* e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 February 10, 1999 United States Nuclear Regulatory Commission Attention:
* VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 e
Document Control Desk Washington, D.C. 20555 Gentlemen:
February 10, 1999 United States Nuclear Regulatory Commission                       Serial No. 99-095 Attention: Document Control Desk                                   SPS Lic/JSA RO Washington, D.C. 20555                                             Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Serial No. SPS Lic/JSA Docket Nos. License Nos. 99-095 RO 50-280 50-281 DPR-32 DPR-37 The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of January *i 999 is provided in the attachment.
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of January *i 999 is provided in the attachment.
If you have any questions or require additional information, please contact us. Very truly yours, E. S. Grecheck, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc: U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth Street, S. W. . Q 1 i*, (:~ S *t 23T85 1. r, '. '* ' ,.) u1 e J. . ..J *
If you have any questions or require additional information, please contact us.
* Atlanta, Georgia 30303 Mr. R. A. Musser NRG Senior Resident Inspector Surry Power Station 9902220181 990131 PDR ADOCK 05000280 R PDR, . L ____ ....
Very truly yours, E. S. Grecheck, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc:   U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth Street, S. W. . Q i*, (:~
~'. \ I . . "' VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 99-01 Approved:  
S u1*te 23T85                   1.J.. r,       1
'( Date e TABLE OF CONTENTS Section
                                                ..J '. * * '* ' ,.)
* Surry Monthly Operating Report No. 99-01 Page 2 of 16 Page Operating Data Report -Unit No. 1 ............................................................................................................................
Atlanta, Georgia 30303 Mr. R. A. Musser NRG Senior Resident Inspector Surry Power Station t
3 Operating Data Report -Unit No. 2 ............................................................................................................................
(
4 Unit Shutdowns and Power Reductions  
9902220181 990131                                     i PDR ADOCK 05000280 R                   PDR,L    .
-Unit No. 1 ..................................................................................................
____....
5 Unit Shutdowns and Power Reductions  
 
-Unit No. 2 ..................................................................................................
~'.   \
6 Average Daily Unit Power Level -Unit No. 1 ..............................................................................................................
. . "'
7 Average Daily Unit Power Level -Unit No. 2 ..............................................................................................................
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 99-01
8 Summary of Operating Experience  
                                              '(
-Unit Nos. 1 and 2 .............................................................................................
Approved:
9 Facility Changes That Did Not Require NRC Approval ............................................................................................
Date
1 O Procedure or Method of Operation Changes That Did Not Require NRC Approval.  
 
................................................
e
12 Tests and Experiments That Did Not Require NRC Approval.  
* Surry Monthly Operating Report No. 99-01 Page 2 of 16 TABLE OF CONTENTS Section                                                                                                                                                          Page Operating Data Report - Unit No. 1 ............................................................................................................................ 3 Operating Data Report - Unit No. 2 ............................................................................................................................ 4 Unit Shutdowns and Power Reductions - Unit No. 1 .................................................................................................. 5 Unit Shutdowns and Power Reductions - Unit No. 2 .................................................................................................. 6 Average Daily Unit Power Level - Unit No. 1.............................................................................................................. 7 Average Daily Unit Power Level - Unit No. 2 .............................................................................................................. 8 Summary of Operating Experience - Unit Nos. 1 and 2 ............................................................................................. 9 Facility Changes That Did Not Require NRC Approval ............................................................................................ 1O Procedure or Method of Operation Changes That Did Not Require NRC Approval. ................................................ 12 Tests and Experiments That Did Not Require NRC Approval. ................................................................................. 13 Chemistry Report ..................................................................................................................................................... 14 Fuel Handling - Unit Nos. 1 and 2 ............................................................................................................................ 15 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications ....................................................................................................................... 16
.................................................................................
 
