, 2008 DISTRIBUTION
:


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF TELEPHONE CONFERENCE CALL HELD ON APRIL 17, 2008, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND SOUTHERN NUCLEAR OPERATING COMPANY, INC., CONCERNING REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION HARD COPY: DLR RF E-MAIL: PUBLIC SSmith (srs3) SDuraiswamy RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDciCvib RidsNrrDciCpnb RidsNrrDraAfpb RidsNrrDeEmcb RidsNrrDeEeeb RidsNrrDssSrxb RidsNrrDssSbpb RidsNrrDssScvb RidsOgcMailCenter  
OF TELEPHONE CONFERENCE CALL HELD ON APRIL 17, 2008, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND SOUTHERN NUCLEAR OPERATING COMPANY, INC., CONCERNING REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION HARD COPY:
------------- DAshley JPLeous SLingam CJulian, RII GMcCoy, RII Vogtle Electric Generating Plant,    Units 1 and 2 cc:  Mr. Tom E. Tynan Vice President - Vogtle Vogtle Electric Generating Plant        7821 River Road Waynesboro, GA  30830
DLR RF E-MAIL:
 
PUBLIC SSmith (srs3)
Mr. N. J. Stringfellow Manager, Licensing Southern Nuclear Operating Company, Inc. P.O. Box 1295 Birmingham, AL  35201-1295 Mr. Jeffrey T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc. P.O. Box 1295 Birmingham, AL  35201-1295
SDuraiswamy RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDciCvib RidsNrrDciCpnb RidsNrrDraAfpb RidsNrrDeEmcb RidsNrrDeEeeb RidsNrrDssSrxb RidsNrrDssSbpb RidsNrrDssScvb RidsOgcMailCenter
 
-------------
Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia 1470 Riveredge Parkway, NW Atlanta, GA  30328-4684
DAshley JPLeous SLingam CJulian, RII GMcCoy, RII
 
Mr. Reece McAlister Executive Secretary Georgia Public Service Commission 244 Washington Street, SW Atlanta, GA  30334 Mr. Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA  30334 Attorney General Law Department 132 Judicial Building Atlanta, GA  30334
 
Mr. Laurence Bergen Oglethorpe Power Corporation 2100 East Exchange Place P.O. Box 1349 Tucker, GA  30085-1349
 
Arthur H. Domby, Esquire Troutman Sanders Nations Bank Plaza 600 Peachtree Street, NE Suite 5200 Atlanta, GA  30308-2216
 
Resident Inspector Vogtle Plant 8805 River Road Waynesboro, GA  30830
 
Office of the County Commissioner Burke County Commission Waynesboro, GA  30830 Mr. Stanford M. Blanton, Esq.
Balch & Bingham, LLP P.O. Box 306 Birmingham, AL  35201 Ms. Moanica M. Caston Vice President and General Counsel Southern Nuclear Operating Company, Inc. 40 Inverness Center Parkway P.O. Box 1295 Birmingham, AL  35201-1295


