| | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 10, 2012 |
| | |
| | Mr. Barry Allen Site Vice President |
| | |
| | FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 |
| | |
| | Oak Harbor, OH 43449-9760 |
| | |
| | ==SUBJECT:== |
| | REQUALIFICATION PROGRAM INSPECTION |
| | |
| | ==Dear Mr. Allen:== |
| | In a telephone conversation on August 29, 2012, Mr. C. Steenbergen, Operations Training Supervisor, and Mr. R. K. Walton, Lead Inspector, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at Davis-Besse Nuclear Power Station. The inspection is planned for the week of November 26, 2012, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the written examinations and operating tests scheduled for the week of the inspection to the NRC by the week of November 19, 2012. Mr. Steenbergen has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB), approval number 3150-0018. The public reporting burden for this collection of information is estimated to average four hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. |
| | |
| | B. Allen |
| | |
| | The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. R. K. Walton at 630-829-9836, or me at 630-829-9707. |
| | Sincerely, |
| | /RA/ Hironori Peterson, Chief |
| | |
| | Operations Branch Division of Reactor Safety Docket Nos. 50-346 and 72-014 License No. NPF-3 |
| | |
| | cc: Distribution via ListServŽ |
| | |
| | B. Allen |
| | |
| | The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. R. K. Walton at 630-829-9836, or me at 630-829-9707. |
| | Sincerely, |
| | /RA/ Hironori Peterson, Chief |
| | |
| | Operations Branch Division of Reactor Safety Docket Nos. 50-346 and 72-014 License No. NPF-3 |
| | |
| | cc: Distribution via ListServŽ |
| | |
| | DISTRIBUTION: |
| | Silas Kennedy |
| | |
| | RidsNrrDorlLpl3-2 Resource |
| | |
| | RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck |
| | |
| | Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak |
| | |
| | John McHale, NRR |
| | |
| | Janet Kweiser, DRS |
| | |
| | DOCUMENT NAME: Ltr 091012 Davis Besse Requalification Program Inspection.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII N RIII RIII RIII NAME DMcNeil for RKWalton:cs HPeterson DATE 09/05/12 09/10/12 OFFICIAL RECORD COPY}} |
Revision as of 21:29, 1 August 2018
|
---|
Category:Letter
MONTHYEARIR 05000346/20240032024-11-14014 November 2024 Integrated Inspection Report 05000346/2024003 ML24303A3282024-10-29029 October 2024 Information Request for the Cyber Security Baseline Inspection Identification to Perform Inspection ML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components IR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 ML24269A0552024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 The Associated Independent Spent Fuel Storage Installations IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan 2024-09-06
[Table view] Category:License-Operator
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24045A0722024-02-14014 February 2024 Form 5.1-1 Post Examination Check Sheet IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 ML24045A0702024-01-29029 January 2024 Form 1.3-1 Examination Security Agreement-Post Examination ML24045A0712024-01-29029 January 2024 Form 2.1-1 Examination Prep Checklist L-24-029, Post-Exam Package Cover Letter2024-01-25025 January 2024 Post-Exam Package Cover Letter ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 ML24045A0342023-12-14014 December 2023 Form 2.3-2 Operating Test Quality Checklist ML24045A0152023-12-14014 December 2023 Form 2.3-1 Exam Outline Quality Checklist for Davis-Besse ML24045A0382023-12-14014 December 2023 Form 2.3-4 Written Exam Quality Checklist ML24045A0162023-12-14014 December 2023 Form 3.4-1 Events and Evolutions Checklist for Davis-Besse ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter ML23160A2342023-06-13013 June 2023 Confirmation of Initial License Examination IR 05000346/20223012022-04-12012 April 2022 NRC Initial License Examination Report 05000346/2022301 L-22-061, Ile Post Exam Letter L-22-0612022-02-24024 February 2022 Ile Post Exam Letter L-22-061 ML22108A2442022-02-24024 February 2022 Ile ES-201-2 ML22115A1552022-02-24024 