MONTHYEARIR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 IR 05000315/20230012023-05-0303 May 2023 Integrated Inspection Report 05000315/2023001 and 05000316/2023001 IR 05000315/20234012023-03-16016 March 2023 Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220042023-02-0101 February 2023 Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion IR 05000315/20230102023-01-31031 January 2023 Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 IR 05000315/20220112022-11-0404 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 IR 05000315/20220032022-10-28028 October 2022 Integrated Inspection Report 05000315/2022003 and 05000316/2022003 IR 05000315/20224202022-10-19019 October 2022 Cover Letter - Donald C. Cook Nuclear Plant Units 1 and 2 - Security Baseline Inspection Report 05000315/2022420 and 05000316/2022420 IR 05000315/20224012022-09-21021 September 2022 Security Baseline Inspection Report 05000315 2022401 05000316 2022401 Independent Spent Fuel Storage Security Inspection Report 07200072 2022401 IR 05000315/20223012022-08-31031 August 2022 NRC Initial License Examination Report 05000315/2022301; 05000316/2022301 IR 05000315/20220052022-08-24024 August 2022 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022005 and 05000316/2022005) IR 05000315/20220022022-08-0808 August 2022 Integrated Inspection Report 05000315/2022002 and 05000316/2022002 IR 05000315/20224022022-07-0505 July 2022 Material Control and Accounting Program Inspection Report 05000315/2022402 and 05000316/2022402 ML22165A2012022-06-14014 June 2022 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000315/2022001 and 05000316/2022001 IR 05000315/20220012022-05-10010 May 2022 Integrated Inspection Report 05000315/2022001 and 05000316/2022001 ML22129A2052022-05-10010 May 2022 Integrated Inspection Report 05000315/2022001 and 05000316/2022001 IR 05000315/20220102022-04-0505 April 2022 Triennial Fire Protection Inspection Report 05000315/2022010 and 05000316/2022010 ML22084A5812022-03-25025 March 2022 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000315/2022011 05000316/2022011 IR 05000315/20210062022-03-0202 March 2022 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2021006 and 05000316/2021006) IR 05000315/20210042022-02-0707 February 2022 Integrated Inspection Report 05000315/2021004 and 05000316/2021004 and Exercise of Enforcement Discretion IR 05000315/20210132021-12-0606 December 2021 Inspection Report 05000315/2021013 and 05000316/2021013 IR 05000315/20214032021-11-17017 November 2021 Security Baseline Inspection Report 05000315/2021403 and 05000316/2021403 IR 05000315/20210112021-11-15015 November 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000315/2021011 and 05000316/2021011 IR 05000315/20210032021-10-26026 October 2021 Integrated Inspection Report 05000315/2021003; 05000316/2021003; and 07200072/2021001 IR 05000315/20214012021-10-21021 October 2021 Cyber Security Inspection Report 05000315/2021401 and 05000316/2021401 IR 05000315/20215012021-10-0606 October 2021 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2021501 and 05000316/2021501 IR 05000315/20210102021-09-0707 September 2021 Biennial Problem Identification and Resolution Inspection Report 05000315/2021010 and 05000316/2021010 IR 05000315/20210052021-09-0101 September 2021 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2021005 and 05000316/2021005) IR 05000315/20210122021-08-0202 August 2021 Donald Cook Nuclear Plant - NRC Inspection Report 05000315/2021012 and 05000316/2021012 IR 05000315/20210022021-07-22022 July 2021 Integrated Inspection Report 05000315/2021002 and 05000316/2021002 ML21158A1732021-06-0909 June 2021 Review of the Fall 2017 Steam Generator Tube Inspections Report IR 05000315/20214022021-06-0909 June 2021 Donald D. C. Cook Nuclear Plant - Security Baseline Inspection Report 05000315/2021402 and 05000316/2021402 IR 05000315/20210012021-04-28028 April 2021 Integrated Inspection Report 05000315/2021001 and 05000316/2021001 IR 05000315/20200062021-03-0404 March 2021 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2020006 and 05000316/2020006) IR 05000315/20200042021-02-0808 February 2021 Integrated Inspection Report 05000315/2020004 and 05000316/2020004 IR 05000315/20204032020-12-16016 December 2020 Security Baseline Inspection Report 05000315/2020403 and 05000316/2020403 IR 05000315/20204022020-11-0404 November 2020 Security Baseline Inspection Report 05000315/2020402 and 05000316/2020402 IR 05000315/20200032020-10-28028 October 2020 Integrated Inspection Report 05000315/2020003 and 05000316/2020003 IR 05000315/20203012020-10-19019 October 2020 NRC Initial License Examination Report 05000315/2020301; 05000316/2020301 IR 05000315/20200112020-09-17017 September 2020 Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000315/2020011; 05000316/2020011 IR 05000315/20200052020-09-0101 September 2020 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2020005 and 05000316/2020005) IR 05000315/20200022020-08-10010 August 2020 Integrated Inspection Report 05000315/2020002 and 05000316/2020002 2024-01-31
[Table view] Category:Letter
