{{#Wiki_filter:Iso rq~/A~ute tavw Cu Iu Q s FLORIDA POWER 5 LIGHT COMPANY AUG 1 6 1886 L-85-315 Dr.3.Nelson Grace Regional Administrator, Region!1 U.S.Nuclear Regulatory
{{#Wiki_filter:Iso rq~/A~ute tavw Cu Iu Q s FLORIDA POWER 5 LIGHT COMPANY AUG 1 6 1886 L-85-315 Dr.3.Nelson Grace Regional Administrator, Region!1 U.S.Nuclear Regulatory Cominission Suite 2900 101 Marietta Street, N.W.Atlanta, Georgia 30323  
Cominission
 
Suite 2900 101 Marietta Street, N.W.Atlanta, Georgia 30323 Dear Dr.Grace: Re: St.Lucie Units 1 and 2 Docket Nos.50-335, 50-389 Ins ection Re ort 335/85-17 and 389/85-17 Florida Power 2 Light Company has reviewed the subject inspection
==Dear Dr.Grace:==
report, and a response is attached.There is no proprietary
Re: St.Lucie Units 1 and 2 Docket Nos.50-335, 50-389 Ins ection Re ort 335/85-17 and 389/85-17 Florida Power 2 Light Company has reviewed the subject inspection report, and a response is attached.There is no proprietary information in the report.Very truly yours, I~~~3.W.Williams, 3r.Group Vice President Nuclear Energy 3W W/SA V:dkw Attachment cc: Harold F.Reis, Esquire8508270069 0335 PDR ADOCP, 05000 6 EOPLE.~SERVING p' f
information
ATTACHMENT Re: St.Lucie Units 1 and 2 Docket iVos.50-335, 50-389 lns ection Re ort 335/85-17<<nd 389/85-17 FINDING 10 CFR 50, Appendix B, Criterion V, as impleinented by section 5.0 of FPRL Topical Quality Assurance Report, requires, in part, that activities affecting quality be prescribed by documented instructions, procedures and drawings and shall be accomplished in accordance with these instructions, procedures and drawings.Contrary to the above, plant modifications were performed on Unit 2 in 1980 per plant change/'modification (PC/M)-015-283 which added redundant over-current devices to electrical distribution systems to comply with iVRC Regulatory Guides 1.63 an'd 1.75.The addition of these devices resulted in some safety-related relays no longer being testable with the unit at power.On 3une 26, 1985, an attempt was made to perform Operating Procedure (OP)2-0000053, Engineered Safeguards Relay Test, for Semi-annual Surveillance.
in the report.Very truly yours, I~~~3.W.Williams, 3r.Group Vice President Nuclear Energy 3W W/SA V:dkw Attachment
The PC/M's did not modify~the procedures to prevent testing of certain relays.This resulted in a plant transient that almost tripped tne reactor.RESPONSE 1.FPL concurs with the finding.2.The reason for the violation was due to an oversight in the review of the applicable PC/i%i.It was not recognized that a change to procedure OP2-0000053 (Engineered Safeguards Relay Test, for semi-annual surveillance) would be required.3.The required change has been made to OP2-0000053.
cc: Harold F.Reis, Esquire8508270069
Additionally, our Engineering Staff has been requested to review the design of the PC/M.0.The imgortafice of a thorough review of PC/M has been stressed to the appropriate personnel.
0335 PDR ADOCP, 05000 6 EOPLE.~SERVING p'  
The procedure update method is being expanded to ensure applicable department reviews are complete.This is expected to be completed by October 1, 1985, which is in time for the PSL Unit 1 Refueling Outage.5.Full compliance will be achieved on October 1, 1985.
f  
i}}
ATTACHMENT
Re: St.Lucie Units 1 and 2 Docket iVos.50-335, 50-389 lns ection Re ort 335/85-17<<nd 389/85-17 FINDING 10 CFR 50, Appendix B, Criterion V, as impleinented
by section 5.0 of FPRL Topical Quality Assurance Report, requires, in part, that activities
affecting quality be prescribed
by documented
instructions, procedures
and drawings and shall be accomplished
in accordance
with these instructions, procedures
and drawings.Contrary to the above, plant modifications
were performed on Unit 2 in 1980 per plant change/'modification (PC/M)-015-283
which added redundant over-current
devices to electrical
distribution
systems to comply with iVRC Regulatory
Guides 1.63 an'd 1.75.The addition of these devices resulted in some safety-related
relays no longer being testable with the unit at power.On 3une 26, 1985, an attempt was made to perform Operating Procedure (OP)2-0000053, Engineered
Safeguards
Relay Test, for Semi-annual
Surveillance.
The PC/M's did not modify~the procedures
to prevent testing of certain relays.This resulted in a plant transient that almost tripped tne reactor.RESPONSE 1.FPL concurs with the finding.2.The reason for the violation was due to an oversight in the review of the applicable
PC/i%i.It was not recognized
that a change to procedure OP2-0000053 (Engineered
Safeguards
Relay Test, for semi-annual surveillance)
would be required.3.The required change has been made to OP2-0000053.
Additionally, our Engineering
Staff has been requested to review the design of the PC/M.0.The imgortafice
of a thorough review of PC/M has been stressed to the appropriate
personnel.
The procedure update method is being expanded to ensure applicable
department
reviews are complete.This is expected to be completed by October 1, 1985, which is in time for the PSL Unit 1 Refueling Outage.5.Full compliance
will be achieved on October 1, 1985.  
i
}}

