Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20202D48612 February 1998Ack Receipt of & Check in Amount of $55,000 in Payment for Civil Penalty Proposed by NRC in . Corrective Actions Will Be Examined During Future Insps
IR 05000485/19960245 March 1997Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-485/96-24Operability Determination
IR 05000485/198507117 June 1986Ack Receipt of 851204 & s Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-485/85-71
ML18037A37927 May 1982Forwards Annual Financial Repts 1981 for Niagara Mohawk Power Corp,Ny State Electric & Gas Corp,Lilco,Rochester Gas & Electric Corp & Central Hudson Gas & Electric Corp
ML17258A18622 September 1981Forwards Endorsements 73 & 74 to ANI Policy NF-170
ML20003G26722 April 1981Forwards Second Draft Safety Evaluation of Snupps 10.1,10.2, 10.3,10.4.1 & 10.4.4, Steam & Power Conversion Sys.Safe Shutdown
ML17258A79510 February 1981Forwards Summary of Actual Cash Flow for 1980,projected Cash Flow for 1981 & Financial Statement for 3 & 12 Months Ended 801231.Info Supports Util Guarantee to Pay Retrospective Premiums Required by Secondary Financial Protection Sys
ML17258A73714 January 1981Forwards Public Version of Upgraded Evacuation Time Estimates for Facilities in Response to NRC 801209 Ltr
ML17250A71629 October 1980Informs of Changes in Organizational Structure Per FE Drake Retirement as Board Chairman & Chief Executive Officer. Corporate Organization Chart,Effective 801001,encl
ML19338C46011 August 1980Requests Info Re Basis for Denial of Certificate for Facility
ML19320A58316 June 1980Responds to IE Bulletin 80-09, Hydramotor Actuator Deficiencies. Two safety-related Uses of Itt General Controls Models AH-90 & NH-90 Series Hydramotor Actuators Have Been Identified.Itt Is Testing Actuators
ML17250A33212 June 1980Comments on 800506 Presentation to NRC Commissioners Re Status of SEP & Description of Difficulty as Lack of Aggression by Licensees.Nrc Has Not Provided Guidelines. Issues W/Higher Priorities Have ArisenSafe Shutdown
ML19323H2796 June 1980Responds to IE Bulletin 80-05 Re Vacuum Condition Resulting in Damage to Chemical Vol Control Sys Holdup Tanks.Tank Damage Due to Vacuum Conditions Precluded by Design Provisions or Suitable Vent Connections
ML19318C1862 June 1980Responds to IE Bulletin 79-28, Possible Malfunction of Namco Model EA180 Limit Switches at Elevated Temps. Top Cover Gaskets on Switches W/Applicable Date Codes Will Be Replaced on Valves Listed in Encl
ML17249A91130 April 1980Forwards Response to IE Bulletin 80-04. Analysis of PWR Main Steam Line Break W/Continued Feedwater Addition. Auxiliary Feedwater Flow Becomes Dominant Factor in Determining Duration & Magnitude of Steam Flow TransientSafe Shutdown
Boric Acid
Shutdown Margin
ML20003H96018 April 1980Advises That Licensee Considers 800320 Deficiency Rept Final.No Addl Action Planned Unless Required by New Info
ML19309G08220 March 1980Responds to IE Bulletin 80-03 Re Charcoal Tray Adsorber Cells.Design & Manufacturer of Adsorber Cells Planned to Be Used Are Different than Type Described in Bulletin
ML19305C37220 March 1980Informs That Snupps Utils Are Investigating Hardware Changes to Preclude Need for Tests to Correct Deficiency in Engineered Safety Features Actuation Sys.Tests Will Be Made Part of Plant Procedures If Changes Are Not Feasible
ML19305D51120 March 1980Discusses Undetectable Failure in Engineered Safety Features Actuation Sys.Utils Are Investigating Hardware Changes That May Preclude Further Testing,Provided That Changes Are Feasible.Otherwise,Tests Will Continue
ML19305C37520 March 1980Informs That C-E 791026 Amend to Rept on IE Bulletin 78-12, Atypical Weld Matl in Reactor Pressure Vessel Welds, Should Be Considered Part of Util Bulletin Response
ML19323D24520 March 1980Responds to IE Bulletins 78-12,12A & 12B, Atypical Weld Matl in Reactor Pressure Vessel Welds. Util 790629 Ltr & C-E 791026 Ltr to NRC Constitutes Response to Bulletin
ML19323C4276 March 1980Responds to IE Bulletin 79-28, Possible Malfunction of Namco Model EA180 Limit Switches at Elevated Temps. Identification of Switches Has Required More Time than Anticipated.Util Will Respond as Soon as Possible
ML19309D3456 March 1980Responds to IE Bulletin 79-28.Investigation Re Planned Use of Namco EA180 Switches,Identification in Snupps Design & Development of Plans for Corrective Action Requires More Time than Anticipated.Will Forward Response Later
ML19294B14522 February 1980Disagrees W/Nrc Plans Re ATWS Issue.New Plans May Not Serve Best Interests of Public Health & Safety.Nrc Should Not Impose Requirements Before Thorough Review of Mass of Technical Info Supplied Last Year
