|
|
Line 1: |
Line 1: |
| #REDIRECT [[PNP 2011-061, Voluntary Response to NRC Regulatory Issue Summary 2011-04: Preparation and Scheduling of Operator Licensing Examinations]] | | {{Adams |
| | | number = ML112060503 |
| | | issue date = 07/22/2011 |
| | | title = Voluntary Response to NRC Regulatory Issue Summary 2011-04: Preparation and Scheduling of Operator Licensing Examinations |
| | | author name = Gustafson O W |
| | | author affiliation = Entergy Nuclear Operations, Inc |
| | | addressee name = |
| | | addressee affiliation = NRC/Document Control Desk, NRC/NRR |
| | | docket = 05000255 |
| | | license number = DPR-020 |
| | | contact person = |
| | | case reference number = PNP 2011-061, RIS-11-004 |
| | | document type = Letter, License-Operator, Part 55 Examination Related Material |
| | | page count = 2 |
| | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:Entergy Nuclear Operations, Inc.Palisades Nuclear Plant-~I~'nter 27780 Blue Star Memorial Highway Covert, Ml 49043 Tel 269 764 2000 Otto W.Gustafson Licensing Manager PNP 2011-061 July 22, 2011 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 |
| | |
| | ==SUBJECT:== |
| | Voluntary Response to NRC Regulatory Issue Summary 2011-04: Preparation and Scheduling of Operator Licensing Examinations Palisades Nuclear Plant Docket 50-255 License No.DPR-20 |
| | |
| | ==Dear Sir or Madam:== |
| | Nuclear Regulatory Commission (NRC)Regulatory Issue Summary 2011-04,"Preparation and Scheduling of Operator Licensing Examinations," |
| | requests that licensees submit, on a voluntary basis, a NRC Form 536,"Operator Licensing Examination Data."Estimates are requested for calendar years 2013 through 2016.The purpose of these estimates is to assist the NRC in budgeting and scheduling resources. |
| | In response to this request, Entergy Nuclear Operations, Inc.is providing the enclosed NRC Form 536 for the Palisades Nuclear Plant (PNP).PNP currently has examinations scheduled in 2012 for six reactor operators, five senior reactor operators-instant, and four senior reactor operators-upgrade. |
| | Examinations begin the week of June 25, 2012.This letter makes no new commitments or revision to previous commitments. |
| | Sincerely, OWG/bed |
| | |
| | ==Attachment:== |
| | |
| | 1.NRC Form 536-Operator Licensing Examination Data CC Administrator, Region III, USNRC Project Manager, Palisades, USN RC Resident Inspector, Palisades, USN RC ATTACHMENT 1 NRC FORM 536-OPERATOR LICENSING EXAMINATION DATA NRC FORM 536 US NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB NO 315-0131 EXPIRES 10/31/2011 (10-2008)Estimated burden per response to comply with this voluntary information collection request: 1 hour.This information collection is used to plan budgets and resources for operator examinations. |
| | Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), US APERAT('IR I"ENSING Nuclear Regulatory Commission, Washington, DC~20555-0001, or by internet email to infocollects@nrc.gov, and EXAMINATION DATA to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection. |
| | FACILITY: Palisades Nuclear Plant, 27780 Blue Star Memorial Highway, Covert, MI 49043 NRC REGION III DOCKET 50-255 LICENSE DPR-20 A.PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2013 CY2014 CY2015 CY2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B.INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2013 CY2014 CY2015 CY2016 NUMBER OF REACTOR 0 0 6 OPERATORS 6 NUMBER OF SENIOR REACTOR 0 3 0 3 OPERATORS-INSTANT NUMBEROFSENIORREACTOR 0 3 0 3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED_DATES PRIMARY DATE N/A 6/2/2014 N/A 8/1/2016 ALTERNATE DATE N A 6/30/2014 N/A 9/26/2016 C.PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE)SCHEDULE CY2012 CY2013 PROPOSED NUMBER March June September December March June September December ESTIMATED NUMBER OF 0 0 0 0 9 0 0 0 CANDIDATES Page 1 of 1}} |
|
---|
Category:Letter
