|
|
Line 17: |
Line 17: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:'/ACCESSIOiV"EBBFACIL:5025050-25150335AUTH~tlAHESCHt'.IDTE A~D~RECIP~4A'<EREGULA'RYINFORlATIONOISTRIBUTIO SYSTE'l(R[DS):8009170279 OOC.DATEs 80/09/06NOTARIZED: | | {{#Wiki_filter:'/ACCESS IOiV"EBB F AC IL: 50 250 50-251 50 335 AU TH~tlAHE SCHt'.IDTE A~D~REC IP~4A'<E REGULA'RY INFOR lATION OISTRIBUTIO SYSTE'l (R[DS):8009170279 OOC.DATEs 80/09/06 NOTARIZED: |
| NoDOCKET4TurkeyPointPlantiUnit3EFloridaPowerandLightC05000250TurkeyPointPlantiUnit4EFloridaPowerandLightC05000251St~LuciePlantiUnit1EFloridaPower8LightCo~0AUTHORAFFILIATION FloridaPower8LightCo~RECIPIEVTAFFILIATIOVOfficeof'4lanagement andProgramAnalysisSUBJECT;Forwardsmonthlyooeratina reotsforAug1980'ISTRISUTIOICODE;AOOSSCOPIESRECEIVED;LTR
| | No DOCKET 4 Turkey Point Planti Unit 3E Florida Power and Light C 05000250 Turkey Point Planti Unit 4E Florida Power and Light C 05000251 St~Lucie Planti Unit 1E Florida Power 8 Light Co~0 AUTHOR AFFILIATION Florida Power 8 Light Co~RECIP IEVT AFF ILIAT IOV Office of'4lanagement and Program Analysis SUBJECT;Forwards monthly ooeratina reots for Aug 1980'ISTR ISUTIO I CODE;AOOSS COPIES RECEIVED;LTR |
| /EVCLJ'IIE:TITl.E:Annual'emi Annus'l,i, MonthlyOoerating Reoorts(OLStagNOTEStRECI~!EVTIDC3OE/VA'1E ACTIOiv.'ARGAE S~04INTERNAl.: | | /EVCL J'IIE: TITl.E: Annual'emi Annus'l,i, Monthly Ooerating Reoorts (OL Stag NOTESt RECI~!EV T ID C3OE/VA'1E ACTIOiv.'ARGAE S~04 INTERNAl.: |
| AEOOOIRHU"FAC08R)A13EXEVALBR09REGFII.E01COPIESLTTRENCL771111221111RECIPIEVTIOCODE/NAvTE CLARKERD04D/9IRgAU~iFAC07ICE06NRCPOR02ORASSESSBR10CUTIESLTTRENCL771122111,1UTERI'vAL; ACRSLPDR03BRO:3I','HAVEVVSIC05111'gygs~s~oTJ'IKLyJ""E1=CI=OSRREi.lll=D:LTT"~EVCL
| | AEOO OIR HU" FAC 08 R)A 13 EX EVAL BR09 REG F II.E 01 COPIES LTTR ENCL 7 7 1 1 1 1 2 2 1 1 1 1 REC I P IEVT IO CODE/NAvTE CLARKERD 04 D/9 IR g AU~i F AC07 ICE 06 NRC POR 02 OR ASSESS BR 10 CUTIES LTTR ENCL 7 7 1 1 2 2 1 1 1, 1 UTERI'vAL; ACRS LPDR 03 B R O:3 I','H A V E V VSIC 05 1 1 1'gy gs~s~o TJ'I KL y J""E 1=CI=OS RRE i.ll l=D: LT T"~EVCL |
| ()/Of~i) | | ()/Of~i) |
| P.O.BOX529100,MIAMI,FL33162yllgi',:.i:~.i5:-,=JiA~eiXiFLORIDAPOWER8LIGHTCOMPANYSeptember 6,l980OfficeofManagement Information andProgramControlsU.S.Regulatory Commission Washington, D.C.20555Gentlemen: | | P.O.BOX 529100, MIAMI, FL 33162 yllgi',:.i:~.i5:-,=Ji A~eiXi FLORIDA POWER 8 LIGHT COMPANY September 6, l980 Office of Management Information and Program Controls U.S.Regulatory Commission Washington, D.C.20555 Gentlemen: |
| AttachedaretheAugust,1980,Operating StatusReportsforTurkeyPointUnitNos.3and4.andSt.LucieUnitNo.l.Verytrulyyours,A.D.SchmidtVicePresident PowerResources VTC/ddccc:Mr.JamesP.O'ReillyRobertLowenstein, Esquire/DOER'i1o~~/PEOPLE...
| | Attached are the August, 1980, Operating Status Reports for Turkey Point Unit Nos.3 and 4.and St.Lucie Unit No.l.Very truly yours, A.D.Schmidt Vice President Power Resources VTC/ddc cc: Mr.James P.O'Reilly Robert Lowenstein, Esquire/DOER'i 1o~~/PEOPLE...SERVING PEOPLE I 4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.*COMPLETED II Y V.T.Chilson TELEPHONE MONTH AUGUSTA 1980 DAY AVERAGE DAILY POWER LEVEL (MWe.Net)I 643 639 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)653 l7 IS l0 l3 l4 IS 16 INSTRUCTIONS 63 637 646 503 664 658 655 658 656 656 656 649 656 19 20 12 23 24 25 26 27 2S 29 30 31 NOTE: 647 653 647 652 657 652 642 643 644 648 Average daily power level greater than 646 MWe due to cooler condenser cooling water.On this format.list the average daily unit power (evel in MWe Net for each day in the reporting ntonth.Compute to the nearest whole megawatt.(')(77) |
| SERVINGPEOPLE I4 AVERAGEDAILYUNITPOWERLEVELDOCKETNO.*COMPLETED IIYV.T.ChilsonTELEPHONE MONTHAUGUSTA1980DAYAVERAGEDAILYPOWERLEVEL(MWe.Net)
| | .OPERATING DATA REPORT'OPERATING STATUS Turke'oint Unit No.3 760 693 680 1.Unit Name: 2.Reporting Period: 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net MWe): 6.Maximum Dependable Capacity (Gross MWe): 7.Maximum Dependable Capacity (Net MWe): DOCKET NO.oATE SeSs~.980.COMPLETED BY J~~hilson TELEPHONE 4851~2-3824 Notes-Unit No.3 operated at approximately 1008 R.P.>except for outage of Aug.6-7, 1980 8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: Maximum De endable Ca acit Gross MWe has been rerated to the mbst restricted seasonal conditions (summer)experienced. |
| I643639DAYAVERAGEDAILYPOWERLEVEL(MWe-Net) 653l7ISl0l3l4IS16INSTRUCTIONS 6363764650366465865565865665665664965619201223242526272S293031NOTE:647653647652657652642643644648Averagedailypowerlevelgreaterthan646MWeduetocoolercondenser coolingwater.Onthisformat.listtheaveragedailyunitpower(evelinMWeNetforeachdayinthereporting ntonth.Computetothenearestwholemegawatt.
