| issue date = 05/17/1988
| issue date = 05/17/1988
| title = Forwards Rev 12 to Engineering Manual Procedure EM-09-02, Inservice Testing of Plant Valves. Step 5.1.4 Revised to Require Submittal of All New Relief Requests to NRC within 60 Days
| title = Forwards Rev 12 to Engineering Manual Procedure EM-09-02, Inservice Testing of Plant Valves. Step 5.1.4 Revised to Require Submittal of All New Relief Requests to NRC within 60 Days
| author name = KUEMIN J L
| author name = Kuemin J
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| addressee name =  
| addressee name =  

Revision as of 21:25, 17 June 2019

Forwards Rev 12 to Engineering Manual Procedure EM-09-02, Inservice Testing of Plant Valves. Step 5.1.4 Revised to Require Submittal of All New Relief Requests to NRC within 60 Days
ML18053A382
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/17/1988
From: Kuemin J
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML18053A383 List:
References
NUDOCS 8805240191
Download: ML18053A382 (2)


Text

'. '* consumers Power POW ERi Nii NllCHlliAN'S PROliRESS General Offices: 1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-0550 May 17, 1988 Nuclear Regu'latory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 -LICENSE DPR-20 -PALISADES PLANT -INSERVICE VALVE TESTING PROGRAM UPDATE

  • Attached is a copy of Palisades Engineering Manual Procedure EM-09-02, Rev 12, "Inservice Testing of Plant Valves." This document is submitted in accordance with the requirements of 10CFR50.55a.

It revises and supersedes the same procedure submitted in our December l, 1987 letter. The changes to this document are listed as follows. Step 5.1.4 has been revised to require submittal of all new relief requests to the NRC within 60 days as defined in the step. In Attachment 1, consistency is provided between the safety field of this table and the Palisades Equipment Data Base. Cold shutdown testing basis No. 20 (Attachment

3) and special clarifications 1 through 5 (Attachment
5) have also been added to this revision.

Finally, a relief request for two check valves in the CCW system is added to Attachment

4. The 60 day requirement for new relief request submittals is a result of a Palisades corrective action. The concern of this document is the possibility of administering a program which includes relief requests not submitted to the NRC. Under the new requirements Palisades will fulfill its responsibility of submitting all relief requests in a timely manner for NRC review. Attachment 1 revisions are primarily editorial in nature. There has been an attempt to make _this attachment .consistent with the plant equipment data base safe-ty fields. Revision tq this attachment are designated by margin bars. Finally, relief request* No. 13 is added to this procedure.

Check valves CK-CC401 and CK-CC402 are part of the component cooling system which provides pump cooling water to the safety injection pumps. These valves are identified on plant piping and Instrument Diagram M-209, Sh 2, Area C7. They must pass flow to ensure the operability of the safety injection pumps. This is demonstrated by Surveillance Procedure Q0-19. Also, in order to assure the OC0588-0007-NL04

  • sao5240191*

se:os-i 7 . 1 I PDR. . _ADOCK . 05000255 ) 1 P -ncn ll t( !,.

  • Nuclear Regulatory Commission Palisades Plant Inservice Valve Testing Program Update May 17, 1988
  • 2 operability of the component cooling system, back leakage through these valves must not diminish the CCWs ability to meet its required cooling loads. In order to assure this, control valves CV-0913 and CV-0950 are normally closed. Additionally, an acceptable test per Q0-15, "Component Cooling Water Pumps," assures the CCW system can meet all of its cooling demands required by the FSAR Chapter 9. Therefore, further testing is not required to 4emonstrate the safety positions of CK-CC401 or CK-CC402.

Consumers Power Company requests NRC review of all the enclosed relief requests pursuant to 10CFR50.55a(g)(6)(i).

As was described in our December 1, 1987 letter a previous application fee of $4000.00 was submitted.

Therefore no application fee is accompanying this submittal.

Staff Licensing Engineer CC Administrator, Region III, NRC NRC Resident Inspector

-Palisades Attachment OC0588-0007-NL04