| | issue date = 11/04/2013 | | | issue date = 11/04/2013 |
| | title = IR 05000315-13-407; 05000316-13-407; 09/16/2013 - 09/20/2013, Donald C. Cook Nuclear Power Plant, Units 1 and 2; Routine Security Baseline Inspection (Public) | | | title = IR 05000315-13-407; 05000316-13-407; 09/16/2013 - 09/20/2013, Donald C. Cook Nuclear Power Plant, Units 1 and 2; Routine Security Baseline Inspection (Public) |
| | author name = Skokowski R A | | | author name = Skokowski R |
| | author affiliation = NRC/RGN-III/DRS/PSB | | | author affiliation = NRC/RGN-III/DRS/PSB |
| | addressee name = Weber L | | | addressee name = Weber L |
Line 19: |
Line 19: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 November 4, 2013 | | {{#Wiki_filter:November 4, 2013 |
|
| |
|
| EA-12-005
| | ==SUBJECT:== |
| | | DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2, NRC INSPECTION REPORT 05000315/2013407; 05000316/2013407 |
| Mr. Larry Weber Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company
| |
| | |
| Nuclear Generation Group One Cook Place
| |
| | |
| Bridgman, MI 49106 SUBJECT: DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2, NRC INSPECTION REPORT 05000315/2013407; 05000316/2013407
| |
|
| |
|
| ==Dear Mr. Weber:== | | ==Dear Mr. Weber:== |
Line 114: |
Line 109: |
| None | | None |
| ==LIST OF DOCUMENTS REVIEWED== | | ==LIST OF DOCUMENTS REVIEWED== |
| The following is a list of documents reviewed during the inspection.
| |
| : Inclusion on this list does not imply that the NRC inspector reviewed the documents in their entirety but rather that selected sections or portions of the documents were evaluated as part of the overall inspection effort.
| |
| : Inclusion of a document on this list does not imply NRC acceptance of the document, or any part of it, unless this is stated in the body of the inspection report.
| |
|
| |
| ==4OA5 Other Activities==
| |
| : Confirmatory Order
| |
| : EA-12-005; dated June 28, 2012
| |
| : Letter from J. Gebbie to C. Casto; Donald C. Cook Nuclear Plant, Units 1 and 2;
| |
| : Response to Confirmatory Order
| |
| : EA-12-005; dated June 20, 2013
| |
| : AR 2012-8093; Confirmatory Order Issued to I&M by NRC, regarding 10 CFR 26
| |
| ==LIST OF ACRONYMS==
| |
| : [[USED]] [[]]
| |
| : [[ADAMS]] [[Agencywide Documents and Access Management System]]
| |
| : [[CFR]] [[Code of Federal Regulations]]
| |
| DRS Division of Reactor Safety
| |
| NRC U.S. Nuclear Regulatory Commission L. Weber -2-
| |
| If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from public disclosure under
| |
| : [[10 CFR]] [[2.390" in accordance with 10]]
| |
| : [[CFR]] [[2.390(d)(1) and follow the instructions for withholding in]]
| |
| : [[10 CFR]] [[2.390 (b)(1). In accordance with 10]]
| |
| CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
| |
|
| |
| Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
| |
| Sincerely, /RA/ By John B. Giessner Acting For/ Richard Skokowski, Chief
| |
| Plant Support Branch Division of Reactor Safety
| |
|
| |
| Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74
| |
|
| |
| Nonpublic Enclosure 1: Inspection Report 05000315/2013407; 05000316/2013407 w/Attachment 1: Supplemental Information (Nonpublic)
| |
| Public Enclosure 2: Inspection Report 05000315/2013407; 05000316/2013407 w/Attachment 2: Supplemental Information (Public)
| |
| cc w/Enclosure 1:
| |
| : [[S.]] [[Coker,]]
| |
| : [[NSIR]] [[/DSO/DDSO/ST]]
| |
| : [[R.]] [[Albert,]]
| |
| : [[NSIR]] [[]]
| |
| : [[T.]] [[Dimitriadis,]]
| |
| : [[RI]] [[]]
| |
| : [[B.]] [[Desai,]]
| |
| : [[RII]] [[]]
| |
| : [[M.]] [[Haire,]]
| |
| RIV
| |
| K. Yale, State Liaison Officer, State of Michigan
| |
| cc w/o Enclosure 1: Distribution via ListServTM cc w/Enclosure 2: Distribution via ListServŽ
| |
|
| |
| DISTRIBUTION w/Enclosure 2: Daniel Rich
| |
| RidsNrrDorlLpl3-1 Resource
| |
| RidsNrrPMDCCook Resource RidsNrrDirsIrib Resource Cynthia Pederson
| |
| Anne Boland
| |
| Steven Orth
| |
|
| |
|
| Allan Barker
| |
| Carole Ariano Linda Linn
| |
| : [[DRPIII]] [[]]
| |
| DRSIII
| |
| Patricia Buckley Tammy Tomczak ROPreports.Resource@nrc.gov
| |
| : [[DOCUME]] [[NT NAME:]]
| |
| : [[DCC]] [[2013407]]
| |
| : [[DRS]] [[]]
| |