ML19296C57119 February 1980Responds to NRC 800204 Ltr Received 800213 Re NRC 800208 Meeting W/Snupps Representatives to Discuss Snupps QA Program.Requests NRC Reschedule Meeting & Provide State Public Svc Commission Sufficient Time to Participate
ML19294B86614 February 1980Forwards Ny State Board on Electric Generation Siting & Environ 800211 Opinion & Order Vacating Previously Granted Certificate.Denies Application & Closes Proceeding
ML19260D5625 February 1980Forwards Supplemental Deficiency Rept Re Qualification of Control Sys
ML19309B5495 February 1980Forwards Supplemental Rept on Potential Deficiency Re Qualification of Control Sys Discussed in Util 790928 Ltr.No Unresolved Safety Concerns Re Pressure Controllers & Main Steam Line Atmospheric Relief Valve
ML19296D9961 February 1980Responds to IE Bulletin 79-28.Investigation Re Planned Use of Namco EA180 Switches for Snupps Facilities Not Complete.Investigation Results & Corrective Actions Will Be Submitted in 3-4 Wks
ML19294B18930 January 1980Notifies That Ny State Board on Electric Generation Siting & Environ Voted on 800123 to Rescind Approval of Plant Const & Operation.No Decision Can Be Made Re Continuation of NRC Proceedings Until Util Has Received Formal Opinion
ML19260E05630 January 1980Notifies of Ny State Board on Electric Generation Siting & Environ 800123 Decision to Rescind Prior Approval of Const & Operation of Facility.No Date Set for Formal Opinion. Certificate of Svc Encl
ML19296B98018 January 1980Forwards RO Pohl Testimony on Radon Emissions from U Mill Tailings Piles
ML19308C99818 January 1980Responds to IE Bulletin 79-25.Westinghouse Bfd/Nbfd Relays Are Not Included in safety-related Portions of Design
ML19211D27514 January 1980Discusses NRC Delay in Review of FSAR & OL Application. Review Schedule Should Be Established Promptly
ML19257B8874 January 1980Responds to IE Bulletin 79-25, Failures of Westinghouse Bfd Relays in Safety-Related Sys. No Such Relays Have Been Identified.Will Advise Further in Two Wks
ML19291C3063 January 1980Responds to IE Bulletin 79-02,Revision 2.Initial Response Satisfies Requirements of Revision 1.Facility Does Not Use Concrete Expansion Anchor Bolts to Support Seismic Category I Piping
ML19296D7053 January 1980Responds to IE Bulletin 79-02,Revision 1.Initial 790705 Response Resolves NRC Concerns Re Use of Concrete Expansion Anchor Bolts for Pipe Support Base Plates.Util Does Not Use Expansion Anchors in Concrete or Structural Steel Members
ML19262C4243 January 1980Responds to IE Bulletin 79-02,Revision 2, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts. Expansion Anchors in Concrete Block Walls Not Used.Util 790705 Response Need Not Be Modified or Amended
ML17249A4552 January 1980Supplements 791212 Ltr Listing Six Suits Against Util. Seventh,Ew Garrett Vs Util,Received
ML19262B56720 December 1979Responds to NRC 791018 Request for Addl Info Re Snupps Fire Protection Sys.Detailed Responses to Requests Will Be Included in FSAR Revision.Clarification of Sys Description Will Show Design in Compliance W/Nrc Requirements
ML19262B58314 December 1979Discusses Potential Deficiency,Per 791116 Telcon to Nrc. Westinghouse Review Reveals That Dropped Rod Safety Analysis Deficiency May Affect Four Addl Loop Plants.Further Info Will Be Provided by FSAR Revision
ML19253C9366 December 1979Notifies of Corrective Action for Potential Deficiency Re Engineered Safety Features Actuation Sys.Test Sequence to Detect Failure Will Be Incorporated Into Appropriate Procedures
ML19260C94829 November 1979Forwards Final Deficiency Rept Re Gulf & Western Preassembly Formations
ML19305B9597 November 1979Discusses Undetectable Failure in Engineered Safety Features Actuation Sys.Failure of P-4 Permissive Circuit in Both Redundant Protection Trains Could Result in Failure of Sys to Automatically Initiate Protective Function.Details Encl
ML19210C1337 November 1979Confirms That Snupps FSAR Should Be Considered Tendered by Util.Snupps FSAR Will Be Incorporated by Formal Amend to License Application
ML19211A4241 November 1979Submits Generic Response to IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. Seismic Analysis Input Info Conforms to Actual as-built Configuration of safety-related Sys
ML19254F2061 November 1979Requests NRC Concurrence on Usage of ASME Section III Code Case N-240, Hydrostatic Testing of Open-Ended Piping, Section Iii,Div 1.Hydrostatic
ML19253C59626 October 1979Responds to IE Bulletin 79-23 Re Potential Failure of Emergency Diesel Generator Field Exciter Transformer.Problem Not Applicable to Snupps Diesel Generators
ML20125B30418 October 1979Forwards Request for Addl Info Re QA Aspects of Fire Protection Sys for Snupps Portion of FacilitiesSafe Shutdown
Fire Protection Program
ML19253C79815 October 1979Forwards Interim Deficiency Rept Re Qualification of Control Sys.Supplemental Rept in Approx Three Months