#REDIRECT [[IR 05000482/2009005]]
{{Adams
| number = ML100610613
| issue date = 03/02/2010
| title = IR 05000482-09-005, for Wolf Creek, Replacement Page 18 of Report Details and Insert Page A-4A Into Supplemental Information, Errata
| author name = Miller G
| author affiliation = NRC/RGN-IV/DRP/RPB-B
| addressee name = Sunseri M
| addressee affiliation = Wolf Creek Nuclear Operating Corp
| docket = 05000482
| license number = NPF-042
| contact person =
| document report number = IR-09-005
| document type = Letter, Inspection Report
| page count = 5
}}
See also: [[see also::IR 05000482/2009005]]
 
=Text=
{{#Wiki_filter:March 2, 2010
  Matthew W. Sunseri, President and 
  Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS  66839
SUBJECT:  WOLF CREEK GENERATING STATION - NRC INTEGRATED INSPECTION                    REPORT 05000482/2009005 ERRATA Dear Mr. Sunseri: Please replace page 18 of the Report Details and insert page A-4A into the Supplemental Information in NRC Inspection Report 05000482/2009005, dated February 11, 2010, using the enclosed revised pages.  These changes are needed to properly document a flood protection inspection. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely,  /RA/  Geoffrey B. Miller, Chief
Project Branch B  Division of Reactor Projects
Docket:  50-482 License:  NPF-42 
 
Enclosure:  As stated
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125
cc w/Enclosure:  Vice President Operations/Plant Manager Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS  66839
Jay Silberg, Esq. Pillsbury Winthrop Shaw Pittman LLP 2300 N Street, NW Washington, DC  20037
Supervisor Licensing Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS  66839
Chief Engineer Utilities Division
Kansas Corporation Commission 1500 SW Arrowhead Road Topeka, KS  66604-4027
Office of the Governor
State of Kansas Topeka, KS  66612-1590
Attorney General 120 S.W. 10th Avenue, 2nd Floor
Topeka, KS  66612-1597
County Clerk Coffey County Courthouse 110 South 6th Street
Burlington, KS  66839
Chief, Radiation and Asbestos  Control Section Kansas Department of Health and
  Environment Bureau of Air and Radiation 1000 SW Jackson, Suite 310 Topeka, KS  66612-1366
   
Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Chuck.Casto@nrc.gov) DRP Director (Dwight.Chamberlain@nrc.gov) DRP Deputy Director (Anton.Vegel@nrc.gov) DRS Director (Roy.Caniano@nrc.gov)
DRS Deputy Director (Troy.Pruett@nrc.gov) Senior Resident Inspector (Chris.Long@nrc.gov) Site Secretary (Shirley.Allen@nrc.gov) Branch Chief, DRP/B (Geoffrey.Miller@nrc.gov) Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov) Senior Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)
Only inspection reports to the following: DRS/TSB STA (Dale.Powers@nrc.gov) L. Trocine, OEDO RIV Coordinator (Leigh.Trocine@nrc.gov) ROPreports
 
   
   
   
  SUNSI Review Completed:  __CML__ ADAMS:    Yes  No    Initials: __CML__
Publicly Available          Non-Publicly Available        Sensitive          Non-Sensitive ML 100610613
SRI:DRP/B PE:DRP/B BC:DRP/B  CMLong GPTutak GBMiller  /RA by E/ /RA/ /RA/  3/2/10 3/2/10 3/2/10  OFFICIAL RECORD COPY    T=Telephone          E=E-mail        F=Fax 
for bunkers/manholes; verified that operator actions for coping with flooding can reasonably achieve the desired outcomes; and walked down the area listed below to verify the adequacy of equipment seals located below the flood line, floor and wall penetration seals, watertight door seals, common drain lines and sumps, sump pumps, level alarms, and control circuits, and temporary or removable flood barriers.  Specific documents reviewed during this inspection are listed in the attachment. 
 
* October 6, 2009, Auxiliary feedwater rooms and sump pumps
* November 13, 2009, Residual Heat Removal Pump Room A after room cooler leakage These activities constitute completion of two flood protection measures inspection samples as defined by Inspection Procedure IP 71111.06-05.
b. Findings
No findings of significance were identified.
1R07 Heat Sink Performance (71111.07)
 
.1 Annual Inspection
  a. Inspection Scope
The inspectors reviewed licensee programs, verified performance against industry standards, and reviewed critical operating parameters and maintenance records. 
 
* January 14, 2009, STN PE-38 on containment cooler SGN01D  The inspectors verified that performance tests were satisfactorily conducted for heat exchangers/heat sinks and reviewed for problems or errors; the licensee utilized the periodic maintenance method outlined in Electric Power Research Institute Report NP 7552, "Heat Exchanger Performance Monitoring Guidelines;" the licensee properly utilized biofouling controls; the licensee's heat exchanger inspections adequately assessed the state of cleanliness of their tubes; and the heat exchanger was correctly categorized under 10 CFR 50.65, "Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants."  Specific documents reviewed
during this inspection are listed in the attachment.
These activities constitute completion of one heat sink inspection sample as defined by Inspection Procedure IP 71111.07-05.
b. Findings
No findings of significance were identified.
   
