Category:CORRESPONDENCE-LETTERS
MONTHYEARML20202D4861998-02-12012 February 1998 Ack Receipt of & Check in Amount of $55,000 in Payment for Civil Penalty Proposed by NRC in . Corrective Actions Will Be Examined During Future Insps IR 05000485/19960241997-03-0505 March 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-485/96-24 IR 05000485/19850711986-06-17017 June 1986 Ack Receipt of 851204 & s Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-485/85-71 ML18037A3791982-05-27027 May 1982 Forwards Annual Financial Repts 1981 for Niagara Mohawk Power Corp,Ny State Electric & Gas Corp,Lilco,Rochester Gas & Electric Corp & Central Hudson Gas & Electric Corp ML17258A1861981-09-22022 September 1981 Forwards Endorsements 73 & 74 to ANI Policy NF-170 ML20003G2671981-04-22022 April 1981 Forwards Second Draft Safety Evaluation of Snupps 10.1,10.2, 10.3,10.4.1 & 10.4.4, Steam & Power Conversion Sys. ML17258A7951981-02-10010 February 1981 Forwards Summary of Actual Cash Flow for 1980,projected Cash Flow for 1981 & Financial Statement for 3 & 12 Months Ended 801231.Info Supports Util Guarantee to Pay Retrospective Premiums Required by Secondary Financial Protection Sys ML17258A7371981-01-14014 January 1981 Forwards Public Version of Upgraded Evacuation Time Estimates for Facilities in Response to NRC 801209 Ltr ML17250A7161980-10-29029 October 1980 Informs of Changes in Organizational Structure Per FE Drake Retirement as Board Chairman & Chief Executive Officer. Corporate Organization Chart,Effective 801001,encl ML19338C4601980-08-11011 August 1980 Requests Info Re Basis for Denial of Certificate for Facility ML19320A5831980-06-16016 June 1980 Responds to IE Bulletin 80-09, Hydramotor Actuator Deficiencies. Two safety-related Uses of Itt General Controls Models AH-90 & NH-90 Series Hydramotor Actuators Have Been Identified.Itt Is Testing Actuators ML17250A3321980-06-12012 June 1980 Comments on 800506 Presentation to NRC Commissioners Re Status of SEP & Description of Difficulty as Lack of Aggression by Licensees.Nrc Has Not Provided Guidelines. Issues W/Higher Priorities Have Arisen ML19323H2791980-06-0606 June 1980 Responds to IE Bulletin 80-05 Re Vacuum Condition Resulting in Damage to Chemical Vol Control Sys Holdup Tanks.Tank Damage Due to Vacuum Conditions Precluded by Design Provisions or Suitable Vent Connections ML19318C1861980-06-0202 June 1980 Responds to IE Bulletin 79-28, Possible Malfunction of Namco Model EA180 Limit Switches at Elevated Temps. Top Cover Gaskets on Switches W/Applicable Date Codes Will Be Replaced on Valves Listed in Encl ML17249A9111980-04-30030 April 1980 Forwards Response to IE Bulletin 80-04. Analysis of PWR Main Steam Line Break W/Continued Feedwater Addition. Auxiliary Feedwater Flow Becomes Dominant Factor in Determining Duration & Magnitude of Steam Flow Transient ML20003H9601980-04-18018 April 1980 Advises That Licensee Considers 800320 Deficiency Rept Final.No Addl Action Planned Unless Required by New Info ML19309G0821980-03-20020 March 1980 Responds to IE Bulletin 80-03 Re Charcoal Tray Adsorber Cells.Design & Manufacturer of Adsorber Cells Planned to Be Used Are Different than Type Described in Bulletin ML19305C3721980-03-20020 March 1980 Informs That Snupps Utils Are Investigating Hardware Changes to Preclude Need for Tests to Correct Deficiency in Engineered Safety Features Actuation Sys.Tests Will Be Made Part of Plant Procedures If Changes Are Not Feasible ML19305D5111980-03-20020 March 1980 Discusses Undetectable Failure in Engineered Safety Features Actuation Sys.Utils Are Investigating Hardware Changes That May Preclude Further Testing,Provided That Changes Are Feasible.Otherwise,Tests Will Continue ML19305C3751980-03-20020 March 