ML20195D185: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:._  +
  -(lSMun  SACRAMENTO MUNICIPAL uTIUTY DISTRICT O P. O. Box 15830, Sacramento CA 95852-1830, (916) 452-3211 l
AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA MPC&D 99-089 l
May 27, 1999 i
1 l
U. S. Nuclear Regulatory Commission Attn: Document Control Desk
                                                                                                                  )
Washington, D. C. 20555                                                                              j Docket No. 50-312 Rancho Seco Nuclear Station License No. DPR-54                                                                                    I l
RANCHO SECO ANNUAL REPORT                                                                              '
Attention: Seymour Weiss The District submits the Rancho Seco Annual Report in accordance with Rancho Seco Permanently Defueled Technical Specifications (PDTS) D6.9.4 and D6.9.6b, and 10 CFR 50.59(b)(2). The enclosed report contains (1) shutdown statistics, (2) a narrative summary of shutdown experience, (3) Environmental Report information, and (4) a tabulation of facility changes, tests, and experiments required pursuant to 10 CFR 50.59(b).
The enclosed report covers the period May 7,1998, through May 6,1999. The NRC approved                l the original PDTS, which included the current Rancho Seco Annual Report requirement,in April          l 1992, and the District implemented the PDTS on May 7,1992. Prior to May 1992, Rancho Seco            i submitted monthly reports in accordance with the Operating Plant Technical Specifications.
Members of your staff requiring additional information or clarification may contact Richard Mannheimer at (916) 732-4916.
Sincerely, ff.
4Ste        . Redeker Manager                                                                                        -  I Plant Closure & Decommissioning                                                                    l Enclosure cc w/ Encl:      E. W. Mecschoff, NRC, Arlington, Texas R. Dudley, NRC, Rockville 9906090096 990527                                        id PDR      ADOCK 05000312                            ,i R                      PDR ,
RANCHO SECO NUCLEAR GENERATING STATION O 14440 Twin Cities Road, Herald, CA 95638-9799;(209) 333-2935}}

Latest revision as of 18:58, 16 December 2020

Forwards Rancho Seco Annual Rept, IAW Plant Permanently Defueled TS D6.9.4 & D6.9.6b.Rept Contains Shutdown Statistics,Narrative Summary of Shutdown Experience,Er Info & Tabulation of Facility Changes,Tests & Experiments
ML20195D185
Person / Time
Site: Rancho Seco
Issue date: 05/27/1999
From: Redeker S
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Weiss S
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20195D188 List:
References
MPC&D-99-089, MPC&D-99-89, NUDOCS 9906090096
Download: ML20195D185 (1)


Text

._ +

-(lSMun SACRAMENTO MUNICIPAL uTIUTY DISTRICT O P. O. Box 15830, Sacramento CA 95852-1830, (916) 452-3211 l

AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA MPC&D 99-089 l

May 27, 1999 i

1 l

U. S. Nuclear Regulatory Commission Attn: Document Control Desk

)

Washington, D. C. 20555 j Docket No. 50-312 Rancho Seco Nuclear Station License No. DPR-54 I l

RANCHO SECO ANNUAL REPORT '

Attention: Seymour Weiss The District submits the Rancho Seco Annual Report in accordance with Rancho Seco Permanently Defueled Technical Specifications (PDTS) D6.9.4 and D6.9.6b, and 10 CFR 50.59(b)(2). The enclosed report contains (1) shutdown statistics, (2) a narrative summary of shutdown experience, (3) Environmental Report information, and (4) a tabulation of facility changes, tests, and experiments required pursuant to 10 CFR 50.59(b).

The enclosed report covers the period May 7,1998, through May 6,1999. The NRC approved l the original PDTS, which included the current Rancho Seco Annual Report requirement,in April l 1992, and the District implemented the PDTS on May 7,1992. Prior to May 1992, Rancho Seco i submitted monthly reports in accordance with the Operating Plant Technical Specifications.

Members of your staff requiring additional information or clarification may contact Richard Mannheimer at (916) 732-4916.

Sincerely, ff.

4Ste . Redeker Manager - I Plant Closure & Decommissioning l Enclosure cc w/ Encl: E. W. Mecschoff, NRC, Arlington, Texas R. Dudley, NRC, Rockville 9906090096 990527 id PDR ADOCK 05000312 ,i R PDR ,

RANCHO SECO NUCLEAR GENERATING STATION O 14440 Twin Cities Road, Herald, CA 95638-9799;(209) 333-2935