13 Chemistry Report .....................................................................................................................................................
e     Surry Monthly Operating Report No. 99-01 Page 3 of 16 OPERATING DATA REPORT Docket No.:   50-280 Date:  02/02/99 Completed By:  R. Stief Telephone:  (757) 365-2486
14 Fuel Handling -Unit Nos. 1 and 2 ............................................................................................................................
: 1. Unit Name: ........................................................... Surry Unit 1
15 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications  
: 2. Reporting Period: ................................................ . January 1999
.......................................................................................................................
: 3. Licensed Thermal Power (MWt): ......................... .                  2546
16
: 4. Nameplate Rating (Gross MWe): ........................ .                    847.5
: 1. 2. 3. 4. 5. 6. 7. OPERATING DATA REPORT e Surry Monthly Operating Report No. 99-01 Page 3 of 16 Docket No.: Date: Completed By: 50-280 02/02/99 R. Stief Unit Name: .......................................................... . Reporting Period: ................................................ . Licensed Thermal Power (MWt): ......................... . Nameplate Rating (Gross MWe): ........................ . Design Electrical Rating (Net MWe): ................... . Maximum Dependable Capacity (Gross MWe): .. . Maximum Dependable Capacity (Net MWe): ...... . Surry Unit 1 January 1999 2546 847.5 788 840 801 Telephone:
: 5. Design Electrical Rating (Net MWe): ................... .                  788
(757) 365-2486 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: 9. Power Level To Which Restricted, If Any (Net MWe): 10. Reasons For Restrictions, If Any: This Month Year-To-Date Cumulative
: 6. Maximum Dependable Capacity (Gross MWe): .. .                              840
: 11. Hours in Reporting Period 744.0 744.0 228888.0 12. Hours Reactor Was Critical 744.0 744.0 162060.5 13. Reactor Reserve Shutdown Hours 0.0 0.0 3774.5 14. Hours Generator On-Line 744.0 744.0 159515.4 15. Unit Reserve Shutdown Hours 0.0 0.0 3736.2 16. Gross Thermal Energy Generated (MWH) 1893674.1 1893674.1 376084631.6
: 7. Maximum Dependable Capacity (Net MWe): ...... .                             801
: 17. Gross Electrical Energy Generated (MWH) 631358.0 631358.0 123401514.0
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 18. Net Electrical Energy Generated (MWH) 610294.0 610294.0 117596898.0
: 9. Power Level To Which Restricted, If Any (Net MWe):
: 19. Unit Service Factor 100.0% 100.0% 69.7% 20. Unit Availability Factor 100.0% 100.0% 71.3% 21. Unit Capacity Factor (Using MDC Net) 102.4% 102.4% 65.9% 22. Unit Capacity Factor (Using DER Net) 104.1% 104.1% 65.2% 23. Unit Forced Outage Rate 0.0% 0.0% 14.4% 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): 25. If Shut Down at End of Report Period, Estimated Date of Start-up:
: 10. Reasons For Restrictions, If Any:
This Month     Year-To-Date         Cumulative
: 11. Hours in Reporting Period                                                           744.0             744.0         228888.0
: 12. Hours Reactor Was Critical                                                           744.0             744.0         162060.5
: 13. Reactor Reserve Shutdown Hours                                                         0.0               0.0           3774.5
: 14. Hours Generator On-Line                                                             744.0             744.0         159515.4
: 15. Unit Reserve Shutdown Hours                                                           0.0               0.0           3736.2
: 16. Gross Thermal Energy Generated (MWH)                                           1893674.1         1893674.1       376084631.6
: 17. Gross Electrical Energy Generated (MWH)                                         631358.0           631358.0       123401514.0
: 18. Net Electrical Energy Generated (MWH)                                           610294.0           610294.0       117596898.0
: 19. Unit Service Factor                                                               100.0%           100.0%               69.7%
: 20. Unit Availability Factor                                                           100.0%           100.0%               71.3%
: 21. Unit Capacity Factor (Using MDC Net)                                               102.4%           102.4%               65.9%
: 22. Unit Capacity Factor (Using DER Net)                                               104.1%           104.1%               65.2%
: 23. Unit Forced Outage Rate                                                             0.0%               0.0%             14.4%
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
: 25. If Shut Down at End of Report Period, Estimated Date of Start-up:
: 26. Unit In Test Status (Prior to Commercial Operation):
: 26. Unit In Test Status (Prior to Commercial Operation):
FORECAST INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION ACHIEVED
FORECAST               ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
: 1. 2. 3. 4. 5. 6. 7. OPERATING DATA REPORT e Surry Monthly Operating Report No. 99-01 Page 4 of 16 Docket No.: Date: Completed By: 50-281 02/02/99 R. Stief Unit Name: .......................................................... . Reporting Period: ................................................ . Licensed Thermal Power (MWt): ......................... . Nameplate Rating (Gross MWe): ........................ . Design Electrical Rating (Net MWe): ................... . Maximum Dependable Capacity (Gross MWe): .. . Maximum Dependable Capacity (Net MWe): ...... . Surry Unit 2 January 1999 2546 847.5 788 840 801 Telephone:
 
(757) 365-2486 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: 9. Power Level To Which Restricted, If Any (Net MWe): 10. Reasons For Restrictions, If Any: This Month Year-To-Date
e     Surry Monthly Operating Report No. 99-01 Page 4 of 16 OPERATING DATA REPORT Docket No.:   50-281 Date:  02/02/99 Completed By:  R. Stief Telephone:    (757) 365-2486
: 11. Hours in Reporting Period 744.0 744.0 12. Hours Reactor Was Critical 744.0 744.0 13. Reactor Reserve Shutdown Hours 0.0 0.0 14. Hours Generator On-Line 744.0 744.0 15. Unit Reserve Shutdown Hours 0.0 0.0 16. Gross Thermal Energy Generated (MWH) 1894101.8 1894101.8
: 1. Unit Name: .......................................................... . Surry Unit 2
: 17. Gross Electrical Energy Generated (MWH) 636210.0 636210.0 18. Net Electrical Energy Generated (MWH) 615013.0 615013.0 19. Unit Service Factor 100.0% 100.0% 20. Unit Availability Factor 100.0% 100.0% 21. Unit Capacity Factor (Using MDC Net) 103.2% 103.2% 22. Unit Capacity Factor (Using DER Net) 104.9% 104.9% 23. Unit Forced Outage Rate 0.0% 0.0% 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): Refueling, April 19, 1999, 35 Days 25. If Shut Down at End of Report Period, Estimated Date of Start-up:
: 2. Reporting Period: ................................................ . January 1999
: 3. Licensed Thermal Power (MWt): ......................... .                  2546
: 4. Nameplate Rating (Gross MWe): ........................ .                    847.5
: 5. Design Electrical Rating (Net MWe): ................... .                    788
: 6. Maximum Dependable Capacity (Gross MWe): .. .                                840
: 7. Maximum Dependable Capacity (Net MWe): ...... .                             801
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted, If Any (Net MWe):
: 10. Reasons For Restrictions, If Any:
This Month       Year-To-Date         Cumulative
: 11. Hours in Reporting Period                                                             744.0               744.0           225769.0
: 12. Hours Reactor Was Critical                                                             744.0               744.0           160654.3
: 13. Reactor Reserve Shutdown Hours                                                         0.0                 0.0             328.1
: 14. Hours Generator On-Line                                                               744.0               744.0           158637.5
: 15. Unit Reserve Shutdown Hours                                                             0.0                 0.0               0.0
: 16. Gross Thermal Energy Generated (MWH)                                             1894101.8           1894101.8      375689750.8
: 17. Gross Electrical Energy Generated (MWH)                                           636210.0             636210.0       123184103.0
: 18. Net Electrical Energy Generated (MWH)                                             615013.0             615013.0       117437040.0
: 19. Unit Service Factor                                                                 100.0%             100.0%               70.3%
: 20. Unit Availability Factor                                                           100.0%             100.0%               70.3%
: 21. Unit Capacity Factor (Using MDC Net)                                               103.2%             103.2%               66.5%
: 22. Unit Capacity Factor (Using DER Net)                                                 104.9%             104.9%               66.0%
: 23. Unit Forced Outage Rate                                                               0.0%               0.0%               11.3%
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling, April 19, 1999, 35 Days
: 25. If Shut Down at End of Report Period, Estimated Date of Start-up:
: 26. Unit In Test Status (Prior to Commercial Operation):
: 26. Unit In Test Status (Prior to Commercial Operation):
FORECAST INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION ACHIEVED Cumulative 225769.0 160654.3 328.1 158637.5 0.0 375689750.8 123184103.0 117437040.0 70.3% 70.3% 66.5% 66.0% 11.3%
FORECAST               ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
I~ e Surry Monthly Operating Report No. 99-01 Page 5 of 16 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL TO OR GREATER THAN 20%) (1) F: Forced S: Scheduled (4) REPORT MONTH: January 1999 None during the Reporting Period (2) REASON: A -Equipment Failure (Explain)
 
