Thi" s 1* s contrary t T S 3 3 A 6 d
Thi" s 1* s contrary t T S 3 3 A 6 d
* t []JI] LI -----------------------------0
* t []JI] LI -----------------------------0
__ . __ . __ . _. _. __ an __ i_s_r_e..:..p_o_r_-_  
__ . __ . __ . _. _. __ an __ i_s_r_e..:..p_o_r_-_
[[EJ IIITJ [ill] able per T. *s. 6.6.2.b(2).
[[EJ IIITJ [ill] able per T. *s. 6.6.2.b(2).
The redundant pump was operable.
The redundant pump was operable.
Therefore the health and safety of the public were not affected.  
Therefore the health and safety of the public were not affected.
[IE] [[I]] 7 8 9 [ill] 7 8 SYSTEM CODE Isl Fl@ 9 10 LER/RO CVENT YEAR REPORT 1 8 1 0 1 NUMBER 21 22 CAUSE CAUSE CODE SUBCODE COMPONENT CODE w@ L...z.1@)
[IE] [[I]] 7 8 9 [ill] 7 8 SYSTEM CODE Isl Fl@ 9 10 LER/RO CVENT YEAR REPORT 1 8 1 0 1 NUMBER 21 22 CAUSE CAUSE CODE SUBCODE COMPONENT CODE w@ L...z.1@)
I Mio Ir I al Rix I@ 11 12 13 18 SEQUENTIAL OCCURRENCE REPORT NO. CODE I I I a I 4 I 4 I l /I I o I 3 I 23 24 26 27 28 29 COMP, SUBCOOE w@ 19 REPORT TYPE LL.J 30 VALVE SUBCODE w@ 20 l.=l 31 ACTlON FUTURE EFFECT SHUTDOWN ATTACHMENT NPRD-4 PRIME COMP. SUPPLIER REVISION NO. L.uJ 32 COMPONENT MANUFACTURER*
I Mio Ir I al Rix I@ 11 12 13 18 SEQUENTIAL OCCURRENCE REPORT NO. CODE I I I a I 4 I 4 I l /I I o I 3 I 23 24 26 27 28 29 COMP, SUBCOOE w@ 19 REPORT TYPE LL.J 30 VALVE SUBCODE w@ 20 l.=l 31 ACTlON FUTURE EFFECT SHUTDOWN ATTACHMENT NPRD-4 PRIME COMP. SUPPLIER REVISION NO. L.uJ 32 COMPONENT MANUFACTURER*
Line 37: Line 37:
\:;I W@L.I ___ R:.;:o:;.u::.t::.:1::.:*n::.:e:......::T:..:e:..::s;..::t:___.  
\:;I W@L.I ___ R:.;:o:;.u::.t::.:1::.:*n::.:e:......::T:..:e:..::s;..::t:___.  
----------'
----------'
ACTIVITY CONTENT Q\ RELEASED OF RELEASE AMOUNT OF ACTIVITY [QI] LU@) l2J@I . N/ A 7 8 9 10 11 4S 46 44 so 44 4S LOCATION OF RELEASE  N/A. 80 PERSONNEL EXPOSURES NUMBER c;;.. TYPE ~DESCRIPTION  
ACTIVITY CONTENT Q\ RELEASED OF RELEASE AMOUNT OF ACTIVITY [QI] LU@) l2J@I . N/ A 7 8 9 10 11 4S 46 44 so 44 4S LOCATION OF RELEASE  N/A. 80 PERSONNEL EXPOSURES NUMBER c;;.. TYPE ~DESCRIPTION
[IE] I 01 01 OJ~~L......-------..:.:N.t...:./
[IE] I 01 01 OJ~~L......-------..:.:N.t...:./
A;:_ ____ ..;._ _ _..;.. _________
A;:_ ____ ..;._ _ _..;.. _________
Line 55: Line 55:
.. 31...1l.i..8'-"4:__
.. 31...1l.i..8'-"4:__
__ _ 0 a. "
__ _ 0 a. "
a*, *. ***-r, ... ATTACHMENT 1 SURRY POWER DOCKET NO: e STATION, UNIT 2 50-281 80-044/03L-0 11-24-80 e REfOR.! NO: EVENT DATE: SUBJECT 2-SI-P-lA INOPERABLE  
a*, *. ***-r, ... ATTACHMENT 1 SURRY POWER DOCKET NO: e STATION, UNIT 2 50-281 80-044/03L-0 11-24-80 e REfOR.! NO: EVENT DATE: SUBJECT 2-SI-P-lA INOPERABLE
: 1. Description of Event: On 24 November 1980, with Unit No. 2 at 100% power, rain water from a heavy rain storm was observed leaking th~ough a roof hatch on 2-SI-P-lA.
: 1. Description of Event: On 24 November 1980, with Unit No. 2 at 100% power, rain water from a heavy rain storm was observed leaking th~ough a roof hatch on 2-SI-P-lA.
Operability of the redundant pump (2-SI-P-lB) was verified by PT 18.1 and 2-SI-P-lA was removed from service. Investigation revealed that the motor.connection was grounded .. This is contra1:y to Technical Specification 3.3.A.6 *and-* is reportable*
Operability of the redundant pump (2-SI-P-lB) was verified by PT 18.1 and 2-SI-P-lA was removed from service. Investigation revealed that the motor.connection was grounded .. This is contra1:y to Technical Specification 3.3.A.6 *and-* is reportable*
as per Tech. Spec. 6.6.2.b(2).  
as per Tech. Spec. 6.6.2.b(2).
: 2. Probable Consequences and Status of Redundant Equipment:
: 2. Probable Consequences and Status of Redundant Equipment:
The low head Safety Injection  
The low head Safety Injection
:Bumps provide*.
:Bumps provide*.
cooling and makeup water to.2'the reactor during the LOCA. The redundant pump*(2-SI-P-1B) was operable and would have functioned as designed.
cooling and makeup water to.2'the reactor during the LOCA. The redundant pump*(2-SI-P-1B) was operable and would have functioned as designed.
2-SI-P-lA was returned to service in 12 hours, well within the 24 hours allowed. Therefore, the health and safety of the public were not affected.  
2-SI-P-lA was returned to service in 12 hours, well within the 24 hours allowed. Therefore, the health and safety of the public were not affected.
: 3. Cause: Rain water from a leaking roof hatch above the pump leaked into the motor nection box and created a ground. 4. Immediate Corrective Action: The redundant pump (2-SI-P-lB) was verified operable as required by Technical Specification 3.3.B.3. Water was removed from the connection box and heat was applied. 5. Subsequent Corrective Action: The motor connection box was dried using temporary electrical heaters. sequently the pump and motor were verified operable and returned to service. 6. Action Taken to Prevent Recurrance  
: 3. Cause: Rain water from a leaking roof hatch above the pump leaked into the motor nection box and created a ground. 4. Immediate Corrective Action: The redundant pump (2-SI-P-lB) was verified operable as required by Technical Specification 3.3.B.3. Water was removed from the connection box and heat was applied. 5. Subsequent Corrective Action: The motor connection box was dried using temporary electrical heaters. sequently the pump and motor were verified operable and returned to service. 6. Action Taken to Prevent Recurrance  
-The leaking roof hatch was repaired and.inspected during a subsequent rain storm. 7. Generic Implications:
-The leaking roof hatch was repaired and.inspected during a subsequent rain storm. 7. Generic Implications:
None.}}
None.}}