| : [[OUO]] [[Cover Letter.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy]]
| |
| : [[OFFICE]] [[]]
| |
| : [[RIII]] [[]]
| |
| : [[RIII]] [[]]
| |
| : [[RIII]] [[]]
| |
| : [[RIII]] [[]]
| |
| : [[NAME]] [[]]
| |
| : [[JM]] [[aynen:cs GHansen for DFunk SOrth JGiessner for RSkokowski]]
| |
| : [[DATE]] [[10/30/13 10/31/13 11/04/13 11/04/13]]
| |
| : [[OFFICI]] [[AL]]
| |
| : [[RECORD]] [[]]
| |
| : [[COPY]] [[]]
| |
| }} | | }} |
Similar Documents at Cook |
---|
Category:Inspection Report
MONTHYEARIR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 IR 05000315/20230012023-05-0303 May 2023 Integrated Inspection Report 05000315/2023001 and 05000316/2023001 IR 05000315/20234012023-03-16016 March 2023 Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220042023-02-0101 February 2023 Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion IR 05000315/20230102023-01-31031 January 2023 Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 IR 05000315/20220112022-11-0404 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 IR 05000315/20220032022-10-28028 October 2022 Integrated Inspection Report 05000315/2022003 and 05000316/2022003 IR 05000315/20224202022-10-19019 October 2022 Cover Letter - Donald C. Cook Nuclear Plant Units 1 and 2 - Security Baseline Inspection Report 05000315/2022420 and 05000316/2022420 IR 05000315/20224012022-09-21021 September 2022 Security Baseline Inspection Report 05000315 2022401 05000316 2022401 Independent Spent Fuel Storage Security Inspection Report 07200072 2022401 IR 05000315/20223012022-08-31031 August 2022 NRC Initial License Examination Report 05000315/2022301; 05000316/2022301 IR 05000315/20220052022-08-24024 August 2022 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022005 and 05000316/2022005) IR 05000315/20220022022-08-0808 August 2022 Integrated Inspection Report 05000315/2022002 and 05000316/2022002 IR 05000315/20224022022-07-0505 July 2022 Material Control and Accounting Program Inspection Report 05000315/2022402 and 05000316/2022402 ML22165A2012022-06-14014 June 2022 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000315/2022001 and 05000316/2022001 IR 05000315/20220012022-05-10010 May 2022 Integrated Inspection Report 05000315/2022001 and 05000316/2022001 ML22129A2052022-05-10010 May 2022 Integrated Inspection Report 05000315/2022001 and 05000316/2022001 IR 05000315/20220102022-04-0505 April 2022 Triennial Fire Protection Inspection Report 05000315/2022010 and 05000316/2022010 ML22084A5812022-03-25025 March 2022 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000315/2022011 05000316/2022011 IR 05000315/20210062022-03-0202 March 2022 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2021006 and 05000316/2021006) IR 05000315/20210042022-02-0707 February 2022 Integrated Inspection Report 05000315/2021004 and 05000316/2021004 and Exercise of Enforcement Discretion IR 05000315/20210132021-12-0606 December 2021 Inspection Report 05000315/2021013 and 05000316/2021013 IR 05000315/20214032021-11-17017 November 2021 Security Baseline Inspection Report 05000315/2021403 and 05000316/2021403 IR 05000315/20210112021-11-15015 November 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000315/2021011 and 05000316/2021011 IR 05000315/20210032021-10-26026 October 2021 Integrated Inspection Report 05000315/2021003; 05000316/2021003; and 07200072/2021001 IR 05000315/20214012021-10-21021 October 2021 Cyber Security Inspection Report 05000315/2021401 and 05000316/2021401 IR 05000315/20215012021-10-0606 October 2021 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2021501 and 05000316/2021501 IR 05000315/20210102021-09-0707 September 2021 Biennial Problem Identification and Resolution Inspection Report 05000315/2021010 and 05000316/2021010 IR 05000315/20210052021-09-0101 September 2021 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2021005 and 05000316/2021005) IR 05000315/20210122021-08-0202 August 2021 Donald Cook Nuclear Plant - NRC Inspection Report 05000315/2021012 and 05000316/2021012 IR 05000315/20210022021-07-22022 July 2021 Integrated Inspection Report 05000315/2021002 and 05000316/2021002 ML21158A1732021-06-0909 June 2021 Review of the Fall 2017 Steam Generator Tube Inspections Report IR 