|
|
Line 13: |
Line 13: |
| | page count = 1 | | | page count = 1 |
| }} | | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:From:HOO HocSent:Wednesday, January 12, 2011 8:04 PM To:HOO Hoc |
| | |
| | ==Subject:== |
| | Logbook Entry: 1/12/2011 - Turkey Point - CrocodileOps Officer: PETE SNYDEREntry Date: 1/12/2011 - 18:28 Entry Type: 50.72 LOGGED ONLY Notify Date - Time: 1/12/2011 - 18:28 Event Date - Time: 1/12/2011 - 15:15 () |
| | Site: TURKEY POINT Emergency Class: NON EMERGENCY |
| | |
| | ------------------------------------------------------------------------ |
| | |
| | --------------------- |
| | |
| | Units 3 and 4 were at 100% power in mode 1 for this event."This is a 4 hour Non-Emergency notification to the NRC based on a notification to another |
| | |
| | government agency. This event is not related to the health and safety of |
| | |
| | the public."On 01/12/11 at 15:15 EST, a Dead on Arrival (DOA) crocodile was found in the Cooling Canal |
| | |
| | Interceptor ditch south of the Turkey Point plant. The animal exhibited |
| | |
| | evidence of physical |
| | |
| | trauma due to natural causes and is not considered causal from plant |
| | |
| | operations or a plant |
| | |
| | vehicle. The Florida Fish and Wildlife Conservation Commission and the |
| | |
| | US Fish and Wildlife |
| | |
| | Service were notified on 1/12/11 at 15:45." The licensee notified the NRC Resident Inspector. Notified R2DO (Bonser).E-mail Properties Mail Envelope Properties (CC56DD79EC73A545B9890C3C629E307D6F534416F5) |
| | |
| | ==Subject:== |
| | Logbook Entry: 1/12/2011 - Turkey Point - CrocodileSent Date:01/12/2011 8:03:51 PM Received Date:01/12/2011 8:03:51 PM From:HOO HocCreated By: HOO.Hoc@nrc.gov |
| | |
| | Recipients: |
| | HOO.Hoc@nrc.gov (HOO Hoc) |
| | Tracking Status: None Post Office: |
| | HQCLSTR01.nrc.govFilesSizeDate & TimeMESSAGE855801/12/2011 Options Expiration Date: |
| | Priority:olImportanceNormal ReplyRequested:FalseReturn Notification:False Sensitivity: olNormal Recipients received:}} |
Revision as of 21:53, 14 August 2018
Letter Sequence Request |
---|
TAC:ME1624, Administratively Control Containment Penetrations, TSTF-68, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: L-2011-540, Safety Evaluation Report Review Supporting Fuel Storage Criticality Amendments 246 and 242, L-2012-118, Response to NRC ITSB RAI Regarding Clean TS Changes for EPU LAR No. 205 and Incorporation of Amendments 247 and 243 TS Changes on Relocation of Cycle Specific Parameters to the Core Operating Limits Report, L-2012-263, CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - 30 Day Special Report, L-2012-293, FPL Review Comments on Extended Power Uprate Safety Evaluation Report, L-2012-426, Extended Power Uprate Cycle 26 Startup Report, ML110960521, ML110960523, ML112280292, ML12074A248, ML12074A251, ML12122A162, NRC-2011-0094, Federal Register Notice, Notice of Consideration Regarding Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information.