1980 Informs That C-E 791026 Amend to Rept on IE Bulletin 78-12, Atypical Weld Matl in Reactor Pressure Vessel Welds, Should Be Considered Part of Util Bulletin Response ML19323D2451980-03-20020 March 1980 Responds to IE Bulletins 78-12,12A & 12B, Atypical Weld Matl in Reactor Pressure Vessel Welds. Util 790629 Ltr & C-E 791026 Ltr to NRC Constitutes Response to Bulletin ML19323C4271980-03-0606 March 1980 Responds to IE Bulletin 79-28, Possible Malfunction of Namco Model EA180 Limit Switches at Elevated Temps. Identification of Switches Has Required More Time than Anticipated.Util Will Respond as Soon as Possible ML19309D3451980-03-0606 March 1980 Responds to IE Bulletin 79-28.Investigation Re Planned Use of Namco EA180 Switches,Identification in Snupps Design & Development of Plans for Corrective Action Requires More Time than Anticipated.Will Forward Response Later ML19294B1451980-02-22022 February 1980 Disagrees W/Nrc Plans Re ATWS Issue.New Plans May Not Serve Best Interests of Public Health & Safety.Nrc Should Not Impose Requirements Before Thorough Review of Mass of Technical Info Supplied Last Year ML19296C5711980-02-19019 February 1980 Responds to NRC 800204 Ltr Received 800213 Re NRC 800208 Meeting W/Snupps Representatives to Discuss Snupps QA Program.Requests NRC Reschedule Meeting & Provide State Public Svc Commission Sufficient Time to Participate ML19294B8661980-02-14014 February 1980 Forwards Ny State Board on Electric Generation Siting & Environ 800211 Opinion & Order Vacating Previously Granted Certificate.Denies Application & Closes Proceeding ML19260D5621980-02-0505 February 1980 Forwards Supplemental Deficiency Rept Re Qualification of Control Sys ML19309B5491980-02-0505 February 1980 Forwards Supplemental Rept on Potential Deficiency Re Qualification of Control Sys Discussed in Util 790928 Ltr.No Unresolved Safety Concerns Re Pressure Controllers & Main Steam Line Atmospheric Relief Valve ML19296D9961980-02-0101 February 1980 Responds to IE Bulletin 79-28.Investigation Re Planned Use of Namco EA180 Switches for Snupps Facilities Not Complete.Investigation Results & Corrective Actions Will Be Submitted in 3-4 Wks ML19294B1891980-01-30030 January 1980 Notifies That Ny State Board on Electric Generation Siting & Environ Voted on 800123 to Rescind Approval of Plant Const & Operation.No Decision Can Be Made Re Continuation of NRC Proceedings Until Util Has Received Formal Opinion ML19260E0561980-01-30030 January 1980 Notifies of Ny State Board on Electric Generation Siting & Environ 800123 Decision to Rescind Prior Approval of Const & Operation of Facility.No Date Set for Formal Opinion. Certificate of Svc Encl ML19296B9801980-01-18018 January 1980 Forwards RO Pohl Testimony on Radon Emissions from U Mill Tailings Piles ML19308C9981980-01-18018 January 1980 Responds to IE Bulletin 79-25.Westinghouse Bfd/Nbfd Relays Are Not Included in safety-related Portions of Design ML19211D2751980-01-14014 January 1980 Discusses NRC Delay in Review of FSAR & OL Application. Review Schedule Should Be Established Promptly ML19257B8871980-01-0404 January 1980 Responds to IE Bulletin 79-25, Failures of Westinghouse Bfd Relays in Safety-Related Sys. No Such Relays Have Been Identified.Will Advise Further in Two Wks ML19291C3061980-01-0303 January 1980 Responds to IE Bulletin 79-02,Revision 2.Initial Response Satisfies Requirements of Revision 1.Facility Does Not Use Concrete Expansion Anchor Bolts to Support Seismic Category I Piping ML19296D7051980-01-0303 January 1980 Responds to IE Bulletin 79-02,Revision 1.Initial 790705 Response Resolves NRC Concerns Re Use of Concrete Expansion Anchor Bolts for Pipe Support Base Plates.Util Does Not Use Expansion Anchors in Concrete