B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training & Licensing Examination F Administrative G Operational Error (Explain)
I~
Exhibit G -Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NU REG 0161) Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 02/01/99 Completed by: J. R. Pincus Telephone:
e       Surry Monthly Operating Report No. 99-01 Page 5 of 16 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL TO OR GREATER THAN 20%)
(757) 365-2863 (3) METHOD: 1 -Manual 2 -Manual Scram 3 -Automatic Scram 4 -Other (Explain)
REPORT MONTH:   January 1999 Docket No.:   50-280 Unit Name:   Surry Unit 1 Date: 02/01/99 Completed by:   J. R. Pincus Telephone:   (757) 365-2863 None during the Reporting Period (1)                           (2)                                               (3)
(5) Exhibit 1 -Same Source
F:   Forced                 REASON:                                          METHOD:
* e Surry Monthly Operating Report No. 99-01 Page 6 of 16 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%) (1) F: Forced S: Scheduled (4) REPORT MONTH: January 1999 None during the Reporting Period (2) REASON: A -Equipment Failure (Explain)
S:   Scheduled               A - Equipment Failure (Explain)                   1 - Manual B     Maintenance or Test                         2 - Manual Scram C     Refueling                                   3 - Automatic Scram D     Regulatory Restriction                     4 - Other (Explain)
B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training & Licensing Examination F Administrative G Operational Error (Explain)
E     Operator Training & Licensing Examination F     Administrative G     Operational Error (Explain)
Exhibit G -Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NU REG 0161) Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 02/01/99 Completed by: J. R. Pincus Telephone:
(4)                                                                              (5)
(757) 365-2863 (3) METHOD: 1 -Manual 2 -Manual Scram 3 -Automatic Scram 4 -Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets                 Exhibit 1 - Same Source for Licensee Event Report (LER) File (NU REG 0161)
(5) Exhibit 1 -Same Source MONTH: January 1999 Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 INSTRUCTIONS e e Surry Monthly Operating Report No. 99-01 Page 7 of 16 AVERAGE DAILY UNIT POWER LEVEL Average Daily Power Level (MWe -Net) Day 821 17 820 18 822 19 822 20 821 21 821 22 822 23 822 24 823 25 823 26 822 27 822 28 818 29 816 30 821 31 821 Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 02/02/99 Completed by: J. S. Ashley Telephone:
* e      Surry Monthly Operating Report No. 99-01 Page 6 of 16 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)
(757) 365-2161 Average Daily Power Level (Mwe -Net) 821 821 819 819 820 820 821 820 820 821 816 814 820 821 819 On this format, list the average daily unit power level in MWe -Net for each day in the reporting month. Compute to the nearest whole megawatt.
REPORT MONTH: January 1999 Docket No.:   50-281 Unit Name:   Surry Unit 2 Date: 02/01/99 Completed by:   J. R. Pincus Telephone:   (757) 365-2863 None during the Reporting Period (1)                          (2)                                                (3)
MONTH: January 1999 Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 INSTRUCTIONS e Surry Monthly Operating Report No. 99-01 Page 8 of 16 AVERAGE DAILY UNIT POWER LEVEL Average Daily Power Level (Mwe -Net) Day 827 17 827 18 827 19 827 20 826 21 826 22 825 23 827 24 827 25 826 26 825 27 826 28 827 29 828 30 827 31 828 Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 02/02/99 Completed by: J. S. Ashley Telephone:
F:  Forced                  REASON:                                          METHOD:
(757) 365-2161 Average Daily Power Level (Mwe -Net) 827 827 827 824 825 826 827 827 827 826 827 828 828 827 827 On this format, list the average daily unit power level in MWe -Net for each day in the reporting month. Compute to the nearest whole megawatt.
S:  Scheduled              A - Equipment Failure (Explain)                  1 - Manual B    Maintenance or Test                        2 - Manual Scram C    Refueling                                  3 - Automatic Scram D    Regulatory Restriction                      4 - Other (Explain)
E    Operator Training & Licensing Examination F    Administrative G    Operational Error (Explain)
(4)                                                                              (5)
Exhibit G - Instructions for Preparation of Data Entry Sheets                  Exhibit 1 - Same Source for Licensee Event Report (LER) File (NU REG 0161)
 
