|
|
Line 17: |
Line 17: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Attachment ARemoveTechnical Specification pages3.13-4through3.13-6.XnsertattachedTechnical Specification pages3.13-4through3.13-7. | | {{#Wiki_filter:Attachment A Remove Technical Specification pages 3.13-4 through 3.13-6.Xnsert attached Technical Specification pages 3.13-4 through 3.13-7. |
| .abl.e3.13-l{Continued) | | .abl.e 3.13-l{Continued) |
| SafetyRelatedShockSluppressors (Snubbers)
| | Safety Related Shock Sluppressors (Snubbers) |
| SnubberNarkHo.\APl'7-25IIAIIAux.Feedwater Accessibl.e orInaccessible (AorI)Hspecia11y ElijahRadiation**
| | Snubber Nark Ho.\APl'7-25 I I A I I Aux.Feedwater Accessibl.e or Inaccessible (A or I)Hspecia11y Elijah Radiation** |
| AifficulttoZoneRemoveNoAP'">-~6lAFll~7Aux.Peedwater Aux.Peedwater UoNoNoNoAFh'-20APN-29Aux.Feedwater "A",Aux.Feedwater NoNoAFN-31IIAIIAux.Feedwater UoNoAP<'1-49'I F01-30IFU-80"A"Aux.Feedwater "B"Feedwater "8"Peedwater NoNoNoHoNoNoFN-81'tFW-82I"8"Peedwater "B"Peedwater NoNoNo Table3.13-1(Continued)
| | Ai f ficult to Zone Remove No AP'">-~6 l AFll~7 Aux.Peedwater Aux.Peedwater Uo No No No AFh'-20 APN-29 Aux.Feedwater"A",Aux.Feedwater No No AFN-31 IIAII Aux.Feedwater Uo No AP<'1-49'I F01-30 I FU-80"A" Aux.Feedwater"B" Feedwater"8" Peedwater No No No Ho No No FN-81't FW-82 I"8" Peedwater"B" Peedwater No No No Table 3.13-1 (Continued) |
| SachetRelatedShockSuppressors (Snubbers)
| | Sachet Related Shock Suppressors (Snubbers) |
| Snubber.MarkNo.PiinqSystemAccessible orInaccessible (AorI)HiqhRadiation** | | Snubber.Mark No.Pi inq System Accessible or Inaccessible (A or I)Hiqh Radiation** |
| ZoneEspecially Difficult toFN-03;IAFN-10AF!'-13"8"Feedwater "8"Aux.Feedwater"B"Aux.Feedwater NobJoNo'..JoNobJoSbJB-265StmtoTDAux.Feedwater NoHG-22"A"HainSteamNoNoMS-8"B"MainSteamNoYesb1S-146(Top)MS-146(Bottom)"8"blainSteam"8"MainSt.earnNoNoNo Table3.13-1(Continued)
| | Zone Especially Difficult to FN-03;I AFN-1 0 AF!'-1 3"8" Feedwater"8" Aux.Feedwa ter"B" Aux.Feedwater No bJo No'..Jo No bJo SbJB-265 Stm to TD Aux.Feedwater No HG-22"A" Hain Steam No No MS-8"B" Main Steam No Yes b1S-146 (Top)MS-146 (Bottom)"8" blain Steam"8" Main St.earn No No No Table 3.13-1 (Continued) |
| SafetyRelatedShockSupressors(Snubbers)
| | Safety Related Shock Su pressors (Snubbers) |
| SnubberHarkNo.PininSstemAccessible orInaccessible (AorI)Especially HighRadiation**
| | Snubber Hark No.Pinin S stem Accessible or Inaccessible (A or I)Especially High Radiation** |
| Difficult toZoneRemove4)4JIChHG-147-.HS-148>HS-159HS-160'E"t1ainSteam"E"Haz.nSteam"E"HainSteam"E"HainSteamNoNoNoNoNoH-1I'-2H-30H-4H5I,PRZRReliefPR?RBeliefPRZRPe1iefPRZRReliefPPZRReliefYesYesYesYesYesNoNoH-6H-7El-8KPRZRReliefPRZRReliefPPZRReliefYesYesYesNo Table3.13-1(Continued) | | Difficult to Zone Remove 4)4J I Ch HG-147-.HS-148>HS-159 HS-160'E" t1ain Steam"E" Haz.n Steam"E" Hain Steam"E" Hain Steam No No No No No H-1 I'-2 H-3 0 H-4 H 5 I, PRZR Relief PR?R Belief PRZR Pe 1 ie f PRZR Relief PPZR Relief Yes Yes Yes Yes Yes No No H-6 H-7 El-8 K PRZR Relief PRZR Relief PPZR Relief Yes Yes Yes No Table 3.13-1 (Continued) |
