Security Baseline Inspection Report 05000334/2020401 and 05000412/2020401 (Cover Letter Only)
ML20279A604
Person / Time
Site: Beaver Valley
Issue date: 10/05/2020
From: Fred Bower
Plant Support Branch 1
To: Penfield R
Energy Harbor Nuclear Corp
Bower F
References
IR 2020401
Download: ML20279A604 (3)


Text

October 5, 2020

SUBJECT:

BEAVER VALLEY POWER STATION - SECURITY BASELINE INSPECTION REPORT 05000334/2020401 AND 05000412/2020401

Dear Mr. Penfield:

On September 3, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Beaver Valley Power Station and discussed the results of this inspection with Mr. Timothy Steed, Performance Improvement Director, and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low security significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Beaver Valley Power Station.

The following cross cutting aspect was assigned to the finding using Inspection Manual Chapter 0310, Aspects Within Cross Cutting Areas, [H.12] - Avoid Complacency.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Beaver Valley Power Station. The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely, X /RA/

Signed by: Fred L. Bower Fred L. Bower, III, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000334 and 05000412 License Nos. DPR-66 and NPF-73 Enclosure:

As stated cc w/o encl: Distribution via LISTSERV cc w/encl:

M. Fox, Manager, Site Protection, Energy Harbor Nuclear Corp., Beaver Valley D. Allard, State Liaison Officer, PA C. Salz, State Liaison Officer, Ohio T. Patton, State Liaison Officer, West Virginia ML20279A588 (Cover letter w/ enclosure(s))

ADAMS ACCESSION NUMBER: ML20279A604 (Cover letter)

Entire Report: Non-Sensitive Publicly Available X SUNSI Review X Sensitive X Non-Publicly Available Cover Letter Only: X Non-Sensitive X Publicly Available X SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRS RI/DRP RI/DRS NAME SMcCarver KHussar DCaron MYoung FBower SCM KH DC MY FLB DATE 9/25/2020 via 9/30/2020 9/25/2020 10/1/20 10/5/20 email via telcon via email via email via email