ML18108A015: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 9: | Line 9: | ||
| docket = 05000266, 05000301 | | docket = 05000266, 05000301 | ||
| license number = DPR-024, DPR-027 | | license number = DPR-024, DPR-027 | ||
| contact person = Chawla M | | contact person = Chawla M, NRR/DORL/LPLIII, 415-8371 | ||
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs | | document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs | ||
| page count = 8 | | page count = 8 |
Revision as of 10:00, 17 June 2019
ML18108A015 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 05/01/2018 |
From: | Point Beach |
To: | Division of Operating Reactor Licensing |
Chawla M, NRR/DORL/LPLIII, 415-8371 | |
References | |
Download: ML18108A015 (8) | |
Text
NextEra Approach to Resolution of Tornado Missile Protection Point Beach Nuclear Plant Units 1 & 2 May 1, 2018 2 AGENDA*Introductions
- Current Status
- Compensatory Measures
- Resolution Strategy
- Conclusion 3 INTRODUCTIONS
- NRC*NextEra Point Beach Team-Steve Catron, Fleet Licensing Manager-Anil Julka, Reliability & Risk Manager
-Eric Schultz, PB Licensing Manager
-Lori Christensen, PB Licensing Project Manager
- 3 4CURRENT STATUS
- Background
- Initial Nonconformance Declaration (U1 & U2)-Turbine Driven Auxiliary Feedwater Pumps (TDAFPs) for unprotected steam supply piping
- Extent of Condition (U1 & U2)-TDAFPs for unprotected turbine exhaust stacks-Main Steam Isolation Valves, Main Steam Safety Valves, Atmospheric Dump Valves-Emergency Diesel Generator (EDG) Fuel Oil Storage Tank T-175B*4Station implemented enforcement discretion guidance documentsEGM 15-002 and DSS-ISG-2016-01 5 COMPENSATORY MEASURES
- Immediate Compensatory Measures-Per DSS-ISG-2016-01 guidance
- Comprehensive Compensatory Measures-Procedurally controlled measures-FLEX equipment sharing
- Other Discernable Changes from Original Station Design-FLEX implementation-Station modifications (design basis and beyond design basis)
- 5Compensatory measures in place; original station design improved over time and enhanced ability to mitigate a tornado missile event 6 RESOLUTION STRATEGY
- The resolution strategy is to validate that Tornado Missile is not a significant hazard for the site-LAR submittal and approval will clear nonconformances
- Options Considered for LAR Development-TMRE (Point Beach was a pilot plant)-Site-specific High Winds PRA (RG 1.200, Rev. 2)
- Selected Option -Site-specific High Winds PRA (RG 1.200, Rev. 2)
- 6License Amendment Request will screen out tornado missile as a significant hazard for the site 7 RESOLUTION STRATEGY
- Site-specific High Winds PRA-Industry leader-Developed in 2013Updated to reflect as-built/as-operated plant
- 7Site-specific High Winds PRA is peer-reviewed to ASME Standard and Regulatory Guide 1.200, Revision 2 8 CONCLUSION
- Entered Enforcement Discretion Process per EGM 2015-002
- License Amendment Request submittal based on Site-Specific High Winds PRA-Site PRA concludes Tornado Missile is below the regulatory threshold in the Standard Review Plan and screens out as a significant hazard
- Plan to submit LAR in second half of 2018
- 8License Amendment Request will screen out tornado missile as a significant hazard for the site