| | Maximum Dependable Capacity (Net MWe)has been rerated accordingly. |
| (')(77) | | 9.Power Level To Which Restricted. |
| .OPERATING DATAREPORT'OPERATING STATUSTurke'ointUnitNo.37606936801.UnitName:2.Reporting Period:3.LicensedThermalPower(MWt):4.Nameplate Rating(GrossMWe):5.DesignElectrical Rating(NetMWe):6.MaximumDependable Capacity(GrossMWe):7.MaximumDependable Capacity(NetMWe):DOCKETNO.oATESeSs~.980.COMPLETED BYJ~~hilson TELEPHONE 4851~2-3824 Notes-UnitNo.3operatedatapproximately 1008R.P.>exceptforoutageofAug.6-7,19808.IfChangesOccurinCapacityRatings(ItemsNumber3Through7)SinceLastReport,GiveReasons:MaximumDeendableCaacitGrossMWehasbeenreratedtothembstrestricted seasonalconditions (summer)experienced. | | If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr:to-Date 11.Hours In Reporting Period 12.Number Of Hours Reactor Was Critical~13.Reactor Reserve Shutdown Hours 14.Hours Generator On.Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Ge'nerated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months 744.0 4 979.7 0 4 809.4 737.9 1 613 090 10"410 368 3 275 415 503 570 3 104 278 478 174 82.1 99.2 99.2 82.1 99.5'2.1 76.5 0.8 1.3 (Type, Date, and Duration of Each): P o ram-Oct.5-Nov.1 1980.Cumulative 7 6 6 52 249.2 213.4 50 499;6 121.8 101 879 002 32 356 415 30 626 372 74.4 74.6 70.2 65.1 2.5 25.If Shut Down At End Of Report Period, Esthnated Date of Startup: 26.Units ln Test Status (Prior to Commercial Operation): |
| MaximumDependable Capacity(NetMWe)hasbeenreratedaccordingly.
| | Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (u/77) |
| 9.PowerLevelToWhichRestricted. | |
| IfAny(NetMWe):10.ReasonsForRestrictions, IfAny:ThisMonthYr:to-Date 11.HoursInReporting Period12.NumberOfHoursReactorWasCritical~13.ReactorReserveShutdownHours14.HoursGenerator On.Line15.UnitReserveShutdownHours16.GrossThermalEnergyGe'nerated (MWH)17.GrossElectrical EnergyGenerated (MWH)18.NetElectrical EnergyGenerated (MWH)19.UnitServiceFactor20.UnitAvailability Factor21.UnitCapacityFactor(UsingMDCNet)22.UnitCapacityFactor(UsingDERNet)23.UnitForcedOutageRate24.Shutdowns Scheduled OverNext6Months744.04979.704809.4737.9161309010"4103683275415503570310427847817482.199.299.282.199.5'2.176.50.81.3(Type,Date,andDurationofEach):Poram-Oct.5-Nov.11980.Cumulative 76652249.2213.450499;6121.8101879002323564153062637274.474.670.265.12.525.IfShutDownAtEndOfReportPeriod,Esthnated DateofStartup:26.UnitslnTestStatus(PriortoCommercial Operation):
| |
| ForecastAchievedINITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (u/77)
| |
| O. | | O. |
| UNITSHUTDOWNS ANDPOWERREDUCTIONS DOCKETNO.
| | UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO.50-250 No.Date Vl~J L rl IA Q Q~Q~CA Liccnscc Event Report-4l Cl'n cn G R~Q CI O Cr Cause 4 Corrective Action to Prevent Recurrence 16 80-08-06 F 6.1: N/A CB MOTOR X Unit No.3 was removed from service due to low oil level in reactor coolant pump motor No.3C.Cor-rective actions included adding oil.(Nuclear System)F: Forced S: Scheduled<<I/v7)Reason: A-Equipment Failure (Explain)B.Maintenance oi Test~C-Refueling D.Regulatory Restriction E-Operator Training 8r, Liccnsc Examination F-Administrative G-Operational Error (Explain)II.Other (Explain)3 Method: I-Manual 2.Manual Scram.3-Automatic Scram.4-Other (Explain)4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-OI 6 I)5 Exhibit I-Sante Source 0 AVERAGE DAlLY UNIT POWER LEVEL DOCKET NO.COMPLETED BY V-T.ChilSon MONTH AUGUST 1980 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)I 633 DAY AVERAGE DAILY POWER LEVEL (M We.Net)639 17 8 10 12 13 14 l5 16 635 630 633 640 644 645 644 640 641 639 640 18 19 20 21 22 24 25 26 27 28>9 30 31 634 635 634 635 636 638 640 642 634 630 632 636 INSTRUCTIONS On this format.list the'average daily unit I>>>wer levt.l in MWe.Net for each day i>>the reporting>n>>nth.C>>n>pute to the nearest whole megawat t.('t(77) |
| 50-250No.DateVl~JLrlIAQQ~Q~CALiccnsccEventReport-4lCl'ncnGR~QCIOCrCause4Corrective ActiontoPreventRecurrence 1680-08-06F6.1:N/ACBMOTORXUnitNo.3wasremovedfromserviceduetolowoillevelinreactorcoolantpumpmotorNo.3C.Cor-rectiveactionsincludedaddingoil.(NuclearSystem)F:ForcedS:Scheduled | | OPERATING DATA REPORT DOCKET NO.~~2L DATE M~~980 COMPLETED BY 2LZ~~son TELEPHONE OPERATING STATUS Notes-Unit No.4 operated at approximately 100%R.P.1.Unit Name: Turke Point Unit No.4 Reporting Period AU ust 1980 3.I.icensed Thermal Power (MWt): 2200 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net MWe): e~7.Maximum De ndable Ca acit Net MWe: 646 conditions summer ex erienced.Maximum De endable Ca acit Net MWe has been p y()8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: Maximum De endable Ca acit (Grass MWe)has been rerated to the most restricted seasonal rerated accordingly. |
| <<I/v7)Reason:A-Equipment Failure(Explain) | | 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: NONE This Month Yr.-to-Date Cumula tive 6X 584.0 744.0 5 3 9.166.6-0-43 627;3 31'90.848 116-0-1 633 024 28 900 833 2 5 70.8 70.9 69.0 64.1 3.0 11.Hours In Reporting Period 12.Number Of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 12 03 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 12.3 16.Gross Thermal Energy Ge'nerated (MWH)9 629 136 17.Gross Electrical Energy Generated (MWH)2 997 355 19.Unit Service Factor 75.9 20.Unit Availability Factor 100.076.1 21.Unit Capacity Factor (Using MDC Net)98'.6"75.1 22.Unit Capacity Factor (Using DER Net)92.0 70.0 23.Unit Forced Outage Rate-0-0.3 24.Shutdowns Scheduled Over Next 6 Months(Type, Date, and Duration of Each): maintenance and ins ections-Nov.9 1980-Jan.10, 1981.25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation): |
| B.Maintenance oiTest~C-Refueling D.Regulatory Restriction E-Operator Training8r,LiccnscExamination F-Administrative G-Operational Error(Explain) | | Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (lp/77) r UNIT SHUTDOWNS AND POWER REDUCTIONS nit No.4 REPORT hiONTH AUGUST, 1980 305 552-82 No.Date Ih 4 A J a~C/7$Liccnscc Event Report~i~CP 4)o~G CJ~CJ Q C~Cause&Corrective Action to Prevent Recurrence N 0 N F: Forced S: Schedu!ed (')/77)Reason: A.Equipment Failure (Explain)B.Maintenance or Test C-Refueling. |
| II.Other(Explain) 3Method:I-Manual2.ManualScram.3-Automatic Scram.4-Other(Explain) 4ExhibitG-Instructions forPreparation ofDataEntrySheetsforLicenseeEventReport(LER)File(NUREG-OI6I)5ExhibitI-SanteSource 0AVERAGEDAlLYUNITPOWERLEVELDOCKETNO.COMPLETED BYV-T.ChilSonMONTHAUGUST1980DAYAVERAGEDAILYPOWERLEVEL(MWe-Net) | | D.Regulatory Restriction EZperator Training&.License Examination F-Administrative G-Operational Error (Explain)II.Other (Explain)Method: I-Manual 2-Manual Scram.3-Automatic Scram.4-Other (Explain)Exhibit G-instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-OI 6 I)Exlwbrt I-Same Source AVERAGE DAII.Y UNIT POWER LEVEL DOCKET NO.St.Lucre II"-"" COMPLETEDIIY V-T.Chilson MONTH AUGUST 1980 DAY AVERAGE DAILY POWER LEVEL (MWe.Net)I 75 794 796 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)17 18 673 19 787 10 11 13 14 15 16 INSTRUCTIONS 77 770 792 791 790 791 798 797 718 126 255 394 20 21 22 23 24 25 26 27 28 30 31 NOTE: 786 725 783 78 782 757 759 781 779 780 749 Average daily power level greater than 777 MWe due to cooler condenser cooling water.On this format.list the average daily unit power level in MWe.Net for each day in the reporting month.Compute to the nearest whole megawatt.I')/77) |
