{{#Wiki_filter:September 29, 2021
{{#Wiki_filter:
 
==SUBJECT:==
BEAVER VALLEY POWER STATION, UNITS 1 AND 2 - TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000334/2021010 AND 05000412/2021010
 
==Dear Mr. Grabnar:==
On September 16, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Beaver Valley Power Station, Units 1 and 2 and discussed the results of this inspection with Mr. Matthew Enos, General Plant Manager, Nuclear, and other members of your staff. The results of this inspection are documented in the enclosed report.
 
No findings or violations of more than minor significance were identified during this inspection.
 
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
 
Sincerely, Digitally signed by Glenn T.
 
Glenn T. Dentel Dentel Date: 2021.09.29 14:34:54-04'00'
Glenn T. Dentel, Chief Engineering Branch 2 Division of Operating Reactor Safety Docket Nos. 05000334 and 05000412 License Nos. DPR-66 and NPF-73
 
===Enclosure:===
As stated
 
==Inspection Report==
Docket Numbers: 05000334 and 05000412 License Numbers: DPR-66 and NPF-73 Report Numbers: 05000334/2021010 and 05000412/2021010 Enterprise Identifier: I-2021-010-0017 Licensee: Energy Harbor Nuclear Corporation Facility: Beaver Valley Power Station, Units 1 and 2 Location: Shippingport, PA 15077 Inspection Dates: August 30, 2021 to September 16, 2021 Inspectors: E. Dipaolo, Senior Reactor Inspector L. Dumont, Reactor Inspector D. Kern, Senior Reactor Inspector Approved By: Glenn T. Dentel, Chief Engineering Branch 2 Division of Operating Reactor Safety Enclosure
 
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection inspection at Beaver Valley Power Station,
Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
 
===List of Findings and Violations===
 
No findings or violations of more than minor significance were identified.
 
===Additional Tracking Items===
None.
 
=INSPECTION SCOPES=
 
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
 
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site.
 
However, all the inspection activities were performed onsite. The inspections documented below met the objectives and requirements for completion of the IP.
 
==REACTOR SAFETY==
 
===71111.21N.05 - Fire Protection Team Inspection (FPTI) Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01) ===
{{IP sample|IP=IP 71111.21|count=4}}
The inspectors verified that the following systems credited in the approved fire protection program could perform their licensing basis function:
: (1) Fire Protection Water Supply System
: (2) Auxiliary Feedwater System
: (3) Chemical Volume Control System
: (4) Fire Barriers
 
===Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)===
The inspectors verified that the selected fire protection administrative controls were implemented in accordance with the current licensing basis. The inspectors verified that the controls were properly implemented with adequate procedures and that the controls met committed industry standards. The following fire protection administrative controls were reviewed:
: (1) Control of Transient Combustible Material
: (2) National Fire Protection Association (NFPA) 805 Monitoring Program
 
===Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)===
The inspectors reviewed fire protection changes/modifications to ensure that they did not constitute an adverse effect on the ability to safely shutdown post-fire and did not degrade assumptions and performance capability stated in the in the safe shutdown analysis. The inspectors verified that fire protection program documents and procedures affected by the changes were updated. The following fire protections program changes/modifications were reviewed:
: (1) Engineering Change Package (ECP) 15-0450-000, Unit 1 Early Warning Fire Detection Initiating Device Replacement
: (2) ECP 18-0090-000 - Unit 2 Residual Heat Removal System Pump Breaker Normal System Alignment Change
 
==INSPECTION RESULTS==
No findings were identified.
 
==EXIT MEETINGS AND DEBRIEFS==
The inspectors verified no proprietary information was retained or documented in this report.
* On September 16, 2021, the inspectors presented the triennial fire protection inspection results to Mr. Matthew Enos, General Plant Manager, Nuclear, and other members of the licensee staff.
 