Revision as of 11:00, 25 April 2019

LER 80-044/03L-0:on 801124,pump 2-SI-P-1A Declared Inoperable Due to Low Resistance.Caused by Connection Box Grounded Out by Rainwater.Box Dried Out,Roof Hatch Repaired & Pump & Motor Tested
ML18139A942
Person / Time
Site: Surry Dominion icon.png
Issue date: 12/19/1980
From: WILSON J L
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18139A940 List:
References
LER-80-044-03L-03, LER-80-44-3L-3, NUDOCS 8012290460
Download: ML18139A942 (2)


Text

{{#Wiki_filter:l'JRC FORNI 366 (7-77) e LICENSEE EVENT REPORT -NUCLEAR REGULATORY COMMISSION CONTROL BLOCK: I I I,\ (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) !--1 _..____.__ ....... __.... ___ 6 \..!.) CU2J I v1 Al s I PI s I 2101 o I o I -I o I o I o I o I o I -I o I o 101 4 ! 1 I 1 I 1 I 1 101 I I © 7 8 9 LICENSEE. CODE 14 1S LICENSE NUMBER 2S 26 LICEllfSE TYPE JO S7 CAT SB CON'T [IE] 7 8 ~©I o I s I o I o I o I 2 I s I 1 101 1 11 I 2 I 4 I s I o IG)! 1 12 11 I 9 1 s Io 10 60 61 DOCKET NUMBER 68 69 EVENT DATE 74 7S REPORT DATE* 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES@ I On November 24, 1980, with Unit No. 2 at 100 percent power, 2-SI-P-lA was declared inoperable due to low resistance*. Thi" s 1* s contrary t T S 3 3 A 6 d