| I633DAYAVERAGEDAILYPOWERLEVEL(MWe.Net)63917810121314l51663563063364064464564464064163964018192021222425262728>93031634635634635636638640642634630632636INSTRUCTIONS Onthisformat.listthe'average dailyunitI>>>werlevt.linMWe.Netforeachdayi>>thereporting
| | OPERATING STATUS OPERATING DATA REPORT DOCKETNO.~~DATE MI~~980 COMPLETED BY T Chilson TELEPHONE 05 552-3824 St.Lucie Unit No.1 2560 850 802 l.Unit Name: 2.Reporting Period: 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net MWe): 6.Maximum Dependable Capacity (Gross MWe): 7.Maximum Dependable Capacity (Net MWe): 22 Notes-Unit operated at approximately 100%R.P., except for outages of Aug.14, 14-15, and 16-18, 1980, and reduced load operation of Aug.14-18, 1980.8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted. |
| >n>>nth.C>>n>putetothenearestwholemegawatt.('t(77) | | If Any (Net MWe): 10.Reasons For Restrictions, If Any: NONE This Month Yr:to-Date 5 855.0 4 0.2-0-3 889.7 7.3 3 101 490 2 915 036 66.4 64;1 62.1 11.Hours In Reporting Period 744.0 12.Number Of Hours Reactor Was Critical 720.0 13.Reactor Reserve Shutdown Hours-0-~14.Hours Generator On-Line 701.4 15.Unit Reserve Shutdown Hours 7~3 17.Gross Electrical Energy Generated (MWH)551 240 18.Net Electrical Energy Generated (MWH)519 201 19.Unit Service Factor 94.3 20.Unit Availability Factor 22.Unit Capacity Factor (Using DER Net)87.0 23.Unit Forced Outage Rate-0-24.Shutdowns Scheduled Over Next 6 Months (Type.Date, and Duration of Each): Cumulative 32 399.0-2 129.5 24 719;7 39.3 19 395 990 18 242 932 76.3 72.5'70.2 6.4 25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units ln Test Status (Prior to Commercial Operation): |
| OPERATING DATAREPORTDOCKETNO.~~2LDATEM~~980COMPLETED BY2LZ~~sonTELEPHONE OPERATING STATUSNotes-UnitNo.4operatedatapproximately 100%R.P.1.UnitName:TurkePointUnitNo.4Reporting PeriodAUust19803.I.icensed ThermalPower(MWt):22004.Nameplate Rating(GrossMWe):5.DesignElectrical Rating(NetMWe):e~7.MaximumDendableCaacitNetMWe:646conditions summerexerienced. | | N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (u/77) |
| MaximumDeendableCaacitNetMWehasbeenpy()8.IfChangesOccurinCapacityRatings(ItemsNumber3Through7)SinceLastReport,GiveReasons:MaximumDeendableCaacit(GrassMWe)hasbeenreratedtothemostrestricted seasonalreratedaccordingly.
| | Page 1 of 2 80 UNIT SHUTDOWNS AND POWER REDUCTIONS 552-3824 DOCKET NO.l30Sl-No.l No.I Q~tS c 5 tx.'C/I Llccllscc Event Rcport-Cl C~Q Cr Cause&Corrective Action to Prevent Recurrcncc 80-08-14 S 10.7 A N/A EG TRANSF Unit was removed from service to isolate main power transformer No.1B to repair oil leak.Cor-rective actions included installing new bushing.(Non-nuclear system)12 80-08-14-0-B N/A EG TRANSF Load was limited to the capacity of main transformer No.1A.(Non-nuclear system)13 80-08-14 7.3*F N/A EG TRANSP Unit was removed from service to pro-tect personnel using a crane to re-move a faulty bushing from main power transformer No.1B.(Non-nuclear system)I F: Forced S: Schedu!ed ('I/77)Reason: A-Equipment Failure (Explain)B-Maintenance oi Test.C.Refueling D Regulatory Restriction E-Operator Training Sc Liccnsc Examination F-Administrative G-Operational Error (Explain)II-Other (Explain)3 Method: I-Manual 2-Manual Scram.3-Automatic Scram.4-Other (Explain)4 Exhibit G-Instructions for Preparation of Data Entry Sheets Ior Licensee Event Report (LER)File (NUREG-016I)Exhibit I-Same Source UNIT SHUTDOWNS AND POWER REDUCTIONS Page 2 of 2 80*COMPLETED BY I-"'-'Ni).rl MI l J Llcenscc Event Report=CP CJ MI cn G C o~E~Cause Ec Corrective Action to Prevent Recurrence 14 80-08-'17'24.6-B N/A EG TRANSF Unit was removed from service to install new bushing'and return main power transformer No.1B to service.(Non-nuclear system)F: Forced S: Scheduled ('>/77)Reason: A.Equipment Failure (Explain)B-hlaintenance or Test.C-Refueling D Regulatory Restriction E-Operator Training Ec License Examination F-Administrative G-Operational Error (Explain)H-Other (Explairt) h(ethod: I-Manual 2-h(anuai Scram.3-Automatic Scranl.4-Other (Explain)Exhibit G-Instructions |
| 9.PowerLevelToWhichRestricted, IfAny(NetMWe):10.ReasonsForRestrictions, IfAny:NONEThisMonthYr.-to-Date Cumulative6X584.0744.0539.166.6-0-43627;331'90.848116-0-1633024289008332570.870.969.064.13.011.HoursInReporting Period12.NumberOfHoursReactorWasCritical13.ReactorReserveShutdownHours120314.HoursGenerator On-Line15.UnitReserveShutdownHours12.316.GrossThermalEnergyGe'nerated (MWH)962913617.GrossElectrical EnergyGenerated (MWH)299735519.UnitServiceFactor75.920.UnitAvailability Factor100.076.121.UnitCapacityFactor(UsingMDCNet)98'.6"75.122.UnitCapacityFactor(UsingDERNet)92.070.023.UnitForcedOutageRate-0-0.324.Shutdowns Scheduled OverNext6Months(Type, Date,andDurationofEach):maintenance andinsections-Nov.91980-Jan.10,1981.25.IfShutDownAtEndOfReportPeriod,Estimated DateofStartup:26.UnitsInTestStatus(PriortoCommercial Operation): | | .for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG.OI 6I)Exhibit I-Salnc Source P.O.BOX 529100, MIAMI, FL 33162+<Illy~l,==FLORIDA POWER 8 LIGHT COMPANY September 6, l980 Office of Management Information and Program Controls U.S.Regulatory Commission Washington, D.C.20555 Gentlemen: |
| ForecastAchievedINITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (lp/77) r UNITSHUTDOWNS ANDPOWERREDUCTIONS nitNo.4REPORThiONTHAUGUST,1980305552-82No.DateIh4AJa~C/7$LiccnsccEventReport~i~CP4)o~GCJ~CJQC~Cause&Corrective ActiontoPreventRecurrence N0NF:ForcedS:Schedu!ed
| | Attached are the August, 1980, Operating Summary Reports for Turkey Point Unit Nos.3 and 4 and St.Lucie Unit No.l.Very truly yours, D.Schmidt Vice President Power Resources VTC/ddc cc: Mr.James P.O'Reilly Robert Lowenstein, Esquire PEOPLE...SERVING PEOPLE |
| (')/77)Reason:A.Equipment Failure(Explain) | |
| B.Maintenance orTestC-Refueling. | |
| D.Regulatory Restriction EZperator Training&.LicenseExamination F-Administrative G-Operational Error(Explain) | |
| II.Other(Explain) | |
| Method:I-Manual2-ManualScram.3-Automatic Scram.4-Other(Explain) | |
| ExhibitG-instructions forPreparation ofDataEntrySheetsforLicenseeEventReport(LER)File(NUREG-OI6I)ExlwbrtI-SameSource AVERAGEDAII.YUNITPOWERLEVELDOCKETNO.St.LucreII"-""COMPLETEDIIY V-T.ChilsonMONTHAUGUST1980DAYAVERAGEDAILYPOWERLEVEL(MWe.Net)
| |
| I75794796DAYAVERAGEDAILYPOWERLEVEL(MWe-Net) 171867319787101113141516INSTRUCTIONS 777707927917907917987977181262553942021222324252627283031NOTE:78672578378782757759781779780749Averagedailypowerlevelgreaterthan777MWeduetocoolercondenser coolingwater.Onthisformat.listtheaveragedailyunitpowerlevelinMWe.Netforeachdayinthereporting month.Computetothenearestwholemegawatt.
