{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 10, 2012
Mr. Barry Allen Site Vice President
FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080
Oak Harbor, OH  43449-9760
==SUBJECT:==
REQUALIFICATION PROGRAM INSPECTION
==Dear Mr. Allen:==
In a telephone conversation on August 29, 2012, Mr. C. Steenbergen, Operations Training Supervisor, and Mr. R. K. Walton, Lead Inspector, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at Davis-Besse Nuclear Power Station. The inspection is planned for the week of November 26, 2012, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the written examinations and operating tests scheduled for the week of the inspection to the NRC by the week of November 19, 2012. Mr. Steenbergen has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB), approval number 3150-0018. The public reporting burden for this collection of information is estimated to average four hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
B. Allen   
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. R. K. Walton at 630-829-9836, or me at 630-829-9707.
Sincerely, 
      /RA/  Hironori Peterson, Chief
Operations Branch Division of Reactor Safety Docket Nos. 50-346 and 72-014 License No. NPF-3
cc:  Distribution via ListServŽ
B. Allen   
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. R. K. Walton at 630-829-9836, or me at 630-829-9707.
Sincerely, 
      /RA/  Hironori Peterson, Chief
Operations Branch Division of Reactor Safety Docket Nos. 50-346 and 72-014 License No. NPF-3
cc:  Distribution via ListServŽ
DISTRIBUTION:
Silas Kennedy 
RidsNrrDorlLpl3-2 Resource 
RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck
Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak
John McHale, NRR
Janet Kweiser, DRS
DOCUMENT NAME:  Ltr 091012 Davis Besse Requalification Program Inspection.docx Publicly Available  Non-Publicly Available Sensitive  Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII N RIII  RIII  RIII NAME DMcNeil for RKWalton:cs HPeterson  DATE 09/05/12 09/10/12  OFFICIAL RECORD COPY}}

Revision as of 21:29, 1 August 2018

Ltr 09/10/12 Davis-Besse Requalification Program Inspection
ML12255A029
Person / Time
Site: Davis Besse  Cleveland Electric icon.png
Issue date: 09/10/2012
From: Hironori Peterson
Operations Branch III
To: Allen B
FirstEnergy Nuclear Operating Co
References
Download: ML12255A029 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 10, 2012

Mr. Barry Allen Site Vice President

FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080

Oak Harbor, OH 43449-9760

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION

Dear Mr. Allen:

In a telephone conversation on August 29, 2012, Mr. C. Steenbergen, Operations Training Supervisor, and Mr. R. K. Walton, Lead Inspector, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at Davis-Besse Nuclear Power Station. The inspection is planned for the week of November 26, 2012, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the written examinations and operating tests scheduled for the week of the inspection to the NRC by the week of November 19, 2012. Mr. Steenbergen has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB), approval number 3150-0018. The public reporting burden for this collection of information is estimated to average four hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

B. Allen

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. R. K. Walton at 630-829-9836, or me at 630-829-9707.

Sincerely,

/RA/ Hironori Peterson, Chief

Operations Branch Division of Reactor Safety Docket Nos. 50-346 and 72-014 License No. NPF-3

cc: Distribution via ListServŽ

B. Allen

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. R. K. Walton at 630-829-9836, or me at 630-829-9707.

Sincerely,

/RA/ Hironori Peterson, Chief

Operations Branch Division of Reactor Safety Docket Nos. 50-346 and 72-014 License No. NPF-3

cc: Distribution via ListServŽ

DISTRIBUTION:

Silas Kennedy

RidsNrrDorlLpl3-2 Resource

RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck

Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak

John McHale, NRR

Janet Kweiser, DRS

DOCUMENT NAME: Ltr 091012 Davis Besse Requalification Program Inspection.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII N RIII RIII RIII NAME DMcNeil for RKWalton:cs HPeterson DATE 09/05/12 09/10/12 OFFICIAL RECORD COPY