ML17319B655: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 22: Line 22:


~~p PMP 2080 EPP.012 LIST OF EFFECTIVE PAGES Pa e Number Page 1 of 3 Page 2 of 3 EXHIBIT A Page 3 of 3 EXHIBIT B Revision Number And Date Revision 2, 10-19-82 Revision 2, 10-19-82 Revision 2, 10-19-82 Page 1 of 1 Revision 2~10"19-82 0 PMP 2080 EPP.012 INDIANA 6 MICHIGAN ELECTRIC COMPANY DONALD C.COOK NUCLEAR PLANT 1.0 OB JECTIVE This procedure provides guidance to the Plant Manager or Shift Super-visor regarding initial informat'ion supplied to off-site support groups.This information is to be supplied upon declaration of an Unusual Event, Alert, Site Emergency, or General Emergency condition.
~~p PMP 2080 EPP.012 LIST OF EFFECTIVE PAGES Pa e Number Page 1 of 3 Page 2 of 3 EXHIBIT A Page 3 of 3 EXHIBIT B Revision Number And Date Revision 2, 10-19-82 Revision 2, 10-19-82 Revision 2, 10-19-82 Page 1 of 1 Revision 2~10"19-82 0 PMP 2080 EPP.012 INDIANA 6 MICHIGAN ELECTRIC COMPANY DONALD C.COOK NUCLEAR PLANT 1.0 OB JECTIVE This procedure provides guidance to the Plant Manager or Shift Super-visor regarding initial informat'ion supplied to off-site support groups.This information is to be supplied upon declaration of an Unusual Event, Alert, Site Emergency, or General Emergency condition.
 
2.0 RESPONS'IBILITIES 2.1 The Plant Manager is responsible for the accomplishment of initial off-site notifications to individuals or agencies specified in this procedure.
===2.0 RESPONS'IBILITIES===
2.2 The Shift Supervisor is responsible for the initial notifications to individuals or agencies specified in this procedure if: a.In the Shift Supervisor's judgement, the Plant Manager will be unable to complete the notifications in a time-ly manner, or b.The Shift.Supervisor is delegated this responsibility by the Plant Manager.3.0 LIMITATIONS 3.1 Initial notification to the Berrien County Sheriff's Department and the Michigan State Police of an Unusual Event is expected to be completed within fifteen{15)minutes of event classification.
2.1 The Plant Manager is responsible for the accomplishment of initial off-site notifications to individuals or agencies specified in this procedure.
2.2 The Shift Supervisor is responsible for the initial notifications to individuals or agencies specified in this procedure if: a.In the Shift Supervisor's judgement, the Plant Manager will be unable to complete the notifications in a time-ly manner, or b.The Shift.Supervisor is delegated this responsibility by the Plant Manager.3.0 LIMITATIONS
 
===3.1 Initial===
notification to the Berrien County Sheriff's Department and the Michigan State Police of an Unusual Event is expected to be completed within fifteen{15)minutes of event classification.
J 3.2 Initial notifications to the Michigan State Police and the Berrien County Sheriffs Department shall be immediate upon classification of an Alert, Site Emergency or General Emergency Condition and no-tification of the NRC.and appropriate AEP personnel.
J 3.2 Initial notifications to the Michigan State Police and the Berrien County Sheriffs Department shall be immediate upon classification of an Alert, Site Emergency or General Emergency Condition and no-tification of the NRC.and appropriate AEP personnel.
 
