ML17308A465: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:0 0 REGULATORY INFORMATION DISTRIBUTlON SYSTEM (RIDS)ACCESSION NBR: 8904130035 DOC.DATE: 89/03/30 NOTARIZED:
{{#Wiki_filter:0                               0 REGULATORY INFORMATION DISTRIBUTlON SYSTEM       (RIDS)
NO FACIL: 50-389 St.Lucie Planti Unit 2I Florida Poeer 5 Light Co.AUTH.MANE AUTHOR AFFILIATION CONWAYi W.F.Florida Power 5 Light Co.RECIP.NAME REC lP IENT AFFILIATION Document Control Branch (Document Control Desk>DOCKET 0 05000389 SUBSECT: Foreards Rev 4 to updated FSAR 5 advises that cover ltr for previous submittal of 880404 inadvertently stated that Rev 3 covered period from Sbi007-871005 rather than actual period 861007-871006.
ACCESSION NBR: 8904130035         DOC. DATE: 89/03/30   NOTARIZED: NO       DOCKET 0 FACIL: 50-389 St. Lucie     Planti Unit 2I Florida Poeer 5 Light Co.         05000389 AUTH. MANE         AUTHOR AFFILIATION CONWAYi W. F.       Florida Power 5 Light Co.
List of plant changes also encl.~<le)gq DISTRIBUTION CDDE: A05SD CDP ES RECEIVED: LTR Q ENCL Ji SIZE: TITLE: OR Submittal:
RECIP. NAME         REC lP IENT AFFILIATION Document Control Branch (Document Control Desk>
Updated FSAR (50.71)'nd Amendments NOTES: RECIPIENT ID CODE/NANE PD2-2 LA NORRIS'INTERNAL: ACR S N ST/ADS 7E Q FILE 01 EXTERNAL: IRN/DISS/DCB NRC PDR SAIC LINERS R COPIES.LTTR ENCL 1 0 1 1 2 2 0 1 1 1,1 1 1 1 RECIPIENT ID CODE/NANE PD2-2 PD AEOD/DOA/IRB NUDOCS-ABSTRACT RGN2 LPDR NSIC COPIES LTTR ENCL 0 1 1 1 1 1 1 1 1 1 TOTAL NUNBER OF COP IES REQUIRED: LTTR 15 ENCL 12 0~3 t Ph Jl'l P'>>>>33,33'''))fP IP 3 3 1~tt,'3 tt 311 I ISP tt'ti ttt tt'L, ii.l I~t'3 ttll't")3 thl'I lf+P,I 3'Pftpitlt]3:0 E 3 fI~h a'.4 l, 3 ,t, Itth,>I 4" I'l.'" 3.ht gR 311,, (3"$Q'h."'')PI~lh.<IeI 1 ,r tt 3ttr m g~(TP 3 I'~ggQ t y3 3 lthy tt Il tt f Jj" I t 311I't 3'kI>"'Ihh8$'hQ J lt'I)3 f 3'*I-I'tPP,)3'3 h lt th,'g tt II 3,.~PP'h TE., Pt,tI h,litt Ik I'I 0 PI, f tt if'l'/hler'belli 3 tt3 3'>'I!h''1 Ph""'~I"y tt,,PP P.O.Box14000, Juno Beach, FL 33408-0420 Mmcg sO$98S L-89-113 10 CFR 50.71 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
SUBSECT: Foreards Rev 4 to updated FSAR 5 advises that cover ltr for previous submittal of 880404 inadvertently stated that Rev 3 covered period from Sbi007-871005 rather than actual period 861007-871006. List of plant changes also encl.
Re: St.Lucie Unit 2 Docket No.50-389 U dated FSAR Revision 4 Pursuant to 10 CFR 50.71(e), Florida Power 6 Light Company has completed a revision of the St.Lucie Unit 2 Updated Final Safety Analysis Report (FSAR).The required ten copies of the revision are enclosed.The enclosed information accurately presents changes completed since the previous submittal (L-88-136, dated April 4, 1988), necessary to reflect information and analyses submitted to the Commission or prepared pursuant to a Commission requirement.
                    ~   <le)gqCDP 71)'nd Q DISTRIBUTION CDDE: A05SD             ES RECEIVED: LTR     ENCL Ji SIZE:
This revision includes activities completed between October 7, 1987 and October 6, 1988.The cover letter for the previous submittal (L-88-136, dated April 4, 1988)inadvertently stated that Revision 3 covered the period October 7, 1986 to October 5, 1987.The previous submittal actually covered the period October 7, 1986 to October 6, 1987.In addition, we have enclosed a list of Plant Changes/Modifications (PCM)which were completed under the provisions of 10 CFR 50.59 during this period.A brief description of the changes and a summary of the safety evaluation of each are submitted under a separate cover.Very truly yours, W.F Conw Senior Vic President-Nuclear WFC/JRH/gp Enclosure cc: Stewart D.Ebneter, Regional (8904130035 890330 PDR ADQCN, 05000389II PDR an FPL Group company Administrator, Region II, USNRC 0'I I t<<EN(>>'}}
TITLE: OR Submittal: Updated     FSAR (50.         Amendments NOTES:
RECIPIENT          COPIES            RECIPIENT       COPIES ID CODE/NANE      . LTTR ENCL      ID CODE/NANE     LTTR ENCL PD2-2 LA                 1    0      PD2-2 PD                  0 NORRIS'                 1    1 INTERNAL: ACR S                     2    2      AEOD/DOA/ IRB        1    1 N       ST/ADS 7E             0      NUDOCS-ABSTRACT      1    1 Q FILE     01      1    1      RGN2                1    1 EXTERNAL: IRN/DISS/DCB NRC PDR 1,1   1 LPDR NSIC                 1 1
1 SAIC LINERS  R          1     1 TOTAL NUNBER OF COP IES REQUIRED: LTTR         15   ENCL   12
 
