Proposed Tech Specs Re RCS Pressure & Temp Limits Rept
ML17264A600
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/13/1996
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17264A598 List:
References
NUDOCS 9609180196
Download: ML17264A600 (7)


Text

Attachment II Marked Up Copy of R.E. Ginna Nuclear Power Plant Technical Specifications Included Pages:

5.0-22 9609'LSOi9'6 9609i3 PDR ADGCK 05000244 P PDR 1

Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.6 PTLR (continued)

C. The RCS pressure and temperature and LTOP limits shall be those previously reviewed and approved by the NRC. The acce tabilit of LTOP limits are documented in

~~~ )

(NLc. eqprevaW NRC etter ate Specifically, the limits and methodology are descry e sn the following documents:

1. Letter from R.C. Mecredy, Rochester Gas and Electric Corporation (RGLE), to Document Control Desk, NRC, Attention: A.R. Johnson, "Application for Facility

~

Operating License, Revision to Reactor Coolant System

~ ~

r essure and Temperature Limits Report (PTLR),"

~ ~

R t~~o~ l3 1996.~

2. Letter from C. I. Grimes, NRC, to R.A. ewton, westinghouse E'lectric Corporation, "Acceptance for Referencing Topical Report MCAP-14040, Revision 1,

'Methodology used to Develop Cold Overpressure Mitigating System Setpoints and RCS Heatup and Cooldown Limit Curves'," October 16, 1995.

3. Letter from R.C. Mecredy, Rochester Gas and Electric Corporation (RGIIE), to Document Control Desk, NRC, Attention A.R. Johnson, "Technical Specifications Improvement Program, Reactor Coolant System (RCS)

Pressure and Temperature Limits Report (PTLR),"

December 8, 1995.

d. The PTLR shall be prgvided to the NRC upon issuance for each reactor vessel fluenc~period and for revisions or supplement thereto.

0- t -A, ~~oMXo~u~g ~~egg Cp,yg Qg~

W~~. NR~4 .

R.E. Ginna Nuclear Power Plant 5,. 0-22 Amendment No. g, 64

Attachment III Proposed Technical Specifications Included Pages:

5.0-22

Reporting Requirements 5.6 5.6.6 PTLR (continued)

C. The RCS pressure and temperature and LTOP limits shall be those previously reviewed and approved by the NRC. The acceptability of the P/T and LTOP limits are documented in NRC letter dated (NRC approval document>. Specifically, the limits and methodology are described in the following documents:

1. Letter from R.C. Hecredy, Rochester Gas and Electric Corporation (RGEE), to Document Control Desk, NRC, Attention: A.R. Johnson, "Application for Facility Operating License, Revision to Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR),"

September 13, 1996.

2. WCAP-14040-NP-A, "Hethodology Used to Develop Cold Overpressure Hitigating System Setpoints and RCS Heatup and Cooldown Limit Curves," January 1996.
3. Letter from R.C. Hecredy, Rochester Gas and Electric Corporation (RG8E), to Document Control Desk, NRC, Attention A.R. Johnson, "Technical Specifications Improvement Program, Reactor Coolant System (RCS)

Pressure and Temperature Limits Report '(PTLR),"

December 8, 1995.

d. The PTLR shall be provided to the NRC upon issuance for each reactor vessel fluence period and for revisions or supplement thereto.

R.E. Ginna Nuclear Power Plant 5.0-22 Amendment No. Q', PP

l IL

Attachment IV Ginna Station PTLR, Revision 2