Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20202D486 | 12 February 1998 | Ack Receipt of & Check in Amount of $55,000 in Payment for Civil Penalty Proposed by NRC in . Corrective Actions Will Be Examined During Future Insps | |
IR 05000485/1996024 | 5 March 1997 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-485/96-24 | Operability Determination |
IR 05000485/1985071 | 17 June 1986 | Ack Receipt of 851204 & s Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-485/85-71 | |
ML18037A379 | 27 May 1982 | Forwards Annual Financial Repts 1981 for Niagara Mohawk Power Corp,Ny State Electric & Gas Corp,Lilco,Rochester Gas & Electric Corp & Central Hudson Gas & Electric Corp | |
ML17258A186 | 22 September 1981 | Forwards Endorsements 73 & 74 to ANI Policy NF-170 | |
ML20003G267 | 22 April 1981 | Forwards Second Draft Safety Evaluation of Snupps 10.1,10.2, 10.3,10.4.1 & 10.4.4, Steam & Power Conversion Sys. | Safe Shutdown |
ML17258A795 | 10 February 1981 | Forwards Summary of Actual Cash Flow for 1980,projected Cash Flow for 1981 & Financial Statement for 3 & 12 Months Ended 801231.Info Supports Util Guarantee to Pay Retrospective Premiums Required by Secondary Financial Protection Sys | |
ML17258A737 | 14 January 1981 | Forwards Public Version of Upgraded Evacuation Time Estimates for Facilities in Response to NRC 801209 Ltr | |
ML17250A716 | 29 October 1980 | Informs of Changes in Organizational Structure Per FE Drake Retirement as Board Chairman & Chief Executive Officer. Corporate Organization Chart,Effective 801001,encl | |
ML19338C460 | 11 August 1980 | Requests Info Re Basis for Denial of Certificate for Facility | |
ML19320A583 | 16 June 1980 | Responds to IE Bulletin 80-09, Hydramotor Actuator Deficiencies. Two safety-related Uses of Itt General Controls Models AH-90 & NH-90 Series Hydramotor Actuators Have Been Identified.Itt Is Testing Actuators | |
ML17250A332 | 12 June 1980 | Comments on 800506 Presentation to NRC Commissioners Re Status of SEP & Description of Difficulty as Lack of Aggression by Licensees.Nrc Has Not Provided Guidelines. Issues W/Higher Priorities Have Arisen | Safe Shutdown |
ML19323H279 | 6 June 1980 | Responds to IE Bulletin 80-05 Re Vacuum Condition Resulting in Damage to Chemical Vol Control Sys Holdup Tanks.Tank Damage Due to Vacuum Conditions Precluded by Design Provisions or Suitable Vent Connections | |
ML19318C186 | 2 June 1980 | Responds to IE Bulletin 79-28, Possible Malfunction of Namco Model EA180 Limit Switches at Elevated Temps. Top Cover Gaskets on Switches W/Applicable Date Codes Will Be Replaced on Valves Listed in Encl | |
ML17249A911 | 30 April 1980 | Forwards Response to IE Bulletin 80-04. Analysis of PWR Main Steam Line Break W/Continued Feedwater Addition. Auxiliary Feedwater Flow Becomes Dominant Factor in Determining Duration & Magnitude of Steam Flow Transient | Safe Shutdown Boric Acid Shutdown Margin |
ML20003H960 | 18 April 1980 | Advises That Licensee Considers 800320 Deficiency Rept Final.No Addl Action Planned Unless Required by New Info | |
ML19309G082 | 20 March 1980 | Responds to IE Bulletin 80-03 Re Charcoal Tray Adsorber Cells.Design & Manufacturer of Adsorber Cells Planned to Be Used Are Different than Type Described in Bulletin | |
ML19305C372 | 20 March 1980 | Informs That Snupps Utils Are Investigating Hardware Changes to Preclude Need for Tests to Correct Deficiency in Engineered Safety Features Actuation Sys.Tests Will Be Made Part of Plant Procedures If Changes Are Not Feasible | |
ML19305D511 | 20 March 1980 | Discusses Undetectable Failure in Engineered Safety Features Actuation Sys.Utils Are Investigating Hardware Changes That May Preclude Further Testing,Provided That Changes Are Feasible.Otherwise,Tests Will Continue | |
ML19305C375 | 20 March 1980 | Informs That C-E 791026 Amend to Rept on IE Bulletin 78-12, Atypical Weld Matl in Reactor Pressure Vessel Welds, Should Be Considered Part of Util Bulletin Response | |
ML19323D245 | 20 March 1980 | Responds to IE Bulletins 78-12,12A & 12B, Atypical Weld Matl in Reactor Pressure Vessel Welds. Util 790629 Ltr & C-E 791026 Ltr to NRC Constitutes Response to Bulletin | |
ML19323C427 | 6 March 1980 | Responds to IE Bulletin 79-28, Possible Malfunction of Namco Model EA180 Limit Switches at Elevated Temps. Identification of Switches Has Required More Time than Anticipated.Util Will Respond as Soon as Possible | |
ML19309D345 | 6 March 1980 | Responds to IE Bulletin 79-28.Investigation Re Planned Use of Namco EA180 Switches,Identification in Snupps Design & Development of Plans for Corrective Action Requires More Time than Anticipated.Will Forward Response Later | |
ML19294B145 | 22 February 1980 | Disagrees W/Nrc Plans Re ATWS Issue.New Plans May Not Serve Best Interests of Public Health & Safety.Nrc Should Not Impose Requirements Before Thorough Review of Mass of Technical Info Supplied Last Year | |