0                                     ~3 t Ph fP                                                                                                                                                                                            '
IP
                                ~               tt,     3                                        '3 tt                                                                                                         I  lf +P,I 3
1 311 I ISP             tt
                                                                                                              'ti       ttt         tt     '
L, ii.l I                                         3' Pftpitlt]
Jl  'l P
                    '>>                  >> 33,33'          '')      )                                    ~               t   '
3 ttll't") 3 thl l,
I'~ggQ 3
t y3  3 1
fI~h a'                                                                                           ~ lh        .    <IeI                  lthy        tt 3:0                      .4                                                 3            .ht gR 311,,                                                               Il E
                                  ,t, It                                                                                      ,r                            tt tt f
                                                    'l 3ttr        m 3
th,     (3 "$ Q 'h   ."'                                                   g~(TP                   Jj" I     t   311I 't 3'kI>" 'Ihh8$             'hQ
                                        >I 4" I                  .'"                ') PI                3 3
f 3'*I                                             )3'3 J  lt'I )
                                    - I'tPP,                                                                                                                         h lt th,'g tt PP    'h  TE.
II   3,. ~                                                                                       ,   Pt,tI   h,litt           Ik I'I 0 PI, f   tt if     '   l'         /hler
                                                                                                                                                                                        '
belli         3 tt3   3'
                                                                                                                                                                                                >'I! h
                                                                                                                                                          ''1   Ph
                                                                                                                                                                    ""
                                                                                                                                                                        '~ I "y tt,,PP
 
P.O. Box14000, Juno Beach, FL 33408-0420 Mmcg sO         $ 98S L-89-113 10 CFR 50.71 U. S. Nuclear Regulatory Commission Attn:     Document Control Desk Washington, D. C. 20555 Gentlemen:
Re:   St. Lucie Unit           2 Docket No. 50-389 U dated FSAR Revision             4 Pursuant       to     10 CFR 50.71(e), Florida Power 6 Light Company has completed       a   revision of the St. Lucie Unit 2 Updated Final Safety Analysis Report (FSAR). The required ten copies of the revision are enclosed.
The   enclosed information accurately presents changes completed since the previous submittal (L-88-136, dated April 4, 1988),
necessary to reflect information and analyses submitted to the Commission or prepared pursuant to a Commission requirement.                               This revision includes activities completed between October 7, 1987 and October 6, 1988. The cover letter for the previous submittal (L-88-136, dated April 4, 1988) inadvertently stated that Revision 3 covered the period October 7, 1986 to October 5, 1987.                                       The previous submittal actually covered the period October 7, 1986 to October 6, 1987.
In addition, Modifications we   have   enclosed a   list       of Plant Changes/
which were completed under the provisions of (PCM) 10 CFR     50.59 during         this period. A brief description of the changes       and     a   summary   of the safety evaluation of each are submitted under             a separate cover.
Very truly       yours, W. F     Conw Senior Vic President               Nuclear WFC/JRH/gp Enclosure cc:   Stewart         D. Ebneter, Regional Administrator, Region                II,  USNRC 8904130035 890330 PDR   ADQCN,       05000389II
(                          PDR an FPL Group company
 