Revision as of 10:42, 17 August 2019

Responds to Violations Noted in Insp Repts 50-335/85-17 & 50-389/85-17.Corrective Actions:Operating Procedure OP2-0400053 Revised & Engineering Staff Requested to Review Design of Plant Change/Mod-015-283
ML17308A147
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 08/16/1985
From: Williams J
FLORIDA POWER & LIGHT CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
L-85-315, NUDOCS 8508270069
Download: ML17308A147 (4)


Text

Iso rq~/A~ute tavw Cu Iu Q s FLORIDA POWER 5 LIGHT COMPANY AUG 1 6 1886 L-85-315 Dr.3.Nelson Grace Regional Administrator, Region!1 U.S.Nuclear Regulatory Cominission Suite 2900 101 Marietta Street, N.W.Atlanta, Georgia 30323

Dear Dr.Grace:

Re: St.Lucie Units 1 and 2 Docket Nos.50-335, 50-389 Ins ection Re ort 335/85-17 and 389/85-17 Florida Power 2 Light Company has reviewed the subject inspection report, and a response is attached.There is no proprietary information in the report.Very truly yours, I~~~3.W.Williams, 3r.Group Vice President Nuclear Energy 3W W/SA V:dkw Attachment cc: Harold F.Reis, Esquire8508270069 0335 PDR ADOCP, 05000 6 EOPLE.~SERVING p' f

ATTACHMENT Re: St.Lucie Units 1 and 2 Docket iVos.50-335, 50-389 lns ection Re ort 335/85-17<<nd 389/85-17 FINDING 10 CFR 50, Appendix B, Criterion V, as impleinented by section 5.0 of FPRL Topical Quality Assurance Report, requires, in part, that activities affecting quality be prescribed by documented instructions, procedures and drawings and shall be accomplished in accordance with these instructions, procedures and drawings.Contrary to the above, plant modifications were performed on Unit 2 in 1980 per plant change/'modification (PC/M)-015-283 which added redundant over-current devices to electrical distribution systems to comply with iVRC Regulatory Guides 1.63 an'd 1.75.The addition of these devices resulted in some safety-related relays no longer being testable with the unit at power.On 3une 26, 1985, an attempt was made to perform Operating Procedure (OP)2-0000053, Engineered Safeguards Relay Test, for Semi-annual Surveillance.

The PC/M's did not modify~the procedures to prevent testing of certain relays.This resulted in a plant transient that almost tripped tne reactor.RESPONSE 1.FPL concurs with the finding.2.The reason for the violation was due to an oversight in the review of the applicable PC/i%i.It was not recognized that a change to procedure OP2-0000053 (Engineered Safeguards Relay Test, for semi-annual surveillance) would be required.3.The required change has been made to OP2-0000053.

Additionally, our Engineering Staff has been requested to review the design of the PC/M.0.The imgortafice of a thorough review of PC/M has been stressed to the appropriate personnel.

The procedure update method is being expanded to ensure applicable department reviews are complete.This is expected to be completed by October 1, 1985, which is in time for the PSL Unit 1 Refueling Outage.5.Full compliance will be achieved on October 1, 1985.