ML19296C571 | 19 February 1980 | Responds to NRC 800204 Ltr Received 800213 Re NRC 800208 Meeting W/Snupps Representatives to Discuss Snupps QA Program.Requests NRC Reschedule Meeting & Provide State Public Svc Commission Sufficient Time to Participate | |
ML19294B866 | 14 February 1980 | Forwards Ny State Board on Electric Generation Siting & Environ 800211 Opinion & Order Vacating Previously Granted Certificate.Denies Application & Closes Proceeding | |
ML19260D562 | 5 February 1980 | Forwards Supplemental Deficiency Rept Re Qualification of Control Sys | |
ML19309B549 | 5 February 1980 | Forwards Supplemental Rept on Potential Deficiency Re Qualification of Control Sys Discussed in Util 790928 Ltr.No Unresolved Safety Concerns Re Pressure Controllers & Main Steam Line Atmospheric Relief Valve | |
ML19296D996 | 1 February 1980 | Responds to IE Bulletin 79-28.Investigation Re Planned Use of Namco EA180 Switches for Snupps Facilities Not Complete.Investigation Results & Corrective Actions Will Be Submitted in 3-4 Wks | |
ML19294B189 | 30 January 1980 | Notifies That Ny State Board on Electric Generation Siting & Environ Voted on 800123 to Rescind Approval of Plant Const & Operation.No Decision Can Be Made Re Continuation of NRC Proceedings Until Util Has Received Formal Opinion | |
ML19260E056 | 30 January 1980 | Notifies of Ny State Board on Electric Generation Siting & Environ 800123 Decision to Rescind Prior Approval of Const & Operation of Facility.No Date Set for Formal Opinion. Certificate of Svc Encl | |
ML19296B980 | 18 January 1980 | Forwards RO Pohl Testimony on Radon Emissions from U Mill Tailings Piles | |
ML19308C998 | 18 January 1980 | Responds to IE Bulletin 79-25.Westinghouse Bfd/Nbfd Relays Are Not Included in safety-related Portions of Design | |
ML19211D275 | 14 January 1980 | Discusses NRC Delay in Review of FSAR & OL Application. Review Schedule Should Be Established Promptly | |
ML19257B887 | 4 January 1980 | Responds to IE Bulletin 79-25, Failures of Westinghouse Bfd Relays in Safety-Related Sys. No Such Relays Have Been Identified.Will Advise Further in Two Wks | |
ML19291C306 | 3 January 1980 | Responds to IE Bulletin 79-02,Revision 2.Initial Response Satisfies Requirements of Revision 1.Facility Does Not Use Concrete Expansion Anchor Bolts to Support Seismic Category I Piping | |
ML19296D705 | 3 January 1980 | Responds to IE Bulletin 79-02,Revision 1.Initial 790705 Response Resolves NRC Concerns Re Use of Concrete Expansion Anchor Bolts for Pipe Support Base Plates.Util Does Not Use Expansion Anchors in Concrete or Structural Steel Members | |
ML19262C424 | 3 January 1980 | Responds to IE Bulletin 79-02,Revision 2, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts. Expansion Anchors in Concrete Block Walls Not Used.Util 790705 Response Need Not Be Modified or Amended | |
ML17249A455 | 2 January 1980 | Supplements 791212 Ltr Listing Six Suits Against Util. Seventh,Ew Garrett Vs Util,Received | |
ML19262B567 | 20 December 1979 | Responds to NRC 791018 Request for Addl Info Re Snupps Fire Protection Sys.Detailed Responses to Requests Will Be Included in FSAR Revision.Clarification of Sys Description Will Show Design in Compliance W/Nrc Requirements | |
ML19262B583 | 14 December 1979 | Discusses Potential Deficiency,Per 791116 Telcon to Nrc. Westinghouse Review Reveals That Dropped Rod Safety Analysis Deficiency May Affect Four Addl Loop Plants.Further Info Will Be Provided by FSAR Revision | |
ML19253C936 | 6 December 1979 | Notifies of Corrective Action for Potential Deficiency Re Engineered Safety Features Actuation Sys.Test Sequence to Detect Failure Will Be Incorporated Into Appropriate Procedures | |
ML19260C948 | 29 November 1979 | Forwards Final Deficiency Rept Re Gulf & Western Preassembly Formations | |
ML19305B959 | 7 November 1979 | Discusses Undetectable Failure in Engineered Safety Features Actuation Sys.Failure of P-4 Permissive Circuit in Both Redundant Protection Trains Could Result in Failure of Sys to Automatically Initiate Protective Function.Details Encl | |
ML19210C133 | 7 November 1979 | Confirms That Snupps FSAR Should Be Considered Tendered by Util.Snupps FSAR Will Be Incorporated by Formal Amend to License Application | |
ML19211A424 | 1 November 1979 | Submits Generic Response to IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. Seismic Analysis Input Info Conforms to Actual as-built Configuration of safety-related Sys | |
ML19254F206 | 1 November 1979 | Requests NRC Concurrence on Usage of ASME Section III Code Case N-240, Hydrostatic Testing of Open-Ended Piping, Section Iii,Div 1. | Hydrostatic |
ML19253C596 | 26 October 1979 | Responds to IE Bulletin 79-23 Re Potential Failure of Emergency Diesel Generator Field Exciter Transformer.Problem Not Applicable to Snupps Diesel Generators | |
ML20125B304 | 18 October 1979 | Forwards Request for Addl Info Re QA Aspects of Fire Protection Sys for Snupps Portion of Facilities | Safe Shutdown Fire Protection Program |
ML19253C798 | 15 October 1979 | Forwards Interim Deficiency Rept Re Qualification of Control Sys.Supplemental Rept in Approx Three Months |