=DOCUMENTS REVIEWED=
 
Inspection  Type              Designation    Description or Title                              Revision or
Procedure                                                                                      Date
71111.21N.05 Calculations      ARS-BV1-18-217 BVPS-1 Fire Protection SSD Recovery Action Report 2
ARS-BV2-18-219 BVPS-2 Fire Protection SSD Recovery Action Report 2
Calibration      CR-2021-05522
Records
Corrective Action CR-2018-07052
Documents        CR-2018-08406
CR-2019-02500
CR-2019-05145
CR-2019-09822
CR-2020-00074
CR-2020-00079
CR-2020-07579
CR-2020-08721
CR-2021-00202
CR-2021-00578
CR-2021-00871
CR-2021-02372
CR-2021-03186
CR-2021-05523
Corrective Action CR-2021-06269
Documents        CR-2021-06588
Resulting from    CR-2021-06600
Inspection        CR-2021-06615
CR-2021-06639
CR-2021-06645
CR-2021-06677
CR-2021-06683
CR-2021-06685
CR-2021-06686
CR-2021-06692
CR-2021-06837
Inspection Type        Designation    Description or Title                                    Revision or
Procedure                                                                                      Date
CR-2021-06844
CR-2021-06868
CR-2021-06886
CR-2021-06906
CR-2021-06950
CR-2021-06954
CR-2021-06966
CR-2021-06973
Drawings    OP Manual      Fire Protection-Water                                    22
Figure No. 33-1
OP Manual      Fire Protection-Water                                    24
Figure No. 33-2
Engineering ECP 18-0090-    Unit 2 Residual Heat Removal System Pump Breaker        0
Changes    000            Normal System Alignment Change
Engineering 10080-DMC-      Beaver Valley Unit 1 and Unit 2 Fire Water Analysis      0
Evaluations 0915
Engineering
Evaluation
Request
601155097
Fire Protection NFPA 20 Code Compliance Review                          1
Program Change
Evaluation
                      (FPPCE) 15-025
FPPCE 15-026    Engineering Evaluation of Specified NFPA 24              0
Requirements
FPPCE 18-085    Unit 2 RHS Pump Breaker NSA Chan                        0
FPPCE 21-019    Pre-NRC Fire Protection Inspection Self-Assessment-No    0
Surveillance Test that Document Sprinkler System
Inspections
FPPCE 21-021    Fire Alarm and Halon Discharge in Unit 1 Cable Tunnel 1- 1
CV-3
PRA-BV1-21-    BVPS-1 Configuration Risk Determination for Both Normal  0
001-R00        Fire Pumps Out of Service
Inspection Type          Designation    Description or Title                                    Revision or
Procedure                                                                                      Date
PRA-BV2-21-    BVPS-2 Configuration Risk Determination for Both Normal 0
2-R00        Fire Pumps Out of Service
Miscellaneous                Beaver Valley Power Station Unit 1 Updated Final Safety 32
Analysis Report
Beaver Valley Power Station Unit 2 Updated Final Safety 25
Analysis Report
Beaver Valley Power Station Units 1 and 2 Fire Safety  1
Analysis
Fire Protection Program Health Report, January-June
21
1/2OST-33.12  Fire Pump Flow Test                                    11/21/2019
and
06/23/2021
1OST-33.34    GDC Diesel Driven Fire Pump Operation Test              08/12/2021
1OST-33.7      Motor Driven Fire Pump Operation Test                    03/26/2021
and
05/15/2021
1OST-33.8      Diesel Engine Driven Fire Pump Operation Test          07/17/2021
and
08/14/2021
2OM-10.3      Power Supply and Control Switch List                    7
Procedures    1/2-ADM-1900  Fire Protection Program                                47
1/2-ADM-1906  Control of Transient Combustible and Flammable          18
Materials
1/2-ADM-1908  Fire Protection Performance Monitoring Program          4
1/2OM-56B.4A.E Safe Shutdown Intent and Methodology                    9
1OM-33.4.G    Motor-Driven Fire Pump                                  7
1OM-33.4.H    Engine-Driven Fire Pump                                7
1OM-56B.4.CR1  Unit 1 Control Room Fire                                1
1OM-56B.4.NS1  Unit 1 Normal Switchgear Room Fire                      1
2OM-10.4.A    Residual Heat Removal System Startup                    45
2OM-10.4.C    Residual Heat Removal System Shutdown                  42
2OM-56B.4.CB1  Unit 2 Instrumentation and Relay Area                  0
BVBP-OPS-0043  Control of Time Sensitive Actions                      1
Inspection Type        Designation  Description or Title                                Revision or
Procedure                                                                                Date
NOBP-OP-1113  Control of Time Sensitive Operator Actions          2
Self-      ATA-2021-8471 Beaver Valley Power Station Pre-NRC Fire Prevention 08/20/2021
Assessments              Inspection Self-Assessment
Work Orders 200531720
200531721
200531725
200531735
200713993
200713997
200715299
200715317
200716516
200716518
8
}}
}}

Revision as of 21:16, 16 January 2022

Triennial Fire Protection Inspection Report 05000334/2021010 and 05000412/2021010
ML21272A232
Person / Time
Site: Beaver Valley
Issue date: 09/29/2021
From: Glenn Dentel
NRC/RGN-I/DORS
To: Grabnar J
Energy Harbor Nuclear Corp
Dentel G
References
IR 2021010
Download: ML21272A232 (10)


Text