{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, ILLINOIS 60532-4352 January 11, 2018 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: BYRON STATION, UNITS 1 AND 2INFORMATION REQUEST FOR THE CYBER-SECURITY FULL IMPLEMENTATION INSPECTION, NOTIFICATION TO PERFORM INSPECTION 05000454/2018410; 05000455/2018410 Dear Mr. Hanson: On May 21, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin an inspection in accordance with Inspection Procedure 71130.10P -Security, issued May 15, 2017, at your Byron Station, Units 1 and 2. The inspection will be performed to evaluate and verify your ability to meet full implementation requirements of the N-Security Rule, Title 10 of the Code of Federal Regulations, Part 73, Section l Computer and   The onsite portion of the inspection will take place during the weeks of May 21, 2018, and June 4, 2018. Experience has shown that these inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into four groups. The first group specifies information necessary to assist the inspection team in choosing the focus areas (i.e., ) to be inspected by the Cyber-Security Inspection Procedure. This information should be made available via compact disc and delivered to the regional office no later than February 26, 2018. The inspection team will review this information and, by March 26, 2018, will request the specific items that should be provided for review. The second group of additional requested documents will assist the inspection team in the evaluation of the critical systems and critical digital assets, defensive architecture, and the areas of your plantCyber-Security Program selected for the Cyber-Security Inspection. This information will be requested for review in the regional office prior to the inspection by April 23, 2018. The third group of requested documents consists of those items that the inspection team will review, or need access to, during the inspection. Please have this information available by the first day of the onsite inspection, May 21, 2018.
{{#Wiki_filter:UNITED STATES
B. Hanson -2- The fourth group of information is necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. The lead inspector for this inspection is Mr. Dariusz Szwarc. We understand that our regulatory contact for this inspection is Ms. Zoe Cox of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at 630-829-9803 or via e-mail at Dariusz.Szwarc@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.   This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR Sincerely, /RA George Hausman Acting for/   Dariusz Szwarc, Senior Reactor Inspector Engineering Branch 3 Division of Reactor Safety Docket Nos. 50454; 50455 License Nos. NPF37; NPF66 Enclosure: Document Request for Cyber-Security Inspection cc: Distribution via LISTSERV
                              NUCLEAR REGULATORY COMMISSION
B. Hanson -3- Letter to Bryan C. Hanson from Dariusz Szwarc dated January 11, 2018 SUBJECT: BYRON STATION, UNITS 1 AND 2INFORMATION REQUEST FOR THE CYBER-SECURITY FULL IMPLEMENTATION INSPECTION, NOTIFICATION TO PERFORM INSPECTION 05000454/2018410; 05000455/2018410 DISTRIBUTION: Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMByron Resource RidsNrrDirsIrib Resource Steven West Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII                       ADAMS Accession Number ML18012A485 OFFICE RIII RIII RIII RIII NAME GHausman for DSzwarc:cl   DATE 01/11/18   OFFICIAL RECORD COPY
                                                  REGION III
DOCUMENT REQUEST FOR CYBER-SECURITY INSPECTION Enclosure Inspection Report: 05000454/2018410; 05000455/2018410 Inspection Dates: Weeks of May 21, 2018, and June 4, 2018 Inspection Procedure: IP 71130.10PCyber-Security, Issue Date: May 15, 2017 Reference: Guidance Document for Development of the Request for Information and Notification Letter for Full-Implementation of the Cyber-Security Inspection, Issue Date October 26, 2017 (ML17156A215) NRC Inspectors: Dariusz Szwarc, Lead Irfan A. Khan 630-829-9803 630-829-9732 Dariusz.Szwarc@nrc.gov Irfan.Khan@nrc.gov Rui Li Michael L. Brown 301-287-3587 301-287-3679 Rui.Li@nrc.gov Michael.Brown@nrc.gov NRC Contractors: Alan B. Konkal Timothy Marshall 561-989-0210 703-964-6891 Alan.Konkal@nrc.gov Timothy.Marshall@nrc.gov Observers: James D. Beardsley Robert C. Daley 301-287-0908 630-829-9749 James.Beardsley@nrc.gov Robert.Daley@nrc.gov I. Information Requested for In-Office Preparation The initial request for information (i.e., first Request for Information (RFI)) concentrates on providing the inspection team with the general information necessary to select appropriate components and Cyber-Security Program (CSP) elements to develop a site-specific inspection plan. The first RFI is used to identify the list of critical systems and critical digital assets (CSs/CDAs) plus operational and management security control to be inspected by the Cyber-Security Inspection Procedure. The first RFI requested information is specified below in Table RFI #1. The Table RFI #1 information is requested to be provided to the regional office by February 26, 2018, or sooner, to facilitate the selection of the specific items that will be reviewed during the onsite inspection weeks.
                                      2443 WARRENVILLE RD. SUITE 210
DOCUMENT REQUEST FOR CYBER-SECURITY INSPECTION 2 The inspection team will examine the returned documentation from the first RFI and identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more focused follow-up request to develop the second RFI. The inspection team will submit the specific systems and equipment list to your staff by March 26, 2018, which will identify the specific systems and equipment that will be utilized to evaluate the cted for the Cyber-Security Inspection. All requests for this information shall follow the Table RFI #1 and the guidance document referenced above. The required Table RFI #1 information shall be provided on compact disc (CD) to the lead inspector by February 26, 2018. Please provide five copies of each CD submitted (i.e., one for each inspector/contractor). The preferred file format for all lists is a searchable Excel spreadsheet file. These CDs should be indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible. Table RFI #1 Reference Section 3, Paragraph Number/Title: Items 1 List All Identified CSs and CDAs All 2 List CDA Facility and Site EthernetTransmission Control Protocol/Internet Protocol Based Local Area Networks (LANs) and Identify Those LANs That Have Non-CDAs On Them All 3 List CDA Facility and Site Non-Ethernet Transmission Control Protocol/Internet Protocol Based LANs Including Those Industrial Networks and Identify LANs That Have Non-CDAs On Them All 4 Network Topology Diagrams (Be Sure To Include All Network Intrusion Detection Systems and Security Information and Event Managements (SIEM) for Emergency Preparedness Networks and Security Level 3 and 4 Networks) All 8 List All Network Security Boundary Devices for EP Networks and All Network Security Boundary Devices for Levels 3 and 4 All 9 List CDA Wireless Industrial Networks All 11 Network Intrusion Detection System Documentation for CSs That Have CDAs Associated with Them 11.a.1) 11.a.2) 12 SIEM Documentation for CSs That Have CDAs Associated with Them 12.a.1) 12.a.2) 14 List EP and Security Onsite and Offsite Digital Communication Systems All 25 Cyber-Security Assessment and Cyber-Security Incident Response Teams All 28 Copy of Current Cyber Security Plan and Copy of 50.54(p) Analysis To Support Changes To That Plan All 29 Copy Of Any Licensee-Identified Violations and Associated Corrective Action Program Documentation To Resolve Issue(s) All 
                                          LISLE, ILLINOIS 60532-4352