MONTHYEARIR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 ML23242A1832023-08-30030 August 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report ML23159A0192023-06-13013 June 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report ML23131A3282023-05-11011 May 2023 D.C. Cook Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000315/2023404 and 05000316/2023404 IR 05000315/20230012023-05-0303 May 2023 Integrated Inspection Report 05000315/2023001 and 05000316/2023001 AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report ML23117A0062023-04-27027 April 2023 Review of the Spring 2022 Steam Generator Tube Inspections Report ML23114A1142023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report ML23076A0212023-03-20020 March 2023 Request for Information for NRC Commercial Grade Dedication Inspection; Inspection Report 05000315/2023011; 05000316/2023011 IR 05000315/20234012023-03-16016 March 2023 Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 ML23066A1882023-03-0707 March 2023 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Donald C. Cook Nuclear Plant IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220042023-02-0101 February 2023 Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report IR 05000315/20230102023-01-31031 January 2023 Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation ML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in ML22340A1392022-11-30030 November 2022 Submittal of Revision 31 to Updated Final Safety Analysis Report and 10CFR50.71(e) Updated and Related Site Change Reports IR 05000315/20220112022-11-0404 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 IR 05000315/20220032022-10-28028 October 2022 Integrated Inspection Report 05000315/2022003 and 05000316/2022003 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 2024-01-08
[Table view] |
Text
UNITED STATES uly 8, 2013
SUBJECT:
DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000315/2013503; 05000316/2013503
Dear Mr. Weber:
On June 7, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Donald C. Cook Nuclear Power Plant, Units 1 and 2. The enclosed report documents the results of this inspection, which were discussed on June 7, 2013, with Mr. J. Gebbie and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings were identified during this inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS)
component of NRC's Agencywide Documents Access and Management System (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Joseph Maynen, Acting Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74
Enclosure:
Inspection Report 05000315/2013503; 05000316/2013503 w/Attachment: Supplemental Information
REGION III==
Docket Nos: 50-315; 50-316 License Nos: DPR-58; DPR-74 Report No: 05000315/2013503; 05000316/2013503 Licensee: Indiana Michigan Power Company Facility: Donald C. Cook Nuclear Power Plant, Units 1 and 2 Location: Bridgman, MI Dates: June 3 - 7, 2013 Inspectors: R. Jickling, Senior Emergency Preparedness Inspector J. Beavers, Emergency Preparedness Inspector J. Ellegood, Senior Resident Inspector E. Schrader, Emergency Preparedness Specialist N. Valos, Senior Reactor Analyst Approved by: J. Maynen, Acting Chief Plant Support Branch Division of Reactor Safety Enclosure
SUMMARY OF FINDINGS
IR 05000315/2013503; 05000316/2013503; 06/03/2013 - 06/07/2013; Donald C. Cook Nuclear
Power Plant, Units 1 and 2; Baseline Emergency Preparedness Exercise Evaluation - Hostile Action Event; Exercise Evaluation Scenario Review; Performance Indicator Verification.
This report covers a one-week period of announced baseline inspection by three Region III inspectors, one resident inspector, and one emergency preparedness specialist. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 4, dated December 2006.
NRC-Identified
and Self-Revealed Findings
Cornerstone: Emergency Preparedness
No findings were identified.
Licensee-Identified Violations
No violations were identified.
REPORT DETAILS
REACTOR SAFETY
Cornerstone: Emergency Preparedness
1EP7 Exercise Evaluation - Hostile Action Event
Main article: IP 71114.07
.1 Exercise Evaluation
a. Inspection Scope
Title 10, Code of Federal Regulations (CFR), Part 50, Appendix E,Section IV.F.2.j, requires in part, that nuclear power reactor licensees, in each eight calendar year exercise cycle, provide the opportunity for their Emergency Response Organization (ERO) to demonstrate proficiency in the key skills necessary to respond to a Hostile Action (HA) directed at the plant site. Donald C. Cook Nuclear Power Plant designed the June 4, 2013, exercise to satisfy this requirement, and the NRC inspected the Donald C. Cook Nuclear Power Plant HA event exercise to assess the licensees ability to effectively implement their Emergency Plan during an HA event and adequately protect public health and safety.
The exercise evaluation consisted of the following reviews and assessments:
The adequacy of the licensees performance in the biennial exercise conducted on June 4, 2013, regarding the implementation of the Risk-Significant Planning Standards (RSPSs) in 10 CFR 50.47 (b)(4), (5), (9), and (10), which address emergency classification, offsite notification, radiological assessment, and Protective Action Recommendations (PARs), respectively.