| SafetRelatedShockSuppressors (Snubbers)
| | Safet Related Shock Suppressors (Snubbers) |
| SnubberMarkNo.PipingSstemAccessible orInaccessible (AorI)Especially HighPadiation**
| | Snubber Mark No.Piping S stem Accessible or Inaccessible (A or I)Especially High Padiation** |
| Difficult toZoneRemovePS-2PS-4PS-5FS-6PS-0PS-'9PS-10PS-11PRZRSafety6ReliefValvePRZRSafetySReliefValvePRZRSafetySReliefValvePRZRSafetyPRRSafetyRelicfValveFReliefValvePRZRSafety&ReliefValvePRZRSafety6ReliefValvePRZRSafety5ReliefValveYesYesYesYesYesYesYesNoNoNoNoNoNoNoNoI,Snubbers maybeaddedtoorremovedfromsafetyrelatedsystemswithoutpriorLicenseAmendment toTable3.13-1providedthataproposedrevisiontoTable3.13-1isincluded~withthenextLicenseAmendment request.I,Modifications tothistableduetochangesinhighradiation areas(duringshutdown) shallbesubmitted totheNRCaspartofthenextLicenseAmendment request. | | Difficult to Zone Remove PS-2 PS-4 PS-5 FS-6 PS-0 PS-'9 PS-10 PS-11 PRZR Safety 6 Relief Valve PRZR Safety S Relief Valve PRZR Safety S Relief Valve PRZR Safety PR R Safety Relic f Valve F Relief Valve PRZR Safety&Relief Valve PRZR Safety 6 Relief Valve PRZR Safety 5 Relief Valve Yes Yes Yes Yes Yes Yes Yes No No No No No No No No I ,Snubbers may be added to or removed from safety related systems without prior License Amendment to Table 3.13-1 provided that a proposed revision to Table 3.13-1 is included~with the next License Amendment request.I ,Modifications to this table due to changes in high radiation areas (during shutdown)shall be submitted to the NRC as part of the next License Amendment request. |
| Attachment BfTheproposedchangereflectschangesmadetopipingsystemsat.Ginnaasaresultofrecentanalyses. | | Attachment B f The proposed change reflects changes made to piping systems at.Ginna as a result of recent analyses.One hydraulic shock suppressor was added to the steam supply piping for the turbine driven auxiliary feedwater pump.Eight hydraulic shock suppressors were added to the pressurizer safe ty and relief piping.As a result of our seismic upgrade program, four existing hydraulic shock suppressors are being replaced with mechanical units.The seismic upgrade program has been described in previous letters to the URC.Decause of the changes which will result from our seismic upgrade program, the footnote to Table 3.13-1 deal.ing with snubber addition has been revised to permit removal of snubbers without prior license amendment. |
| Onehydraulic shocksuppressor wasaddedtothesteamsupplypipingfortheturbinedrivenauxiliary feedwater pump.Eighthydraulic shocksuppressors wereaddedtothepressurizer safetyandreliefpiping.Asaresultofourseismicupgradeprogram,fourexistinghydraulic shocksuppressors arebeingreplacedwithmechanical units.Theseismicupgradeprogramhasbeendescribed inpreviousletterstotheURC.Decauseofthechangeswhichwillresultfromourseismicupgradeprogram,thefootnotetoTable3.13-1deal.ingwithsnubberadditionhasbeenrevisedtopermitremovalofsnubberswithoutpriorlicenseamendment.