e                                                 e     Surry Monthly Operating Report No. 99-01 Page 7 of 16 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-280 Unit Name:   Surry Unit 1 Date:   02/02/99 Completed by:   J. S. Ashley Telephone:   (757) 365-2161 MONTH:      January 1999 Average Daily Power Level                         Average Daily Power Level Day                  (MWe - Net)                Day                    (Mwe - Net) 1                        821                     17                      821 2                        820                    18                      821 3                        822                    19                      819 4                        822                    20                      819 5                        821                    21                      820 6                        821                    22                      820 7                        822                    23                      821 8                        822                    24                      820 9                        823                    25                      820 10                        823                    26                      821 11                        822                    27                      816 12                        822                    28                      814 13                        818                    29                      820 14                        816                    30                      821 15                        821                     31                      819 16                        821 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
 
e     Surry Monthly Operating Report No. 99-01 Page 8 of 16 AVERAGE DAILY UNIT POWER LEVEL Docket No.:   50-281 Unit Name:   Surry Unit 2 Date:   02/02/99 Completed by:     J. S. Ashley Telephone:   (757) 365-2161 MONTH:    January 1999 Average Daily Power Level                      Average Daily Power Level Day                    (Mwe - Net)                Day                  (Mwe - Net) 1                      827                      17                      827 2                      827                     18                      827 3                      827                      19                      827 4                      827                      20                      824 5                      826                      21                      825 6                      826                     22                      826 7                      825                      23                      827 8                      827                     24                      827 9                      827                      25                      827 10                      826                     26                      826 11                      825                      27                      827 12                      826                      28                      828 13                      827                      29                      828 14                      828                    30                      827 15                      827                    31                      827 16                      828 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
 
e    Surry Monthly Operating Report No. 99-01 Page 9 of 16


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE MONTH/YEAR:
OF OPERATING EXPERIENCE MONTH/YEAR:   January 1999 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.
January 1999 e Surry Monthly Operating Report No. 99-01 Page 9 of 16 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.
UNIT ONE:
UNIT ONE: 01/01/99 01/31/99 UNIT Two: 01/01/99 01/31/99 0000 2400 0000 2400 Unit starts the month at 100% / 855 MWe. Unit finishes the month at 100% / 845 MWe. Unit starts the month at 100% / 859 MWe. Unit finishes the month at 100% / 860 MWe.
01/01/99     0000         Unit starts the month at 100% / 855 MWe.
DCP 97-052 DCP 97-004 DCP 98-069 FS 98-038 DCP 97-056 FS 98-030 e e Surry Monthly Operating Report No. 99-01 Page 10 of 16 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR:
01/31/99    2400          Unit finishes the month at 100% / 845 MWe.
January 1999 Design Change Package (Safety Evaluation 97-145 Rev. 2) 01/28/99 Design Change Package 97-052, "Control Rod Drive Mechanism (CROM) Housing Leak Repair/Surry/Unit 2", describes the repairing of two reactor vessel head nozzle canopy seal weld leaks using Canopy Seal Clamp Assemblies (CSCA). CSCA is a permanent non-welded mechanical method of leak repair developed by ABB Combustion Engineering and has been fully tested at operating temperature, pressure and seismic conditions for nuclear power plant use. Revision 2 of Safety Evaluation 97-145 documents the revising of ABB's Design Report to envelop the Surry Power Plant specific design criteria.
UNIT Two:
Design Change Package (Safety Evaluation 97-158 Rev. 1) 01/28/99 Design Change Package 97-004 "Spent Fuel Pool Cooling Pump Power Upgrade & Piping Reclassification/Surry/1&2", describes providing the Spent Fuel Pool (SFP) cooling pumps with emergency bus power. Pumps were previously powered from the Station Service buses. Revision 1 of Safety Evaluation 97-158 describes the actions necessary should the SPF cooling pumps be de-powered due to the Containment Spray pumps starting and loading on the Emergency Diesel Generator (EOG) if a HI-HI-CLS with a loss of offsite power has occurred.
01/01/99      0000          Unit starts the month at 100% / 859 MWe.
Design Change Package (Safety Evaluation 98-115 Rev. 1) 01/28/99 Design Change Package 98-069, "Control Rod Drive Mechanism (CROM) Housing Leak Repair/Surry/Unit 1 ", describes the repairing of two reactor vessel head nozzle canopy seal weld leaks using Canopy Seal Clamp Assemblies (CSCA). CSCA is a permanent non-welded mechanical method of leak repair developed by ABB Combustion Engineering and has been fully tested at operating temperature, pressure and seismic conditions for nuclear power plant use. Revision 1 of Safety Evaluation 98-115 documents the revising of ABB's Design Report to envelop the Surry Power Plant specific design criteria.
01/31/99    2400          Unit finishes the month at 100% / 860 MWe.
UFSAR Change Request (Safety Evaluation 99-003) 01/14/99 This change clarifies the Topical Report (TR) Table 17.2.0 to add a second records vault for storage of QA records at the Innsbrook Technical Center. Both vaults meet the ANSI N45.2.9-197 4 requirement.
 