    - 18 - 
  MISCELLANEOUS
  Condition Report 21764  Floor Drain Tank Logs 11/12/09 - 11/14/09 
WORK ORDERS
  09-322276-000  09-322259-002   
DRAWINGS  NUMBER TITLE Revision 10466-A-1301 Architectural Auxiliary & Reactor Bldg. Floor Plan El. 1974' 0" 8 C-1C1112 Auxiliary Building - Area 1 Concrete Neat Lines Plan - Base Slab El. 1974' 0"
2 C-1C1122 Auxiliary Building - Area 2 Concrete Neat Lines Plan - Base Slab El. 1974' 0"
2 10466 C-0026 Civil Structural Standard Details Stainless Steel Sumps 11         
   
   
     
A-4a
}}

Revision as of 13:08, 11 July 2019

IR 05000482-09-005, for Wolf Creek, Replacement Page 18 of Report Details and Insert Page A-4A Into Supplemental Information, Errata
ML100610613
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 03/02/2010
From: Geoffrey Miller
NRC/RGN-IV/DRP/RPB-B
To: Matthew Sunseri
Wolf Creek
References
IR-09-005
Download: ML100610613 (5)


See also: IR 05000482/2009005

Text

March 2, 2010

Matthew W. Sunseri, President and

Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839

SUBJECT: WOLF CREEK GENERATING STATION - NRC INTEGRATED INSPECTION REPORT 05000482/2009005 ERRATA Dear Mr. Sunseri: Please replace page 18 of the Report Details and insert page A-4A into the Supplemental Information in NRC Inspection Report 05000482/2009005, dated February 11, 2010, using the enclosed revised pages. These changes are needed to properly document a flood protection inspection. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/ Geoffrey B. Miller, Chief

Project Branch B Division of Reactor Projects

Docket: 50-482 License: NPF-42

Enclosure: As stated

UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125

cc w/Enclosure: Vice President Operations/Plant Manager Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839

Jay Silberg, Esq. Pillsbury Winthrop Shaw Pittman LLP 2300 N Street, NW Washington, DC 20037

Supervisor Licensing Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839

Chief Engineer Utilities Division

Kansas Corporation Commission 1500 SW Arrowhead Road Topeka, KS 66604-4027

Office of the Governor

State of Kansas Topeka, KS 66612-1590

Attorney General 120 S.W. 10th Avenue, 2nd Floor

Topeka, KS 66612-1597

County Clerk Coffey County Courthouse 110 South 6th Street

Burlington, KS 66839

Chief, Radiation and Asbestos Control Section Kansas Department of Health and

Environment Bureau of Air and Radiation 1000 SW Jackson, Suite 310 Topeka, KS 66612-1366

Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Chuck.Casto@nrc.gov) DRP Director (Dwight.Chamberlain@nrc.gov) DRP Deputy Director (Anton.Vegel@nrc.gov) DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov) Senior Resident Inspector (Chris.Long@nrc.gov) Site Secretary (Shirley.Allen@nrc.gov) Branch Chief, DRP/B (Geoffrey.Miller@nrc.gov) Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov) Senior Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)

Only inspection reports to the following: DRS/TSB STA (Dale.Powers@nrc.gov) L. Trocine, OEDO RIV Coordinator (Leigh.Trocine@nrc.gov) ROPreports

SUNSI Review Completed: __CML__ ADAMS: Yes No Initials: __CML__

Publicly Available Non-Publicly Available Sensitive Non-Sensitive ML 100610613

SRI:DRP/B PE:DRP/B BC:DRP/B CMLong GPTutak GBMiller /RA by E/ /RA/ /RA/ 3/2/10 3/2/10 3/2/10 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

for bunkers/manholes; verified that operator actions for coping with flooding can reasonably achieve the desired outcomes; and walked down the area listed below to verify the adequacy of equipment seals located below the flood line, floor and wall penetration seals, watertight door seals, common drain lines and sumps, sump pumps, level alarms, and control circuits, and temporary or removable flood barriers. Specific documents reviewed during this inspection are listed in the attachment.

  • November 13, 2009, Residual Heat Removal Pump Room A after room cooler leakage These activities constitute completion of two flood protection measures inspection samples as defined by Inspection Procedure IP 71111.06-05.

b. Findings

No findings of significance were identified.

1R07 Heat Sink Performance (71111.07)

.1 Annual Inspection

a. Inspection Scope

The inspectors reviewed licensee programs, verified performance against industry standards, and reviewed critical operating parameters and maintenance records.

  • January 14, 2009, STN PE-38 on containment cooler SGN01D The inspectors verified that performance tests were satisfactorily conducted for heat exchangers/heat sinks and reviewed for problems or errors; the licensee utilized the periodic maintenance method outlined in Electric Power Research Institute Report NP 7552, "Heat Exchanger Performance Monitoring Guidelines;" the licensee properly utilized biofouling controls; the licensee's heat exchanger inspections adequately assessed the state of cleanliness of their tubes; and the heat exchanger was correctly categorized under 10 CFR 50.65, "Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants." Specific documents reviewed

during this inspection are listed in the attachment.

These activities constitute completion of one heat sink inspection sample as defined by Inspection Procedure IP 71111.07-05.

b. Findings

No findings of significance were identified.

- 18 -

MISCELLANEOUS

Condition Report 21764 Floor Drain Tank Logs 11/12/09 - 11/14/09

WORK ORDERS

09-322276-000 09-322259-002

DRAWINGS NUMBER TITLE Revision 10466-A-1301 Architectural Auxiliary & Reactor Bldg. Floor Plan El. 1974' 0" 8 C-1C1112 Auxiliary Building - Area 1 Concrete Neat Lines Plan - Base Slab El. 1974' 0"

2 C-1C1122 Auxiliary Building - Area 2 Concrete Neat Lines Plan - Base Slab El. 1974' 0"

2 10466 C-0026 Civil Structural Standard Details Stainless Steel Sumps 11

A-4a