Forwards Fitness for Duty Program Performance Data for Period of Jul-Dec 1993
ML20067C927
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 02/22/1994
From: Bortz A
LONG ISLAND POWER AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LRM-94-042, LRM-94-42, NUDOCS 9403040392
Download: ML20067C927 (3)


Text

.. _. .

~

Lcn9 Shoreham Nucitar Power Station

4. Island P.O. Box 628 g ,- , Power North Country Road W
  • Authority Wading River. N.Y.11792 February 22,1994 LRM 94 042 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Attention: Office of NRR Division of Reactor inspection and Safeguards Re: Fitness for Duty Program Performance July - December 1993

Dear Sir:

Enclosed is the Shoreham Nuclear Power Station's Fitness for Duty Program Performance data for the reporting period of July - December 1993. This report is as described in 10CFR 26.71(d). l Sincerely,  !

c _

l l

A.J.B@z/ V Resident !%anager Shoreham Nuclear Power Station MD!dre Enclosure cc: Thomas T. Martin Regional Administrator R. Nimitz Resident inspector I

O D n n n r.

9403040392 940222  ! '

PDR ADOCK 05000322 .-

R PDR  !<

.i Fitness for Duty Progrmn -

Performance Data Personnel Subject to 10CFR 26 1 2 Iong Island Power Authority 12-31-93 a Mones En#g

% .ny 3 Shoreham Nuclear Power Station Loceson Arthur F. Downs 516-929-8300 ext. 3287 Contact New Phone enclude area code) 6 Cutoff s: Screen / Confirmation (ng/mt) D Appendix A to 10CFR 26

/ Amphetamines / /

Marijuana Cocaine / Phencyclidine / /

Opiates / Alcohol (% B AC)

/ ,

i Long-Term Short-Term Testing Pesults Licensee Employees Contractor Personnel Contractor Personnet j Average Number witt Unescorted Access 7 240 n/A a,n l Categories b Tested Positive Tested Positive Tested Positive I

Pre-Access 3 0 0 0 272 2 l 1

\ .

k Post accident 0 0 o' o o n 0

h Observed behavior 0 0 0 0 0 o Random 103 0 0 0 214 1 Follow up 8 0 0 0 0 0 Other o <0 0 0 0 0 l

)

Total 114 0 0 0 4a6 3 i

REV.1/92

Breekdown of Confirmed Positive Tests for Specific Substances .

Amphe- Phency- Refusal 9 Opiates tammes cfdne Alcohol to Test 1 2 3 4 5 Marijuana Cocaine Ucensee Employees o . O o o O O N/A N/A N/A N/A N/A

_ r Long-Term Contractors N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Short-Term Contractors 1 2 0 0 o o o N/A N/A N/A N/A N/A .A

~

Total 1 2 o o o 0. O N/A N/A N/A N/A N/A 3 i

.=

O h 6

9 l

1 l

1

1. Initiative Taken Although not included in our ?itness for Duty Program, as a precaution, fif ty-seven membern of the tug boat crews bringing the Shoreham fuel to Eddystone, Pennsylvania were tested for i drugs and alcohol between Septe mber and December,1993. There i were no results which were positive. Crew members will be l randomly tested when fuel shipments resume. l
2. Effectiveness Evaluation l An audit of the Fitness for Duty Program at Shoreham concluded that the program is being effectively implemented.

During this reporting period, there were no instances of '

l finding drugs or alcohol in the secured area of the site. In addition, there were no allegations regarding drug or alcohol use.

It is concluded that the Fitness for Duty Program continues to i be effective in meeting its objective of maintaining a safer, drug and alcohol free work environment.

3. Data Analysis and Actions During this period, one positive random drug test occurred for one individual. In addition, there were two pre-access positive drug tests. This total number is consistent with the previous reporting period.

The actions taken during this period for the positive test results were as follows:

  • Contractor positive random drug test - unescorted access was revoked for the individual, o Contractor positive pre-badge drug tests (2 individuals) - access to Shoreham was denied.
4. List of Events Rooprted No events were reported during this reporting period.