Design Change Package UFSAR Change Request (Safety Evaluation 99-004) 01/14/99 The current two Unit 1 555-ton chillers will be replaced with 350-ton chillers and Bearing Cooling (BC) water will be used to cool the new chillers instead of Service Water. There are no UFSAR or Technical Specifications limiting conditions or special requirements associated with this design change.
e                                                 e     Surry Monthly Operating Report No. 99-01 Page 10 of 16 FACILITY CHANGES THAT DID NOT REQUIRE   NRC   APPROVAL MONTHNEAR:   January 1999 DCP 97-052 Design Change Package                                                             01/28/99 (Safety Evaluation 97-145 Rev. 2)
i--1 FS 98-037 FS 87-035 e Surry Monthly Operating Report No. 99-01 Page 11 of 16 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR:
Design Change Package 97-052, "Control Rod Drive Mechanism (CROM) Housing Leak Repair/Surry/Unit 2", describes the repairing of two reactor vessel head nozzle canopy seal weld leaks using Canopy Seal Clamp Assemblies (CSCA). CSCA is a permanent non-welded mechanical method of leak repair developed by ABB Combustion Engineering and has been fully tested at operating temperature, pressure and seismic conditions for nuclear power plant use. Revision 2 of Safety Evaluation 97-145 documents the revising of ABB's Design Report to envelop the Surry Power Plant specific design criteria.
January 1999 UFSAR Change Request (Safety Evaluation 99-005) 01/25/99 UFSAR Change Request FS 98-037 contains corrections and clarifications to the UFSAR sections that discuss Surry's Auxiliary Feedwater (AFW) system as a result of the Integrated Configuration Management project review of the AFW system. Safety Evaluation 99-005 also includes information pertaining to UFSAR Change Request 87-035 that dealt with implementing administrative changes. These changes are to enhance accuracy and do not affect any AFW system or structure, or any of its component's operation or performance.
DCP 97-004 Design Change Package                                                             01/28/99 (Safety Evaluation 97-158 Rev. 1)
e e PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR:
Design Change Package 97-004 "Spent Fuel Pool Cooling Pump Power Upgrade & Piping Reclassification/Surry/1&2", describes providing the Spent Fuel Pool (SFP) cooling pumps with emergency bus power. Pumps were previously powered from the Station Service buses. Revision 1 of Safety Evaluation 97-158 describes the actions necessary should the SPF cooling pumps be de-powered due to the Containment Spray pumps starting and loading on the Emergency Diesel Generator (EOG) if a HI-HI-CLS with a loss of offsite power has occurred.
January 1999 None during the Reporting Period Surry Monthly Operating Report No. 99-01 Page 12 of 16
DCP 98-069 Design Change Package                                                             01/28/99 (Safety Evaluation 98-115 Rev. 1)
* e Surry Monthly Operating Report No. 99-01 Page13of16 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR:
Design Change Package 98-069, "Control Rod Drive Mechanism (CROM) Housing Leak Repair/Surry/Unit 1", describes the repairing of two reactor vessel head nozzle canopy seal weld leaks using Canopy Seal Clamp Assemblies (CSCA). CSCA is a permanent non-welded mechanical method of leak repair developed by ABB Combustion Engineering and has been fully tested at operating temperature, pressure and seismic conditions for nuclear power plant use. Revision 1 of Safety Evaluation 98-115 documents the revising of ABB's Design Report to envelop the Surry Power Plant specific design criteria.
January 1999 None during the Reporting Period CHEMISTRY REPORT MONTHNEAR:
FS 98-038  UFSAR Change Request                                                             01/14/99 (Safety Evaluation 99-003)
January 1999 Unit No. 1 Primary Coolant Analysis Max. Min. AvQ. Gross Radioactivity, µCi/ml 4.27E-1 2.06E-1 3.27E-1 Suspended Solids, ppm ---Gross Tritium, µCi/ml 5.43E-1 2.60E-1 4.10E-1 1131, µCi/ml 4.04E-4 2.37E-4 3.06E-4 113111133 0.09 0.03 0.06 HydroQen, cc/kQ 44.5 35.8 39.2 Lithium, ppm 2.41 2.09 2.24 Boron -10, ppm* 250.7 240.5 245.5 OxyQen, (DO), ppm 0.005 0.005 0.005 Chloride, ppm 0.025 0.020 0.022 pH @ 25 degree Celsius 6.50 6.24 6.37 Boron -10 = Total Boron x 0.196 Comments:
This change clarifies the Topical Report (TR) Table 17.2.0 to add a second records vault for storage of QA records at the Innsbrook Technical Center. Both vaults meet the ANSI N45.2.9-1974 requirement.
None e Surry Monthly Operating Report Unit No. 2 Max. Min. 2.01E-1 6.81 E-2 --2.57E-1 1.57E-1 1.57E-4 4.35E-5 0.18 0.02 41.1 32.9 1.52 1.11 37.2 17.4 0.005 0.005 0.003 0.001 7.51 7.10 No. 99-01 Page14of16 AvQ. 1.29E-1 -2.08E-1 8.10E-5 0.09 37.6 1.32 27.1 0.005 0.002 7.30 J New Fuel Shipment or Cask No. FUEL HANDLING UNITS 1 & 2 MONTHNEAR:
DCP 97-056 Design Change Package                                                           01/14/99 FS 98-030  UFSAR Change Request (Safety Evaluation 99-004)
January 1999 Number of Date Stored or Assemblies Received per Shipment Assembly Number ANSI Number None during the Reporting Period -Surry Monthly Operating Report No. 99-01 Page 15 of 166 Initial Enrichment New or Spent Fuel Shipping Cask Activity
The current two Unit 1 555-ton chillers will be replaced with 350-ton chillers and Bearing Cooling (BC) water will be used to cool the new chillers instead of Service Water. There are no UFSAR or Technical Specifications limiting conditions or special requirements associated with this design change.
* e Surry Monthly Operating Report DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTHNEAR:
 