  • t []JI] LI -----------------------------0

__ . __ . __ . _. _. __ an __ i_s_r_e..:..p_o_r_-_ [[EJ IIITJ [ill] able per T. *s. 6.6.2.b(2). The redundant pump was operable. Therefore the health and safety of the public were not affected. [IE] I 7 8 9 [ill] 7 8 SYSTEM CODE Isl Fl@ 9 10 LER/RO CVENT YEAR REPORT 1 8 1 0 1 NUMBER 21 22 CAUSE CAUSE CODE SUBCODE COMPONENT CODE w@ L...z.1@) I Mio Ir I al Rix I@ 11 12 13 18 SEQUENTIAL OCCURRENCE REPORT NO. CODE I I I a I 4 I 4 I l /I I o I 3 I 23 24 26 27 28 29 COMP, SUBCOOE w@ 19 REPORT TYPE LL.J 30 VALVE SUBCODE w@ 20 l.=l 31 ACTlON FUTURE EFFECT SHUTDOWN ATTACHMENT NPRD-4 PRIME COMP. SUPPLIER REVISION NO. L.uJ 32 COMPONENT MANUFACTURER* 80 TAKEN ACTION ON PLANT METHOD HOURS SUBMITTED FOAM :;us. l.JLJ@l.xJ@) Lz.J@ Lz.J la la la la I LYJ@). W 33 34 3S 36 37 40 41 42 ln.J@) I w I I 2 1.o.J@ CAUSE DESCRIPTION AND CORRECTIVE ACTIONS @ 43 44 I Rain water from a leaking roof batch groirnded out the moto:r' connection box. o:::IIJ I motor connection box dried out. The pump and motor were tested and returned -to DJ]] I service. The roof hatch was repaired. o::m [JJTI 7 8 9 FACILITY '3Q\ STATUS % POWER OTHER STATUS \::::;/ METHOD OF (.;'.;\ 47 The BO tITIJ ~ I 1 1 0 I O l@)I ...... __ N.;..../A __ _,r 8 9 10 12 1'3 DISCOVERY DISCOVERY DESCRIPTION \:;I W@L.I ___ R:.;:o:;.u::.t::.:1::.:*n::.:e:......::T:..:e:..::s;..::t:___.


'

ACTIVITY CONTENT Q\ RELEASED OF RELEASE AMOUNT OF ACTIVITY [QI] LU@) l2J@I . N/ A 7 8 9 10 11 4S 46 44 so 44 4S LOCATION OF RELEASE N/A. 80 PERSONNEL EXPOSURES NUMBER c;;.. TYPE ~DESCRIPTION [IE] I 01 01 OJ~~L......-------..:.:N.t...:./ A;:_ ____ ..;._ _ _..;.. _________ ___. 7 8 9 11 12 13 PERSONNEL INJURIES t,;:;\ so NUMBER DESCRIPTION6 f2TIJ l O I O IO l@'------,-------....:N~/.;.:.A ________________ __. 7 8 9 11 12 . LOSS OF OR DAMAGE TO FACILITY '4J' TYPE DESCRIPTION \::::;) 80 ~(S}r........ ______ ~-----=N~/=A~----~----------------' 7 a 1:su:i;:~o;;CRIPTION@ 8012290 "I< C) NRC USE ONLY 80"' IIli] ~e,~ __________


:;N.:.i..:.:..A

________ ___. l I II II* 1 II I II I 8 9 -{\ 10 68 69 80 ; NAME OF PREPARER ____ ....;J:;..;...* ....;L;;;,,,,;,,.' _W;,,;,.1;;;.* l;;;.s:;.o;:;.n;;;_ _____ _ PHONE: _ _.(_..8...,.0...,,4u)-3i...5:.L7....;- .. 31...1l.i..8'-"4:__ __ _ 0 a. " a*, *. ***-r, ... ATTACHMENT 1 SURRY POWER DOCKET NO: e STATION, UNIT 2 50-281 80-044/03L-0 11-24-80 e REfOR.! NO: EVENT DATE: SUBJECT 2-SI-P-lA INOPERABLE

1. Description of Event: On 24 November 1980, with Unit No. 2 at 100% power, rain water from a heavy rain storm was observed leaking th~ough a roof hatch on 2-SI-P-lA.

Operability of the redundant pump (2-SI-P-lB) was verified by PT 18.1 and 2-SI-P-lA was removed from service. Investigation revealed that the motor.connection was grounded .. This is contra1:y to Technical Specification 3.3.A.6 *and-* is reportable* as per Tech. Spec. 6.6.2.b(2).

2. Probable Consequences and Status of Redundant Equipment:

The low head Safety Injection

Bumps provide*.

cooling and makeup water to.2'the reactor during the LOCA. The redundant pump*(2-SI-P-1B) was operable and would have functioned as designed. 2-SI-P-lA was returned to service in 12 hours, well within the 24 hours allowed. Therefore, the health and safety of the public were not affected.

3. Cause: Rain water from a leaking roof hatch above the pump leaked into the motor nection box and created a ground. 4. Immediate Corrective Action: The redundant pump (2-SI-P-lB) was verified operable as required by Technical Specification 3.3.B.3. Water was removed from the connection box and heat was applied. 5. Subsequent Corrective Action: The motor connection box was dried using temporary electrical heaters. sequently the pump and motor were verified operable and returned to service. 6. Action Taken to Prevent Recurrance

-The leaking roof hatch was repaired and.inspected during a subsequent rain storm. 7. Generic Implications: None.}}