| | Such a change is necessary in order to permit timely implementation of the seismic upgrade program.Changes would only be made following appropriate analysis.Changes to the Technical Specification requirements for snubbers were requested by letter dated starch 23, 1981 from Darrell Eisenhut.A separate change request will be prepared which responds to the request.}} |
| Suchachangeisnecessary inordertopermittimelyimplementation oftheseismicupgradeprogram.Changeswouldonlybemadefollowing appropriate analysis.
| |
| ChangestotheTechnical Specification requirements forsnubberswererequested byletterdatedstarch23,1981fromDarrellEisenhut.
| |
| Aseparatechangerequestwillbepreparedwhichrespondstotherequest.}}
| |
Similar Documents at Ginna |
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML17250B3061999-10-20020 October 1999 Proposed Tech Specs,Consisting of 1999 Changes to TS Bases ML17265A6941999-06-28028 June 1999 Proposed Tech Specs,Revising ITS Associated with RCS Leakage Detection Instrumentation,As Result of Commitment Submitted as Part of Staff Review of Application of leak-before-break Status to Protions of RHR Piping ML17265A5911999-03-0101 March 1999 Proposed Tech Specs Change Revising Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6) ML17265A4661998-11-24024 November 1998 Proposed Tech Specs 4.2.1,revising Description of Fuel Cladding Matl & Updating List of References Provided in TS 5.6.5 for COLR ML17265A3151998-06-0404 June 1998 Proposed Tech Specs Basis Re Main Steam Isolation Setpoint ML17265A2941998-05-21021 May 1998 Tech Specs Consisting of Submittal Changes for 1998 ML17265A2461998-04-27027 April 1998 Proposed Tech Specs Revising Requirements Associated W/Sfp to Reflect Planned Mod to Storage Racks & Temporarily Addressing Boraflex Degradation within Pool ML17264B0671997-10-0808 October 1997 Proposed Tech Specs,Correcting & Clarifying Info Re RCS Pressure & Temp Limits Rept Administrative Controls Requirements ML17264B0441997-09-29029 September 1997 Proposed Tech Specs Revising Adminstrative Controls W/ Respect to Reactor Coolant Sys Pressure & Temp Limits Rept ML17264B0391997-09-29029 September 1997 Proposed Tech Specs Revising Allowable Value & Trip Setpoint for High Steam Flow Input Into LCO Table 3.3.2-1,Function 4d (Main Steam Isolation) to Address Issues Identified in Rev Revised Setpoint Analysis Study ML17264A9991997-08-19019 August 1997 Proposed Tech Specs Correcting Specified Accumulator Borated Water Volume Values in SR 3.5.1.2 to Match Associated Accumulator Percent Level Values ML17264B0031997-08-19019 August 1997 Proposed Tech Specs Allowing Testing of Three ECCS motor- Operated Valves in Mode 4 Which Currently Requires Entry Into LCO 3.0.3 ML17264A9241997-06-0303 June 1997 Proposed Tech Specs Clarifying Issues Re Low Temperature Overpressure Protection ML17264A8671997-04-24024 April 1997 Proposed Tech Specs,Revising Rcs,Pt & Administrative Control Requirements ML17264A8491997-03-31031 March 1997 Proposed Tech Specs 3.7.12 Re Spent Fuel Pool Boron Concentration ML17264A7601996-12-16016 December 1996 Proposed Annual TS Bases ML17264A7131996-10-29029 October 1996 Proposed Tech Specs Re Actions for Inoperable Channels Associated with Auxiliary Feedwater Pump ML17264A6001996-09-13013 September 1996 Proposed Tech Specs Re RCS Pressure & Temp