DOCUMENT REQUEST FOR CYBER-SECURITY INSPECTION 3 In addition to the above information please provide the following: (1.) Electronic copy of the Updated Finals Safety Analysis Report and technical specifications. (2.) Name(s) and phone numbers for the regulatory and technical contacts. (3.) Current management and engineering organizational charts. Based on this information, the inspection team will identify and select specific systems and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and submit a list of specific systems and equipment to your staff by March 26, 2018, for the second RFI (i.e., Table RFI #2). II. Additional Information Requested to be Available Prior to Inspection As stated above, in Section I. of this enclosure, the inspection team will examine the returned documentation requested from Table RFI #1 and submit the list of specific systems and equipment to your staff by March 26, 2018, for the second RFI (i.e., Table RFI #2). The second RFI will request additional information required to evaluate the CSs/selected for the Cyber-Security Inspection. The additional information requested for the specific systems and equipment is identified in Table RFI #2. All requests for this information shall follow the Table RFI #2 and the guidance document referenced above. The Table RFI #2 information shall be provided on CD to the lead inspector by April 23, 2018. Please provide five copies of each CD submitted (i.e., one for each inspector/contractor). The preferred file format for all lists is a searchable Excel spreadsheet file. These CDs should be indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible. Table RFI #2 Reference Section 3, Paragraph Number/Title: Items 5 Plant Computer System Block Diagram (If Plant Computer System Is Selected for Inspection) All 6 Plant Security System Block Diagram (If Security Computer System Is Selected for Inspection) All 7 Systems That Are Distributed Block Diagrams (For Systems Selected for Inspection) All 10 Host-Based Intrusion Detection System Documentation (For CDAs for Systems Selected for Inspection) 10.a.1) 10.a.2) 13 List All Maintenance and Test Equipment Used On CDAs for Systems Selected for Inspection All 15 Configuration Management All 16 Supply Chain Management 16.a. 16.b.1) 16.b.5) 16.b.6) 17 Portable Media and Mobile Device Control All 18 Software Management All
                                            January 11, 2018
DOCUMENT REQUEST FOR CYBER-SECURITY INSPECTION 4 Table RFI #2 Reference Section 3, Paragraph Number/Title: Items 20 Vendor Access and Monitoring All 21 Work Control All 22 Device Access and Key Control All 23 Password/Authenticator Policy All 24 User Account/Credential Policy All 26 Corrective Actions Since Last U.S. Nuclear Regulatory Commission Inspection All 27 Cyber Security Assessments for Selected Systems All III. Information Requested to be Available on First Day of Inspection For the specific systems and equipment identified in this Section II., provide the following RFI (i.e., Table 1st Week Onsite) on CD by May 21, 2018, the first day of the inspection. All requests for this information shall follow the Table 1st Week Onsite and the guidance document referenced above. Please provide five copies of each CD submitted (i.e., one for each inspector/contractor). The preferred file format for all lists is a searchable Excel spreadsheet file. These CDs should be indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible. Table 1st Week Onsite Reference Section 3, Paragraph Number/Title: Items 10 Host-Based Intrusion Detection System Documentation for CDAs for Systems Selected for Inspection 10.a.3) thru 10.a.12) 11 Network Intrusion Detection System Documentation for CSs That Have CDAs Associated with Them 11.a.3) thru 11.a.15) 12 SIEM Documentation for CSs That Have CDAs Associated with Them 12.a.3) thru 12.a.14) 16 Supply Chain Management 16.b.2) 16.b.3) 16.b.4) 19 Cyber-Security Event Notifications All 29 Update to Licensee Identified Violations and Corrective Action Program Actions Taken Since the Initial Request Was Made All In addition to the above information please provide the following: (1.) Copies of the following documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to them. a. Original Final Safety Analysis Report Volumes; b. Original Safety Evaluation Report and Supplements;
Mr. Bryan C. Hanson
DOCUMENT REQUEST FOR CYBER-SECURITY INSPECTION 5 c. Final Safety Analysis Report Question and Answers; d. Quality Assurance Plan; e. Latest Individual Plant Examination/Probabilistic Risk Assessment Report; and f. Vendor Manuals. (2.) Assessment and Corrective Actions: a. The most recent Cyber-Security Quality Assurance audit and/or self-assessment; and b. Corrective action documents (e.g., condition reports, including status of corrective actions) generate as a result of the most recent Cyber-Security Quality Assurance audit and/or self-assessment. IV. Information Requested To Be Provided Throughout the Inspection (1.) Copies of any corrective action documents generated as a result of the e inspection. (2.) Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provided daily during the inspection to each inspection team member). If you have any questions regarding the information requested, please contact the inspection team leader.
Senior VP, Exelon Generation Company, LLC
President and CNO, Exelon Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: BYRON STATION, UNITS 1 AND 2INFORMATION REQUEST FOR THE
              CYBER-SECURITY FULL IMPLEMENTATION INSPECTION, NOTIFICATION
              TO PERFORM INSPECTION 05000454/2018410; 05000455/2018410
Dear Mr. Hanson:
On May 21, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin an inspection in
accordance with Inspection Procedure 71130.10P Cyber-Security, issued May 15, 2017, at
your Byron Station, Units 1 and 2. The inspection will be performed to evaluate and verify your
ability to meet full implementation requirements of the NRCs Cyber-Security Rule, Title 10 of
the Code of Federal Regulations, Part 73, Section 54, Protection of Digital Computer and
Communication Systems and Networks. The onsite portion of the inspection will take place
during the weeks of May 21, 2018, and June 4, 2018.
Experience has shown that these inspections are extremely resource intensive, both for the
NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site
and to ensure a productive inspection for both parties, we have enclosed a request for
documents needed for the inspection. These documents have been divided into four groups.
        The first group specifies information necessary to assist the inspection team in choosing
        the focus areas (i.e., sample set) to be inspected by the Cyber-Security Inspection
        Procedure. This information should be made available via compact disc and delivered to
        the regional office no later than February 26, 2018. The inspection team will review this
        information and, by March 26, 2018, will request the specific items that should be
        provided for review.
        The second group of additional requested documents will assist the inspection team in
        the evaluation of the critical systems and critical digital assets, defensive architecture,
        and the areas of your plants Cyber-Security Program selected for the Cyber-Security
        Inspection. This information will be requested for review in the regional office prior to the
        inspection by April 23, 2018.
        The third group of requested documents consists of those items that the inspection team
        will review, or need access to, during the inspection. Please have this information
        available by the first day of the onsite inspection, May 21, 2018.
 