05000315/20214022021-06-0909 June 2021 Donald D. C. Cook Nuclear Plant - Security Baseline Inspection Report 05000315/2021402 and 05000316/2021402 IR 05000315/20210012021-04-28028 April 2021 Integrated Inspection Report 05000315/2021001 and 05000316/2021001 IR 05000315/20200062021-03-0404 March 2021 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2020006 and 05000316/2020006) IR 05000315/20200042021-02-0808 February 2021 Integrated Inspection Report 05000315/2020004 and 05000316/2020004 IR 05000315/20204032020-12-16016 December 2020 Security Baseline Inspection Report 05000315/2020403 and 05000316/2020403 IR 05000315/20204022020-11-0404 November 2020 Security Baseline Inspection Report 05000315/2020402 and 05000316/2020402 IR 05000315/20200032020-10-28028 October 2020 Integrated Inspection Report 05000315/2020003 and 05000316/2020003 IR 05000315/20203012020-10-19019 October 2020 NRC Initial License Examination Report 05000315/2020301; 05000316/2020301 IR 05000315/20200112020-09-17017 September 2020 Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000315/2020011; 05000316/2020011 IR 05000315/20200052020-09-0101 September 2020 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2020005 and 05000316/2020005) IR 05000315/20200022020-08-10010 August 2020 Integrated Inspection Report 05000315/2020002 and 05000316/2020002 2024-01-31
[Table view] Category:Letter
MONTHYEARIR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 ML23242A1832023-08-30030 August 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report ML23159A0192023-06-13013 June 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report ML23131A3282023-05-11011 May 2023 D.C. Cook Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000315/2023404 and 05000316/2023404 IR 05000315/20230012023-05-0303 May 2023 Integrated Inspection Report 05000315/2023001 and 05000316/2023001 AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report ML23117A0062023-04-27027 April 2023 Review of the Spring 2022 Steam Generator Tube Inspections Report ML23114A1142023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report ML23076A0212023-03-20020 March 2023 Request for Information for NRC Commercial Grade Dedication Inspection; Inspection Report 05000315/2023011; 05000316/2023011 IR 05000315/20234012023-03-16016 March 2023 Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 ML23066A1882023-03-0707 March 2023 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Donald C. Cook Nuclear Plant IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220042023-02-0101 February 2023 Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report IR 05000315/20230102023-01-31031 January 2023 Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation ML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in ML22340A1392022-11-30030 November 2022 Submittal of Revision 31 to Updated Final Safety Analysis Report and 10CFR50.71(e) Updated and Related Site Change Reports IR 05000315/20220112022-11-0404 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 IR 05000315/20220032022-10-28028 October 2022 Integrated Inspection Report 05000315/2022003 and 05000316/2022003 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 2024-01-08
[Table view] |
Text
November 4, 2013
SUBJECT:
DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2, NRC INSPECTION REPORT 05000315/2013407; 05000316/2013407
Dear Mr. Weber:
On September 20, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Donald C. Cook Nuclear Power Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on September 20, 2013, with Mr. S. Partin and other members of your staff. The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. No findings were identified during this inspection. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Request for Withholding,"
of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. Enclosure 1 contains Sensitive Unclassified Non-Safeguards Information. When separated from Enclosure 1, this transmittal document is decontrolled. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1)
and follow the instructions for withholding in 10 CFR 2.390 (b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the a ffidavit requirements for your response. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/RA/ By John B. Giessner Acting For/