Limits Rept ML17264A5301996-06-0303 June 1996 Proposed Tech Specs Re Update to Correction of Typographical Error Request ML17264A5111996-05-29029 May 1996 Proposed Tech Specs Pages 3.3-18 & 3.3-19,reflecting Revs to LCO 3.3.1 ML17264A4711996-05-0808 May 1996 Proposed Tech Specs,Correcting Typos ML17264A4081996-03-20020 March 1996 Proposed Tech Specs 3.9.3,Containment Penetrations Re Use of Roll Up Door & Associated Encl Building for LCO 3.9.3 Requirements ML17264A4051996-03-15015 March 1996 Proposed Tech Specs Changing Section 5.6.6 Page 5.0-22 to Incorporate Methodology for Determining RCS P/T & LTOP Limits Into Administrative Controls Section for RCS P/T Limits Rept ML17264A3451996-02-0909 February 1996 Proposed Tech Specs,Revising Setpoints for SG Water Level High Feedwater Isolation Function ML17264A3401996-02-0909 February 1996 Proposed Tech Specs Re LTOP Limits Using Util Proposed Methodology ML17264A3341996-02-0909 February 1996 Proposed Tech Specs Containment Requirements During Mode 6 Cost Beneficial Licensing Action ML17264A3231996-01-26026 January 1996 Proposed Tech Specs Re Nuclear Fuel Cycle for NRC Approval ML17264A2811995-12-0808 December 1995 Proposed Tech Specs Re Changes to Current RCS Pressure & Temp Limits for Heatup,Cooldown,Criticality & Hydrostatic Testing ML17264A2531995-11-27027 November 1995 Proposed Tech Specs for Implementation of 10CFR50,App J, Option B ML17264A2571995-11-20020 November 1995 Proposed Tech Specs,Discussing Changes to TS Instrumentation Requirements & Conversion to Improved TS ML17264A2491995-11-20020 November 1995 Proposed Tech Specs Re Ventilation Filter Testing Program ML17264A1511995-08-31031 August 1995 Proposed Tech Specs Implementing WCAP-10271,its Assoc Suppls & Other Re Changes W/Respect to RTS & ESFAS ML17263A9781995-03-13013 March 1995 Proposed Tech Specs to Revise TS 4.4.2.4.a,replacing Specific Leakage Testing Frequencies for Containment Isolation Valves ML17263A7901994-09-27027 September 1994 Proposed TS Section 6.0, Administrative Controls. ML17263A7281994-07-15015 July 1994 Proposed Tech Specs Providing NRC W/Opportunity to Communicate at Early Stage Any Concerns W/Respect to Differences from NUREG-1431 ML17263A6581994-05-23023 May 1994 Proposed Tech Specs,Increasing Allowable Reactor Coolant Activity Levels ML17263A6431994-05-13013 May 1994 Proposed Tech Specs Administrative Section 6.0 ML17263A3701993-08-20020 August 1993 Corrected Proposed TS Page 5.1-1,changing Word Released to Leased ML17263A3571993-08-0606 August 1993 Proposed Tech Specs Re Alternative Requirements for Snubber Visual Insp Intervals ML17263A3191993-07-15015 July 1993 Proposed Tech Specs,Removing Containment Isolation Valve Table 3.6-1 from TS ML17263A2101993-04-0505 April 1993 Proposed TS Table 3.6-1, Containment Isolation Valves. ML17262B1191992-12-17017 December 1992 Proposed Tech Specs Sections 3.2 & 3.3 Re Acid Storage Tank Boron Concentration Reduction Study ML17309A5021992-11-30030 November 1992 Proposed Tech Specs Reflecting Removal of Table of Containment Isolation Valves ML17262B0441992-10-0808 October 1992 Proposed TS 3.7.1 Re Auxiliary Electrical Sys ML17262B0211992-09-15015 September 1992 Proposed Tech Specs Sections 3.1.1.4,3.1.1.6 & 4.3.4, Addressing GL 90-06, Resolution of Generic Issue 70, 'Porv & Block Valve Reliability' & Generic