January 1999 None during the Reporting Period No. 99-01 Page 16 of 16}}
i--
1 e     Surry Monthly Operating Report No. 99-01 Page 11 of 16 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: January 1999 FS 98-037 UFSAR Change Request                                                         01/25/99 FS 87-035 (Safety Evaluation 99-005)
UFSAR Change Request FS 98-037 contains corrections and clarifications to the UFSAR sections that discuss Surry's Auxiliary Feedwater (AFW) system as a result of the Integrated Configuration Management project review of the AFW system. Safety Evaluation 99-005 also includes information pertaining to UFSAR Change Request 87-035 that dealt with implementing administrative changes. These changes are to enhance accuracy and do not affect any AFW system or structure, or any of its component's operation or performance.
 
e                                       e Surry Monthly Operating Report No. 99-01 Page 12 of 16 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC   APPROVAL MONTHNEAR:   January 1999 None during the Reporting Period
* e Surry Monthly Operating Report No. 99-01 Page13of16 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR:   January 1999 None during the Reporting Period
 
e    Surry Monthly Operating Report No. 99-01 Page14of16 CHEMISTRY REPORT MONTHNEAR:   January 1999 Unit No. 1                         Unit No. 2 Primary Coolant Analysis         Max.         Min.         AvQ. Max.          Min.        AvQ.
Gross Radioactivity, µCi/ml           4.27E-1     2.06E-1     3.27E-1 2.01E-1      6.81 E-2    1.29E-1 Suspended Solids, ppm                     -           -           -       -            -            -
Gross Tritium, µCi/ml                 5.43E-1     2.60E-1     4.10E-1 2.57E-1      1.57E-1      2.08E-1 1131, µCi/ml                         4.04E-4     2.37E-4     3.06E-4 1.57E-4      4.35E-5      8.10E-5 113111133                               0.09         0.03         0.06   0.18          0.02        0.09 HydroQen, cc/kQ                         44.5         35.8         39.2   41.1          32.9        37.6 Lithium, ppm                           2.41         2.09         2.24   1.52          1.11        1.32 Boron - 10, ppm*                       250.7       240.5       245.5   37.2          17.4        27.1 OxyQen, (DO), ppm                     0.005       0.005       0.005  0.005        0.005        0.005 Chloride, ppm                         0.025       0.020       0.022   0.003        0.001        0.002 pH @ 25 degree Celsius                 6.50         6.24         6.37   7.51          7.10        7.30 Boron - 10 = Total Boron x 0.196 Comments:
None J
 
                                                                    -Surry Monthly Operating Report No. 99-01 Page 15 of 166 FUEL HANDLING UNITS 1 & 2 MONTHNEAR:   January 1999 New Fuel                  Number of                                               New or Spent Shipment or Date Stored or Assemblies     Assembly          ANSI      Initial    Fuel Shipping Cask No. Received     per Shipment     Number         Number   Enrichment    Cask Activity None during the Reporting Period
* e    Surry Monthly Operating Report No. 99-01 Page 16 of 16 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTHNEAR: January 1999 None during the Reporting Period}}

Revision as of 00:58, 21 October 2019

Monthly Operating Repts for Jan 1999 for Surry Power Station,Units 1 & 2.With 990210 Ltr
ML18152B542
Person / Time
Site: Surry  Dominion icon.png
Issue date: 01/31/1999
From: Grecheck E, Pincus J, Stief R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
99-095, 99-95, NUDOCS 9902220181
Download: ML18152B542 (17)


Text

'

February 10, 1999 United States Nuclear Regulatory Commission Serial No.99-095 Attention: Document Control Desk SPS Lic/JSA RO Washington, D.C. 20555 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of January *i 999 is provided in the attachment.

If you have any questions or require additional information, please contact us.

Very truly yours, E. S. Grecheck, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc: U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth Street, S. W. . Q i*, (:~

S u1*te 23T85 1.J.. r, 1

..J '. * * '* ' ,.)

Atlanta, Georgia 30303 Mr. R. A. Musser NRG Senior Resident Inspector Surry Power Station t

(

9902220181 990131 i PDR ADOCK 05000280 R PDR,L .

____....

~'. \

. . "'

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 99-01

'(

Approved:

Date

e

  • Surry Monthly Operating Report No. 99-01 Page 2 of 16 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1 ............................................................................................................................ 3 Operating Data Report - Unit No. 2 ............................................................................................................................ 4 Unit Shutdowns and Power Reductions - Unit No. 1 .................................................................................................. 5 Unit Shutdowns and Power Reductions - Unit No. 2 .................................................................................................. 6 Average Daily Unit Power Level - Unit No. 1.............................................................................................................. 7 Average Daily Unit Power Level - Unit No. 2 .............................................................................................................. 8 Summary of Operating Experience - Unit Nos. 1 and 2 ............................................................................................. 9 Facility Changes That Did Not Require NRC Approval ............................................................................................ 1O Procedure or Method of Operation Changes That Did Not Require NRC Approval. ................................................ 12 Tests and Experiments That Did Not Require NRC Approval. ................................................................................. 13 Chemistry Report ..................................................................................................................................................... 14 Fuel Handling - Unit Nos. 1 and 2 ............................................................................................................................ 15 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications ....................................................................................................................... 16

e Surry Monthly Operating Report No. 99-01 Page 3 of 16 OPERATING DATA REPORT Docket No.: 50-280 Date: 02/02/99 Completed By: R. Stief Telephone: (757) 365-2486

