DCL-04-003, December 2003 Monthly Operating Report for Diablo Canyon: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 01/15/2004
| issue date = 01/15/2004
| title = December 2003 Monthly Operating Report for Diablo Canyon
| title = December 2003 Monthly Operating Report for Diablo Canyon
| author name = Becker J R
| author name = Becker J
| author affiliation = Pacific Gas & Electric Co
| author affiliation = Pacific Gas & Electric Co
| addressee name =  
| addressee name =  

Revision as of 22:08, 13 July 2019

December 2003 Monthly Operating Report for Diablo Canyon
ML060890092
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/15/2004
From: Becker J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-04-003, FOIA/PA-2006-0139
Download: ML060890092 (6)


Text

3-21-06; 8:53AM;DCPP FIFTH FL. EAST# 2/ 7 t. ' .;- ,.Pacific Gas and Electic Company James L Becker Vite President-Diablo Canyon Operations and Station Director Diablo Canyon Power Plant PO. Box 56 Avita Beach, CA 93424 805.545.3462 Fax: 805.545.4234 January 15, 2004 PG&E Letter DCL-04-003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units I and 2 Monthly Operating Report for December 2003 Dear Commissioners and Staff: Enclosed is the Monthly Operating Report for Diablo Canyon Power Plant, Units 1 and 2, for December 2003. This report is submitted in accordance with Technical Specification 5.6.4 and NRC Generic Letter 97-02.Sincerely, C_.-.,-----.?C- -James R. Becker smg/1 713/R0253694 Enclosures cc/enc: Paul R. Fox, American Nuclear Insurers Robert D. Glynn, Jr.Bruce S. Mallett, NRC Regional Administrator, Region IV David L. Prouix, NRC Senior Resident Inspector Gregory M. Rueger Girija S. Shukla, NRC Project Manager INPO Record Center I.kn A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek
055453 4 159 # 3/ 7 3-21-06; 8
53AM;DCPP FIFTH FL. EAST Enclosure I PG&E Letter DCL-04-003 DECEMBER 2003, OPERATION SUMMARIES DIABLO CANYON POWER PLANT UNITS 1 AND 2 Summary of Unit I Operation Unit I began the month in Mode I (Power Operation) at approximately 100 percent power. On December 10, 2003, operators commenced a planned ramp to below 25 percent power in response to a storm forecast predicting high ocean swells. After the high swell warning had been terminated, on December 11, 2003, operators commenced ramping to approximately 50 percent power and remained at that power level to inspect the condenser for saltwater leakage. After these inspections were completed, operators commenced ramping to full power and reached approximately 100 percent power on December 12, 2003. On December 22, 2003, at I 1 16 PST, a 6.5M earthquake occurred approximately 50 km NNW from the plant, resulting in an Unusual Event (reference Special Report 2003-04, dated January 5, 2004, DCL-03-184).

The units remained at 100 percent power during the seismic event Summary of Unit 2 Operation Unit 2 began the month in Mode 1 at approximately 100 percent power. On December 10, 2003, operators commenced a planned ramp to below 25 percent power in response to a storm forecast predicting high ocean swells. After the swell warning had been terminated, on December 11, 2003, operators commenced ramping to full power and reached approximately 1 00 percent later that day. With the exception of this planned power change, Unit 2 remained at approximately 100 percent power in December 2003.Actuations of Pressurizer Safety or Power-Operated Relief Valves There were no challenges to the pressurizer power-operated relief valves, pressurizer safety valves, or steam generator safety valves.

SP=3-21-06; e:53AM;DCPP FtFTH FL. EAST Enclosure 2 PG&E Letter DCL-04-003 OPERATING DATA REPORT DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:

50-275 Diablo Canyon Unit 1 110212004 S. Guess (805) 545-4692 REPORT MONTH: December 2003 1. 1 Design Electrical Rating (Mwe -Net): I 1,103 2. Maximum Dependable Capacity (Mwe -Net): 1,087_ _ .This Month I YTD I Cumulative

3. Number of Hours Reactor Critical:

744.0 8,760.0 142,986.8 4. Number of Hours Generator On-Line: 744.0 8,760.0 141,469.6 5. Unit Reserve Shutdown Hours: 0.0 0.0 0.0 6. Net Electrical Energy Generated (MWH): 781,249 9,585,431 146,791,730 I I a 5/ 7 3-21-06; 8:53AM; DCPP FIFTH FL. EAST Enclosure 2 PG&E Letter DCL-04-003 UNIT SHUTDOWNS DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:

50-275 Diablo Canyon Unit 1 1/02/2004 S. Guess (805) 545-4692 REPORT MONTH: December 2003 NO. DATE TYPE DURATION REASON' METHOD CAUSE & CORRECTIVE I LFMDo) (ced) OU) OF ACTIONS S (ScheduLed) qUTN DOWN 2 COMMENTS N/A There were no shutdowns this month._ -- .1. Reason A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)2. Method I-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation from Previous Month 5-Other 2

805+545 3459 # 8/ 7 3-21-06; 8
53AM;DCPP FIFTH FL. EAST Enclosure 2 PG&E Letter DCL-04-003 OPERATING DATA REPORT DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:

50-323 Diablo Canyon Unit 2 1/02/2004 S. Guess (805) 5454692 REPORT MONTH: December 2003 I 1. I Design Electrical Rating (MWe -Net): I 1119 ll 2. l Maximum Dependable Capacity (MWe -Net): 1 1087-- -. 1 ThIs Month I YTD Cumulative

3. Number of Hours Reactor Critical:

744.0 7,291.41 138,649.9 4. Number of Hours Generator On-Line: 744.0 7,226.2 137,114.1 5. Unit Reserve Shutdown Hours: 0.0 0.0 0.0 6. Net Electrical Energy Generated (MWH: 784,934 7,725.227 144,417,217 3

805+545+345
  1. 7/ 7 3-21-06; 8:53AM;DCPP FIFTH FL. EAST Enclosure 2 PG&E Letter DCL-04-003 UNIT SHUTDOWNS DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:

50-323 Diablo Canyon Unit 2 1/02/2004 S. Guess (805) 545-4692 REPORT MONTH: December 2003 NO. DATE TYPE DURATION REASON' METHOD CAUSE & CORRECTIVE

..(YYMMD) F(Fara.d) (HOURS) OF ACSTINGCORRNTS (YMD)S(Scheduled)

SHUTTINGACIN

______ DWN 2 COMMENTS N/A There were no shutdowns this month.1. Reason A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)2. Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation from Previous Month 5-Other 4