| |
| I')/77) | |
| OPERATING STATUSOPERATING DATAREPORTDOCKETNO. | |
| ~~DATEMI~~980COMPLETED BYTChilsonTELEPHONE 05552-3824St.LucieUnitNo.12560850802l.UnitName:2.Reporting Period:3.LicensedThermalPower(MWt):4.Nameplate Rating(GrossMWe):5.DesignElectrical Rating(NetMWe):6.MaximumDependable Capacity(GrossMWe):7.MaximumDependable Capacity(NetMWe):22Notes-Unitoperatedatapproximately 100%R.P.,exceptforoutagesofAug.14,14-15,and16-18,1980,andreducedloadoperation ofAug.14-18, 1980.8.IfChangesOccurinCapacityRatings(ItemsNumber3Through7)SinceLastReport,GiveReasons:9.PowerLevelToWhichRestricted. | |
| IfAny(NetMWe):10.ReasonsForRestrictions, IfAny:NONEThisMonthYr:to-Date 5855.040.2-0-3889.77.33101490291503666.464;162.111.HoursInReporting Period744.012.NumberOfHoursReactorWasCritical720.013.ReactorReserveShutdownHours-0-~14.HoursGenerator On-Line701.415.UnitReserveShutdownHours7~317.GrossElectrical EnergyGenerated (MWH)55124018.NetElectrical EnergyGenerated (MWH)51920119.UnitServiceFactor94.320.UnitAvailability Factor22.UnitCapacityFactor(UsingDERNet)87.023.UnitForcedOutageRate-0-24.Shutdowns Scheduled OverNext6Months(Type.Date,andDurationofEach):Cumulative 32399.0-2129.524719;739.3193959901824293276.372.5'70.26.425.IfShutDownAtEndOfReportPeriod,Estimated DateofStartup:26.UnitslnTestStatus(PriortoCommercial Operation):
| |
| N/AForecastAchievedINITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (u/77) | |
| Page1of280UNITSHUTDOWNS ANDPOWERREDUCTIONS 552-3824DOCKETNO.l30Sl-No.lNo.IQ~tSc5tx.'C/ILlccllscc EventRcport-ClC~QCrCause&Corrective ActiontoPreventRecurrcncc 80-08-14S10.7AN/AEGTRANSFUnitwasremovedfromservicetoisolatemainpowertransformer No.1Btorepairoilleak.Cor-rectiveactionsincludedinstalling newbushing.(Non-nuclear system)1280-08-14-0-BN/AEGTRANSFLoadwaslimitedtothecapacityofmaintransformer No.1A.(Non-nuclearsystem)1380-08-147.3*FN/AEGTRANSPUnitwasremovedfromservicetopro-tectpersonnel usingacranetore-moveafaultybushingfrommainpowertransformer No.1B.(Non-nuclear system)IF:ForcedS:Schedu!ed
| |
| ('I/77)Reason:A-Equipment Failure(Explain) | |
| B-Maintenance oiTest.C.Refueling DRegulatory Restriction E-Operator TrainingScLiccnscExamination F-Administrative G-Operational Error(Explain) | |
| II-Other(Explain) 3Method:I-Manual2-ManualScram.3-Automatic Scram.4-Other(Explain) 4ExhibitG-Instructions forPreparation ofDataEntrySheetsIorLicenseeEventReport(LER)File(NUREG-016I)ExhibitI-SameSource UNITSHUTDOWNS ANDPOWERREDUCTIONS Page2of280*COMPLETED BYI-"'-'Ni).rlMIlJLlcensccEventReport=CPCJMIcnGCo~E~CauseEcCorrective ActiontoPreventRecurrence 1480-08-'17 | |
| '24.6-BN/AEGTRANSFUnitwasremovedfromservicetoinstallnewbushing'andreturnmainpowertransformer No.1Btoservice.(Non-nuclear system)F:ForcedS:Scheduled | |
| ('>/77)Reason:A.Equipment Failure(Explain) | |
| B-hlaintenance orTest.C-Refueling DRegulatory Restriction E-Operator TrainingEcLicenseExamination F-Administrative G-Operational Error(Explain) | |
| H-Other(Explairt) h(ethod:I-Manual2-h(anuai Scram.3-Automatic Scranl.4-Other(Explain) | |
| ExhibitG-Instructions
| |
| .forPreparation ofDataEntrySheetsforLicenseeEventReport(LER)File(NUREG.OI6I)ExhibitI-SalncSource P.O.BOX529100,MIAMI,FL33162+<Illy~l,==FLORIDAPOWER8LIGHTCOMPANYSeptember 6,l980OfficeofManagement Information andProgramControlsU.S.Regulatory Commission Washington, D.C.20555Gentlemen: | |
| AttachedaretheAugust,1980,Operating SummaryReportsforTurkeyPointUnitNos.3and4andSt.LucieUnitNo.l.Verytrulyyours,D.SchmidtVicePresident PowerResources VTC/ddccc:Mr.JamesP.O'ReillyRobertLowenstein, EsquirePEOPLE...
| |
| SERVINGPEOPLE
| |
| 'L | | 'L |
| .SUMMARYOFOPERATING EXPERIENCE DOCKETNO.50-250TurkeyPointUNITUnitNo.3DATESet.6,1980COMPLETED BYV..T.ChilsonREPORTMONTHAUGUST,1980TELEPHONE (305)552-.3824UnitNo.3operatedatapproximately 100%R.P.,exceptforoutageofAug.6-7,1980.Referto"UnitShutdowns and'owerReductions" sectionofAugust,1980,Operating StatusReportforadditional infor-mation.MajorSafety-'related maintenance activities performed duringthemonthincluded: | | . |
| Inspections andrequirements ofIEBulletins andNUREG-0578 arecontinuing. | | |
| FloridaPoweraLightCompanycommitments forNUREG-0578 implementation arecontinuing.
| | ==SUMMARY== |
| Refertocorrespondence betweenFPLand.NRCforad-ditionalinformation.