1. Unit Name: ........................................................... Surry Unit 1
2. Reporting Period: ................................................ . January 1999
3. Licensed Thermal Power (MWt): ......................... . 2546
4. Nameplate Rating (Gross MWe): ........................ . 847.5
5. Design Electrical Rating (Net MWe): ................... . 788
6. Maximum Dependable Capacity (Gross MWe): .. . 840
7. Maximum Dependable Capacity (Net MWe): ...... . 801
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-To-Date Cumulative

11. Hours in Reporting Period 744.0 744.0 228888.0
12. Hours Reactor Was Critical 744.0 744.0 162060.5
13. Reactor Reserve Shutdown Hours 0.0 0.0 3774.5
14. Hours Generator On-Line 744.0 744.0 159515.4
15. Unit Reserve Shutdown Hours 0.0 0.0 3736.2
16. Gross Thermal Energy Generated (MWH) 1893674.1 1893674.1 376084631.6
17. Gross Electrical Energy Generated (MWH) 631358.0 631358.0 123401514.0
18. Net Electrical Energy Generated (MWH) 610294.0 610294.0 117596898.0
19. Unit Service Factor 100.0% 100.0% 69.7%
20. Unit Availability Factor 100.0% 100.0% 71.3%
21. Unit Capacity Factor (Using MDC Net) 102.4% 102.4% 65.9%
22. Unit Capacity Factor (Using DER Net) 104.1% 104.1% 65.2%
23. Unit Forced Outage Rate 0.0% 0.0% 14.4%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down at End of Report Period, Estimated Date of Start-up:
26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

e Surry Monthly Operating Report No. 99-01 Page 4 of 16 OPERATING DATA REPORT Docket No.: 50-281 Date: 02/02/99 Completed By: R. Stief Telephone: (757) 365-2486

1. Unit Name: .......................................................... . Surry Unit 2
2. Reporting Period: ................................................ . January 1999
3. Licensed Thermal Power (MWt): ......................... . 2546
4. Nameplate Rating (Gross MWe): ........................ . 847.5
5. Design Electrical Rating (Net MWe): ................... . 788
6. Maximum Dependable Capacity (Gross MWe): .. . 840
7. Maximum Dependable Capacity (Net MWe): ...... . 801
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-To-Date Cumulative

11. Hours in Reporting Period 744.0 744.0 225769.0
12. Hours Reactor Was Critical 744.0 744.0 160654.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 328.1
14. Hours Generator On-Line 744.0 744.0 158637.5
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1894101.8 1894101.8 375689750.8
17. Gross Electrical Energy Generated (MWH) 636210.0 636210.0 123184103.0
18. Net Electrical Energy Generated (MWH) 615013.0 615013.0 117437040.0
19. Unit Service Factor 100.0% 100.0% 70.3%
20. Unit Availability Factor 100.0% 100.0% 70.3%
21. Unit Capacity Factor (Using MDC Net) 103.2% 103.2% 66.5%
22. Unit Capacity Factor (Using DER Net) 104.9% 104.9% 66.0%
23. Unit Forced Outage Rate 0.0% 0.0% 11.3%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling, April 19, 1999, 35 Days

25. If Shut Down at End of Report Period, Estimated Date of Start-up:
26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

I~

e Surry Monthly Operating Report No. 99-01 Page 5 of 16 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL TO OR GREATER THAN 20%)

REPORT MONTH: January 1999 Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 02/01/99 Completed by: J. R. Pincus Telephone: (757) 365-2863 None during the Reporting Period (1) (2) (3)

F: Forced REASON: METHOD:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B Maintenance or Test 2 - Manual Scram C Refueling 3 - Automatic Scram D Regulatory Restriction 4 - Other (Explain)

E Operator Training & Licensing Examination F Administrative G Operational Error (Explain)

(4) (5)

Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NU REG 0161)

  • e Surry Monthly Operating Report No. 99-01 Page 6 of 16 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: January 1999 Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 02/01/99 Completed by: J. R. Pincus Telephone: (757) 365-2863 None during the Reporting Period (1) (2) (3)

F: Forced REASON: METHOD:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B Maintenance or Test 2 - Manual Scram C Refueling 3 - Automatic Scram D Regulatory Restriction 4 - Other (Explain)

E Operator Training & Licensing Examination F Administrative G Operational Error (Explain)

(4) (5)

Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NU REG 0161)

e e Surry Monthly Operating Report No. 99-01 Page 7 of 16 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 02/02/99 Completed by: J. S. Ashley Telephone: (757) 365-2161 MONTH: January 1999 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (Mwe - Net) 1 821 17 821 2 820 18 821 3 822 19 819 4 822 20 819 5 821 21 820 6 821 22 820 7 822 23 821 8 822 24 820 9 823 25 820 10 823 26 821 11 822 27 816 12 822 28 814 13 818 29 820 14 816 30 821 15 821 31 819 16 821 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

e Surry Monthly Operating Report No. 99-01 Page 8 of 16 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 02/02/99 Completed by: J. S. Ashley Telephone: (757) 365-2161 MONTH: January 1999 Average Daily Power Level Average Daily Power Level Day (Mwe - Net) Day (Mwe - Net) 1 827 17 827 2 827 18 827 3 827 19 827 4 827 20 824 5 826 21 825 6 826 22 826 7 825 23 827 8 827 24 827 9 827 25 827 10 826 26 826 11 825 27 827 12 826 28 828 13 827 29 828 14 828 30 827 15 827 31 827 16 828 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

e Surry Monthly Operating Report No. 99-01 Page 9 of 16

SUMMARY

OF OPERATING EXPERIENCE MONTH/YEAR: January 1999 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.

UNIT ONE:

01/01/99 0000 Unit starts the month at 100% / 855 MWe.