or Structural Steel Members ML19262C4241980-01-0303 January 1980 Responds to IE Bulletin 79-02,Revision 2, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts. Expansion Anchors in Concrete Block Walls Not Used.Util 790705 Response Need Not Be Modified or Amended ML17249A4551980-01-0202 January 1980 Supplements 791212 Ltr Listing Six Suits Against Util. Seventh,Ew Garrett Vs Util,Received ML19262B5671979-12-20020 December 1979 Responds to NRC 791018 Request for Addl Info Re Snupps Fire Protection Sys.Detailed Responses to Requests Will Be Included in FSAR Revision.Clarification of Sys Description Will Show Design in Compliance W/Nrc Requirements ML19262B5831979-12-14014 December 1979 Discusses Potential Deficiency,Per 791116 Telcon to Nrc. Westinghouse Review Reveals That Dropped Rod Safety Analysis Deficiency May Affect Four Addl Loop Plants.Further Info Will Be Provided by FSAR Revision ML19253C9361979-12-0606 December 1979 Notifies of Corrective Action for Potential Deficiency Re Engineered Safety Features Actuation Sys.Test Sequence to Detect Failure Will Be Incorporated Into Appropriate Procedures ML19260C9481979-11-29029 November 1979 Forwards Final Deficiency Rept Re Gulf & Western Preassembly Formations ML19305B9591979-11-0707 November 1979 Discusses Undetectable Failure in Engineered Safety Features Actuation Sys.Failure of P-4 Permissive Circuit in Both Redundant Protection Trains Could Result in Failure of Sys to Automatically Initiate Protective Function.Details Encl ML19210C1331979-11-0707 November 1979 Confirms That Snupps FSAR Should Be Considered Tendered by Util.Snupps FSAR Will Be Incorporated by Formal Amend to License Application ML19211A4241979-11-0101 November 1979 Submits Generic Response to IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. Seismic Analysis Input Info Conforms to Actual as-built Configuration of safety-related Sys ML19254F2061979-11-0101 November 1979 Requests NRC Concurrence on Usage of ASME Section III Code Case N-240, Hydrostatic Testing of Open-Ended Piping, Section Iii,Div 1. ML19253C5961979-10-26026 October 1979 Responds to IE Bulletin 79-23 Re Potential Failure of Emergency Diesel Generator Field Exciter Transformer.Problem Not Applicable to Snupps Diesel Generators ML20125B3041979-10-18018 October 1979 Forwards Request for Addl Info Re QA Aspects of Fire Protection Sys for Snupps Portion of Facilities ML19253C7981979-10-15015 October 1979 Forwards Interim Deficiency Rept Re Qualification of Control Sys.Supplemental Rept in Approx Three Months 1998-02-12
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18037A3791982-05-27027 May 1982 Forwards Annual Financial Repts 1981 for Niagara Mohawk Power Corp,Ny State Electric & Gas Corp,Lilco,Rochester Gas & Electric Corp & Central Hudson Gas & Electric Corp ML17258A1861981-09-22022 September 1981 Forwards Endorsements 73 & 74 to ANI Policy NF-170 ML20003G2671981-04-22022 April 1981 Forwards Second Draft Safety Evaluation of Snupps 10.1,10.2, 10.3,10.4.1 & 10.4.4, Steam & Power Conversion Sys. ML17258A7951981-02-10010 February 1981 Forwards Summary of Actual Cash Flow for 1980,projected Cash Flow for 1981 & Financial Statement for 3 & 12 Months Ended 801231.Info Supports Util Guarantee to Pay Retrospective Premiums Required by Secondary Financial Protection Sys ML17258A7371981-01-14014 January 1981 Forwards Public Version of Upgraded Evacuation Time Estimates for Facilities in Response to NRC 801209 Ltr ML17250A7161980-10-29029 October 1980 Informs of Changes in Organizational Structure Per FE Drake Retirement as Board Chairman & Chief Executive Officer. Corporate Organization Chart,Effective 801001,encl ML19338C4601980-08-11011 August 1980 Requests Info Re Basis for Denial