ML20128Q366: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:,
                                                                                  -  =.      Awana:w
          ~                "
                ,  o; F
((y                                    BROOKHAVEN NATIONAL LABORATORY
          '?E]7 L{0 L'          a ASSOCIATED UNIVERSITIES, INC.
Upton, Long is!cnd. New York 11973 (516)282s Department of Nuclear Energy                                    FTS 666    2363 June 12, 1984                            .
Dr. Ashok Thadani Reliability and Risk Assessment Branch Division of Safety Technology Office of Nuclear Reactor Regulation
      -          U.S. Nuclear Regulatory Commission Washington, DC 20555
 
==Dear Dr. Thadani:==
 
As per the conference call held on June 12, 1984, between yourself and R. A. Bari, R. W. Youngblood, and K. Shiu, it will be necessary to revise the schedule for the Shoreham PRA Review (FIN A-3740). The new schedule is as follows:
Draft Report      October 15, 1984 Final Report      2 months after receipt of appropriate NRC Comments.
This has been necessitated by the diversion of key personnel from the Shoreham project to work on Gessar (FIN A-3366), which per your instruc-tions, has a higher priority. Specifically, BNL will contribute to prepara-tion of the SER, and will provide technical assistance to NRC in treating                    "
design improvements and possibly Unresolved Safety Issues. Additional funds l
needed for work going beyond the present requirements of FIN A-3366 will be identified shortly. This schedule for the Shoreham review assumes that there c,
will be no substantial diversion of key personnel to provide technical sup-port for the Limerick hearings.
If you have any questions, please do not hesitate to call me.
Sinc rely ou r ,
8507130419 850426 PDR    FOIA BELAIR85-199        PDR Robert You gblood RY/nn cc:  K. Shiu R. Hall                                      .
R. Bari W. Kato E. Chow                                                                            \
A. Busiik                                                                                ,
,                                                                                                            .}}

Latest revision as of 08:10, 23 July 2020

Submits Revised Schedule for Facility PRA Review.Draft Rept Due 841015.Final Rept Due 2 Months After Receipt of Appropriate NRC Comments
ML20128Q366
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 06/12/1984
From: Youngblood R
BROOKHAVEN NATIONAL LABORATORY
To: Thadani A
Office of Nuclear Reactor Regulation
Shared Package
ML20127A367 List:
References
CON-FIN-A-3366, CON-FIN-A-3740, FOIA-85-199 NUDOCS 8507130419
Download: ML20128Q366 (1)


Text

,

- =. Awana:w

~ "

, o; F

((y BROOKHAVEN NATIONAL LABORATORY

'?E]7 L{0 L' a ASSOCIATED UNIVERSITIES, INC.

Upton, Long is!cnd. New York 11973 (516)282s Department of Nuclear Energy FTS 666 2363 June 12, 1984 .

Dr. Ashok Thadani Reliability and Risk Assessment Branch Division of Safety Technology Office of Nuclear Reactor Regulation

- U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Dr. Thadani:

As per the conference call held on June 12, 1984, between yourself and R. A. Bari, R. W. Youngblood, and K. Shiu, it will be necessary to revise the schedule for the Shoreham PRA Review (FIN A-3740). The new schedule is as follows:

Draft Report October 15, 1984 Final Report 2 months after receipt of appropriate NRC Comments.

This has been necessitated by the diversion of key personnel from the Shoreham project to work on Gessar (FIN A-3366), which per your instruc-tions, has a higher priority. Specifically, BNL will contribute to prepara-tion of the SER, and will provide technical assistance to NRC in treating "

design improvements and possibly Unresolved Safety Issues. Additional funds l

needed for work going beyond the present requirements of FIN A-3366 will be identified shortly. This schedule for the Shoreham review assumes that there c,

will be no substantial diversion of key personnel to provide technical sup-port for the Limerick hearings.

If you have any questions, please do not hesitate to call me.

Sinc rely ou r ,

8507130419 850426 PDR FOIA BELAIR85-199 PDR Robert You gblood RY/nn cc: K. Shiu R. Hall .

R. Bari W. Kato E. Chow \

A. Busiik ,

, .