4.0 INSTRUCTIONS 4.1 Upon declaration of an Unusual Event, Alert, Site Emergency or General Emergency the Plant Manager or SS shall provide all immediately available information from EXHIBIT A,'ACCIDENT INFORMATION REPORTING DATA SHEET, to those listed on EXHIBIT B, INITIAL OFF-SITE NOTIFICATION LIST.NOTE: NOTE: NOTE: EXHIBIT A AND EXHIBIT B SHOULD BE COMPLETED AND ROUTED TO THE PLANT MANAGER'S OFFICE UPON EVENT CLOSE-OUT.
==4.0 INSTRUCTIONS==
4.1 Upon declaration of an Unusual Event, Alert, Site Emergency or General Emergency the Plant Manager or SS shall provide all immediately available information from EXHIBIT A,'ACCIDENT INFORMATION REPORTING DATA SHEET, to those listed on EXHIBIT B, INITIAL OFF-SITE NOTIFICATION LIST.NOTE: NOTE: NOTE: EXHIBIT A AND EXHIBIT B SHOULD BE COMPLETED AND ROUTED TO THE PLANT MANAGER'S OFFICE UPON EVENT CLOSE-OUT.
PHONE NUMBERS FOR ALL PERSONNEL ARE CONTAINED IN APPENDIX A OF THESE EMERGENCY PLAN PROCEDURES.
PHONE NUMBERS FOR ALL PERSONNEL ARE CONTAINED IN APPENDIX A OF THESE EMERGENCY PLAN PROCEDURES.
IF PUBLIC AFFAIRS AND NRC AGREE A NEWS RELEASE IS TO BE MADE, THE NUCLEAR CENTER WILL PROVIDE THE RELEASE TO THE MICHIGAN STATE POLICE, THE BERRIEN COUNTY SHERIFF'S DEPARTMENT AND THE NEWS MEDIA.Page 1 of 3 Revision 2, o
IF PUBLIC AFFAIRS AND NRC AGREE A NEWS RELEASE IS TO BE MADE, THE NUCLEAR CENTER WILL PROVIDE THE RELEASE TO THE MICHIGAN STATE POLICE, THE BERRIEN COUNTY SHERIFF'S DEPARTMENT AND THE NEWS MEDIA.Page 1 of 3 Revision 2, o

Revision as of 04:54, 6 May 2019

Public Version of Revision 2 to Emergency Plan Implementing Procedure PMP 2080 EPP.012, Initial Offsite Notifications. Procedure Index Encl
ML17319B655
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/20/1982
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17319B653 List:
References
PMP-2080-EPP.01, PMP-2080-EPP.1, NUDOCS 8211110557
Download: ML17319B655 (10)


Text

PMP EPP INDEX 1 j INDIANA 5 i4lICHIGAN POWER COMPANY DONALD C.COOK NUCLm<'R PLANT P AN MANA PR indev Identification Number Ti tie Revision No.And Oat C oRFi2n ts PNP 2080 EPP.001 Emergency Plan Activation and Condition Classification Revision 3 10-12-82 EPP.002 Unusual Event EPP.OO Alert EPP.OO Site Emergency EPP:00 General Emergency EPP.006 Initial Dose Assessment (Gaseous)CANCELLED 10-29-81 CANCELLED 10-29-81 CANCELLED 10-29-81 CANCELLED 10-29-81 Revilion 3 8-27-82 EPP.007 Initial Release Assessments (Liquid)Revision 0 4-1-81 TP-1,2-23-82 Exp NA EPP.OO EPP.009 Initiating Manning of Emer-gency Response Facilities 8 Calling Off-Duty Personnel Fire Emergency Guidelines Revision 3 10-12-82 Revision 1 6-15-82 EPP.010 Toxic Gas Release Guidelines Revision 1 6-2-82 EPP.011 Natural Emergency Guidelines Revision 0 4-1-81 QEPP.01 Initial Off-Site Notificatioq Pevision 2'0-19-82 82iiii0557 82ii0i PDR ADQCK 050003i5 F PDR Rav na-.a lOQ-Q.

1~INDIANA 8I MICHIGAN ELECTRIC COMPANY DONALD C COOK NUCLEAR PLANT PROCEDURE COVER SHEET Pzooed,e No PMP 2080 EPP.012 Revision No.2 INITIAL OFF-S ITE NOTIFICATIONS SCOPE OF REVISION Rev.1: Incorporated Temporary Sheets.Revised Exhibit A and B.Rev.2: Incorporated temporary sheet.Established a goal of reporting Unusual Events within fifteen (15)minutes.9'IGNATURES ORIGINAL Rev.S G.PREPARED BY QUALITY ASSURANCE REVIPiV INTERFACING DEPARTMENT HEAD CONCURRENCE DEPARTMENT HEAD APPROVAL PLANT NUCLEAR SAFEIY COMhKTEE PLANT MANAGER APPROVAL DATE OF ISSUE N.A.N.A.3-31-81'f q1 8-/o--/'I-Q,

~~p PMP 2080 EPP.012 LIST OF EFFECTIVE PAGES Pa e Number Page 1 of 3 Page 2 of 3 EXHIBIT A Page 3 of 3 EXHIBIT B Revision Number And Date Revision 2, 10-19-82 Revision 2, 10-19-82 Revision 2, 10-19-82 Page 1 of 1 Revision 2~10"19-82 0 PMP 2080 EPP.012 INDIANA 6 MICHIGAN ELECTRIC COMPANY DONALD C.COOK NUCLEAR PLANT 1.0 OB JECTIVE This procedure provides guidance to the Plant Manager or Shift Super-visor regarding initial informat'ion supplied to off-site support groups.This information is to be supplied upon declaration of an Unusual Event, Alert, Site Emergency, or General Emergency condition.

