{{#Wiki_filter:.f fc-*.]4*Ju n.ROCHESTER GAS AND ELECTRIC CORFCeATION 8'? EAST AVENUE, ROCHESTER, N.Y.146J9
{{#Wiki_filter:*
.. ,"l H.s > , a May 29, 1979 Mr. Boyce H.
  .
Grier, Director Office of Inspection and Enforcement, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406  
f fc-
.
                                                                                  ]4*
Ju                                                                           n     .
ROCHESTER GAS AND ELECTRIC CORFCeATION   8'? EAST AVENUE, ROCHESTER, N.Y.146J9
                                                                    .. ,   "l H.s > , a May 29, 1979 Mr. Boyce H. Grier, Director Office of Inspection and Enforcement, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406


==SUBJECT:==
==SUBJECT:==
IE Bulletin 79-07 RLNRC-0029 Docket No. 50-485
IE Bulletin 79-07                               RLNRC-0029 Docket No. 50-485


==Dear Mr. Grier:==
==Dear Mr. Grier:==


Your letter dated April 14, 1979 forwarded IE Bulletin 79-07 concerning seismic stress analysis of safety related piping.
Your letter dated April 14, 1979 forwarded IE Bulletin 79-07 concerning seismic stress analysis of safety related piping. The following information is provided in response to your letter.
The following information is provided in response to your letter.
The items below are numbered to correspond to the Bulletin action items.
The items below are numbered to correspond to the Bulletin action items.1.All of the seismic analyses for safety related piping were performed properly.
: 1. All of the seismic analyses for safety related piping were performed properly. None of the methods specified in the bulletin were used in the analyses.
None of the methods specified in the bulletin were used in the analyses.
: 2. This item is not applicable because proper analysis techniques were used. Computer program listings need not be provided.
2.This item is not applicable because proper analysis techniques were used.
: 3. All computer codes used in the seismic analysis of safety-related piping have verified as shown below:
Computer program listings need not be provided.
(a)   ME 632:   Verified using PISOL (EDS Nuclear Inc.),
3.All computer codes used in the seismic analysis of safety-related piping have verified as shown below: (a)ME 632: Verified using PISOL (EDS Nuclear Inc.), PIPESD (URS/ John A.
PIPESD (URS/ John A. Blum and Associates, Engineers), and TPIPE (PMB Systems Engineering Inc.).
Blum and Associates, Engineers), and TPIPE (PMB Systems Engineering Inc.).(b)ME 101: Verified using ME 632, TPIPE and SUPERPIPE (EDS Nuclear Inc.).(c)TPIPE: Verified using PISOL (EDS Nuclear Inc.) and ME 632.27'L 158 (d)BSAP: Verified using ME 101.( e)WESTDYN: Refer to WCAP 8252, Rev.
(b)   ME 101:   Verified using ME 632, TPIPE and SUPERPIPE (EDS Nuclear Inc.).
1," Documentation of Selected Westinghouse Structural Analysis 79070204'67
(c)   TPIPE:     Verified using PISOL (EDS Nuclear Inc.) and ME 632.
/  
(d)   BSAP:     Verified using ME 101.               27'L 158
,'ROCHESTER GAS AtJO ELECTRIC CORP.
( e) WESTDYN:   Refer to WCAP 8252, Rev. 1, " Documentation of Selected Westinghouse Structural Analysis 79070204'67
SHEET No.04TE May 29, 1979 To Mr. Boyce H.
                            /
Grier 2 Computer Codes", May 1977, which is currently under NRC ceview.
 
4.Because all seismic stress analyses for safety related piping were performed using proper techniques no corrective action plan is necessary.
  ,
Sincerely yours, t r.O n E.A thur.ief Engineer xc: '.C.R.Anderson Lex K.Larson.N.A.Petrick.Gerald Charnoff
'
.J.L.Turdera.U.S.Nuclear Regulatory Commission
ROCHESTER GAS AtJO ELECTRIC CORP.                                   SHEET No.
.Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, DC 20555 272 159}}
04TE   May 29, 1979 To     Mr. Boyce H. Grier                                               2 Computer Codes", May 1977, which is currently under NRC ceview.
: 4. Because all seismic stress analyses for safety related piping were performed using proper techniques no corrective action plan is necessary.
Sincerely yours, t r.
O n E. A thur.
ief Engineer xc: '. C. R. Anderson
          . Lex K. Larson
          . N. A. Petrick
          . Gerald Charnoff
          . J. L. Turdera
          . U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, DC 20555 272 159}}

Revision as of 11:55, 19 October 2019

Responds to IE Bulletin 79-07 Re Seismic Stress Analysis of safety-related Piping.All Analyses Properly Performed & Methods Specified in Bulletin Not Used
ML19224C524
Person / Time
Site: Sterling
Issue date: 05/29/1979
From: Arthur J
ROCHESTER GAS & ELECTRIC CORP.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
RLNRC-0029, RLNRC-29, NUDOCS 7907020487
Download: ML19224C524 (2)


Text

.

f fc-

.

]4*

Ju n .

ROCHESTER GAS AND ELECTRIC CORFCeATION 8'? EAST AVENUE, ROCHESTER, N.Y.146J9

.. , "l H.s > , a May 29, 1979 Mr. Boyce H. Grier, Director Office of Inspection and Enforcement, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406

SUBJECT:

IE Bulletin 79-07 RLNRC-0029 Docket No. 50-485

Dear Mr. Grier:

Your letter dated April 14, 1979 forwarded IE Bulletin 79-07 concerning seismic stress analysis of safety related piping. The following information is provided in response to your letter.

The items below are numbered to correspond to the Bulletin action items.

1. All of the seismic analyses for safety related piping were performed properly. None of the methods specified in the bulletin were used in the analyses.
2. This item is not applicable because proper analysis techniques were used. Computer program listings need not be provided.
3. All computer codes used in the seismic analysis of safety-related piping have verified as shown below:

(a) ME 632: Verified using PISOL (EDS Nuclear Inc.),

PIPESD (URS/ John A. Blum and Associates, Engineers), and TPIPE (PMB Systems Engineering Inc.).

(b) ME 101: Verified using ME 632, TPIPE and SUPERPIPE (EDS Nuclear Inc.).

(c) TPIPE: Verified using PISOL (EDS Nuclear Inc.) and ME 632.

(d) BSAP: Verified using ME 101. 27'L 158

( e) WESTDYN: Refer to WCAP 8252, Rev. 1, " Documentation of Selected Westinghouse Structural Analysis 79070204'67

/

,

'

ROCHESTER GAS AtJO ELECTRIC CORP. SHEET No.

04TE May 29, 1979 To Mr. Boyce H. Grier 2 Computer Codes", May 1977, which is currently under NRC ceview.

4. Because all seismic stress analyses for safety related piping were performed using proper techniques no corrective action plan is necessary.

Sincerely yours, t r.

O n E. A thur.

ief Engineer xc: '. C. R. Anderson

. Lex K. Larson

. N. A. Petrick

. Gerald Charnoff

. J. L. Turdera

. U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, DC 20555 272 159