B. Hanson                                       -2-
      The fourth group of information is necessary to aid the inspection team in tracking issues
        identified as a result of the inspection. It is requested that this information be provided to
        the lead inspector as the information is generated during the inspection. It is important
        that all of these documents are up to date and complete in order to minimize the number
        of additional documents requested during the preparation and/or the onsite portions of
        the inspection.
The lead inspector for this inspection is Mr. Dariusz Szwarc. We understand that our regulatory
contact for this inspection is Ms. Zoe Cox of your organization. If there are any questions about
the inspection or the material requested, please contact the lead inspector at 630-829-9803 or
via e-mail at Dariusz.Szwarc@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
                                                Sincerely,
                                                /RA George Hausman Acting for/
                                                Dariusz Szwarc, Senior Reactor Inspector
                                                Engineering Branch 3
                                                Division of Reactor Safety
Docket Nos. 50-454; 50-455
License Nos. NPF-37; NPF-66
Enclosure:
Document Request for Cyber-Security Inspection
cc: Distribution via LISTSERV
 
B. Hanson                                 -3-
Letter to Bryan C. Hanson from Dariusz Szwarc dated January 11, 2018
SUBJECT: BYRON STATION, UNITS 1 AND 2INFORMATION REQUEST FOR THE
            CYBER-SECURITY FULL IMPLEMENTATION INSPECTION, NOTIFICATION
            TO PERFORM INSPECTION 05000454/2018410; 05000455/2018410
DISTRIBUTION:
Jeremy Bowen
RidsNrrDorlLpl3
RidsNrrPMByron Resource
RidsNrrDirsIrib Resource
Steven West
Darrell Roberts
Richard Skokowski
Allan Barker
Carole Ariano
Linda Linn
DRPIII
DRSIII
ADAMS Accession Number ML18012A485
  OFFICE RIII                   RIII             RIII             RIII
  NAME       GHausman for
              DSzwarc:cl
  DATE       01/11/18
                                OFFICIAL RECORD COPY
 