|
MONTHYEARL-2009-133, License Amendment Request 196 Alternative Source Term and Conforming Amendment2009-06-25025 June 2009 License Amendment Request 196 Alternative Source Term and Conforming Amendment Project stage: Request ML0920205292009-07-22022 July 2009 Supplemental Information Needed for Acceptance of Requested Licensing Action Alternate Source Term Amendment Request (LAR 196) (Tac Nos. ME1624 and ME1625) Project stage: Acceptance Review ML0922206962009-08-18018 August 2009 Supplemental Information Needed for Acceptance of Requested Licensing Action Alternate Source Term Amendment Request (LAR 196) Project stage: Acceptance Review L-2009-195, Response to Request for Additional Information on Proposed Amendments to Revise the Technical Specifications to Adopt Alternative Source Term2009-08-26026 August 2009 Response to Request for Additional Information on Proposed Amendments to Revise the Technical Specifications to Adopt Alternative Source Term Project stage: Response to RAI ML0926005302009-09-25025 September 2009 Acceptance Letter Regarding the Alternative Source Term License Amendment Request Project stage: Acceptance Review ML0935006652009-12-17017 December 2009 RAI, Regarding Alternative Source Term Project stage: RAI L-2010-021, Turkey Points, Units 3 & 4, Response to Request for Additional Information Regarding Alternative Source Term Amendment Request2010-02-10010 February 2010 Turkey Points, Units 3 & 4, Response to Request for Additional Information Regarding Alternative Source Term Amendment Request Project stage: Response to RAI ML1005603882010-02-25025 February 2010 Request for Additional Information Regarding Request to Adopt the Alternate Source Term Project stage: RAI L-2010-048, Response to Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) 1962010-03-15015 March 2010 Response to Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) 196 Project stage: Response to RAI ML1007004462010-03-24024 March 2010 Request for Additional Information Regarding Request to Adopt the Alternate Source Team (TAC ME1624 & ME1625) Project stage: RAI L-2010-065, Response to Request for Additional Information (RAI) Regarding Alternative Source Tear (AST) License Amendment Request (LAR) 1962010-04-14014 April 2010 Response to Request for Additional Information (RAI) Regarding Alternative Source Tear (AST) License Amendment Request (LAR) 196 Project stage: Response to RAI L-2010-083, Supplement to License Amendment Request (LAR) 196 and 3/24/2010 Request for Additional Information (RAI) Regarding Alternative Source Term (AST)2010-05-21021 May 2010 Supplement to License Amendment Request (LAR) 196 and 3/24/2010 Request for Additional Information (RAI) Regarding Alternative Source Term (AST) Project stage: Supplement L-2010-121, Revised Meteorological Data for 2005-2009 Supporting Alternative Source Term and Conforming License Amendment Request 1962010-06-11011 June 2010 Revised Meteorological Data for 2005-2009 Supporting Alternative Source Term and Conforming License Amendment Request 196 Project stage: Request L-2010-131, Response to 5/28/2010 Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) 1962010-06-23023 June 2010 Response to 5/28/2010 Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) 196 Project stage: Request L-2010-137, Revised Radiological Dose Consequences for Alternative Source Term and Conforming License Amendment Request 1962010-06-25025 June 2010 Revised Radiological Dose Consequences for Alternative Source Term and Conforming License Amendment Request 196 Project stage: Request ML1024400682010-08-27027 August 2010 Acceptance Review: Fuel Storage Criticality Analysis LAR (ME4470 and ME4471) Project stage: Acceptance Review L-2010-136, Revised Meteorological Data for 2005-2009 with T Bias Supporting Alternative Source Term and Conforming License Amendment Request 1962010-09-0202 September 2010 Revised Meteorological Data for 2005-2009 with T Bias Supporting Alternative Source Term and Conforming License Amendment Request 196 Project stage: Request ML1024602052010-09-0303 September 2010 E-mail Acceptance Review TSTF-448 Project stage: Acceptance Review L-2010-197, Response to Request for Additional Information Regarding Alternative Source Term License Amendment Request (LAR) 196 and Proposed Changes to Technical Specification (TS) 3/4.7.5 on Control Room Emergency Ventilation System2010-09-15015 September 2010 Response to Request for Additional Information Regarding Alternative Source Term License Amendment Request (LAR) 196 and Proposed Changes to Technical Specification (TS) 3/4.7.5 on Control Room Emergency Ventilation System Project stage: Response to RAI L-2010-226, Summary of NRC Public Meeting Discussion on Meteorological Data for Alternative Source Term and Conforming License Amendment Request 1962010-10-13013 October 2010 Summary of NRC Public Meeting Discussion on Meteorological Data for Alternative Source Term and Conforming