of Certificate for Facility ML19320A5831980-06-16016 June 1980 Responds to IE Bulletin 80-09, Hydramotor Actuator Deficiencies. Two safety-related Uses of Itt General Controls Models AH-90 & NH-90 Series Hydramotor Actuators Have Been Identified.Itt Is Testing Actuators ML17250A3321980-06-12012 June 1980 Comments on 800506 Presentation to NRC Commissioners Re Status of SEP & Description of Difficulty as Lack of Aggression by Licensees.Nrc Has Not Provided Guidelines. Issues W/Higher Priorities Have Arisen ML19323H2791980-06-0606 June 1980 Responds to IE Bulletin 80-05 Re Vacuum Condition Resulting in Damage to Chemical Vol Control Sys Holdup Tanks.Tank Damage Due to Vacuum Conditions Precluded by Design Provisions or Suitable Vent Connections ML19318C1861980-06-0202 June 1980 Responds to IE Bulletin 79-28, Possible Malfunction of Namco Model EA180 Limit Switches at Elevated Temps. Top Cover Gaskets on Switches W/Applicable Date Codes Will Be Replaced on Valves Listed in Encl ML17249A9111980-04-30030 April 1980 Forwards Response to IE Bulletin 80-04. Analysis of PWR Main Steam Line Break W/Continued Feedwater Addition. Auxiliary Feedwater Flow Becomes Dominant Factor in Determining Duration & Magnitude of Steam Flow Transient ML20003H9601980-04-18018 April 1980 Advises That Licensee Considers 800320 Deficiency Rept Final.No Addl Action Planned Unless Required by New Info ML19305D5111980-03-20020 March 1980 Discusses Undetectable Failure in Engineered Safety Features Actuation Sys.Utils Are Investigating Hardware Changes That May Preclude Further Testing,Provided That Changes Are Feasible.Otherwise,Tests Will Continue ML19305C3751980-03-20020 March 1980 Informs That C-E 791026 Amend to Rept on IE Bulletin 78-12, Atypical Weld Matl in Reactor Pressure Vessel Welds, Should Be Considered Part of Util Bulletin Response ML19305C3721980-03-20020 March 1980 Informs That Snupps Utils Are Investigating Hardware Changes to Preclude Need for Tests to Correct Deficiency in Engineered Safety Features Actuation Sys.Tests Will Be Made Part of Plant Procedures If Changes Are Not Feasible ML19309G0821980-03-20020 March 1980 Responds to IE Bulletin 80-03 Re Charcoal Tray Adsorber Cells.Design & Manufacturer of Adsorber Cells Planned to Be Used Are Different than Type Described in Bulletin ML19323D2451980-03-20020 March 1980 Responds to IE Bulletins 78-12,12A & 12B, Atypical Weld Matl in Reactor Pressure Vessel Welds. Util 790629 Ltr & C-E 791026 Ltr to NRC Constitutes Response to Bulletin ML19309D3451980-03-0606 March 1980 Responds to IE Bulletin 79-28.Investigation Re Planned Use of Namco EA180 Switches,Identification in Snupps Design & Development of Plans for Corrective Action Requires More Time than Anticipated.Will Forward Response Later ML19323C4271980-03-0606 March 1980 Responds to IE Bulletin 79-28, Possible Malfunction of Namco Model EA180 Limit Switches at Elevated Temps. Identification of Switches Has Required More Time than Anticipated.Util Will Respond as Soon as Possible ML19294B1451980-02-22022 February 1980 Disagrees W/Nrc Plans Re ATWS Issue.New Plans May Not Serve Best Interests of Public Health & Safety.Nrc Should Not Impose Requirements Before Thorough Review of Mass of Technical Info Supplied Last Year ML19296C5711980-02-19019 February 1980 Responds to NRC 800204 Ltr Received 800213 Re NRC 800208 Meeting W/Snupps Representatives to Discuss Snupps QA Program.Requests NRC Reschedule Meeting & Provide State Public Svc Commission Sufficient Time to Participate ML19294B8661980-02-14014 February 1980 Forwards Ny State Board on Electric Generation Siting & Environ 800211 Opinion & Order Vacating Previously Granted Certificate.Denies Application & Closes Proceeding