MONTHYEARPNP 2024-014, Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances2024-10-0909 October 2024 Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances PNP 2024-037, Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-0202024-10-0404 October 2024 Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-020 ML24267A2962024-10-0101 October 2024 Summary of Conference Call Regarding Steam Generator Tube Inspections ML24263A1712024-09-20020 September 2024 Environmental Request for Additional Information ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24219A4202024-09-12012 September 2024 Change in Estimated Hours and Review Schedule for Licensing Actions Submitted to Support Resumption of Power Operations (Epids L-2023-LLE-0025, L-2023-LLM-0005, L-2023-LLA-0174, L-2024-LLA-0013, L-2024-LLA-0060, L-2024-LLA-0071) IR 05000255/20244022024-09-0606 September 2024 Public: Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2024402 PNP 2024-029, Notice of Payroll Transition at Palisades Nuclear Plant2024-08-15015 August 2024 Notice of Payroll Transition at Palisades Nuclear Plant IR 05000255/20240022024-08-0909 August 2024 NRC Inspection Report No. 05000255/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 PNP 2024-032, Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-07-31031 July 2024 Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations ML24206A0572024-07-25025 July 2024 PRM-50-125 - Letter to Alan Blind; Docketing of Petition for Rulemaking and Sufficiency Review Status (10 CFR Part 50) PNP 2024-033, Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-07-24024 July 2024 Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-031, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-07-18018 July 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000255/20240112024-07-15015 July 2024 Nuclear Plant - Restart Inspection Report 05000255/2024011 PNP 2024-027, Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2024-07-0909 July 2024 Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24183A1382024-07-0202 July 2024 Tribal Letter - Lac Du Flambeau Band of Lake Superior Chippewa Indians ML24137A0142024-07-0202 July 2024 OEDO-24-00011 - 2.206 Petition for Misuse of Palisades Decommissioning Trust Fund (EPID L-2023-CRS-0008) - Letter ML24183A1492024-07-0101 July 2024 Tribal Letter - Pokagon Band of Potawatomi Indians ML24156A0222024-07-0101 July 2024 Initiation of Scoping Process to Prepare an Environmental Assessment for the Environmental Review of Holtec Decommissioning International, Llc’S Licensing and Regulatory Requests for Reauthorization of Power Operations at Palisades EPID L-2 ML24183A1552024-07-0101 July 2024 Tribal Letter - Red Lake Band of Chippewa Indians ML24183A1542024-07-0101 July 2024 Tribal Letter Red Cliff Band of Lake Superior Chippewa Indians ML24172A0032024-07-0101 July 2024 Letter to L. Powers, Mackinac Bands of Chippewa and Ottawa Indians Re Initiation of Scoping Process for Environ Review Holtec Decommissioning Intl, LLC Request for Reauthorization of Power Ops-Palisades ML24183A1332024-07-0101 July 2024 Tribal Letter-Forest County Potawatomi Community ML24183A1582024-07-0101 July 2024 Tribal Letter Sault Ste. Marie Tribe of Chippewa Indians ML24183A1302024-07-0101 July 2024 Tribal Letter-Chippewa Cree Indians of the Rocky Boys Reservation ML24183A1282024-07-0101 July 2024 Tribal letter-Bay Mills Indian Community ML24183A1532024-07-0101 July 2024 Tribal Letter Quechan Tribe of the Fort Yuma Indian Reservation ML24183A1572024-07-0101 July 2024 Tribal Letter - Saint Croix Chippewa Indians of Wisconsin ML24183A1462024-07-0101 July 2024 Tribal letter-Mille Lacs Band of Ojibwe ML24183A1422024-07-0101 July 2024 Tribal Letter-Little Traverse Bay Bands of Odawa Indians ML24183A1312024-07-0101 July 2024 Tribal Letter-Citizen Potawatomi Nation ML24163A0552024-07-0101 July 2024 Rebecca Held Knoche NOAA-Palisades-NOI to Conduct Scoping Process and Prepare an EA - EPID No. L-2024-LNE-0003-Docket No. 50-0255 ML24163A2392024-07-0101 July 2024 Sara Thompson, Michigan DNR-Palisades-NOI to Conduct Scoping Process and Prepare an EPID No. L-2024-LNE-0003-Docket No. 50-0255 ML24155A0102024-07-0101 July 2024 Quentin L. Messer Jr., Michigan Econ-Palisades-NOI to Conduct Scoping Process and Prep an EA-EPID No. L-2024-LNE-0003 Docket No.50-0255P ML24155A0032024-07-0101 July 2024 Kathy Kowal, Us EPA Region 5-Palisades-NOI to Cibdyct Scoping Process and Prepare an EA EPID L-2024-LNE-0003 ML24163A0832024-07-0101 July 2024 Ltr to R Schumaker SHPO Re Initiation of Scoping Process, Section 106 Consult for Env Rev of HDI, LLC Request for Reauth of Power