| | OF OPERATING EXPERIENCE DOCKET NO.50-250 Turkey Point UNIT Unit No.3 DATE Se t.6, 1980 COMPLETED BY V..T.Chilson REPORT MONTH AUGUST, 1980 TELEPHONE (305)552-.3824 Unit No.3 operated at approximately 100%R.P., except for outage of Aug.6-7, 1980.Refer to"Unit Shutdowns and'ower Reductions" section of August, 1980, Operating Status Report for additional infor-mation.Major Safety-'related maintenance activities performed during the month included: Inspections and requirements of IE Bulletins and NUREG-0578 are continuing. |
| .SUMMARYOFOPERATING EXPERIENCE DOCKETNO.50-'251TurkeyPointUNITUnitNo.4DATESept.6,1980COMPLETED BYV.T.ChilsonREPORTMONTHAUGUST1980TELEPHONE (305)552-3824UnitNo.4operatedatapproximately 100%.R.P.Referto"UnitShut-downsandPowerReductions" sectionoftheAugust,1980Operating StatusReportforadditional information. | | Florida Power a Light Company commitments for NUREG-0578 implementation are continuing. |
| MajorSafety-related maintenance activities performed duningthemonthincluded:
| | Refer to correspondence between FPL and.NRC for ad-ditional information. |
| Inspections andrequirements ofIEBulletins andNUREG-0578 inprogress. | | . |
| FloridaPoweraLightCompanycommitments forNUREG-'0578 implementation arecontinuning.
| | |
| Refertocorrespondence betweenFPLandNRCforad-ditionalinformation.
| | ==SUMMARY== |
| .SUMMARYOFOPERATING EXPERIENCE DOCKETNO.50-335St.LucieUNITUnitNo.1DATESet.61980COMPLETED BYTELEPHONE V.T.Chilson('305)552-3824REPORTMONTHUnitoperatedatapproximately 100%R.P.,exceptforoutagesofAugust14,14-15,and16.-18,1980,andreducedloadoperation ofAugust14-18,1980.Referto"UnitShutdowns andPowerReductions" sectionoftheAugust,1980,Operating StatusReportforadditional information. | | OF OPERATING EXPERIENCE DOCKET NO.50-'251 Turkey Point UNIT Unit No.4 DATE Sept.6, 1980 COMPLETED BY V.T.Chilson REPORT MONTH AUGUST 1980 TELEPHONE (305)552-3824 Unit No.4 operated at approximately 100%.R.P.Refer to"Unit Shut-downs and Power Reductions" section of the August, 1980 Operating Status Report for additional information. |
| MajorSafety-related maintenance activities performed duringthemonthincluded:
| | Major Safety-related maintenance activities performed duning the month included: Inspections and requirements of IE Bulletins and NUREG-0578 in progress.Florida Power a Light Company commitments for NUREG-'0578 implementation are continuning. |
| Inspections andrequirements ofIEBulletins andNUREG-0578 arecontinuing. | | Refer to correspondence between FPL and NRC for ad-ditional information. |
| FloridaPower6LightCompanyCommitments forNUREG-0578 implementation arecontinuing.
| | . |
| Refertocorrespondence betweenFPLandNRCforad-ditionalinformation.
| | |
| Amodification toprovideredundant 15voltpowersupplytoeachControlElementAssemblydrivemechanism corepowerprogrammer isinprogress.}}
| | ==SUMMARY== |
| | OF OPERATING EXPERIENCE DOCKET NO.50-335 St.Lucie UNIT Unit No.1 DATE Se t.6 1980 COMPLETED BY TELEPHONE V.T.Chilson ('305)552-3824 REPORT MONTH Unit operated at approximately 100%R.P., except for outages of August 14, 14-15, and 16.-18, 1980, and reduced load operation of August 14-18, 1980.Refer to"Unit Shutdowns and Power Reductions" section of the August, 1980, Operating Status Report for additional information. |
| | Major Safety-related maintenance activities performed during the month included: Inspections and requirements of IE Bulletins and NUREG-0578 are continuing. |
| | Florida Power 6 Light Company Commitments for NUREG-0578 implementation are continuing. |
| | Refer to correspondence between FPL and NRC for ad-ditional information. |
| | A modification to provide redundant 15 volt power supply to each Control Element Assembly drive mechanism core power programmer is in progress.}} |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML20217F6171999-10-0808 October 1999 Forwards Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-09.No Violations Identified.Matl Encl Contained Safeguards Info as Defined by 10CFR73.21 & Disclosed to Unauthorized Individuals Prohibited by Section 147 of AEA ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML20209F1541999-07-0606 July 1999 Informs That NRC in Process of Conducting Operational Safeguards Response Evaluations at Nuclear Power Reactors. Plant Chosen for Such Review Scheduled for Wk of 990823-26 ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 ML20195F3871999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML17355A3491999-06-0404 June 1999 Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEARML17348A5661990-09-14014 September 1990 Responds to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule. ML17223A9401990-09-13013 September 1990 Forwards Evaluation of Potential Safety Impact of Failed Control Element Assemblies on Limiting Transients for Facility ML17223A9341990-09-10010 September 1990 Forwards Addl Info Re Generic Implications & Resolution of Control Element Assembly (CEA) Failure at Facility,Per NRC Request.Description of Testing Program for Old Style CEAs in Unit 1 Core Encl ML17348A5501990-09-0707 September 1990 Forwards Jul 1990 Integrated Schedule Regulatory Rept for Facilities ML17348A5461990-09-0707 September 1990 Forwards 1990 Inservice Insp Refueling Outage Summary Rept of NDE Activities 900206-0404 First Refueling Outage Second Period Second Insp Interval. ML17348A5521990-09-0606 September 1990 Forwards Matrix of Changes to Emergency Power Sys That Affect Revised Tech Specs Issued on 900828.Matrix Sent for Info & to Assist in NRC Review of No Significant Hazards Rept for Revised Tech Specs ML17348A5431990-08-31031 August 1990 Forwards Objectives for 901108 Emergency Plan Exercise. Exercise Will Involve Participation by Local Emergency Response Agencies & State Emergency Response Personnel & Will Not Be Evaluated by FEMA L-90-315, Advises That Util Has Completed Evaluation of NUREG-0737, Item II.D.1,SER Item 81990-08-30030 August 1990 Advises That Util Has Completed Evaluation of NUREG-0737, Item II.D.1,SER Item 8 ML17223A9201990-08-28028 August 1990 Forwards Forms NIS-1 & NIS-2, Owners Rept for Inservice Insps as Required by Provisions of ASME Code Rules, Per 900725 Ltr ML17348A5361990-08-27027 August 1990 Forwards Turkey Point Units 3 & 4 Semiannual Radioactive Effluent Release Rept,Jan-June 1990 & Health Physics Procedure HP-48, Process Control Program for Dewatering Radwaste Liners. ML17348A5171990-08-24024 August 1990 Forwards Ref Matl in Preparation for Operator License Exams Scheduled for Wk of 901029,per NRC 900628 Request ML17223A8911990-08-20020 August 1990 Forwards Corrected Monthly Operating Repts for Jul 1990 for St Lucie Units 1 & 2 & Summary of Operating Experience ML17348A5041990-08-17017 August 1990 Forwards fitness-for-duty Program Performance Data for Jan-June 1990 L-90-301, Discusses