License Amendment Request 196 Project stage: Meeting ML1035601692010-10-21021 October 2010 License Amendment Request for Extended Power Uprate (LAR 205) Project stage: Request L-2010-160, Supplement to the Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 Regarding the EPU Related System Impact Study (SIS)2010-10-29029 October 2010 Supplement to the Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 Regarding the EPU Related System Impact Study (SIS) Project stage: Supplement L-2010-293, Response to Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) No. 196 and Meteorological Data Sensitivity2010-12-14014 December 2010 Response to Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) No. 196 and Meteorological Data Sensitivity Project stage: Response to RAI ML1035601832010-12-14014 December 2010 License Amendment Request for Extended Power Uprate, Attachment 07; Supplemental Environmental Report Project stage: Supplement ML1035601742010-12-14014 December 2010 License Amendment Request for Extended Power Uprate, Attachment 1; Descriptions and Technical Justifications for the Renewed Operating License, Technical Specifications, and Licensing Basis Changes Project stage: Request ML1028710232010-12-16016 December 2010 Summary of Meeting with Florida Power & Light Company to Discuss Turkey Point, Units 3 and 4, Alternative Source Term License Amendment Request Project stage: Meeting L-2010-303, Supplemental Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Equivalent Margin Analysis (EMA)2010-12-21021 December 2010 Supplemental Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Equivalent Margin Analysis (EMA) Project stage: Supplement ML1036400512010-12-26026 December 2010 Logbook Entry for 12/26/2010 Project stage: Request ML1036400522010-12-27027 December 2010 Logbook Entry for 12/27/2010 Project stage: Request L-2011-004, Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Mechanical/Civil Engineering Issues2011-01-0707 January 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Mechanical/Civil Engineering Issues Project stage: Response to RAI ML1103101842011-01-12012 January 2011 Crocodile Log Book 1/12/2011 Project stage: Request ML1035500302011-01-19019 January 2011 Summary of Meeting with Florida Power & Light Company, Regarding Turkey Point, Units 3 & 4, Spent Fuel Criticality Analysis License Amendment Request Project stage: Meeting L-2011-027, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Fire Protection Issues2011-02-22022 February 2011 Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Fire Protection Issues Project stage: Response to RAI L-2011-030, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Human Performance Issues - Round 12011-03-0303 March 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Human Performance Issues - Round 1 Project stage: Response to RAI ML1107000212011-03-11011 March 2011 Acceptance for Review of License Amendment Request for Extended Power Uprate Project stage: Acceptance Review L-2011-102, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Unit 3 Mechanical/Civil Engineering Issues2011-03-25025 March 2011 Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Unit 3 Mechanical/Civil Engineering Issues Project stage: Response to RAI L-2011-081, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Electrical Engineering Branch Issues2011-03-31031 March 2011 Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Electrical Engineering Branch Issues Project stage: Response to RAI ML1108907262011-03-31031 March 2011 Slides for Turkey Point, 3 and 4, Regarding Extended Power Uprate and Spent Fuel Criticality Project stage: Request ML11095A0122011-04-21021 April 2011 Summary of Public Meeting with Florida Power & Light Company, on Turkey Points, Units 2 and 4 Extended Power Uprate License Amendment Request Currently Under Review (TAC Nos. ME4907 and ME4908) Project stage: Meeting L-2011-153, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues2011-04-22022 April 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues Project stage: Response to RAI L-2011-084, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Containment and Ventilation Issues2011-04-28028 April 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Containment and Ventilation Issues Project stage: Response to RAI L-2011-142, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Health Physics and Human Performance Issues2011-04-29029 April 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Health Physics and Human Performance Issues Project stage: Response to RAI NRC-2011-0094, Federal Register Notice, Notice of Consideration Regarding Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information.2011-05-0202 May 2011 Federal Register Notice, Notice of Consideration Regarding Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information. Project stage: Other ML1109605232011-05-0202 May 2011 Federal Register Notice, Notice of Consideration