February 2022 Ile ES-401-2 and ES-401-3 ML22131A2132022-02-24024 February 2022 Ile Outline Review Comments and Resolutions ML22108A2512022-02-24024 February 2022 Ile Outline Submittal Letter L-21-219 ML22115A1732022-02-24024 February 2022 Ile ES-301-3 ML22116A1912022-02-24024 February 2022 Walkthrough Portion JPMs As-Administered ML22116A1892022-02-24024 February 2022 Scenarios As-Administered ML22116A1932022-02-24024 February 2022 Written Exam As-Administered ML22116A0462022-02-24024 February 2022 Ile ES-401-6 ML22116A0572022-02-24024 February 2022 Ile Proposed Exam JPMs ML22108A2412022-02-24024 February 2022 Ile ES-201-2 NRC Written Outline Only ML22131A1942022-02-24024 February 2022 Ile ES-301-7 ML22115A1492022-02-24024 February 2022 Ile ES-301-1 ML22118A3302022-02-24024 February 2022 Ile ES-201-1 ML22108A2492022-02-24024 February 2022 Ile Forms ES-301-5 ML22131A2042022-02-24024 February 2022 Ile ES-401-9 ML22131A2112022-02-24024 February 2022 Ile ES-401-4 ML22115A1532022-02-24024 February 2022 Ile ES-301-2 ML22116A0612022-02-24024 February 2022 Ile Proposed Written Exam ML22118A7952022-02-24024 February 2022 Ile Forms ES-201-3 ML22116A0592022-02-24024 February 2022 Ile Proposed Exam Scenarios ML22115A1762022-02-24024 February 2022 Ile Proposed Exam Submittal Letter L-21-267 ML22115A1572022-02-24024 February 2022 Ile Forms ES-D-1 ML22027A5092022-01-27027 January 2022 Operator Licensing Examination Approval ML21181A4052021-07-0101 July 2021 Confirmation of Initial License Examination IR 05000346/20213012021-03-15015 March 2021 NRC Initial License Examination Report 05000346/2021301 ML21137A2942021-02-18018 February 2021 Proposed in Plant JPMs ML21137A1832021-02-18018 February 2021 ES-201-2 Written Outline ML21137A3342021-02-18018 February 2021 ES-401-9 ML21137A2192021-02-18018 February 2021 ES-301-2 ML21137A2962021-02-18018 February 2021 Proposed Sim JPMs ML21137A2922021-02-18018 February 2021 Proposed Admin JPMs ML21137A3302021-02-18018 February 2021 Ile Outline Review Comments Licensee Responses ML21137A2812021-02-18018 February 2021 ES-401-6 ML21137A3202021-02-18018 February 2021 ES-403-1 ML21137A3212021-02-18018 February 2021 L-21-025 Post Exam Submittal Cover Letter 2024-02-02
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 10, 2012
Mr. Barry Allen Site Vice President
FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080
Oak Harbor, OH 43449-9760
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION
Dear Mr. Allen:
In a telephone conversation on August 29, 2012, Mr. C. Steenbergen, Operations Training Supervisor, and Mr. R. K. Walton, Lead Inspector, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at Davis-Besse Nuclear Power Station. The inspection is planned for the week of November 26, 2012, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the written examinations and operating tests scheduled for the week of the inspection to the NRC by the week of November 19, 2012. Mr. Steenbergen has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB), approval number 3150-0018. The public reporting burden for this collection of information is estimated to average four hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
B. Allen
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. R. K. Walton at 630-829-9836, or me at 630-829-9707.
Sincerely,
/RA/ Hironori Peterson, Chief
Operations Branch Division of Reactor Safety Docket Nos. 50-346 and 72-014 License No. NPF-3
cc: Distribution via ListServŽ
B. Allen
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. R. K. Walton at 630-829-9836, or me at 630-829-9707.
Sincerely,
/RA/ Hironori Peterson, Chief
Operations Branch Division of Reactor Safety Docket Nos. 50-346 and 72-014 License No. NPF-3
cc: Distribution via ListServŽ
DISTRIBUTION:
Silas Kennedy
RidsNrrDorlLpl3-2 Resource
RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck
Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak
John McHale, NRR
Janet Kweiser, DRS
DOCUMENT NAME: Ltr 091012 Davis Besse Requalification Program Inspection.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII N RIII RIII RIII NAME DMcNeil for RKWalton:cs HPeterson DATE 09/05/12 09/10/12 OFFICIAL RECORD COPY