ML19309B5491980-02-0505 February 1980 Forwards Supplemental Rept on Potential Deficiency Re Qualification of Control Sys Discussed in Util 790928 Ltr.No Unresolved Safety Concerns Re Pressure Controllers & Main Steam Line Atmospheric Relief Valve ML19260D5621980-02-0505 February 1980 Forwards Supplemental Deficiency Rept Re Qualification of Control Sys ML19296D9961980-02-0101 February 1980 Responds to IE Bulletin 79-28.Investigation Re Planned Use of Namco EA180 Switches for Snupps Facilities Not Complete.Investigation Results & Corrective Actions Will Be Submitted in 3-4 Wks ML19294B1891980-01-30030 January 1980 Notifies That Ny State Board on Electric Generation Siting & Environ Voted on 800123 to Rescind Approval of Plant Const & Operation.No Decision Can Be Made Re Continuation of NRC Proceedings Until Util Has Received Formal Opinion ML19260E0561980-01-30030 January 1980 Notifies of Ny State Board on Electric Generation Siting & Environ 800123 Decision to Rescind Prior Approval of Const & Operation of Facility.No Date Set for Formal Opinion. Certificate of Svc Encl ML19296B9801980-01-18018 January 1980 Forwards RO Pohl Testimony on Radon Emissions from U Mill Tailings Piles ML19308C9981980-01-18018 January 1980 Responds to IE Bulletin 79-25.Westinghouse Bfd/Nbfd Relays Are Not Included in safety-related Portions of Design ML19211D2751980-01-14014 January 1980 Discusses NRC Delay in Review of FSAR & OL Application. Review Schedule Should Be Established Promptly ML19257B8871980-01-0404 January 1980 Responds to IE Bulletin 79-25, Failures of Westinghouse Bfd Relays in Safety-Related Sys. No Such Relays Have Been Identified.Will Advise Further in Two Wks ML19296D7051980-01-0303 January 1980 Responds to IE Bulletin 79-02,Revision 1.Initial 790705 Response Resolves NRC Concerns Re Use of Concrete Expansion Anchor Bolts for Pipe Support Base Plates.Util Does Not Use Expansion Anchors in Concrete or Structural Steel Members ML19262C4241980-01-0303 January 1980 Responds to IE Bulletin 79-02,Revision 2, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts. Expansion Anchors in Concrete Block Walls Not Used.Util 790705 Response Need Not Be Modified or Amended ML19291C3061980-01-0303 January 1980 Responds to IE Bulletin 79-02,Revision 2.Initial Response Satisfies Requirements of Revision 1.Facility Does Not Use Concrete Expansion Anchor Bolts to Support Seismic Category I Piping ML17249A4551980-01-0202 January 1980 Supplements 791212 Ltr Listing Six Suits Against Util. Seventh,Ew Garrett Vs Util,Received ML19262B5671979-12-20020 December 1979 Responds to NRC 791018 Request for Addl Info Re Snupps Fire Protection Sys.Detailed Responses to Requests Will Be Included in FSAR Revision.Clarification of Sys Description Will Show Design in Compliance W/Nrc Requirements ML19262B5831979-12-14014 December 1979 Discusses Potential Deficiency,Per 791116 Telcon to Nrc. Westinghouse Review Reveals That Dropped Rod Safety Analysis Deficiency May Affect Four Addl Loop Plants.Further Info Will Be Provided by FSAR Revision ML19253C9361979-12-0606 December 1979 Notifies of Corrective Action for Potential Deficiency Re Engineered Safety Features Actuation Sys.Test Sequence to Detect Failure Will Be Incorporated Into Appropriate Procedures ML19260C9481979-11-29029 November 1979 Forwards Final Deficiency Rept Re Gulf & Western Preassembly Formations ML19210C1331979-11-0707 November 1979 Confirms That Snupps FSAR Should Be Considered Tendered by Util.Snupps FSAR Will Be Incorporated by Formal Amend to License Application ML19305B9591979-11-0707 November 1979 Discusses Undetectable Failure in Engineered Safety Features Actuation Sys.Failure of P-4 Permissive Circuit in Both Redundant Protection Trains Could