ML18101B332: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 22: Line 22:
RESPONSE TO GENERIC LETTER 96-01 1 TESTING OF SAFETY-RELATED LOGIC CIRCUITS SALEM GENERATING STATION, UNIT NOS. 1 AND 2 HOPE CREEK GENERATING STATION FACILITY OPERATING LICENSE NOS. DPR-70 1 DPR-75, AND NFP-57 DOCKET NOS. 50-272, 50-311 1 AND 50-354 Public Service Electric & Gas Company (PSE&G) has received Generic Letter 96-01 and will implement its requested actions for the Salem and Hope Creek facilities.
RESPONSE TO GENERIC LETTER 96-01 1 TESTING OF SAFETY-RELATED LOGIC CIRCUITS SALEM GENERATING STATION, UNIT NOS. 1 AND 2 HOPE CREEK GENERATING STATION FACILITY OPERATING LICENSE NOS. DPR-70 1 DPR-75, AND NFP-57 DOCKET NOS. 50-272, 50-311 1 AND 50-354 Public Service Electric & Gas Company (PSE&G) has received Generic Letter 96-01 and will implement its requested actions for the Salem and Hope Creek facilities.
Specifically, PSE&G will: (1) Compare electrical schematic drawings and logic diagrams for the reactor protection system, Emergency Diesel Generator (EDG) load shedding and sequencing, and actuation logic for the engineered safety feature systems against each plant's surveillance test procedures to ensure that all portions of the logic circuitry, including the parallel logic, interlocks, bypasses and inhibit circuits, are adequately covered in the surveillance procedures to fulfill each respective plant's Technical Specifications requirements.
Specifically, PSE&G will: (1) Compare electrical schematic drawings and logic diagrams for the reactor protection system, Emergency Diesel Generator (EDG) load shedding and sequencing, and actuation logic for the engineered safety feature systems against each plant's surveillance test procedures to ensure that all portions of the logic circuitry, including the parallel logic, interlocks, bypasses and inhibit circuits, are adequately covered in the surveillance procedures to fulfill each respective plant's Technical Specifications requirements.
This review will include relay contacts, control switches and other relevant components within these systems, used in the logic circuits performing a safety function.  
This review will include relay contacts, control switches and other relevant components within these systems, used in the logic circuits performing a safety function.
(2) Modify station surveillance procedures as necessary for complete testing to comply with the Technical "Specifications.
(2) Modify station surveillance procedures as necessary for complete testing to comply with the Technical "Specifications.
Implementation of the above actions will be completed prior to startup of each plant following the first refueling outage for that plant commencing after January 10, 1997. 260021 9604260133 960416 PDR ADOCK 05000272 p PDR @. Printed on Recycled Paper Document control Desk LR-N96092  APR 16 1996 Within 30 days following completion of the requested actions, PSE&G will provide written confirmation of completion.
Implementation of the above actions will be completed prior to startup of each plant following the first refueling outage for that plant commencing after January 10, 1997. 260021 9604260133 960416 PDR ADOCK 05000272 p PDR @. Printed on Recycled Paper Document control Desk LR-N96092  APR 16 1996 Within 30 days following completion of the requested actions, PSE&G will provide written confirmation of completion.

Revision as of 14:08, 25 April 2019

Informs That Util Received GL 96-01, Testing of Safety-Related Logic Circuits, & Will Implement Requested Actions for Facilities
ML18101B332
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 04/16/1996
From: STORZ L F
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-96-01, GL-96-1, LR-N96092, NUDOCS 9604260133
Download: ML18101B332 (3)


Text

Public Service Electric and Gas Company

  • Louis F. Storz Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-5700
  • Senior Vice President

-Nuclear Operations APRl 6 1996 LR-N96092 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 -0001 Gentlemen:

RESPONSE TO GENERIC LETTER 96-01 1 TESTING OF SAFETY-RELATED LOGIC CIRCUITS SALEM GENERATING STATION, UNIT NOS. 1 AND 2 HOPE CREEK GENERATING STATION FACILITY OPERATING LICENSE NOS. DPR-70 1 DPR-75, AND NFP-57 DOCKET NOS. 50-272, 50-311 1 AND 50-354 Public Service Electric & Gas Company (PSE&G) has received Generic Letter 96-01 and will implement its requested actions for the Salem and Hope Creek facilities.

Specifically, PSE&G will: (1) Compare electrical schematic drawings and logic diagrams for the reactor protection system, Emergency Diesel Generator (EDG) load shedding and sequencing, and actuation logic for the engineered safety feature systems against each plant's surveillance test procedures to ensure that all portions of the logic circuitry, including the parallel logic, interlocks, bypasses and inhibit circuits, are adequately covered in the surveillance procedures to fulfill each respective plant's Technical Specifications requirements.

This review will include relay contacts, control switches and other relevant components within these systems, used in the logic circuits performing a safety function.

(2) Modify station surveillance procedures as necessary for complete testing to comply with the Technical "Specifications.

Implementation of the above actions will be completed prior to startup of each plant following the first refueling outage for that plant commencing after January 10, 1997. 260021 9604260133 960416 PDR ADOCK 05000272 p PDR @. Printed on Recycled Paper Document control Desk LR-N96092 APR 16 1996 Within 30 days following completion of the requested actions, PSE&G will provide written confirmation of completion.

Should you have any questions regarding this response, we will be pleased to discuss them with you. Sincerely, Affidavit c Mr. T. T. Martin, Administrator

-Region I U. S. Nuclear Regulatory Commission Mr. L. Olshan, Licensing Project Manager -Salem u. s. Nuclear Regulatory Commission Mr. D. Jaffe, Licensing Project Manager -Hope Creek U. S. Nuclear Regulatory Commission Mr. c. Marschall (X24) USNRC Senior Resident Inspector

-Salem Mr. R. Summers (X24) USNRC Senior Resident Inspector

-Hope Creek Mr. K. Tosch, Manager IV NJ Department of Environmental Protection Bureau of Nuclear Engineering

  • REF: LR-N96092 STATE OF NEW JERSEY SS. COUNTY OF SALEM L. F. Storz, being duly sworn according to law, deposes and says: I am Senior Vice President

-Nuclear Operations of Public Service Electric and Gas Company, and as such, I find the matters set forth in the above referenced letter concerning the Salem Generating Station, Unit Nos. 1 & 2, and the Hope Creek Generating Station are true to the best of my knowledge, information and belief. My Commission expires on KIMBERLY JO BROWN NOTARY PUBLIC OF NEW JERSEY Mv Cmnmi:;sinn f.rnirP* April 21, 19\Hl