0
'I I t <<EN(>>'}}

Revision as of 08:57, 29 October 2019

Forwards Rev 4 to Updated FSAR & Advises That Cover Ltr for Previous Submittal of 880404 Inadvertently Stated That Rev 3 Covered Period from 861007-871005 Rather than Actual Period of 861007-871006.List of Plant Changes Also Encl
ML17308A465
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/30/1989
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17308A464 List:
References
L-89-113, NUDOCS 8904130035
Download: ML17308A465 (4)


Text

0 0 REGULATORY INFORMATION DISTRIBUTlON SYSTEM (RIDS)

ACCESSION NBR: 8904130035 DOC. DATE: 89/03/30 NOTARIZED: NO DOCKET 0 FACIL: 50-389 St. Lucie Planti Unit 2I Florida Poeer 5 Light Co. 05000389 AUTH. MANE AUTHOR AFFILIATION CONWAYi W. F. Florida Power 5 Light Co.

RECIP. NAME REC lP IENT AFFILIATION Document Control Branch (Document Control Desk>

SUBSECT: Foreards Rev 4 to updated FSAR 5 advises that cover ltr for previous submittal of 880404 inadvertently stated that Rev 3 covered period from Sbi007-871005 rather than actual period 861007-871006. List of plant changes also encl.

~ <le)gqCDP 71)'nd Q DISTRIBUTION CDDE: A05SD ES RECEIVED: LTR ENCL Ji SIZE:

TITLE: OR Submittal: Updated FSAR (50. Amendments NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NANE . LTTR ENCL ID CODE/NANE LTTR ENCL PD2-2 LA 1 0 PD2-2 PD 0 NORRIS' 1 1 INTERNAL: ACR S 2 2 AEOD/DOA/ IRB 1 1 N ST/ADS 7E 0 NUDOCS-ABSTRACT 1 1 Q FILE 01 1 1 RGN2 1 1 EXTERNAL: IRN/DISS/DCB NRC PDR 1,1 1 LPDR NSIC 1 1

1 SAIC LINERS R 1 1 TOTAL NUNBER OF COP IES REQUIRED: LTTR 15 ENCL 12

0 ~3 t Ph fP '

IP

~ tt, 3 '3 tt I lf +P,I 3

1 311 I ISP tt

'ti ttt tt '

L, ii.l I 3' Pftpitlt]

Jl 'l P

'>> >> 33,33' ) ) ~ t '

3 ttll't") 3 thl l,

I'~ggQ 3

t y3 3 1

fI~h a' ~ lh . <IeI lthy tt 3:0 .4 3 .ht gR 311,, Il E

,t, It ,r tt tt f

'l 3ttr m 3

th, (3 "$ Q 'h ."' g~(TP Jj" I t 311I 't 3'kI>" 'Ihh8$ 'hQ

>I 4" I .'" ') PI 3 3

f 3'*I )3'3 J lt'I )

- I'tPP, h lt th,'g tt PP 'h TE.

II 3,. ~ , Pt,tI h,litt Ik I'I 0 PI, f tt if ' l' /hler

'

belli 3 tt3 3'

>'I! h

1 Ph

""

'~ I "y tt,,PP

P.O. Box14000, Juno Beach, FL 33408-0420 Mmcg sO $ 98S L-89-113 10 CFR 50.71 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: St. Lucie Unit 2 Docket No. 50-389 U dated FSAR Revision 4 Pursuant to 10 CFR 50.71(e), Florida Power 6 Light Company has completed a revision of the St. Lucie Unit 2 Updated Final Safety Analysis Report (FSAR). The required ten copies of the revision are enclosed.

The enclosed information accurately presents changes completed since the previous submittal (L-88-136, dated April 4, 1988),

necessary to reflect information and analyses submitted to the Commission or prepared pursuant to a Commission requirement. This revision includes activities completed between October 7, 1987 and October 6, 1988. The cover letter for the previous submittal (L-88-136, dated April 4, 1988) inadvertently stated that Revision 3 covered the period October 7, 1986 to October 5, 1987. The previous submittal actually covered the period October 7, 1986 to October 6, 1987.

In addition, Modifications we have enclosed a list of Plant Changes/

which were completed under the provisions of (PCM) 10 CFR 50.59 during this period. A brief description of the changes and a summary of the safety evaluation of each are submitted under a separate cover.

Very truly yours, W. F Conw Senior Vic President Nuclear WFC/JRH/gp Enclosure cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC 8904130035 890330 PDR ADQCN, 05000389II

( PDR an FPL Group company