Regarding Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information. Project stage: Other ML1109605212011-05-0606 May 2011 Letter, Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing and Order Imposing Procedures for Document Access to Sensitive Unclassified Non-Safeguards Information Project stage: Other L-2011-141, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues2011-05-11011 May 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues Project stage: Response to RAI L-2011-170, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Nuclear Performance and Code Review Issues2011-05-19019 May 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Nuclear Performance and Code Review Issues Project stage: Response to RAI L-2011-154, Response to NRC Request for Additional Information Regarding Fuel Storage Criticality Analysis License Amendment Request No. 2072011-05-20020 May 2011 Response to NRC Request for Additional Information Regarding Fuel Storage Criticality Analysis License Amendment Request No. 207 Project stage: Response to RAI L-2011-210, Regarding Supplementary Information Related to Fpl'S Response to NRC Request for Additional Information (RAI) IHPB-1.52011-06-0707 June 2011 Regarding Supplementary Information Related to Fpl'S Response to NRC Request for Additional Information (RAI) IHPB-1.5 Project stage: Supplement ML11174A1652011-06-21021 June 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Instrumentation and Controls Issues Project stage: Response to RAI 2010-06-25
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24282A6722024-10-0808 October 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24261B8062024-09-17017 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24250A0852024-09-0606 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24250A0242024-09-0606 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24248A0822024-09-0303 September 2024 NRR E-mail Capture - Acceptance Review for Turkey Point Alternative Request VR-02 for Certain Motor-Operated Isolation Valves (L-2024-LLR-0059) ML24234A0842024-08-21021 August 2024 Notification of Inspection and Request for Information ML24234A0142024-08-20020 August 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Spent Fuel Storage License Amendment Request (LAR) (L-2023-LLA-0142) ML24170A9352024-06-18018 June 2024 NRR E-mail Capture - Supplement to Audit Plan - Turkey Point - 18 to 24 Month Fuel Cycle LAR (L-2023-LLA-0161) ML24149A3532024-05-24024 May 2024 Change in Estimated Review Schedule for Nextera Common Emergency Plan Amendment ML24130A0112024-05-0808 May 2024 NRR E-mail Capture - Acceptance Review - Turkey Point 3 and 4 - Sixth 10-Year Inservice Testing Interval Proposed Alternative PR-02 (L-2024-LLR-0029) ML24122C6922024-05-0101 May 2024 NextEra Fleet EP Amendment - Demonstration Drill ML24113A0372024-04-22022 April 2024 NRR E-mail Capture - Acceptance Review - Turkey Point 3 and 4 and St. Lucie 2 - Request to Use Later Code of ASME (L-2024-LLR-0024) ML24101A0602024-04-11011 April 2024 NRC to NMFS, Notification of Nrc’S Issuance of the Final EIS for Turkey Point Subsequent License Renewal ML24102A2772024-04-11011 April 2024 NRR E-mail Capture - Audit Plan - Turkey Point - Spent Fuel Pool Criticality License Amendment Request (LAR) (L-2023-LLA-0142) ML24101A0592024-04-11011 April 2024 NRC to Fws, Notification of Nrc’S Issuance of the Final EIS for Turkey Point Subsequent License Renewal ML24107A9062024-04-11011 April 2024 Fws to NRC, Response to Notification of Final EIS for Turkey Point SLR ML24102A1692024-04-11011 April 2024 NRR E-mail Capture - Audit Plan - Turkey Point - 18 to 24 Month Fuel Cycle License Amendment Request (LAR) (L-2023-LLA-0161) ML24024A0182024-01-24024 January 2024 LTR-23-0216-1 - (E-Mail) Turkey Point Nuclear Plant, Units 3 and 4 - 10 CFR 2.206 Petition -Turkey Point and PWR RPV Embrittlement E-Mail Closure Letter to Petitioner, January 23, 2024 ML24023A0622024-01-10010 January 2024 10 CFR 2.206 Petition - LTR-23-0216-1 - Turkey Point and PWR RPV Embrittlement - E-mail Final Determination Status to Petitioner - 1-10-2024 - L-2023-CRS-0005 ML23347A0772023-12-13013 December 2023 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - LAR to Transition to 24-Month Fuel Cycles (L-2023-LLA-00161) ML23341A0602023-12-0707 December 2023 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Exemption Request for Use of Axiom Fuel Cladding (L-2023-LLE-0036) ML23317A3752023-11-0808 November 2023 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - LAR to Update SFP Criticality Analysis (L-2023-LLA-0142) ML23307A2382023-11-0303 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 - Initial Assessment; Turkey Point Subsequent License Renewal with Petitioner 11/3/2023 - L-2023-CRS-0005 ML23333A0092023-10-27027 October 2023 Attachment a - NRC Extension of Comment Period-1 ML23265A2692023-09-15015 September 2023 Turkey Point,_Rp Document Request 2023-004 