The overall adequacy of the licensees emergency response facilities with regard to NUREG-0696, Functional Criteria for Emergency Response Facilities, and Emergency Plan commitments. The facilities assessed were the Control Room Simulator (CRS), Alternate Emergency Response Facility, Incident Command Post (ICP), and the Emergency Operations Facility (EOF).
A review of other performance areas, such as the licensee EROs recognition of abnormal plant conditions; command and control, including interactions with site security staff; intra - and inter-facility communications; prioritization of mitigating activities; utilization of repair and field monitoring teams; interface with offsite agencies, including local law enforcement agencies; staffing and procedure adequacy; and the overall implementation of the Emergency Plan and its implementing procedures.
Past performance issues from NRC Inspection Reports (IRs) to determine the effectiveness of corrective actions, as demonstrated during this exercise, to ensure compliance with 10 CFR 50.47(b)(14).
The adequacy of the licensees post-exercise critiques, to evaluate Donald C. Cook Nuclear Power Plants self-assessment of its ERO performance during the June 4, 2013, exercise and to ensure compliance with 10 CFR Part 50, Appendix E, Section IV.F.2.g.
The inspectors reviewed various documents, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.
This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.07-06.
b. Findings
No findings were identified.
1EP8 Exercise Evaluation - Scenario Review
Main article: IP 71114.08
a. Inspection Scope
Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC using IP 71114.08, Exercise Evaluation - Scenario Review, to determine if the exercise would test major elements of the Emergency Plan, as required by 10 CFR 50.47(b)(14). This inspection activity represents one sample on a biennial cycle.
The inspectors reviewed various documents, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.
This review of the exercise objectives and scenario constituted one sample as defined in IP 71114.08-06.
b. Findings
No findings were identified.
OTHER ACTIVITIES
Cornerstone: Emergency Preparedness
4OA1 Performance Indicator Verification
.1 Drill/Exercise Performance
a. Inspection Scope
The inspectors sampled licensee submittals for the Drill and Exercise Performance (DEP) Indicator, for the period from the first quarter 2012 through first quarter 2013. To determine the accuracy of the Performance Indicator (PI) data reported during those periods, PI definitions and guidance contained in the Nuclear Energy Institute (NEI) Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used. The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, assessments of PI opportunities during pre-designated CRS training sessions, and performance during other drills. Documents reviewed are listed in the Attachment to this report.
This inspection constituted one DEP sample as defined in IP 71151-05.
b. Findings
No findings were identified.
.2 Emergency Response Organization Drill Participation
a. Inspection Scope
The inspectors sampled licensee submittals for the ERO Drill Participation PI, for the period from the first quarter 2012 through the first quarter 2013. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used. The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, participation during the 2012 and 2013 drills, and revisions of the roster of personnel assigned to key ERO positions. Documents reviewed are listed in the Attachment to this report.
This inspection constituted one ERO Drill Participation sample as defined in IP 71151-05.
b. Findings
No findings were identified.
.3 Alert and Notification System
a. Inspection Scope
The inspectors sampled licensee submittals for the Alert and Notification System (ANS)
PI for the period from the first quarter 2012 through the first quarter 2013. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used. The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI Guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI and results of periodic scheduled ANS operability tests.
Documents reviewed are listed in the Attachment to this report.
This inspection constituted one ANS sample as defined in IP 71151-05.
b. Findings
No findings were identified.
4OA6 Management Meetings
.1 Exit Meeting Summary
On June 7, 2013, the inspectors presented the biennial exercise inspection results to Mr. J. Gebbie and other members of the licensee staff. The licensee acknowledged the issues presented.
The inspectors confirmed that none of the potential report input discussed was considered proprietary.
.2 Public and Media Briefing
On June 7, 2013, the inspector summarized the NRC's preliminary exercise inspection conclusions at a public and media briefing hosted by the DHS and FEMA Region V Field Office staff at the Berrien County Building in Benton Harbor, Michigan.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- J. Gebbie, Site Vice President
- J. Calhoun, Emergency Preparedness Coordinator
- M. Carlson, Vice President of Site Support Services
- D. Cantrell, Operations Director
- B. Chambers, Emergency Preparedness Manger
- K. Henderson, Regulatory Affairs
- C. Hutchinson, Nuclear Security Director
- S. Lies, Engineering Vice President
- J. Nimtz, Emergency Preparedness Coordinator
- S. Parton, Plant Manager
- J. Ross, Plant Engineer Director
- M. Scarpello, Regulatory Assurance Manager
- R. Sieber, Training Manger
- A. Thompson, Emergency Preparedness Coordinator
- C. Wohlgamuth, Regulatory Affairs
- T. Woods, Plant Support Director
Nuclear Regulatory Commission
- J. Ellegood, Senior Resident Inspector
- P. LaFlamme, Resident Inspector
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened, Closed, and Discussed
None Attachment
LIST OF DOCUMENTS REVIEWED