Proposed Tech Specs Changing Section 5.6.6 Page 5.0-22 to Incorporate Methodology for Determining RCS P/T & LTOP Limits Into Administrative Controls Section for RCS P/T Limits Rept
ML17264A405
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/15/1996
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17264A403 List:
References
NUDOCS 9603210240
Download: ML17264A405 (7)


Text

Attachment II Marked Up Copy of R.E. Ginna Nuclear Power Plant Technical Specifications Included Pages:

5.0-22, 9603210240 9603i5 aDOCV, 0Soooae4 P PDR

~I f

Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.6 PTLR (continued)

C. The RCS pressure and temperature and LTOP limits shall be those previously reviewed and approved by the RC in men ~men Ao. 48. 1he accep a ~ ity o e T and LTOP limits are documented in NRC letter, "R.E. Ginna-Acceptance for Referencing .of Pressure Limits Report,"

December 26, 1995. Speci ically, the limits and methodology are described i e o ow>ng ocumen s:

i. ia men ment Ao. 45~ aci > y Operating LLicense io.

DPR-18, R.E. Ginna Nuclear Power Plant, Harch 6, 1992.

2. Letter from C. I. Grimes, NRC, to R.A. Newton, Mestinghouse Electric Corporation, "Acceptance for Referencing Topical Report MCAP-14040,'evision 1,

'Hethodology used to Develop Cold Overpressure Hitigating System Setpoints and RCS Heatup and Cooldown Limit Curves','" October 16, 1995.

3. Letter from R.C. Mecredy, Rochester Gas and Electric Corporation (RG8E), to Document Control Desk, NRC, Attention A.R. Johnson, "Technical Specifications Improvement Program, Reactor Coolant System (RCS)

Pressure and Temperature Limits Report (PTLR),"

December 8, 1995.

d. The PTLR shall be provided to the NRC upon issuance for each reactor vessel fluency period and for revisions or supplement thereto.

R.E. Ginna Nuclear Power Plant 5.0-22 Amendment No. 61

1 4

Attachment III Proposed Technical Specifications Included Pages:

5.0-22

~

eporting Requirements 5.6

~

5.6 Reporting Requirements 5.6.6 PTLR (continued)

C. The analytical methods used to determine the RCS pressure and temperature and LTOP limits shall be those previously reviewed and approved by the NRC in the following documents:

1. (NRC approval document>
2. Letter from C. I. Grimes, NRC, to R.A. Newton, Westinghouse Electric Corporation, "Acceptance for Referencing Topical Report WCAP-14040, Revision 1,

'Hethodology used to Develop Cold Overpressure Hitigating System Setpoints and RCS Heatup and Cooldown Limit Curves'," October 16, 1995.

3. Letter from R.C. Hecredy, Rochester Gas and Electric Corporation (RGSE), to Document Control Desk, NRC, Attention A.R. Johnson, "Technical Specifications Improvement Program, Reactor Coolant System (RCS)

Pressure and Temperature Limits Report (PTLR),"

December 8, 1995.

d. The PTLR shall be provided to the NRC upon issuance for each reactor vessel fluency period and for revisions or supplement thereto.

R.E. Ginna Nuclear Power Plant 5.0-22 Amendment No. Q

lf