Result in Failure of Sys to Automatically Initiate Protective Function.Details Encl ML19254F2061979-11-0101 November 1979 Requests NRC Concurrence on Usage of ASME Section III Code Case N-240, Hydrostatic Testing of Open-Ended Piping, Section Iii,Div 1. ML19211A4241979-11-0101 November 1979 Submits Generic Response to IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. Seismic Analysis Input Info Conforms to Actual as-built Configuration of safety-related Sys ML19253C5961979-10-26026 October 1979 Responds to IE Bulletin 79-23 Re Potential Failure of Emergency Diesel Generator Field Exciter Transformer.Problem Not Applicable to Snupps Diesel Generators ML19253C7981979-10-15015 October 1979 Forwards Interim Deficiency Rept Re Qualification of Control Sys.Supplemental Rept in Approx Three Months ML17249A1791979-10-0808 October 1979 Responds to 790808 Ltr Re Adequacy of Station Electric Distribution Sys Voltages.Submits Sys Model & Acceptance Criteria for Use W/Proprietary Code PTI-PSS/E to Verify Offsite Power Capability.Final Rept Submitted in 60 Days ML19268C0321979-10-0505 October 1979 Responds to IE Bulletin 79-03 Followup Rept.Data Developed on Generic Basis & Considered Applicable to All Snupps Units.Fabrication & Installation of Youngstown Pipe Spools Will Proceed W/All Matl Analyzed Prior to Use ML19209C2201979-10-0202 October 1979 Forwards Snupps FSAR to Be Incorporated Into Applications for OLs ML19250A6451979-09-28028 September 1979 Notifies That Licensee Informed NRC on 790830 of Potential Deficiency Re Qualification of Control Sys Which Was Later Subj of IE Info Notice 79-22.Suppl Rept Will Be Issued in About 90 Days 1982-05-27
[Table view] Category:LEGAL/LAW FIRM TO NRC
MONTHYEARML18037A3791982-05-27027 May 1982 Forwards Annual Financial Repts 1981 for Niagara Mohawk Power Corp,Ny State Electric & Gas Corp,Lilco,Rochester Gas & Electric Corp & Central Hudson Gas & Electric Corp ML17258A1861981-09-22022 September 1981 Forwards Endorsements 73 & 74 to ANI Policy NF-170 ML19294B8661980-02-14014 February 1980 Forwards Ny State Board on Electric Generation Siting & Environ 800211 Opinion & Order Vacating Previously Granted Certificate.Denies Application & Closes Proceeding ML19260E0561980-01-30030 January 1980 Notifies of Ny State Board on Electric Generation Siting & Environ 800123 Decision to Rescind Prior Approval of Const & Operation of Facility.No Date Set for Formal Opinion. Certificate of Svc Encl ML19294B1891980-01-30030 January 1980 Notifies That Ny State Board on Electric Generation Siting & Environ Voted on 800123 to Rescind Approval of Plant Const & Operation.No Decision Can Be Made Re Continuation of NRC Proceedings Until Util Has Received Formal Opinion ML17249A4551980-01-0202 January 1980 Supplements 791212 Ltr Listing Six Suits Against Util. Seventh,Ew Garrett Vs Util,Received ML19225B2471979-07-18018 July 1979 Requests Substitution of Hh Voigt for Ae Upton on NRC 790713 Distribution List ML20136B1041979-06-0505 June 1979 Notifies of Typographical Errors in Licensee Joint Motion for Summary Disposition of Radon Issues.Certificate of Svc Encl ML19256A3821978-12-15015 December 1978 Forwards Order Defining Scope of Rehearing on Public Need Dtd 781205 by State of Ny Board on Electric Generation Siting & Environ.Provides That Record Developed in State Hearings Will Be Basis for Determining Need for Power ML20062G1881978-12-12012 December 1978 Requests That Petition for Review,Timely Filed on 781207 But Mistakenly W/Wrong Div of Nrc,Be Considered as Properly Filed ML20062G1731978-12-0707 December 1978 Forwards Petition for Review of Decision ALAB-507 1982-05-27
[Table view] |
Text
. . .
LEBO EU F, L AM B, LEISY & M AC RAE 1333 NEW HAMPSHIRC AVENUC, N.W.