Operations at Palisades Nuclear Plant ML24183A1342024-07-0101 July 2024 Tribal Letter-Grand Portage Band of Lake Superior Chippewa ML24183A1392024-07-0101 July 2024 Tribal Letter-Lac Vieux Desert Band of Lake Superior Chippewa Indians ML24183A1272024-07-0101 July 2024 Tribal Letter-Bad River Band of the Lake Superior Tribe of Chippewa ML24183A1412024-07-0101 July 2024 Tribal Letter-Little River Band of Ottawa Indians ML24163A1922024-07-0101 July 2024 Jeremy Rubio, Dept of Env, Great Lakes and Energy, Kalamazoo District-Palisades-NOI to Conduct Scoping Process and Prepare an EA EPID No. L-2024-LNE-0003 Docket No.50-0255 ML24183A1322024-07-0101 July 2024 Tribal Letter-Fond Du Lac Band of Lake Superior Chippewa ML24183A1592024-07-0101 July 2024 Tribal letter-Sokaogon Chippewa Community ML24163A0822024-07-0101 July 2024 Ltr to J Loichinger Achp Re Initiation of Scoping Process, Section 106 Consult for Env Rev of HDI, LLC Request for Reauth of Power Operations at Palisades Nuclear Plant ML24183A1252024-07-0101 July 2024 Letter to G. Gould, Swan Creek Black River Confederated Ojibwa-Init of Scoping Process for the Env Rev of Holtec Decommissioning Intl, LLC Request for Reauth of Power Ops at Palisades ML24183A1352024-07-0101 July 2024 Tribal Letter-Hannahville Indian Community ML24183A1442024-07-0101 July 2024 Tribal Letter - Menominee Indian Tribe of Wisconsin ML24183A1502024-07-0101 July 2024 Tribal Letter - Prarie Band Potawatomi Nation ML24183A1452024-07-0101 July 2024 Tribal Letter - Miami Tribe of Oklahoma 2024-09-06
[Table view] Category:License-Operator
MONTHYEARIR 05000255/20203012020-08-13013 August 2020 NRC Initial License Examination Report 05000255/2020301 ML20268A0732020-07-0606 July 2020 2020 Palisades Ile Form ES-401-4 PNP 2020-003, 2020 Palisades Ile Proposed Exam Submittal Letter2020-07-0606 July 2020 2020 Palisades Ile Proposed Exam Submittal Letter ML20267A3102020-07-0606 July 2020 2020 Palisades Ile Form ES-301-3 ML20267A3212020-07-0606 July 2020 2020 Palisades Ile Form ES-301-4 ML20267A3322020-07-0606 July 2020 2020 Palisades Ile Form ES-301-6 - Rev 0 ML20267A5882020-07-0606 July 2020 2020 Palisades Ile Form ES-403-1 ML20267A5822020-07-0606 July 2020 2020 Palisades Ile Form ES-201-1 ML20268A1502020-07-0606 July 2020 2020 Palisades Ile Administered Written Exam with Answer Key - Redacted ML20268A1312020-07-0606 July 2020 2020 Palisades Ile Administered Walkthrough JPMs ML20267A3592020-07-0606 July 2020 2020 Palisades Ile Proposed Written Exam with Answer Key - Redacted ML20267A3492020-07-0606 July 2020 2020 Palisades Ile Proposed Scenarios ML20268A0842020-07-0606 July 2020 2020 Palisades Ile Op Test Outline Review Comments ML20267A3442020-07-0606 July 2020 2020 Palisades Ile Proposed RO Admin JPMs ML20267A3432020-07-0606 July 2020 2020 Palisades Ile Form ES-401-6 ML20268A0762020-07-0606 July 2020 2020 Palisades Ile Form ES-401-9 ML20268A1092020-07-0606 July 2020 2020 Palisades Ile Administered Scenarios ML20268A1632020-07-0606 July 2020 2020 Palisades Ile Administered Written Exam - Redacted ML20267A5922020-07-0606 July 2020 2020 Palisades Post-Examination Submittal Letter ML20267A3342020-07-0606 July 2020 2020 Palisades Ile Form ES-301-6 - Rev 1 ML20268A0792020-07-0606 July 2020 2020 Palisades Ile Post-Exam Comments - Redacted ML20268A1012020-07-0606 July 2020 2020 Palisades Ile Administered RO Admin JPMs ML20267A5852020-07-0606 July 2020 2020 Palisades Ile Form ES-201-3 ML20268A1112020-07-0606 July 2020 2020 Palisades Ile Administered SRO Admin JPMs ML20267A3522020-07-0606 July 2020 2020 Palisades Ile Proposed SRO Admin JPMs ML20268A0712020-07-0606 July 2020 2020 Palisades Ile Form ES-301-7 ML20267A3562020-07-0606 July 2020 2020 Palisades Ile Proposed Walkthrough JPMs ML20099D2832020-04-0808 April 2020 Operator Licensing Examination Approval ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations PNP 2019-038, 2020 Palisades Ile Outline Submittal Letter2019-11-0707 November 2019 2020 Palisades Ile Outline Submittal Letter ML19234A0332019-08-22022 August 2019 Confirmation of Initial License Examination (Bab) ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19009A2502019-01-0808 January 2019 GFE Annual Registration Letter - 2019 Examinations, Region III ML18284A1822018-09-27027 September 