              DOCUMENT REQUEST FOR CYBER-SECURITY INSPECTION
Inspection Report:             05000454/2018410; 05000455/2018410
Inspection Dates:             Weeks of May 21, 2018, and June 4, 2018
Inspection Procedure:         IP 71130.10P, Cyber-Security, Issue Date: May 15, 2017
Reference:                     Guidance Document for Development of the Request for
                              Information and Notification Letter for Full-Implementation of
                              the Cyber-Security Inspection, Issue Date October 26, 2017
                              (ML17156A215)
NRC Inspectors:               Dariusz Szwarc, Lead                   Irfan A. Khan
                              630-829-9803                           630-829-9732
                              Dariusz.Szwarc@nrc.gov                 Irfan.Khan@nrc.gov
                              Rui Li                                 Michael L. Brown
                              301-287-3587                           301-287-3679
                              Rui.Li@nrc.gov                         Michael.Brown@nrc.gov
NRC Contractors:               Alan B. Konkal                         Timothy Marshall
                              561-989-0210                           703-964-6891
                              Alan.Konkal@nrc.gov                     Timothy.Marshall@nrc.gov
Observers:                     James D. Beardsley                     Robert C. Daley
                              301-287-0908                           630-829-9749
                              James.Beardsley@nrc.gov                 Robert.Daley@nrc.gov
I.   Information Requested for In-Office Preparation
      The initial request for information (i.e., first Request for Information (RFI)) concentrates
      on providing the inspection team with the general information necessary to select
      appropriate components and Cyber-Security Program (CSP) elements to develop a
      site-specific inspection plan. The first RFI is used to identify the list of critical systems
      and critical digital assets (CSs/CDAs) plus operational and management security control
      portions of the CSP to be chosen as the sample set required to be inspected by the
      Cyber-Security Inspection Procedure. The first RFIs requested information is specified
      below in Table RFI #1. The Table RFI #1 information is requested to be provided to the
      regional office by February 26, 2018, or sooner, to facilitate the selection of the specific
      items that will be reviewed during the onsite inspection weeks.
                                                                                            Enclosure
 
          DOCUMENT REQUEST FOR CYBER-SECURITY INSPECTION
The inspection team will examine the returned documentation from the first RFI and
identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more
focused follow-up request to develop the second RFI. The inspection team will submit
the specific systems and equipment list to your staff by March 26, 2018, which will
identify the specific systems and equipment that will be utilized to evaluate the
CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected for the
Cyber-Security Inspection. All requests for this information shall follow the Table RFI #1
and the guidance document referenced above.
The required Table RFI #1 information shall be provided on compact disc (CD) to the
lead inspector by February 26, 2018. Please provide five copies of each CD submitted
(i.e., one for each inspector/contractor). The preferred file format for all lists is a
searchable Excel spreadsheet file. These CDs should be indexed and hyper-linked to
facilitate ease of use. If you have any questions regarding this information, please call
the inspection team leader as soon as possible.
                                        Table RFI #1
Reference Section 3, Paragraph Number/Title:                                           Items
  1   List All Identified CSs and CDAs                                                 All
  2   List CDA Facility and Site EthernetTransmission Control                         All
        Protocol/Internet Protocol Based Local Area Networks (LANs) and
        Identify Those LANs That Have Non-CDAs On Them
  3   List CDA Facility and Site Non-Ethernet Transmission Control                     All
        Protocol/Internet Protocol Based LANs Including Those Industrial
        Networks and Identify LANs That Have Non-CDAs On Them
  4   Network Topology Diagrams (Be Sure To Include All Network Intrusion               All
        Detection Systems and Security Information and Event Managements
        (SIEM) for Emergency Preparedness Networks and Security Level 3
        and 4 Networks)
  8   List All Network Security Boundary Devices for EP Networks and All               All
        Network Security Boundary Devices for Levels 3 and 4
  9   List CDA Wireless Industrial Networks                                             All
  11   Network Intrusion Detection System Documentation for CSs That Have             11.a.1)
        CDAs Associated with Them                                                      11.a.2)
  12   SIEM Documentation for CSs That Have CDAs Associated with Them                 12.a.1)
                                                                                        12.a.2)
  14 List EP and Security Onsite and Offsite Digital Communication Systems               All
  25 Cyber-Security Assessment and Cyber-Security Incident Response                     All
        Teams
  28 Copy of Current Cyber Security Plan and Copy of 50.54(p) Analysis To               All
        Support Changes To That Plan
  29 Copy Of Any Licensee-Identified Violations and Associated Corrective               All
        Action Program Documentation To Resolve Issue(s)
                                          2
 
              DOCUMENT REQUEST FOR CYBER-SECURITY INSPECTION
    In addition to the above information please provide the following:
    (1.)     Electronic copy of the Updated Finals Safety Analysis Report and technical
              specifications.
    (2.)     Name(s) and phone numbers for the regulatory and technical contacts.
    (3.)     Current management and engineering organizational charts.
    Based on this information, the inspection team will identify and select specific systems
    and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and
    submit a list of specific systems and equipment to your staff by March 26, 2018, for the
    second RFI (i.e., Table RFI #2).
II. Additional Information Requested to be Available Prior to Inspection
    As stated above, in Section I. of this enclosure, the inspection team will examine the
    returned documentation requested from Table RFI #1 and submit the list of specific
    systems and equipment to your staff by March 26, 2018, for the second RFI
    (i.e., Table RFI #2). The second RFI will request additional information required to
    evaluate the CSs/CDAs, defensive architecture, and the areas of the licensees CSP
    selected for the Cyber-Security Inspection. The additional information requested for
    the specific systems and equipment is identified in Table RFI #2. All requests for this
    information shall follow the Table RFI #2 and the guidance document referenced above.
    The Table RFI #2 information shall be provided on CD to the lead inspector by
    April 23, 2018. Please provide five copies of each CD submitted (i.e., one for each
    inspector/contractor). The preferred file format for all lists is a searchable Excel
    spreadsheet file. These CDs should be indexed and hyper-linked to facilitate ease of
    use. If you have any questions regarding this information, please call the inspection
    team leader as soon as possible.
                                            Table RFI #2
    Reference Section 3, Paragraph Number/Title:                                       Items
      5   Plant Computer System Block Diagram (If Plant Computer System Is               All
            Selected for Inspection)
      6   Plant Security System Block Diagram (If Security Computer System Is           All
            Selected for Inspection)
      7   Systems That Are Distributed Block Diagrams (For Systems Selected             All
            for Inspection)
      10   Host-Based Intrusion Detection System Documentation (For CDAs for           10.a.1)
            Systems Selected for Inspection)                                            10.a.2)
      13   List All Maintenance and Test Equipment Used On CDAs for Systems               All
            Selected for Inspection
      15   Configuration Management                                                       All
      16   Supply Chain Management                                                       16.a.
                                                                                        16.b.1)
                                                                                        16.b.5)
                                                                                        16.b.6)
      17 Portable Media and Mobile Device Control                                         All
      18 Software Management                                                             All
                                              3
 
              DOCUMENT REQUEST FOR CYBER-SECURITY INSPECTION
                                                Table RFI #2
      Reference Section 3, Paragraph Number/Title:                                       Items
      20 Vendor Access and Monitoring                                                     All
      21 Work Control                                                                     All
      22 Device Access and Key Control                                                   All
      23 Password/Authenticator Policy                                                   All
      24 User Account/Credential Policy                                                   All
      26 Corrective Actions Since Last U.S. Nuclear Regulatory Commission                 All
          Inspection
      27 Cyber Security Assessments for Selected Systems                                   All
III. Information Requested to be Available on First Day of Inspection
    For the specific systems and equipment identified in this enclosures Section II., provide
    the following RFI (i.e., Table 1st Week Onsite) on CD by May 21, 2018, the first day of
    the inspection. All requests for this information shall follow the Table 1st Week Onsite
    and the guidance document referenced above.
    Please provide five copies of each CD submitted (i.e., one for each inspector/contractor).
    The preferred file format for all lists is a searchable Excel spreadsheet file. These CDs
    should be indexed and hyper-linked to facilitate ease of use. If you have any questions
    regarding this information, please call the inspection team leader as soon as possible.
                                          Table 1st Week Onsite
      Reference Section 3, Paragraph Number/Title:                                       Items
      10 Host-Based Intrusion Detection System Documentation for CDAs for               10.a.3)
            Systems Selected for Inspection                                                thru
                                                                                        10.a.12)
      11   Network Intrusion Detection System Documentation for CSs That Have 11.a.3)
            CDAs Associated with Them                                                      thru
                                                                                        11.a.15)
      12   SIEM Documentation for CSs That Have CDAs Associated with Them               12.a.3)
                                                                                          thru
                                                                                        12.a.14)
      16   Supply Chain Management                                                     16.b.2)
                                                                                        16.b.3)
                                                                                        16.b.4)
      19   Cyber-Security Event Notifications                                             All
      29   Update to Licensee Identified Violations and Corrective Action Program         All
            Actions Taken Since the Initial Request Was Made
    In addition to the above information please provide the following:
    (1.)     Copies of the following documents do not need to be solely available to the
              inspection team as long as the inspectors have easy and unrestrained access
              to them.
              a. Original Final Safety Analysis Report Volumes;
              b. Original Safety Evaluation Report and Supplements;
                                                  4
 