Chalmer R. Myer Southern Nuclear Operating Company, Inc. 40 Inverness Center Parkway P.O. Box 1295 Birmingham, AL 35201-1295}}
Vogtle Electric Generating Plant, Units 1 and 2 cc:
Mr. Tom E. Tynan                        Mr. Laurence Bergen Vice President - Vogtle                  Oglethorpe Power Corporation Vogtle Electric Generating Plant        2100 East Exchange Place 7821 River Road                          P.O. Box 1349 Waynesboro, GA 30830                    Tucker, GA 30085-1349 Mr. N. J. Stringfellow                  Arthur H. Domby, Esquire Manager, Licensing                      Troutman Sanders Southern Nuclear Operating Company, Inc. Nations Bank Plaza P.O. Box 1295                            600 Peachtree Street, NE Birmingham, AL 35201-1295                Suite 5200 Atlanta, GA 30308-2216 Mr. Jeffrey T. Gasser Executive Vice President                Resident Inspector Southern Nuclear Operating Company, Inc. Vogtle Plant P.O. Box 1295                            8805 River Road Birmingham, AL 35201-1295                Waynesboro, GA 30830 Mr. Steven M. Jackson                    Office of the County Commissioner Senior Engineer - Power Supply          Burke County Commission Municipal Electric Authority of Georgia  Waynesboro, GA 30830 1470 Riveredge Parkway, NW Atlanta, GA 30328-4684                  Mr. Stanford M. Blanton, Esq.
Balch & Bingham, LLP Mr. Reece McAlister                      P.O. Box 306 Executive Secretary                      Birmingham, AL 35201 Georgia Public Service Commission 244 Washington Street, SW                Ms. Moanica M. Caston Atlanta, GA 30334                        Vice President and General Counsel Southern Nuclear Operating Company, Inc.
Mr. Harold Reheis, Director              40 Inverness Center Parkway Department of Natural Resources          P.O. Box 1295 205 Butler Street, SE, Suite 1252        Birmingham, AL 35201-1295 Atlanta, GA 30334 Chalmer R. Myer Attorney General                        Southern Nuclear Operating Company, Inc.
Law Department                          40 Inverness Center Parkway 132 Judicial Building                    P.O. Box 1295 Atlanta, GA 30334                        Birmingham, AL 35201-1295}}

Latest revision as of 18:01, 14 November 2019

04/17/2008 - Summary of Telephone Conference with Southern Nuclear Operating Company, Inc., Concerning Scoping and Screen RAI Pertaining to the the Vogtle Electric Generating Plant, Unit 1 and 2, License Renewal Application
ML081290027
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/13/2008
From: Ashley D
NRC/NRR/ADRO/DLR
To:
Ashley D NRR/DLR 415-3191
References
Download: ML081290027 (6)


Text

May 13, 2008 LICENSEE: Southern Nuclear Operating Company, Inc.

FACILITY: Vogtle Electric Generating Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON APRIL 17, 2008, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND SOUTHERN NUCLEAR OPERATING COMPANY, INC., CONCERNING REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory and representatives of Southern Nuclear Operating Company, Inc., held a telephone conference call on April 17, 2008, to discuss and clarify the staffs request for additional information (RAI) concerning the Vogtle Electric Generating Plant, Units 1 and 2, license renewal application. The telephone conference call was useful in clarifying the intent of the staffs RAIs. provides a listing of the participants. Enclosure 2 contains a summary of the discussions and a listing of the RAIs discussed with the applicant, including a brief description on the status of the items.

The applicant had an opportunity to comment on this summary.

/RA/

Donnie J. Ashley, Sr. Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425

Enclosures:

As stated cc w/encls: See next page

ML081290027 OFFICE LA:DLR PM:RPB1:DLR BC:RPB1:DLR NAME IKing DAshley LLund DATE 5/ 9 /08 5/ 9 /08 5/ 13 /08

TELEPHONE CONFERENCE CALL VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS APRIL 17, 2008 PARTICIPANTS AFFILIATIONS Donnie Ashley U.S. Nuclear Regulatory Commission (NRC)

Edward Smith NRC Chalmer Myer Southern Nuclear Operating Company, Inc Louis Bohn SNOC ENCLOSURE 1

SUMMARY

OF TELEPHONE CONFERENCE VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION APRIL 17, 2008 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Southern Nuclear Operating Company, Inc., held a telephone conference call on April 17, 2008, to discuss and clarify the applicants responses to previous requests for additional information (RAI) concerning the Vogtle Electric Generating Plant (VEGP), Units 1 and 2, license renewal application (LRA).

These questions are focused on the scoping and screening section of the LRA.

In RAI 2.3.3.20-4, we requested that the applicant provide additional information explaining which tank vents on the LRA drawings do or do not have the tank vent screen component that is listed as item 36 in LRA Table 2.3.3.20. The applicants response stated that ...Since the vents for both tanks provide the same function, it is assumed that screen covers were installed on the diesel fuel day tank vents as well. We will accept this response by stating that there are screen vents on the diesel fuel day tanks - thereby committing the applicant to having an aging management review for them. If it turns out that there are no screens, then the applicant should advise us and we will modify the response.