2018 Gfes Results, September 2018 PNP 2018-030, Voluntary Response to NRC Regulatory Issue Summary 2018-02: Preparation and Scheduling of Operator Licensing Examinations2018-06-0606 June 2018 Voluntary Response to NRC Regulatory Issue Summary 2018-02: Preparation and Scheduling of Operator Licensing Examinations ML17361A0302017-12-26026 December 2017 GFE Annual Registration Letter - 2018 Examinations - Region III ML22145A5972017-08-14014 August 2017 2017 Palisades Retake Outline and Operating Test Comments (ES-301-7) ML22145A5962017-08-14014 August 2017 2017 Palisades Retake ES-201-3 ML22145A5952017-08-14014 August 2017 2017 Palisades Retake ES-201-1 PNP 2017-051, 2017 Palisades Retake Post Exam Submittal Letter2017-08-0909 August 2017 2017 Palisades Retake Post Exam Submittal Letter ML22146A0172017-08-0808 August 2017 JPM 1a ML22146A0242017-08-0808 August 2017 JPM 3 ML22146A0192017-08-0808 August 2017 JPM 1b ML22146A0232017-08-0808 August 2017 JPM 2 ML22146A0262017-08-0808 August 2017 JPM 4 ML17222A1812017-08-0707 August 2017 Operator Licensing Reexamination Approval ML22146A0502017-08-0101 August 2017 2017 Palisades Retake ES-201-2 ML22146A0542017-08-0101 August 2017 2017 Palisades Retake ES-301-1 ML22146A0292017-07-24024 July 2017 2017 Palisades Retake ES-301-3 ML22146A0322017-07-24024 July 2017 2017 Palisades Retake Proposed Admin JPMs 2020-08-13
[Table view] Category:Part 55 Examination Related Material
[Table view] |
Text
Entergy Nuclear Operations, Inc.Palisades Nuclear Plant-~I~'nter 27780 Blue Star Memorial Highway Covert, Ml 49043 Tel 269 764 2000 Otto W.Gustafson Licensing Manager PNP 2011-061 July 22, 2011 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Voluntary Response to NRC Regulatory Issue Summary 2011-04: Preparation and Scheduling of Operator Licensing Examinations Palisades Nuclear Plant Docket 50-255 License No.DPR-20
Dear Sir or Madam:
Nuclear Regulatory Commission (NRC)Regulatory Issue Summary 2011-04,"Preparation and Scheduling of Operator Licensing Examinations,"
requests that licensees submit, on a voluntary basis, a NRC Form 536,"Operator Licensing Examination Data."Estimates are requested for calendar years 2013 through 2016.The purpose of these estimates is to assist the NRC in budgeting and scheduling resources.
In response to this request, Entergy Nuclear Operations, Inc.is providing the enclosed NRC Form 536 for the Palisades Nuclear Plant (PNP).PNP currently has examinations scheduled in 2012 for six reactor operators, five senior reactor operators-instant, and four senior reactor operators-upgrade.
Examinations begin the week of June 25, 2012.This letter makes no new commitments or revision to previous commitments.
Sincerely, OWG/bed
Attachment:
1.NRC Form 536-Operator Licensing Examination Data CC Administrator, Region III, USNRC Project Manager, Palisades, USN RC Resident Inspector, Palisades, USN RC ATTACHMENT 1 NRC FORM 536-OPERATOR LICENSING EXAMINATION DATA NRC FORM 536 US NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB NO 315-0131 EXPIRES 10/31/2011 (10-2008)Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.This information collection is used to plan budgets and resources for operator examinations.
Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), US APERAT('IR I"ENSING Nuclear Regulatory Commission, Washington, DC~20555-0001, or by internet email to infocollects@nrc.gov, and EXAMINATION DATA to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY: Palisades Nuclear Plant, 27780 Blue Star Memorial Highway, Covert, MI 49043 NRC REGION III DOCKET 50-255 LICENSE DPR-20 A.PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2013 CY2014 CY2015 CY2016 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B.INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2013 CY2014 CY2015 CY2016 NUMBER OF REACTOR 0 0 6 OPERATORS 6 NUMBER OF SENIOR REACTOR 0 3 0 3 OPERATORS-INSTANT NUMBEROFSENIORREACTOR 0 3 0 3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED_DATES PRIMARY DATE N/A 6/2/2014 N/A 8/1/2016 ALTERNATE DATE N A 6/30/2014 N/A 9/26/2016 C.PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE)SCHEDULE CY2012 CY2013 PROPOSED NUMBER March June September December March June September December ESTIMATED NUMBER OF 0 0 0 0 9 0 0 0 CANDIDATES Page 1 of 1