                DOCUMENT REQUEST FOR CYBER-SECURITY INSPECTION
              c. Final Safety Analysis Report Question and Answers;
              d. Quality Assurance Plan;
              e. Latest Individual Plant Examination/Probabilistic Risk Assessment Report;
                  and
              f. Vendor Manuals.
        (2.)   Assessment and Corrective Actions:
              a. The most recent Cyber-Security Quality Assurance audit and/or
                  self-assessment; and
              b. Corrective action documents (e.g., condition reports, including status of
                  corrective actions) generate as a result of the most recent Cyber-Security
                  Quality Assurance audit and/or self-assessment.
IV.     Information Requested To Be Provided Throughout the Inspection
        (1.)   Copies of any corrective action documents generated as a result of the
              inspection teams questions or queries during the inspection.
        (2.)   Copies of the list of questions submitted by the inspection team members and
              the status/resolution of the information requested (provided daily during the
              inspection to each inspection team member).
If you have any questions regarding the information requested, please contact the inspection
team leader.
                                                  5
}}
}}

Latest revision as of 05:56, 22 October 2019

Information Request for the Cyber-Security Full Implementation Inspection, Notification to Perform Inspection 05000454/2018410; 05000455/2018410 (DRS-D.Szwarc)
ML18012A485
Person / Time
Site: Byron  Constellation icon.png
Issue date: 01/11/2018
From: Dariusz Szwarc
Division of Reactor Safety III
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2018410
Download: ML18012A485 (8)


See also: IR 05000454/2018410

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, ILLINOIS 60532-4352

January 11, 2018

Mr. Bryan C. Hanson

Senior VP, Exelon Generation Company, LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: BYRON STATION, UNITS 1 AND 2INFORMATION REQUEST FOR THE

CYBER-SECURITY FULL IMPLEMENTATION INSPECTION, NOTIFICATION

TO PERFORM INSPECTION 05000454/2018410; 05000455/2018410

Dear Mr. Hanson:

On May 21, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin an inspection in

accordance with Inspection Procedure 71130.10P Cyber-Security, issued May 15, 2017, at

your Byron Station, Units 1 and 2. The inspection will be performed to evaluate and verify your

ability to meet full implementation requirements of the NRCs Cyber-Security Rule, Title 10 of

the Code of Federal Regulations, Part 73, Section 54, Protection of Digital Computer and

Communication Systems and Networks. The onsite portion of the inspection will take place

during the weeks of May 21, 2018, and June 4, 2018.

Experience has shown that these inspections are extremely resource intensive, both for the

NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site

and to ensure a productive inspection for both parties, we have enclosed a request for

documents needed for the inspection. These documents have been divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing

the focus areas (i.e., sample set) to be inspected by the Cyber-Security Inspection

Procedure. This information should be made available via compact disc and delivered to

the regional office no later than February 26, 2018. The inspection team will review this

information and, by March 26, 2018, will request the specific items that should be

provided for review.

The second group of additional requested documents will assist the inspection team in

the evaluation of the critical systems and critical digital assets, defensive architecture,

and the areas of your plants Cyber-Security Program selected for the Cyber-Security

Inspection. This information will be requested for review in the regional office prior to the

inspection by April 23, 2018.

The third group of requested documents consists of those items that the inspection team

will review, or need access to, during the inspection. Please have this information

available by the first day of the onsite inspection, May 21, 2018.

B. Hanson -2-

The fourth group of information is necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to

the lead inspector as the information is generated during the inspection. It is important

that all of these documents are up to date and complete in order to minimize the number

of additional documents requested during the preparation and/or the onsite portions of

the inspection.

The lead inspector for this inspection is Mr. Dariusz Szwarc. We understand that our regulatory

contact for this inspection is Ms. Zoe Cox of your organization. If there are any questions about

the inspection or the material requested, please contact the lead inspector at 630-829-9803 or

via e-mail at Dariusz.Szwarc@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA George Hausman Acting for/

Dariusz Szwarc, Senior Reactor Inspector

Engineering Branch 3

Division of Reactor Safety

Docket Nos. 50-454; 50-455

License Nos. NPF-37; NPF-66

Enclosure:

Document Request for Cyber-Security Inspection

cc: Distribution via LISTSERV

B. Hanson -3-

Letter to Bryan C. Hanson from Dariusz Szwarc dated January 11, 2018

SUBJECT: BYRON STATION, UNITS 1 AND 2INFORMATION REQUEST FOR THE

CYBER-SECURITY FULL IMPLEMENTATION INSPECTION, NOTIFICATION

TO PERFORM INSPECTION 05000454/2018410; 05000455/2018410

DISTRIBUTION:

Jeremy Bowen

RidsNrrDorlLpl3

RidsNrrPMByron Resource

RidsNrrDirsIrib Resource

Steven West

Darrell Roberts

Richard Skokowski

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

ADAMS Accession Number ML18012A485

OFFICE RIII RIII RIII RIII

NAME GHausman for

DSzwarc:cl

DATE 01/11/18

OFFICIAL RECORD COPY

DOCUMENT REQUEST FOR CYBER-SECURITY INSPECTION

Inspection Report: 05000454/2018410; 05000455/2018410

Inspection Dates: Weeks of May 21, 2018, and June 4, 2018

Inspection Procedure: IP 71130.10P, Cyber-Security, Issue Date: May 15, 2017

Reference: Guidance Document for Development of the Request for

Information and Notification Letter for Full-Implementation of

the Cyber-Security Inspection, Issue Date October 26, 2017

(ML17156A215)

NRC Inspectors: Dariusz Szwarc, Lead Irfan A. Khan

630-829-9803 630-829-9732

Dariusz.Szwarc@nrc.gov Irfan.Khan@nrc.gov

Rui Li Michael L. Brown

301-287-3587 301-287-3679

Rui.Li@nrc.gov Michael.Brown@nrc.gov

NRC Contractors: Alan B. Konkal Timothy Marshall

561-989-0210 703-964-6891

Alan.Konkal@nrc.gov Timothy.Marshall@nrc.gov

Observers: James D. Beardsley Robert C. Daley

301-287-0908 630-829-9749

James.Beardsley@nrc.gov Robert.Daley@nrc.gov

I. Information Requested for In-Office Preparation

The initial request for information (i.e., first Request for Information (RFI)) concentrates

on providing the inspection team with the general information necessary to select

appropriate components and Cyber-Security Program (CSP) elements to develop a

site-specific inspection plan. The first RFI is used to identify the list of critical systems

and critical digital assets (CSs/CDAs) plus operational and management security control

portions of the CSP to be chosen as the sample set required to be inspected by the

Cyber-Security Inspection Procedure. The first RFIs requested information is specified

below in Table RFI #1. The Table RFI #1 information is requested to be provided to the

regional office by February 26, 2018, or sooner, to facilitate the selection of the specific

items that will be reviewed during the onsite inspection weeks.

Enclosure

DOCUMENT REQUEST FOR CYBER-SECURITY INSPECTION

The inspection team will examine the returned documentation from the first RFI and

identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more

focused follow-up request to develop the second RFI. The inspection team will submit

the specific systems and equipment list to your staff by March 26, 2018, which will

identify the specific systems and equipment that will be utilized to evaluate the

CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected for the

Cyber-Security Inspection. All requests for this information shall follow the Table RFI #1

and the guidance document referenced above.

The required Table RFI #1 information shall be provided on compact disc (CD) to the

lead inspector by February 26, 2018. Please provide five copies of each CD submitted

(i.e., one for each inspector/contractor). The preferred file format for all lists is a

searchable Excel spreadsheet file. These CDs should be indexed and hyper-linked to

facilitate ease of use. If you have any questions regarding this information, please call

the inspection team leader as soon as possible.

Table RFI #1

Reference Section 3, Paragraph Number/Title: Items

1 List All Identified CSs and CDAs All

2 List CDA Facility and Site EthernetTransmission Control All

Protocol/Internet Protocol Based Local Area Networks (LANs) and

Identify Those LANs That Have Non-CDAs On Them

3 List CDA Facility and Site Non-Ethernet Transmission Control All

Protocol/Internet Protocol Based LANs Including Those Industrial

Networks and Identify LANs That Have Non-CDAs On Them

4 Network Topology Diagrams (Be Sure To Include All Network Intrusion All

Detection Systems and Security Information and Event Managements

(SIEM) for Emergency Preparedness Networks and Security Level 3

and 4 Networks)

8 List All Network Security Boundary Devices for EP Networks and All All

Network Security Boundary Devices for Levels 3 and 4

9 List CDA Wireless Industrial Networks All

11 Network Intrusion Detection System Documentation for CSs That Have 11.a.1)

CDAs Associated with Them 11.a.2)

12 SIEM Documentation for CSs That Have CDAs Associated with Them 12.a.1)

12.a.2)

14 List EP and Security Onsite and Offsite Digital Communication Systems All

25 Cyber-Security Assessment and Cyber-Security Incident Response All

Teams

28 Copy of Current Cyber Security Plan and Copy of 50.54(p) Analysis To All

Support Changes To That Plan

29 Copy Of Any Licensee-Identified Violations and Associated Corrective All

Action Program Documentation To Resolve Issue(s)

2

DOCUMENT REQUEST FOR CYBER-SECURITY INSPECTION

In addition to the above information please provide the following:

(1.) Electronic copy of the Updated Finals Safety Analysis Report and technical

specifications.