Generic Implications & Resolution of Control Element Assemblies Failure at Plant1990-08-16016 August 1990 Discusses Generic Implications & Resolution of Control Element Assemblies Failure at Plant ML17348A5051990-08-15015 August 1990 Forwards Monthly Operating Repts for Jul 1990 for Turkey Point Units 3 & 4 & Revise Rept for June 1990 for Unit 3 ML20059B0111990-08-14014 August 1990 Requests That Encl Intervenor Motion for Extension of Time to Appeal to Docketing & Svcs Branch Re Tech Spec Replacement Hearing Be Provided.Motion Inadvertently Omitted in Svc of Request on 900813 ML17348A4971990-08-10010 August 1990 Responds to Violations Noted in Insp Repts 50-250/90-18 & 50-251/90-18.Corrective Actions:Unit Stabilized in Mode 3, Operating Surveillance Procedures 3/4-OSP-089 Revised & Event Response Team Formed IR 05000335/19900141990-08-0909 August 1990 Responds to Violations Noted in Insp Rept 50-335/90-14. Corrective Actions:Rcs Flow Determination by Calorimetric Procedure Repeated W/Supervisor of Individual Observing & Individual Counseled by Supervisor ML17223A8751990-08-0909 August 1990 Responds to Violations Noted in Insp Rept 50-335/90-14. Corrective Actions:Rcs Flow Determination by Calorimetric Procedure Repeated W/Supervisor of Individual Observing & Individual Counseled by Supervisor ML17348A4701990-07-27027 July 1990 Forwards Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per Unsatisfactory Performance Testing ML17348A4281990-07-25025 July 1990 Forwards Decommissioning Financial Assurance Repts for Plants,Per 10CFR50.33(k) & 50.75(b) ML17223A8621990-07-25025 July 1990 Advises That NIS-1 & NIS-2 Forms,As Part of Inservice Insp Rept,Will Be Submitted by 900831 ML17223A8631990-07-25025 July 1990 Submits Addl Info Re Implementation of Programmed Enhancements Per Generic Ltr 88-17, Loss of Dhr. All Mods for Unit 1 Completed & Operational.Mods for Unit 2 Schedule for Upcoming Refueling Outage L-90-282, Forwards Rev 23 to Physical Security Plan.Plan Withheld (Ref 10CFR73.21 & 2.790)1990-07-25025 July 1990 Forwards Rev 23 to Physical Security Plan.Plan Withheld (Ref 10CFR73.21 & 2.790) ML17348A4691990-07-23023 July 1990 Forwards Addl Info on Emergency Power Sys Enhancement Project Re Load Sequencer,Programmable Logic Controllers & Implementation of Sys in Plant,Per NRC 900705 Request L-90-271, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-335/90-09 & 50-389/90-09.Corrective Actions:Procedural Expectation Re Hanging & Removal of Deficiency Tags Will Be Reemphasized to Personnel Generating Work Orders1990-07-20020 July 1990 Responds to NRC Ltr Re Violations Noted in Insp Repts 50-335/90-09 & 50-389/90-09.Corrective Actions:Procedural Expectation Re Hanging & Removal of Deficiency Tags Will Be Reemphasized to Personnel Generating Work Orders ML17348A4141990-07-20020 July 1990 Responds to Violations Noted in Insp Repts 50-250/90-14 & 50-251/90-14.Corrective Actions:Breakers Closed,Returning Monitoring Sys to Operable Level & Briefings Held to Explain Rvlms Sys Theory to Operations Control Room Personnel ML17348A4191990-07-20020 July 1990 Advises That Comments on NRC Safety Evaluation Re Implementation of Station Blackout Rule Will Be Provided by 900921 ML17348A4201990-07-20020 July 1990 Forwards Revised No Significant Hazards Determination for Proposed Tech Specs 1.17 & 3.0.5 & Bases,Per 890605 Ltr ML17223A8581990-07-19019 July 1990 Forwards Implementation Status of 10CFR50.62 Mod at Facility Re Requirements for Reduction of Risk from ATWS Events for Light Water Cooled Nuclear Power Plants ML17348A4171990-07-19019 July 1990 Forwards May 1990 Integrated Schedule Regulatory Rept for Plant ML17223A8491990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount. No Rosemount Transmitters Models 1153 Series B,1153 Series D & 1154 Mfg Prior to 890711 Supplied by Different Vendor ML17348A4121990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. ML17348A4251990-07-17017 July 1990 Withdraws 900207 & 0424 Proposed Changes to Tech Specs Re Util Nuclear Review Board Composition ML17223A8521990-07-17017 July 1990 Forwards Addl Info Requested Re Generic Implications & Resolution of Control Element Assembly Failure at Plant.Encl Confirms Util Intent to Follow C-E Regulatory Response Group Action Program ML17348A4161990-07-16016 July 1990 Responds to Commitment Re Reverse Testing of Containment Isolation Valves Per Insp Repts 50-250/90-13 & 50-251/90-13. Corrective Action Plan Addresses Penetrations 16 & 53 for Unit 3 Only & Penetrations 11,47,54A & 54B for Both Units IR 05000250/19900131990-07-16016 July 1990 Provides Info Re Plant Implementation of 10CFR50.44 & NUREG- 0737,Item II.E.4.1 Re Hydrogen Recombiners,Per 900518 Meeting & Insp Repts 50-250/90-13 & 50-251/90-13.Agreement Re Use of External Recombiners Will Be Reactivated ML17348A4151990-07-16016 July 1990 Provides Info Re Plant Implementation of 10CFR50.44 & NUREG- 0737,Item II.E.4.1 Re Hydrogen Recombiners,Per 900518 Meeting & Insp Repts 50-250/90-13 & 50-251/90-13.Agreement Re Use of External Recombiners Will Be Reactivated ML20055G8641990-07-16016 July 1990 Informs ASLB That Petitioners Ref to Several Telephone Contacts Between J Butler & M Gutman,Of ATI Career Training Inst Is Inadvertent Misstatement & Should Be Changed to Telephone Contact. W/Certificate of Svc ML17348A4041990-07-12012 July 1990 Forwards Addl Info Re Responses to NRC Questions on Piping Codes Used for Emergency Power Sys Enhancement Project ML17348A3921990-07-12012 July 1990 Summarizes Facility Performance Since Last SALP Evaluation Period Which Ended 890731.Util Pursued Aggressive self- Assessment Program,Including Significant Internal or Outside Assessments in Areas of Operator Performance & EOPs ML17348A4321990-07-11011 July 1990 Forwards Rev 8 to Updated FSAR for Turkey Point Units 3 & 4. Rev Includes Activities Completed Between 890123 & 900122. Rept of Changes for Jul 1989 Through June 1990 Will Be Provided by 900901 L-90-259, Forwards Rev 22 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(a)(3))1990-07-11011 July 1990 Forwards Rev 22 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(a)(3)) L-90-261, Forwards Rev 7 to Guard Training & Qualification Plan.Rev Withheld1990-07-11011 July 1990 Forwards Rev 7 to Guard Training & Qualification Plan.Rev Withheld ML17223A8421990-07-0909 July 1990 Responds to Violations Noted in Insp Repts 50-335/90-13 & 50-389/90-13.Corrective Actions:Maint Personnel Counseled & Aware of Importance of Verifying Design Configuration Requirements IR 05000335/19900131990-07-0909 July 1990 Responds to Violations Noted in Insp Repts 50-335/90-13 & 50-389/90-13.Corrective Actions:Maint Personnel Counseled & Aware of Importance of Verifying Design Configuration Requirements ML17348A3941990-07-0909 July 1990 Forwards Requested Addl Info Re Emergency Power Sys Enhancement Project.Specific Detailed Changes Will Be Made to Procedures to Address Mods Affecting Equipment Relied Upon for Safe Shutdown ML17348A4311990-07-0505 July 1990 Documents Written & Verbal Request of Region II Personnel for Temporary Waiver of Compliance of Tech Spec 3.4.2.b.1 Re Allowable Out of Svc Time for One Emergency Containment Cooler from 24 H to 72 Hr W/Addl Reasons ML17348A3881990-07-0505 July 1990 Requests Audit of NRC Records to Independently Verify Reasonableness of Charges Assessed Against Util,Per 10CFR170 Svcs ML17223A8391990-07-0303 July 1990 Forwards Results of Beach Survey Procedure & Reduction of Field Survey Data,Per Tech Spec 4.7.6.1.1.Unit 1 Updated Fsar,Section 2.4.2.2,concluded That Dune Condition Acceptable Per Tech Spec 5.1.3 1990-09-07