2.0 RESPONS'IBILITIES 2.1 The Plant Manager is responsible for the accomplishment of initial off-site notifications to individuals or agencies specified in this procedure.

2.2 The Shift Supervisor is responsible for the initial notifications to individuals or agencies specified in this procedure if: a.In the Shift Supervisor's judgement, the Plant Manager will be unable to complete the notifications in a time-ly manner, or b.The Shift.Supervisor is delegated this responsibility by the Plant Manager.3.0 LIMITATIONS 3.1 Initial notification to the Berrien County Sheriff's Department and the Michigan State Police of an Unusual Event is expected to be completed within fifteen{15)minutes of event classification.

J 3.2 Initial notifications to the Michigan State Police and the Berrien County Sheriffs Department shall be immediate upon classification of an Alert, Site Emergency or General Emergency Condition and no-tification of the NRC.and appropriate AEP personnel.

4.0 INSTRUCTIONS 4.1 Upon declaration of an Unusual Event, Alert, Site Emergency or General Emergency the Plant Manager or SS shall provide all immediately available information from EXHIBIT A,'ACCIDENT INFORMATION REPORTING DATA SHEET, to those listed on EXHIBIT B, INITIAL OFF-SITE NOTIFICATION LIST.NOTE: NOTE: NOTE: EXHIBIT A AND EXHIBIT B SHOULD BE COMPLETED AND ROUTED TO THE PLANT MANAGER'S OFFICE UPON EVENT CLOSE-OUT.

PHONE NUMBERS FOR ALL PERSONNEL ARE CONTAINED IN APPENDIX A OF THESE EMERGENCY PLAN PROCEDURES.

IF PUBLIC AFFAIRS AND NRC AGREE A NEWS RELEASE IS TO BE MADE, THE NUCLEAR CENTER WILL PROVIDE THE RELEASE TO THE MICHIGAN STATE POLICE, THE BERRIEN COUNTY SHERIFF'S DEPARTMENT AND THE NEWS MEDIA.Page 1 of 3 Revision 2, o

PMP 2080 EPP.012 EXHIBIT A ACCIDENT INFORMATION REPORTING DATA SHEET D.C.Cook Unit Date Time Classified Classification Description of Event Release Involved: Yes No.Estimated Duration (Time)Release Rate Ci/sec Noble Wind Speed (mph)bT C Pascal Category Site Boundary Dose Rate Projected Gas Height: Ground Level Wind Direction (From)Precipitation Measured Injured Personnel Radioactively Contaminated Recommended Off-Site Emergency Protective Actions Off-Site Support Requested and Type Prognosis For Termination Or Worsening Prepared By SS/OSEC Page 2 of 3 Revision 2, ly E PMP 2080 EPP.012 EXHIBIT B INITIAL OFF-SITE NOTIFICATION LIST Event Classification:

Unusual Event Alert Site Emergency General Emergency Event Notification Initials/Time Event Closed-Out Or Upgraded Initials/Time Berrien County Sheriff's Department REQUEST CALL BACK VERIFICATION Michigan State Police, Benton Harbor REQUEST CALL BACK VERIFICATION Assistant V.P.and Chief Nuclear Engineer Alternate:

Assistant Chief Nuclear Engineer Alternate:

Executive V,P.-Construction and New York Engineering Executive Assistant to the IRMECo President Alternate:

ISMECo President.

Alternate:

IGHECo V.P.NRC Resident Inspector Alternate:

Assistant NRC Resident Inspector NRC Region III/Washington Energy Information Center Manager Alternate:

Public Affairs Director Alternate:

Information Services Manager*Optional For Unusual Event Page 3 of 3 Revision 2,