Issues 94, 'Addl LTOP for Lwrs.' ML17262A9141992-06-22022 June 1992 Proposed TS 4.3.1 Re Reactor Vessel Matl Surveillance Testing ML17262A8321992-04-23023 April 1992 Proposed Tech Specs Re Snubber Visual Insp Schedule ML17262A8221992-04-21021 April 1992 Proposed Tech Specs Re Fire Protection Program ML17262A7871992-03-23023 March 1992 Proposed Tech Spec Revising Section 6.5.1 Re Plant Operations Review Committee Function ML17262A7911992-03-20020 March 1992 Proposed Tech Specs Revising 6.9.1.2 & 6.9.2.5 1999-06-28
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17250B3061999-10-20020 October 1999 Proposed Tech Specs,Consisting of 1999 Changes to TS Bases ML17265A6941999-06-28028 June 1999 Proposed Tech Specs,Revising ITS Associated with RCS Leakage Detection Instrumentation,As Result of Commitment Submitted as Part of Staff Review of Application of leak-before-break Status to Protions of RHR Piping ML17265A6401999-05-12012 May 1999 Rev 11 to Technical Requirements Manual for Ginna Station. ML17265A6261999-04-18018 April 1999 Rev 10 to Technical Requirements Manual (Trm), for Ginna Station ML17311A0701999-04-14014 April 1999 Rev 10 to AP-PRZR.1, Abnormal Pressurizer Pressure. ML17309A6521999-04-14014 April 1999 Rev 14 to AP-RCS.1, Reactor Coolant Leak. ML17309A6531999-04-13013 April 1999 Rev 1 to FIG-2.0, Figure Sdm. with 990413 Ltr ML17265A6111999-03-26026 March 1999 Rev 9 to Technical Requirements Manual for Ginna Station. ML17265A5911999-03-0101 March 1999 Proposed Tech Specs Change Revising Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6) ML17265A5571999-02-25025 February 1999 Rev 4 to Technical Requirements Manual (Trm). ML17265A5491999-02-12012 February 1999 to EOP FR-H.5, Response to SG Low Level. ML17265A5481999-02-12012 February 1999 to EOP ATT-22.0, Attachment Restoring Feed Flow. ML17265A5461999-02-12012 February 1999 0 to EOP AP-TURB.1, Turbine Trip Without Rx Trip Required. ML17309A6481999-01-25025 January 1999 Revised Ginna Station Emergency Operating Procedures. with 990125 Ltr ML17265A5151999-01-14014 January 1999 Revised Emergency Operating Procedures,Including Rev 14 to AP-SW.1,rev 3 to ATT-5.2,rev 5 to ATT-8.0,rev 1 to ATT-14.6, Rev 17 to E-1,rev 16 to ECA-1.1,rev 26 to ES-1.3,rev 4 to FR-Z.2 & Index ML17265A5081999-01-0808 January 1999 Rev 7 to Technical Requirements Manual, for Ginna Station ML17265A4961998-12-18018 December 1998 Rev 6 to Technical Requirements Manual. ML20198C0361998-12-14014 December 1998 Rev 11 to ECA-0.2, Loss of All AC Power Recovery with SI Required ML20198C0121998-12-14014 December 1998 Rev 10 to AP-RCS.2, Loss of Reactor Coolant Flow ML20198C0581998-12-14014 December 1998 Rev 5 to FR-Z.1, Response to High Containment Pressure ML20198C0411998-12-14014 December 1998 Rev 16 to FR-C.1, Response to Inadequate Core Cooling ML20198C0521998-12-14014 December 1998 Rev 13 to FR-S.1, Response to Reactor Restart/Atws ML17265A4661998-11-24024 November 1998 Proposed Tech Specs 4.2.1,revising Description of Fuel Cladding Matl & Updating List of References Provided in TS 5.6.5 for COLR ML20155G0301998-10-30030 October 1998 Rev 13 to EOP AP-CCW.1, Leakage Into Component Cooling Loop ML17265A4091998-08-24024 August 1998 Rev 13 to AP-SW.1, Svc Water Leak. W/980824 Ltr ML17265A3721998-07-16016 July 1998 Rev 14 to EOP AP-CW.1, Loss of Circ Water Pump. W/980716 Ltr ML17265A3151998-06-0404 June 1998 Proposed Tech Specs Basis Re Main Steam Isolation Setpoint ML17265A2941998-05-21021 May 1998 Tech Specs Consisting of Submittal Changes for 1998 ML17265A2861998-05-0606 May 1998 Rev 19 to EOP ECA-3.2, SGTR W/Loss of Reactor Coolant Saturated Recovery Desired & Updated ECA Index.W/980506 Ltr ML17265A2461998-04-27027 April 1998 Proposed Tech Specs Revising Requirements Associated W/Sfp to Reflect Planned Mod to Storage Racks & Temporarily Addressing Boraflex Degradation within Pool ML17265A1821998-02-20020 February 1998 Rev 1 to EWR 5111, MOV Qualification Program Plan, Calculation Assumption Verification Criteria. ML17265A1491997-12-31031 December 1997 Rev 1 to Inservice Testing Program. ML17264B0731997-10-14014 October 1997 Rev 4 to Technical Requirements Manual (TRM) for Ginna Station. ML17264B0671997-10-0808 October 1997 Proposed Tech Specs,Correcting & Clarifying Info Re RCS Pressure & Temp Limits Rept Administrative Controls Requirements ML17264B0441997-09-29029 September 1997 Proposed Tech Specs Revising Adminstrative Controls W/ Respect to Reactor Coolant Sys Pressure & Temp Limits Rept ML17264B0391997-09-29029 September 1997 Proposed Tech Specs Revising Allowable Value & Trip Setpoint for High Steam Flow Input Into LCO Table 3.3.2-1,Function 4d (Main Steam Isolation) to Address Issues Identified in Rev Revised Setpoint Analysis Study ML17265A1541997-09-16016 September 1997 Rev 1 to DA EE-92-089-21, Design Analysis Ginna Station Instrument Loop Performance Evaluation & Setpoint Verification. ML17264B0031997-08-19019 August 1997 Proposed Tech Specs Allowing Testing of Three ECCS motor- Operated Valves in Mode 4 Which Currently Requires Entry Into LCO 3.0.3 ML17264A9991997-08-19019 August 1997 Proposed Tech Specs Correcting Specified Accumulator Borated Water Volume Values in SR 3.5.1.2 to Match Associated Accumulator Percent Level Values ML17264A9791997-08-0505 August 1997 Rev 7 to AP-RCS.3, High Reactor Coolant Activity. ML17264A9781997-08-0505 August 1997 Rev 12 to AP-RCS.1, Reactor Coolant Leak. ML17264A9771997-08-0505 August 1997 Rev 11 to AP-RCP.1, RCP Seal Malfunction. ML17264A9751997-08-0505 August 1997 Rev 14 to AP-ELEC.1, Loss of 12A & 12B Busses. ML17264A9851997-08-0404 August 1997 Rev 2 to Summary Description of Compliance w/10CFR73 Amend Protection Against Malevolent Use of Vehicles at Nuclear Power Plants. ML17264A9391997-07-0707 July 1997 Rev 3 to Technical Requirements Manual for Ginna Station, Inserting New Tabs Accordingly Per Previous Transmittal for Rev ML17264A9341997-07-0101 July 1997 to Technical Requirements Manual (TRM) & inter-office Correspondence Dtd 970624 ML17264A9461997-06-20020 June 1997 to Inservice Insp (ISI) Program. ML17264A9241997-06-0303 June 1997 Proposed Tech Specs Clarifying Issues Re Low Temperature Overpressure Protection ML17311A0471997-05-22022 May 1997 Revised Eops,Including Procedures Index,Rev 5 to ATT-15.0, Rev 3 to ATT-15.2,rev 3 to AP-ELEC.3,rev 13 to ECA-0.1 & Rev 9 to ECA-0.2.W/970522 Ltr ML17264A8671997-04-24024 April 1997 Proposed Tech Specs,Revising Rcs,Pt & Administrative Control Requirements 1999-06-28
[Table view] |
Text
Attachment A Remove Technical Specification pages 3.13-4 through 3.13-6.Xnsert attached Technical Specification pages 3.13-4 through 3.13-7.