01/31/99 2400 Unit finishes the month at 100% / 845 MWe.

UNIT Two:

01/01/99 0000 Unit starts the month at 100% / 859 MWe.

01/31/99 2400 Unit finishes the month at 100% / 860 MWe.

e e Surry Monthly Operating Report No. 99-01 Page 10 of 16 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: January 1999 DCP 97-052 Design Change Package 01/28/99 (Safety Evaluation 97-145 Rev. 2)

Design Change Package 97-052, "Control Rod Drive Mechanism (CROM) Housing Leak Repair/Surry/Unit 2", describes the repairing of two reactor vessel head nozzle canopy seal weld leaks using Canopy Seal Clamp Assemblies (CSCA). CSCA is a permanent non-welded mechanical method of leak repair developed by ABB Combustion Engineering and has been fully tested at operating temperature, pressure and seismic conditions for nuclear power plant use. Revision 2 of Safety Evaluation 97-145 documents the revising of ABB's Design Report to envelop the Surry Power Plant specific design criteria.

DCP 97-004 Design Change Package 01/28/99 (Safety Evaluation 97-158 Rev. 1)

Design Change Package 97-004 "Spent Fuel Pool Cooling Pump Power Upgrade & Piping Reclassification/Surry/1&2", describes providing the Spent Fuel Pool (SFP) cooling pumps with emergency bus power. Pumps were previously powered from the Station Service buses. Revision 1 of Safety Evaluation 97-158 describes the actions necessary should the SPF cooling pumps be de-powered due to the Containment Spray pumps starting and loading on the Emergency Diesel Generator (EOG) if a HI-HI-CLS with a loss of offsite power has occurred.

DCP 98-069 Design Change Package 01/28/99 (Safety Evaluation 98-115 Rev. 1)

Design Change Package 98-069, "Control Rod Drive Mechanism (CROM) Housing Leak Repair/Surry/Unit 1", describes the repairing of two reactor vessel head nozzle canopy seal weld leaks using Canopy Seal Clamp Assemblies (CSCA). CSCA is a permanent non-welded mechanical method of leak repair developed by ABB Combustion Engineering and has been fully tested at operating temperature, pressure and seismic conditions for nuclear power plant use. Revision 1 of Safety Evaluation 98-115 documents the revising of ABB's Design Report to envelop the Surry Power Plant specific design criteria.

FS98-038 UFSAR Change Request 01/14/99 (Safety Evaluation 99-003)

This change clarifies the Topical Report (TR) Table 17.2.0 to add a second records vault for storage of QA records at the Innsbrook Technical Center. Both vaults meet the ANSI N45.2.9-1974 requirement.

DCP 97-056 Design Change Package 01/14/99 FS98-030 UFSAR Change Request (Safety Evaluation 99-004)

The current two Unit 1 555-ton chillers will be replaced with 350-ton chillers and Bearing Cooling (BC) water will be used to cool the new chillers instead of Service Water. There are no UFSAR or Technical Specifications limiting conditions or special requirements associated with this design change.

i--

1 e Surry Monthly Operating Report No. 99-01 Page 11 of 16 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: January 1999 FS98-037 UFSAR Change Request 01/25/99 FS87-035 (Safety Evaluation 99-005)

UFSAR Change Request FS98-037 contains corrections and clarifications to the UFSAR sections that discuss Surry's Auxiliary Feedwater (AFW) system as a result of the Integrated Configuration Management project review of the AFW system. Safety Evaluation 99-005 also includes information pertaining to UFSAR Change Request 87-035 that dealt with implementing administrative changes. These changes are to enhance accuracy and do not affect any AFW system or structure, or any of its component's operation or performance.

e e Surry Monthly Operating Report No. 99-01 Page 12 of 16 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: January 1999 None during the Reporting Period

  • e Surry Monthly Operating Report No. 99-01 Page13of16 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: January 1999 None during the Reporting Period

e Surry Monthly Operating Report No. 99-01 Page14of16 CHEMISTRY REPORT MONTHNEAR: January 1999 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max. Min. AvQ. Max. Min. AvQ.

Gross Radioactivity, µCi/ml 4.27E-1 2.06E-1 3.27E-1 2.01E-1 6.81 E-2 1.29E-1 Suspended Solids, ppm - - - - - -

Gross Tritium, µCi/ml 5.43E-1 2.60E-1 4.10E-1 2.57E-1 1.57E-1 2.08E-1 1131, µCi/ml 4.04E-4 2.37E-4 3.06E-4 1.57E-4 4.35E-5 8.10E-5 113111133 0.09 0.03 0.06 0.18 0.02 0.09 HydroQen, cc/kQ 44.5 35.8 39.2 41.1 32.9 37.6 Lithium, ppm 2.41 2.09 2.24 1.52 1.11 1.32 Boron - 10, ppm* 250.7 240.5 245.5 37.2 17.4 27.1 OxyQen, (DO), ppm 0.005 0.005 0.005 0.005 0.005 0.005 Chloride, ppm 0.025 0.020 0.022 0.003 0.001 0.002 pH @ 25 degree Celsius 6.50 6.24 6.37 7.51 7.10 7.30 Boron - 10 = Total Boron x 0.196 Comments:

None J

-Surry Monthly Operating Report No. 99-01 Page 15 of 166 FUEL HANDLING UNITS 1 & 2 MONTHNEAR: January 1999 New Fuel Number of New or Spent Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received per Shipment Number Number Enrichment Cask Activity None during the Reporting Period

  • e Surry Monthly Operating Report No. 99-01 Page 16 of 16 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTHNEAR: January 1999 None during the Reporting Period