WAS HIN GTo N, D. C . 2 0 0 36 T C L C PMO se t 808 4877900 Casks Acontse LEON A. A L L E N. J a. CAMERON F. MAC m AC 8 Lgew m.wA3MaNGTON.B.C maseOALL J. LaSOCUF.Ja. i O2 8 -18 ? S JOSCPM C. B AC M E LO C N.;K CAMEmON F . Mac m A C. IK 4 ERNCST S.SALLANO.Ja. Otm AmD A. M AMCm fatta:A4 0 4 % MOR ACC 4. LAMS i$34 1977 O. S. ptTCm simOCN e SMCILA M.MAmSMALL ADatAN C.LElev aest-lete OCOFrav O.C.sEST J AM ES 0. Me t LROY 'ELEC O
O Avi D p. SeC R S J AM E S p. Mc o m AN C m V, J a.* a TAVLOm 4.enlGQS eMILip PALMC A MCQ UlO AN 208**S7*7948 4 AO gmOADeAv CMAmLCS N. Sum 0Em C. CLLSwonTM McMECN.23 NEW TOmn,N.Y.lOOC4 TMOM AS C. Suma t wlLLIAM Q mom mlSON
- WIL LI AM A.CamNAMAN* MamvCY A. N AptCm TELE PMONC 218 a 8 9 3* 1100 JOHN 5.CMASC J A M E S O'M A L L E Y. J a, a CABLE AOOmE SS NOGCm O.FCLDMAN's J. MIC HAE L paalSM CVGE NC m. FIDELL
- a LggesN. htw FOmsi JCMN C. mlCMamOSON a JACOs FasEDLANDER weL LIA M w. RO S E N G LATT TELEE 433466 Gtmano GionDA NO JOMN A.mVOY --
CONa LD J. Om CEN C PATalCR J. SCOGN AMIG LIO JAMES A.GmCEm.E s' M AROLD M. S EIOCL 47 SEmaELtv SOuang JOMN L.onOSE e M A LCTON Q.SRINNEm DOUG L A S w JOSCpH S. STRAUSS LONDON wlE SOS. ENGLAND Cant o. MO maw ELMA~CS S AM u c L TELEPMONE Ol* A93*F331 MICH AE L IOvC Na0 CUGE N E M. S ua oC ". J E 's
- 5. TMOMAS Janua*~J 30, 1980 TELEA423685 JAMES F. JOMN SON,4N LE ONAND M.TRO STEN *4 RON ALD O. JONES Mammy M. vosoT 's sA MES A. L APC NN M.mlCMAmO WACHTEL GRANT S. LCwis GCmAm0 p. wAT SO N RIMSA w.LovCJOY THOM AS A.2tEmm '
- mcsiOE NT PANTNcm3 wASHINoTON OF FIC C 3 eN' . s
- aCSiocNT pamTwenS LONoON OFFiCr
'/, y ',
y '\
e AowTTCo TO TMC oiSTalCT OF CO Lv M ei A sam
'k so -q:,;M ..~ 7 } '
-BY HAND ,N' 7 1. ..
Alan S. Rosenthal, Esq.
3 A-O effp[e3 -
\' #
Chairman, Atomic Safety and ,
(;hf <
Licensing Appeal Board A j
U.S. Nuclear Regulatory x Commission M Washington, D.C. 20555 Re: Rochester Gas and Electric Corporation, et al.
(Sterling Power Project, Nuclear Unit No71T-
Dear Mr. Rosenthal:
On January 23, 1980, the New York State Board on Electric Generation Siting and the Environment for the Sterling Power Project, Nuclear Unit No. 1, met in open session and voted 4-1 to rescind its prior approval of construction and operation of the Sterling nuclear plant.
The Siting Board announced that it would render a formal opinion, but no definite date was set for its issuance.
Until Rochester Gas and Electric Corporation and the co-owners of Sterling have received the formal opinion and have had an opportunity to review it, no final decision
/
/
4 h,
BDUp2;oSOlf.
Alan S. Rosenthal, Esq.
January 30, 1980 Page 2 on the continuation of pending proceedings before the Nuclear Regulatory Commission can be made. When a decision has been made, you will be notified as soon as possible.
Very truly yours, cc: Michael C. Farrar, Esq.
Richard S. Salzman, Esq.
Dr. John H. Buck Dr. W. Reed Johnson
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING APPEA.' BOARD In the Matter of )
)
ROCHESTER GAS AND ELECTRIC ) Docket No. STN 50-485 CORPORATION , et al. )
(Sterling Power Project, Nuclear )
Unit No. 1) )
CERTIFICATE OF SERVICE I hereby certify that I have served, this 30th day of January, 1980, a copy of the foregoing letter, by first-class mail, postage prepaid, and properly addressed to the following:
Ms. Sharon Morey Stephen Schinki, Esq.
Ecology Action Office of the Executive P. O. Box 94 Legal Director Oswego, New York 13126 U.S. Nuclear Regulatory Commission Jay Silberg, Esq. Washington, D.C. 20555 Shaw, Pittman, Potts &
Trowbridge Troy B. Conner, Jr., Esq.
1800 M Street, N.W. Conner, Moore & Corber Washington, D.C. 20036 1747 Pennsylvania Avenue, N.W.
Washington, D.C. 20006 Mr. Chauncey Kepford 433 Orlando Avenue State College, Pennsyl/ania 16801
Mr. David Caccia Bernard Bordenick, Esq.
R. D. #2 Office of the Executive Box 70-A Legal Director Sewell, New Jersey 08080 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Y
Michael F. McBride
!!L Attorney for Rochester Gas and Electric Corp., et al.