.abl.e 3.13-l{Continued)
Safety Related Shock Sluppressors (Snubbers)
Snubber Nark Ho.\APl'7-25 I I A I I Aux.Feedwater Accessibl.e or Inaccessible (A or I)Hspecia11y Elijah Radiation**
Ai f ficult to Zone Remove No AP'">-~6 l AFll~7 Aux.Peedwater Aux.Peedwater Uo No No No AFh'-20 APN-29 Aux.Feedwater"A",Aux.Feedwater No No AFN-31 IIAII Aux.Feedwater Uo No AP<'1-49'I F01-30 I FU-80"A" Aux.Feedwater"B" Feedwater"8" Peedwater No No No Ho No No FN-81't FW-82 I"8" Peedwater"B" Peedwater No No No Table 3.13-1 (Continued)
Sachet Related Shock Suppressors (Snubbers)
Snubber.Mark No.Pi inq System Accessible or Inaccessible (A or I)Hiqh Radiation**
Zone Especially Difficult to FN-03;I AFN-1 0 AF!'-1 3"8" Feedwater"8" Aux.Feedwa ter"B" Aux.Feedwater No bJo No'..Jo No bJo SbJB-265 Stm to TD Aux.Feedwater No HG-22"A" Hain Steam No No MS-8"B" Main Steam No Yes b1S-146 (Top)MS-146 (Bottom)"8" blain Steam"8" Main St.earn No No No Table 3.13-1 (Continued)
Safety Related Shock Su pressors (Snubbers)
Snubber Hark No.Pinin S stem Accessible or Inaccessible (A or I)Especially High Radiation**
Difficult to Zone Remove 4)4J I Ch HG-147-.HS-148>HS-159 HS-160'E" t1ain Steam"E" Haz.n Steam"E" Hain Steam"E" Hain Steam No No No No No H-1 I'-2 H-3 0 H-4 H 5 I, PRZR Relief PR?R Belief PRZR Pe 1 ie f PRZR Relief PPZR Relief Yes Yes Yes Yes Yes No No H-6 H-7 El-8 K PRZR Relief PRZR Relief PPZR Relief Yes Yes Yes No Table 3.13-1 (Continued)
Safet Related Shock Suppressors (Snubbers)
Snubber Mark No.Piping S stem Accessible or Inaccessible (A or I)Especially High Padiation**
Difficult to Zone Remove PS-2 PS-4 PS-5 FS-6 PS-0 PS-'9 PS-10 PS-11 PRZR Safety 6 Relief Valve PRZR Safety S Relief Valve PRZR Safety S Relief Valve PRZR Safety PR R Safety Relic f Valve F Relief Valve PRZR Safety&Relief Valve PRZR Safety 6 Relief Valve PRZR Safety 5 Relief Valve Yes Yes Yes Yes Yes Yes Yes No No No No No No No No I ,Snubbers may be added to or removed from safety related systems without prior License Amendment to Table 3.13-1 provided that a proposed revision to Table 3.13-1 is included~with the next License Amendment request.I ,Modifications to this table due to changes in high radiation areas (during shutdown)shall be submitted to the NRC as part of the next License Amendment request.
Attachment B f The proposed change reflects changes made to piping systems at.Ginna as a result of recent analyses.One hydraulic shock suppressor was added to the steam supply piping for the turbine driven auxiliary feedwater pump.Eight hydraulic shock suppressors were added to the pressurizer safe ty and relief piping.As a result of our seismic upgrade program, four existing hydraulic shock suppressors are being replaced with mechanical units.The seismic upgrade program has been described in previous letters to the URC.Decause of the changes which will result from our seismic upgrade program, the footnote to Table 3.13-1 deal.ing with snubber addition has been revised to permit removal of snubbers without prior license amendment.
Such a change is necessary in order to permit timely implementation of the seismic upgrade program.Changes would only be made following appropriate analysis.Changes to the Technical Specification requirements for snubbers were requested by letter dated starch 23, 1981 from Darrell Eisenhut.A separate change request will be prepared which responds to the request.