[Table view] |
Text
'/ACCESS IOiV"EBB F AC IL: 50 250 50-251 50 335 AU TH~tlAHE SCHt'.IDTE A~D~REC IP~4A'<E REGULA'RY INFOR lATION OISTRIBUTIO SYSTE'l (R[DS):8009170279 OOC.DATEs 80/09/06 NOTARIZED:
No DOCKET 4 Turkey Point Planti Unit 3E Florida Power and Light C 05000250 Turkey Point Planti Unit 4E Florida Power and Light C 05000251 St~Lucie Planti Unit 1E Florida Power 8 Light Co~0 AUTHOR AFFILIATION Florida Power 8 Light Co~RECIP IEVT AFF ILIAT IOV Office of'4lanagement and Program Analysis SUBJECT;Forwards monthly ooeratina reots for Aug 1980'ISTR ISUTIO I CODE;AOOSS COPIES RECEIVED;LTR
/EVCL J'IIE: TITl.E: Annual'emi Annus'l,i, Monthly Ooerating Reoorts (OL Stag NOTESt RECI~!EV T ID C3OE/VA'1E ACTIOiv.'ARGAE S~04 INTERNAl.:
AEOO OIR HU" FAC 08 R)A 13 EX EVAL BR09 REG F II.E 01 COPIES LTTR ENCL 7 7 1 1 1 1 2 2 1 1 1 1 REC I P IEVT IO CODE/NAvTE CLARKERD 04 D/9 IR g AU~i F AC07 ICE 06 NRC POR 02 OR ASSESS BR 10 CUTIES LTTR ENCL 7 7 1 1 2 2 1 1 1, 1 UTERI'vAL; ACRS LPDR 03 B R O:3 I','H A V E V VSIC 05 1 1 1'gy gs~s~o TJ'I KL y J""E 1=CI=OS RRE i.ll l=D: LT T"~EVCL
()/Of~i)
P.O.BOX 529100, MIAMI, FL 33162 yllgi',:.i:~.i5:-,=Ji A~eiXi FLORIDA POWER 8 LIGHT COMPANY September 6, l980 Office of Management Information and Program Controls U.S.Regulatory Commission Washington, D.C.20555 Gentlemen:
Attached are the August, 1980, Operating Status Reports for Turkey Point Unit Nos.3 and 4.and St.Lucie Unit No.l.Very truly yours, A.D.Schmidt Vice President Power Resources VTC/ddc cc: Mr.James P.O'Reilly Robert Lowenstein, Esquire/DOER'i 1o~~/PEOPLE...SERVING PEOPLE I 4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.*COMPLETED II Y V.T.Chilson TELEPHONE MONTH AUGUSTA 1980 DAY AVERAGE DAILY POWER LEVEL (MWe.Net)I 643 639 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)653 l7 IS l0 l3 l4 IS 16 INSTRUCTIONS 63 637 646 503 664 658 655 658 656 656 656 649 656 19 20 12 23 24 25 26 27 2S 29 30 31 NOTE: 647 653 647 652 657 652 642 643 644 648 Average daily power level greater than 646 MWe due to cooler condenser cooling water.On this format.list the average daily unit power (evel in MWe Net for each day in the reporting ntonth.Compute to the nearest whole megawatt.(')(77)
.OPERATING DATA REPORT'OPERATING STATUS Turke'oint Unit No.3 760 693 680 1.Unit Name: 2.Reporting Period: 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net MWe): 6.Maximum Dependable Capacity (Gross MWe): 7.Maximum Dependable Capacity (Net MWe): DOCKET NO.oATE SeSs~.980.COMPLETED BY J~~hilson TELEPHONE 4851~2-3824 Notes-Unit No.3 operated at approximately 1008 R.P.>except for outage of Aug.6-7, 1980 8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: Maximum De endable Ca acit Gross MWe has been rerated to the mbst restricted seasonal conditions (summer)experienced.
Maximum Dependable Capacity (Net MWe)has been rerated accordingly.
9.Power Level To Which Restricted.
If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr:to-Date 11.Hours In Reporting Period 12.Number Of Hours Reactor Was Critical~13.Reactor Reserve Shutdown Hours 14.Hours Generator On.Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Ge'nerated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months 744.0 4 979.7 0 4 809.4 737.9 1 613 090 10"410 368 3 275 415 503 570 3 104 278 478 174 82.1 99.2 99.2 82.1 99.5'2.1 76.5 0.8 1.3 (Type, Date, and Duration of Each): P o ram-Oct.5-Nov.1 1980.Cumulative 7 6 6 52 249.2 213.4 50 499;6 121.8 101 879 002 32 356 415 30 626 372 74.4 74.6 70.2 65.1 2.5 25.If Shut Down At End Of Report Period, Esthnated Date of Startup: 26.Units ln Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (u/77)
O.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO.50-250 No.Date Vl~J L rl IA Q Q~Q~CA Liccnscc Event Report-4l Cl'n cn G R~Q CI O Cr Cause 4 Corrective Action to Prevent Recurrence 16 80-08-06 F 6.1: N/A CB MOTOR X Unit No.3 was removed from service due to low oil level in reactor coolant pump motor No.3C.Cor-rective actions included adding oil.(Nuclear System)F: Forced S: Scheduled<9 30 31 634 635 634 635 636 638 640 642 634 630 632 636 INSTRUCTIONS On this format.list the'average daily unit I>>>wer levt.l in MWe.Net for each day i>>the reporting>n>>nth.C>>n>pute to the nearest whole megawat t.('t(77)
OPERATING DATA REPORT DOCKET NO.~~2L DATE M~~980 COMPLETED BY 2LZ~~son TELEPHONE OPERATING STATUS Notes-Unit No.4 operated at approximately 100%R.P.1.Unit Name: Turke Point Unit No.4 Reporting Period AU ust 1980 3.I.icensed Thermal Power (MWt): 2200 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net MWe): e~7.Maximum De ndable Ca acit Net MWe: 646 conditions summer ex erienced.Maximum De endable Ca acit Net MWe has been p y()8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: Maximum De endable Ca acit (Grass MWe)has been rerated to the most restricted seasonal rerated accordingly.
9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: NONE This Month Yr.-to-Date Cumula tive 6X 584.0 744.0 5 3 9.166.6-0-43 627;3 31'90.848 116-0-1 633 024 28 900 833 2 5 70.8 70.9 69.0 64.1 3.0 11.Hours In Reporting Period 12.Number Of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 12 03 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 12.3 16.Gross Thermal Energy Ge'nerated (MWH)9 629 136 17.Gross Electrical Energy Generated (MWH)2 997 355 19.Unit Service Factor 75.9 20.Unit Availability Factor 100.076.1 21.Unit Capacity Factor (Using MDC Net)98'.6"75.1 22.Unit Capacity Factor (Using DER Net)92.0 70.0 23.Unit Forced Outage Rate-0-0.3 24.Shutdowns Scheduled Over Next 6 Months(Type, Date, and Duration of Each): maintenance and ins ections-Nov.9 1980-Jan.10, 1981.25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (lp/77) r UNIT SHUTDOWNS AND POWER REDUCTIONS nit No.4 REPORT hiONTH AUGUST, 1980 305 552-82 No.Date Ih 4 A J a~C/7$Liccnscc Event Report~i~CP 4)o~G CJ~CJ Q C~Cause&Corrective Action to Prevent Recurrence N 0 N F: Forced S: Schedu!ed (')/77)Reason: A.Equipment Failure (Explain)B.Maintenance or Test C-Refueling.