In RAI 2.3.3.23-3, we requested that the applicant provide additional information to verify that the continuation of pipeline 097-2 from LRA drawings 1X4LD179-2 and 2X4LD179-2 had been made to the correct drawings and locations and to provide the drawings. The applicant stated that the pipeline continues to P&ID AX4DB124-2 and shows the point where the license renewal boundary ends at the Auxiliary Building to Radwaste Transfer Tunnel Boundary. The applicant further stated that 1X4LD179-2 and 2X4LD179-2 ...should have been revised to include the Auxiliary Building to Radwaste Transfer Tunnel Boundary for clarity. Since X4LD179-2 and 2X4LD179-2 were not revised to show the boundary and AX4DB124-2 was not provided for our review, we are unable to confirm that there are no new component types within the boundary for which the drawing was not provided. The applicant confirmed that there are no new component types within the boundary discussed.

In RAI2.3.4.4, we requested additional information justifying the boundary locations for line 153-10" at HV5103. The applicants response referred to 1302-153-10" and 1302-010-10".

There is some confusion regarding which line is being referred to. We can find no 1302-153-10". According to drawing 1(2)X4LD161-1, the line from HV5103 is 1305-153-10."

The applicant stated that 1302-153-10" was mislabeled and should have been 1305-153-10".

Enclosure 2

Letter to Southern Nuclear from D. Ashley, dated May 13, 2008 DISTRIBUTION:

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON APRIL 17, 2008, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND SOUTHERN NUCLEAR OPERATING COMPANY, INC., CONCERNING REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION HARD COPY:

DLR RF E-MAIL:

PUBLIC SSmith (srs3)

SDuraiswamy RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDciCvib RidsNrrDciCpnb RidsNrrDraAfpb RidsNrrDeEmcb RidsNrrDeEeeb RidsNrrDssSrxb RidsNrrDssSbpb RidsNrrDssScvb RidsOgcMailCenter


DAshley JPLeous SLingam CJulian, RII GMcCoy, RII

Vogtle Electric Generating Plant, Units 1 and 2 cc:

Mr. Tom E. Tynan Mr. Laurence Bergen Vice President - Vogtle Oglethorpe Power Corporation Vogtle Electric Generating Plant 2100 East Exchange Place 7821 River Road P.O. Box 1349 Waynesboro, GA 30830 Tucker, GA 30085-1349 Mr. N. J. Stringfellow Arthur H. Domby, Esquire Manager, Licensing Troutman Sanders Southern Nuclear Operating Company, Inc. Nations Bank Plaza P.O. Box 1295 600 Peachtree Street, NE Birmingham, AL 35201-1295 Suite 5200 Atlanta, GA 30308-2216 Mr. Jeffrey T. Gasser Executive Vice President Resident Inspector Southern Nuclear Operating Company, Inc. Vogtle Plant P.O. Box 1295 8805 River Road Birmingham, AL 35201-1295 Waynesboro, GA 30830 Mr. Steven M. Jackson Office of the County Commissioner Senior Engineer - Power Supply Burke County Commission Municipal Electric Authority of Georgia Waynesboro, GA 30830 1470 Riveredge Parkway, NW Atlanta, GA 30328-4684 Mr. Stanford M. Blanton, Esq.

Balch & Bingham, LLP Mr. Reece McAlister P.O. Box 306 Executive Secretary Birmingham, AL 35201 Georgia Public Service Commission 244 Washington Street, SW Ms. Moanica M. Caston Atlanta, GA 30334 Vice President and General Counsel Southern Nuclear Operating Company, Inc.

Mr. Harold Reheis, Director 40 Inverness Center Parkway Department of Natural Resources P.O. Box 1295 205 Butler Street, SE, Suite 1252 Birmingham, AL 35201-1295 Atlanta, GA 30334 Chalmer R. Myer Attorney General Southern Nuclear Operating Company, Inc.

Law Department 40 Inverness Center Parkway 132 Judicial Building P.O. Box 1295 Atlanta, GA 30334 Birmingham, AL 35201-1295