(2.) Name(s) and phone numbers for the regulatory and technical contacts.

(3.) Current management and engineering organizational charts.

Based on this information, the inspection team will identify and select specific systems

and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and

submit a list of specific systems and equipment to your staff by March 26, 2018, for the

second RFI (i.e., Table RFI #2).

II. Additional Information Requested to be Available Prior to Inspection

As stated above, in Section I. of this enclosure, the inspection team will examine the

returned documentation requested from Table RFI #1 and submit the list of specific

systems and equipment to your staff by March 26, 2018, for the second RFI

(i.e., Table RFI #2). The second RFI will request additional information required to

evaluate the CSs/CDAs, defensive architecture, and the areas of the licensees CSP

selected for the Cyber-Security Inspection. The additional information requested for

the specific systems and equipment is identified in Table RFI #2. All requests for this

information shall follow the Table RFI #2 and the guidance document referenced above.

The Table RFI #2 information shall be provided on CD to the lead inspector by

April 23, 2018. Please provide five copies of each CD submitted (i.e., one for each

inspector/contractor). The preferred file format for all lists is a searchable Excel

spreadsheet file. These CDs should be indexed and hyper-linked to facilitate ease of

use. If you have any questions regarding this information, please call the inspection

team leader as soon as possible.

Table RFI #2

Reference Section 3, Paragraph Number/Title: Items

5 Plant Computer System Block Diagram (If Plant Computer System Is All

Selected for Inspection)

6 Plant Security System Block Diagram (If Security Computer System Is All

Selected for Inspection)

7 Systems That Are Distributed Block Diagrams (For Systems Selected All

for Inspection)

10 Host-Based Intrusion Detection System Documentation (For CDAs for 10.a.1)

Systems Selected for Inspection) 10.a.2)

13 List All Maintenance and Test Equipment Used On CDAs for Systems All

Selected for Inspection

15 Configuration Management All

16 Supply Chain Management 16.a.

16.b.1)

16.b.5)

16.b.6)

17 Portable Media and Mobile Device Control All

18 Software Management All

3

DOCUMENT REQUEST FOR CYBER-SECURITY INSPECTION

Table RFI #2

Reference Section 3, Paragraph Number/Title: Items

20 Vendor Access and Monitoring All

21 Work Control All

22 Device Access and Key Control All

23 Password/Authenticator Policy All

24 User Account/Credential Policy All

26 Corrective Actions Since Last U.S. Nuclear Regulatory Commission All

Inspection

27 Cyber Security Assessments for Selected Systems All

III. Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in this enclosuresSection II., provide

the following RFI (i.e., Table 1st Week Onsite) on CD by May 21, 2018, the first day of

the inspection. All requests for this information shall follow the Table 1st Week Onsite

and the guidance document referenced above.

Please provide five copies of each CD submitted (i.e., one for each inspector/contractor).

The preferred file format for all lists is a searchable Excel spreadsheet file. These CDs

should be indexed and hyper-linked to facilitate ease of use. If you have any questions

regarding this information, please call the inspection team leader as soon as possible.

Table 1st Week Onsite

Reference Section 3, Paragraph Number/Title: Items

10 Host-Based Intrusion Detection System Documentation for CDAs for 10.a.3)

Systems Selected for Inspection thru

10.a.12)

11 Network Intrusion Detection System Documentation for CSs That Have 11.a.3)

CDAs Associated with Them thru

11.a.15)

12 SIEM Documentation for CSs That Have CDAs Associated with Them 12.a.3)

thru

12.a.14)

16 Supply Chain Management 16.b.2)

16.b.3)

16.b.4)

19 Cyber-Security Event Notifications All

29 Update to Licensee Identified Violations and Corrective Action Program All

Actions Taken Since the Initial Request Was Made

In addition to the above information please provide the following:

(1.) Copies of the following documents do not need to be solely available to the

inspection team as long as the inspectors have easy and unrestrained access

to them.

a. Original Final Safety Analysis Report Volumes;

b. Original Safety Evaluation Report and Supplements;

4

DOCUMENT REQUEST FOR CYBER-SECURITY INSPECTION

c. Final Safety Analysis Report Question and Answers;

d. Quality Assurance Plan;

e. Latest Individual Plant Examination/Probabilistic Risk Assessment Report;

and

f. Vendor Manuals.

(2.) Assessment and Corrective Actions:

a. The most recent Cyber-Security Quality Assurance audit and/or

self-assessment; and

b. Corrective action documents (e.g., condition reports, including status of

corrective actions) generate as a result of the most recent Cyber-Security

Quality Assurance audit and/or self-assessment.

IV. Information Requested To Be Provided Throughout the Inspection

(1.) Copies of any corrective action documents generated as a result of the

inspection teams questions or queries during the inspection.

(2.) Copies of the list of questions submitted by the inspection team members and

the status/resolution of the information requested (provided daily during the

inspection to each inspection team member).

If you have any questions regarding the information requested, please contact the inspection

team leader.

5