D.Regulatory Restriction EZperator Training&.License Examination F-Administrative G-Operational Error (Explain)II.Other (Explain)Method: I-Manual 2-Manual Scram.3-Automatic Scram.4-Other (Explain)Exhibit G-instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-OI 6 I)Exlwbrt I-Same Source AVERAGE DAII.Y UNIT POWER LEVEL DOCKET NO.St.Lucre II"-"" COMPLETEDIIY V-T.Chilson MONTH AUGUST 1980 DAY AVERAGE DAILY POWER LEVEL (MWe.Net)I 75 794 796 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)17 18 673 19 787 10 11 13 14 15 16 INSTRUCTIONS 77 770 792 791 790 791 798 797 718 126 255 394 20 21 22 23 24 25 26 27 28 30 31 NOTE: 786 725 783 78 782 757 759 781 779 780 749 Average daily power level greater than 777 MWe due to cooler condenser cooling water.On this format.list the average daily unit power level in MWe.Net for each day in the reporting month.Compute to the nearest whole megawatt.I')/77)
OPERATING STATUS OPERATING DATA REPORT DOCKETNO.~~DATE MI~~980 COMPLETED BY T Chilson TELEPHONE 05 552-3824 St.Lucie Unit No.1 2560 850 802 l.Unit Name: 2.Reporting Period: 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net MWe): 6.Maximum Dependable Capacity (Gross MWe): 7.Maximum Dependable Capacity (Net MWe): 22 Notes-Unit operated at approximately 100%R.P., except for outages of Aug.14, 14-15, and 16-18, 1980, and reduced load operation of Aug.14-18, 1980.8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted.
If Any (Net MWe): 10.Reasons For Restrictions, If Any: NONE This Month Yr:to-Date 5 855.0 4 0.2-0-3 889.7 7.3 3 101 490 2 915 036 66.4 64;1 62.1 11.Hours In Reporting Period 744.0 12.Number Of Hours Reactor Was Critical 720.0 13.Reactor Reserve Shutdown Hours-0-~14.Hours Generator On-Line 701.4 15.Unit Reserve Shutdown Hours 7~3 17.Gross Electrical Energy Generated (MWH)551 240 18.Net Electrical Energy Generated (MWH)519 201 19.Unit Service Factor 94.3 20.Unit Availability Factor 22.Unit Capacity Factor (Using DER Net)87.0 23.Unit Forced Outage Rate-0-24.Shutdowns Scheduled Over Next 6 Months (Type.Date, and Duration of Each): Cumulative 32 399.0-2 129.5 24 719;7 39.3 19 395 990 18 242 932 76.3 72.5'70.2 6.4 25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units ln Test Status (Prior to Commercial Operation):
N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (u/77)
Page 1 of 2 80 UNIT SHUTDOWNS AND POWER REDUCTIONS 552-3824 DOCKET NO.l30Sl-No.l No.I Q~tS c 5 tx.'C/I Llccllscc Event Rcport-Cl C~Q Cr Cause&Corrective Action to Prevent Recurrcncc 80-08-14 S 10.7 A N/A EG TRANSF Unit was removed from service to isolate main power transformer No.1B to repair oil leak.Cor-rective actions included installing new bushing.(Non-nuclear system)12 80-08-14-0-B N/A EG TRANSF Load was limited to the capacity of main transformer No.1A.(Non-nuclear system)13 80-08-14 7.3*F N/A EG TRANSP Unit was removed from service to pro-tect personnel using a crane to re-move a faulty bushing from main power transformer No.1B.(Non-nuclear system)I F: Forced S: Schedu!ed ('I/77)Reason: A-Equipment Failure (Explain)B-Maintenance oi Test.C.Refueling D Regulatory Restriction E-Operator Training Sc Liccnsc Examination F-Administrative G-Operational Error (Explain)II-Other (Explain)3 Method: I-Manual 2-Manual Scram.3-Automatic Scram.4-Other (Explain)4 Exhibit G-Instructions for Preparation of Data Entry Sheets Ior Licensee Event Report (LER)File (NUREG-016I)Exhibit I-Same Source UNIT SHUTDOWNS AND POWER REDUCTIONS Page 2 of 2 80*COMPLETED BY I-"'-'Ni).rl MI l J Llcenscc Event Report=CP CJ MI cn G C o~E~Cause Ec Corrective Action to Prevent Recurrence 14 80-08-'17'24.6-B N/A EG TRANSF Unit was removed from service to install new bushing'and return main power transformer No.1B to service.(Non-nuclear system)F: Forced S: Scheduled ('>/77)Reason: A.Equipment Failure (Explain)B-hlaintenance or Test.C-Refueling D Regulatory Restriction E-Operator Training Ec License Examination F-Administrative G-Operational Error (Explain)H-Other (Explairt) h(ethod: I-Manual 2-h(anuai Scram.3-Automatic Scranl.4-Other (Explain)Exhibit G-Instructions
.for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG.OI 6I)Exhibit I-Salnc Source P.O.BOX 529100, MIAMI, FL 33162+<Illy~l,==FLORIDA POWER 8 LIGHT COMPANY September 6, l980 Office of Management Information and Program Controls U.S.Regulatory Commission Washington, D.C.20555 Gentlemen:
Attached are the August, 1980, Operating Summary Reports for Turkey Point Unit Nos.3 and 4 and St.Lucie Unit No.l.Very truly yours, D.Schmidt Vice President Power Resources VTC/ddc cc: Mr.James P.O'Reilly Robert Lowenstein, Esquire PEOPLE...SERVING PEOPLE
'L
.
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.50-250 Turkey Point UNIT Unit No.3 DATE Se t.6, 1980 COMPLETED BY V..T.Chilson REPORT MONTH AUGUST, 1980 TELEPHONE (305)552-.3824 Unit No.3 operated at approximately 100%R.P., except for outage of Aug.6-7, 1980.Refer to"Unit Shutdowns and'ower Reductions" section of August, 1980, Operating Status Report for additional infor-mation.Major Safety-'related maintenance activities performed during the month included: Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.
Florida Power a Light Company commitments for NUREG-0578 implementation are continuing.
Refer to correspondence between FPL and.NRC for ad-ditional information.
.
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.50-'251 Turkey Point UNIT Unit No.4 DATE Sept.6, 1980 COMPLETED BY V.T.Chilson REPORT MONTH AUGUST 1980 TELEPHONE (305)552-3824 Unit No.4 operated at approximately 100%.R.P.Refer to"Unit Shut-downs and Power Reductions" section of the August, 1980 Operating Status Report for additional information.
Major Safety-related maintenance activities performed duning the month included: Inspections and requirements of IE Bulletins and NUREG-0578 in progress.Florida Power a Light Company commitments for NUREG-'0578 implementation are continuning.
Refer to correspondence between FPL and NRC for ad-ditional information.
.
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.50-335 St.Lucie UNIT Unit No.1 DATE Se t.6 1980 COMPLETED BY TELEPHONE V.T.Chilson ('305)552-3824 REPORT MONTH Unit operated at approximately 100%R.P., except for outages of August 14, 14-15, and 16.-18, 1980, and reduced load operation of August 14-18, 1980.Refer to"Unit Shutdowns and Power Reductions" section of the August, 1980, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included: Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.
Florida Power 6 Light Company Commitments for NUREG-0578 implementation are continuing.
Refer to correspondence between FPL and NRC for ad-ditional information.
A modification to provide redundant 15 volt power supply to each Control Element Assembly drive mechanism core power programmer is in progress.