Richard A. Skokowski, Chief
Plant Support Branch
Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74
Nonpublic Enclosure 1: Inspection Report 05000315/2013407; 05000316/2013407 w/Attachment 1: Supplemental Information (Nonpublic)
Public Enclosure 2: Inspection Report 05000315/2013407; 05000316/2013407 w/Attachment 2: Supplemental Information (Public)
cc w/Enclosure 1: S. Coker, NSIR/DSO/DDSO/ST R. Albert, NSIR T. Dimitriadis, RI
B. Desai, RII M. Haire, RIV K. Yale, State Liaison Officer, State of Michigan cc w/o Enclosure 1: Distribution via ListServTM cc w/Enclosure 2: Distribution via ListServŽ
Enclosure 2 U. S. NUCLEAR REGULATORY COMMISSION
REGION III
Docket Nos: 05000315; 05000316 License Nos: DPR-58; DPR-74
Report No: 05000315/2013407; 05000316/2013407
Licensee: Indiana Michigan Power Company Facility: Donald C. Cook Nuclear Power Plant, Units 1 and 2
Location: Bridgman, Michigan Dates: September 16 through September 20, 2013
Inspector: J. Maynen, Senior Physical Security Inspector Approved by: R. Skokowski, Chief Plant Support Branch
Division of Reactor Safety 1 Enclosure 2
SUMMARY OF FINDINGS
IR 05000315/2013407; 05000316/2013407; 09/16/2013 - 09/20/2013, Donald C. Cook Nuclear Power Plant, Units 1 and 2; Routine Security Baseline Inspection. This report covers a one week period of announced routine baseline inspection on security. The inspection was conducted by one Region III physical security inspector. No findings were identified. The NRC's program for overseeing t he safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process." A. Inspector-Identified and Self-Revealed Findings
Cornerstone: Security
No findings were identified.
B. Licensee-Identified Violations
None.
2
REPORT DETAILS
OTHER ACTIVITIES
4OA5 Other Activities
.1 Inspection of Confirmatory Order EA-12-005 On June 28, 2012, the NRC issued Confirmatory Order EA-12-005 (Order) to the licensee.
The elements of the agreement between the U.S. Nuclear Regulatory Commission (NRC) and the licensee consisted of the following three specific actions: Section V, Item 1. Within 90 days of the effective date of the Order, develop a lessons-learned presentation and within 180 days of the effective date of the Order, present these lessons-learned to first line supervisors and above.Section V, Item 2. Within 365 days of the effective date of the Order, develop and present the facts and lessons learned at an industry FFD forum and a broader industry forum.Section V, Item 3. Notify the NRC Regional Administrator, Region III, within 30 days of the completion of all actions described in the Order. A lessons-learned presentation was developed on August 1, 2012, and the site supervisors and managers were briefed on the issue at the site leadership meeting held on October 3, 2012. The licensee made arrangements to ensure that supervisors and managers who did not attend the meeting received the briefing prior to resuming supervisory duties. On June 5, 2013, the Site Vice President presented the facts and lessons learned to a broad industry forum, including industry FFD management and senior management personnel, at the annual USA/STARS Annual Conference. On June 20, 2013, the NRC Regional Administrator, Region III, was notified of the completion of the actions required by the Order. The inspectors independently verified the actions completed by the licensee as required by Section V of Confirmatory Order EA-12-005.
4OA6 Management Meetings
.1 Exit Meeting The inspector presented the inspection results to Mr. S. Partin and other members of licensee management at the conclusion of the inspection on September 20, 2013.
The inspector asked the licensee whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.
ATTACHMENT 2:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- S. Partin, Plant Manager
- C. Hutchinson, Director, Nuclear Site Services
- J. Carter, Security
- K. Henderson, Regulatory Affairs
Nuclear Regulatory Commission
- J. Ellegood, Senior Resident Inspector
- P. LaFlamme, Resident Inspector
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened, Closed, and Discussed
None
LIST OF DOCUMENTS REVIEWED