ML23226A0752023-08-14014 August 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23171B0532023-06-20020 June 2023 NRR E-mail Capture - Change in Estimated Review Schedule for Turkey Point Improved Standard Technical Specifications (ITS) LAR (L-2022-LLI-0002) ML23198A0592023-05-22022 May 2023 FPL to Fws, Notification of Doa Crocodile in CCS on 5/22/23 ML23138A0212023-05-17017 May 2023 Telephone Record, Call with Florida Power and Light Regarding Decommissioning Funding Plan Update Dated March 30, 2021 ML23129A8322023-05-0505 May 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23109A1862023-04-19019 April 2023 and Turkey Point Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23117A2712023-04-11011 April 2023 NRR E-mail Capture - (External_Sender) Updated Data for Doa Turkey Point American Crocodile at 4/10/2023 ML23067A2812023-03-0808 March 2023 NRR E-mail Capture - (External_Sender) Non-causal American Croc Doa Turkey Point ML23038A1892023-02-0303 February 2023 RP RFI April 2023 ML23006A0262023-01-0505 January 2023 NRR E-mail Capture - Audit Plan - Turkey Point Fire Protection Changes to Support RCP Seal Replacement LAR ML22311A4752022-11-0707 November 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - ITS ML22293B6562022-10-18018 October 2022 Request for 45 Day Extension of Comment Period of Turkey Point Subsequent License Renewal Scoping Process, Docket Id NRC-2022-0172 by Natural Resources Defense Council, Miami Waterkeeper and Counsel for Friends of the Earth ML22265A1522022-09-21021 September 2022 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - LAR to Revise Fire Protection Program (L-2022-LLA-0128) ML22258A1862022-09-15015 September 2022 NRR E-mail Capture - Turkey Point Unit Nos. 3 and 4 - Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Requests to Replace Instrumentation with Digital Systems ML22181A0562022-06-30030 June 2022 NRR E-mail Capture - Request for Additional Information - Turkey Point U3 Sgtir (L-2022-LRO-0070) ML22178A1032022-06-25025 June 2022 NRR E-mail Capture - (External_Sender) Turkey Point Doa American Crocodile 6/25/22 ML22147A0672022-05-19019 May 2022 NRR E-mail Capture - (External_Sender) Turkey Point Doa Crocodile 05/19/2022 ML22095A0162022-04-0505 April 2022 NRR E-mail Capture - Verbal Authorization of Turkey Point Nuclear Plant Unit 3 - Icw Relief Request No. 10-II ML22081A0292022-03-21021 March 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit No. 3 - Request for Additional Information - Icw Alternative ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21302A0052021-12-23023 December 2021 Email to Nextera/Fpl Re Discussion of Availability of Human Factor Validation Information to Support the Planned Turkey Point Digital I&C License Amendment Request ML21307A2882021-11-18018 November 2021 NRC to Fws, Request to Reinitiate Endangered Species Act Section 7 Consultation for Continued Operation of Turkey Point ML21298A0572021-10-25025 October 2021 NRR E-mail Capture - Final: Tpn Request for Additional Information - Round 2 Concerning Relief Request 10 - Extension EPID: L-2021-LLR-0077 ML21291A1272021-10-14014 October 2021 NRR E-mail Capture - Request for Additional Information - Fifth Ten-Year Inservice Inspection Interval Relief Request No.10 - Extension (L-2021-LLR-0077) 2024-09-06
[Table view] |
Text
From:HOO HocSent:Wednesday, January 12, 2011 8:04 PM To:HOO Hoc
Subject:
Logbook Entry: 1/12/2011 - Turkey Point - CrocodileOps Officer: PETE SNYDEREntry Date: 1/12/2011 - 18:28 Entry Type: 50.72 LOGGED ONLY Notify Date - Time: 1/12/2011 - 18:28 Event Date - Time: 1/12/2011 - 15:15 ()
Site: TURKEY POINT Emergency Class: NON EMERGENCY
Units 3 and 4 were at 100% power in mode 1 for this event."This is a 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Non-Emergency notification to the NRC based on a notification to another
government agency. This event is not related to the health and safety of
the public."On 01/12/11 at 15:15 EST, a Dead on Arrival (DOA) crocodile was found in the Cooling Canal
Interceptor ditch south of the Turkey Point plant. The animal exhibited
evidence of physical
trauma due to natural causes and is not considered causal from plant
operations or a plant
vehicle. The Florida Fish and Wildlife Conservation Commission and the
US Fish and Wildlife
Service were notified on 1/12/11 at 15:45." The licensee notified the NRC Resident Inspector. Notified R2DO (Bonser).E-mail Properties Mail Envelope Properties (CC56DD79EC73A545B9890C3C629E307D6F534416F5)
Subject:
Logbook Entry: 1/12/2011 - Turkey Point - CrocodileSent Date:01/12/2011 8:03:51 PM Received Date:01/12/2011 8:03:51 PM From:HOO HocCreated By: HOO.Hoc@nrc.gov
Recipients:
HOO.Hoc@nrc.gov (HOO Hoc)
Tracking Status: None Post Office:
HQCLSTR01.nrc.govFilesSizeDate & TimeMESSAGE855801/12/2011 Options Expiration Date:
Priority:olImportanceNormal ReplyRequested:FalseReturn Notification:False Sensitivity: olNormal Recipients received: