NRC-92-0059, Monthly Operating Rept for May 1992 for Fermi 2: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:'*
  ...      s.
4~
UOMi.?Aet
                    ~
Delroll        - r mi:
6        4 H:ghaav Ecison      =45)NorthDim*=-"~                      aes o"2de ' '6 June 15, 1992 NRC-92-0059 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
 
==Reference:==
Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43
 
==Subject:==
Monthly Operating Status Report for Hay, 1992 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for May,.1992. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.
                        -If you have any questions, please contact Brian Stone, at (313) 586-5148.
Sincerely, Enclosure cc:    T. G. Colburn A. B. Davis D. R. Hahn M. P. Phillips S.      Stasek P. L. Torpey 10000a gjg62gggojoogi m                                                                                      1
 
4=
        ^
      .                                                          OPERATING DATA REP 0HT DOCKET No. 50-341                                                  C0K'LETED BY                          B. J. Stone DATE                                        June 15, 1992          TELEP110NE                              (313) 586-5148 OPERATING STATUS
: 1. UNIT NAME:                                Fermi 2              l Notes:                      (1) Calculated using            l
: 2. REPORTING PERIOD: May, 1992                                      I weighted averages to reflect                                i 3      LICENSED THERMAL POWER (HWL):                          3293      l variations in HDC.                                          l
: 4. NAHEPLATE RATING (GROSS HWe):                          1154      I                                                            i
: 5. DESIGN ELECT RATING (Net HWe): 1093                              i                                                            i
: 6. HAX DEPENDABLE CAP (GROSS MWe):1110                              l                                                              I
: 7. HAX DEPENDABLE CAP (Net HWe):1060                                l                                                              l  e
: 8.      IF CilANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: N/A 9      POWER LEVEL TO WilICil RESTRICTED, IF ANY (HWe Net):                                                        N/A
: 10. REASONS FOR RESTRICTION, IF ANY:
THIS MONTil                YR TO DATE                    CUMULATIVE
: 11. HRS IN REPORTING PERIOD                                      744                                    3,647            38,173
: 12. IIRS REACTOR WAS CRITICAL                                    744                                    3,541.2          28,804.9
: 13. REACTOR RESERVE SHUTDOWN llRS                                  0                                        0              0
: 14. Il0URS GENERATOR ON-LINE                                    744                    ___3,508.6                        27,535.4
: 15. UNIT RESERVE SHUTDOWN 110URS                                    0                                        0              0
: 16. GROSS THERHAL ENERGY GEN (HWil)                            2,434,776                  11,402,088                  82,883,279.4
: 17. GROSS ELECT ENERGY GEN (HWII)                                828,840                        3,906,980              27,555,017
: 18. NET ELECT ENERGY GEN (HWil)                                  793,063                        3,749,086              26,341,322
: 19. UNIT SERVICE FACTOR                                          100                                    96.2              72.1
: 20. UNIT AVAILABILITY FACTOR                                      100                                    96.2              72.1
: 21. UNIT CAP FACTOR (USING HDC NET)                              100.6                                  97.0              64.4(1)
: 22. UNIT CAP FACTOR (USING DER NET) _ 97.5                                                ,
94.1              63.1
: 23. UNIT FORCED OUTAGE RATE                                        O                                      3.8              8.5
: 24. SHUTDOWNS SCllEDULED OVER NEXT 6 MONTilS (TYPE, DATE, bURATION OF EACH):
Refueling: Starts September 12, 1992: Duration 50 days.
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:                                                          N/A
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST                                ACilIEVED INITIAL CRITICALITY                                        N/A                                      N/A INITIAL ELECTRICITY                                        N/A                                      N/A COMMERCIAL OPERATION                                        N/A                                      N/A l
 
4 AVERACE DAILY UNIT POWEH LEVEL DOCKET NO.      50-341 UNIT            FERMI 2 DATE            June 15, 1992 COMPLETED BY    E. Dawson TELEPHONE        (313) 586-5027 Honth    May, 1992 DAY AVERAGE DAILY POWER LEVEL          DAY AVERAGE DAILY POWER LEVEL (HWe-Net)                                (HWe-Net) 1            1070                      17            1056 2              1053 __                  18            1073 3              1076                      19            1078 4              1086                    20            1069 5            1087                      21            1064 6            1084                      22            1057 7            1083                      23            1057 8            1075                      24              927 9            1070-                    25            1083 10            1073                      26            1083 11            1063                      27            1080 12            1058                      28            1077 __
13            1064                      29            1071 14            1080                      30            1070 15        __ 1079-                      31            1072 16            1073
 
e o
UNIT SHUTDOWN 5 AND POWER REDUCTIONS
  . . . DOCKET NO. 50-341                                                                                                DATE                June 15. 1992
* IfNIT NAME        Fermi 2                                                                                              COMPLETED eV        B. J.      Stone TELEPHONE            (313) 586-514e REPORT WONTH            May, 1992 i                                    i        i      l              .              ,      I                  l          l                                        II J                                            l        l                METHOD OF              LER      SYS  ' COMP    l            CAUSE & CORRECTIVE        l          l
      }  NO.            DATE              TYPE l DUR      , REASON        5 HUTTING DOWN          NO.      CODE    CO2E                ACTION TO PREVENT          l l                                      (1)      (HRS)
(2)          THE REACTOR                        (4)      (S)                    RECURRENCE            I          l l    (6)                                                                          (3)      i                                                                      I f                                                                                                                                                                  I i
None              ---                -        --        -~~              - - -
                                                                                                                        ---- l          ---------~~~--------          l l                !                  i i
i                                        I (1) F: FORCED            (2) REASON:                                                          (3) METHOD:                  (4) EpHIBIT G- INSTRUCTIONS 5: SCHEDULED            A - EOUIPMENT FAILURE (EMPLAIN)                                      1 - MANUAL                    FOR PREPARATION OF DATA B - MAINTENANCE OR TEST                                              2 - MANUAL SCRAM              ENTRY SHEETS FOn LICENSEE C - REFUELING                                                        3 - AUTOUATIC SCRAW          EVENT REPORT (LER) FILE-D - REGULATORY RESTRICTION                                            4 - CONTINUED                (NUREG-0161)
E - OP~RATOR TRAINING & LICENSE EXAMINATION                          5 - REDUCED LOAD F - ADMINISTRATIVE                                                    9 - OTHER G.- OPERATIONAL ERROR (EXPLAIN)
H - OTHER (EMPLAIN)                                                                            (5) EXHIBIT 1 - SAME SOURCE (6) R - PREFIX INDICATES POmER REDUCTION.
5 - PREFIX INDICATES PLANT SHUTDOWN.
l m                  ,                        .                                ,--                      ,}}

Latest revision as of 03:01, 12 May 2020

Monthly Operating Rept for May 1992 for Fermi 2
ML20101E223
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/31/1992
From: Orser W, Stone B
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-92-0059, CON-NRC-92-59 NUDOCS 9206230112
Download: ML20101E223 (4)


Text

'*

... s.

4~

UOMi.?Aet

~

Delroll - r mi:

6 4 H:ghaav Ecison =45)NorthDim*=-"~ aes o"2de ' '6 June 15, 1992 NRC-92-0059 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for Hay, 1992 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for May,.1992. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

-If you have any questions, please contact Brian Stone, at (313) 586-5148.

Sincerely, Enclosure cc: T. G. Colburn A. B. Davis D. R. Hahn M. P. Phillips S. Stasek P. L. Torpey 10000a gjg62gggojoogi m 1

4=

^

. OPERATING DATA REP 0HT DOCKET No. 50-341 C0K'LETED BY B. J. Stone DATE June 15, 1992 TELEP110NE (313) 586-5148 OPERATING STATUS

1. UNIT NAME: Fermi 2 l Notes: (1) Calculated using l
2. REPORTING PERIOD: May, 1992 I weighted averages to reflect i 3 LICENSED THERMAL POWER (HWL): 3293 l variations in HDC. l
4. NAHEPLATE RATING (GROSS HWe): 1154 I i
5. DESIGN ELECT RATING (Net HWe): 1093 i i
6. HAX DEPENDABLE CAP (GROSS MWe):1110 l I
7. HAX DEPENDABLE CAP (Net HWe):1060 l l e
8. IF CilANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: N/A 9 POWER LEVEL TO WilICil RESTRICTED, IF ANY (HWe Net): N/A
10. REASONS FOR RESTRICTION, IF ANY:

THIS MONTil YR TO DATE CUMULATIVE

11. HRS IN REPORTING PERIOD 744 3,647 38,173
12. IIRS REACTOR WAS CRITICAL 744 3,541.2 28,804.9
13. REACTOR RESERVE SHUTDOWN llRS 0 0 0
14. Il0URS GENERATOR ON-LINE 744 ___3,508.6 27,535.4
15. UNIT RESERVE SHUTDOWN 110URS 0 0 0
16. GROSS THERHAL ENERGY GEN (HWil) 2,434,776 11,402,088 82,883,279.4
17. GROSS ELECT ENERGY GEN (HWII) 828,840 3,906,980 27,555,017
18. NET ELECT ENERGY GEN (HWil) 793,063 3,749,086 26,341,322
19. UNIT SERVICE FACTOR 100 96.2 72.1
20. UNIT AVAILABILITY FACTOR 100 96.2 72.1
21. UNIT CAP FACTOR (USING HDC NET) 100.6 97.0 64.4(1)
22. UNIT CAP FACTOR (USING DER NET) _ 97.5 ,

94.1 63.1

23. UNIT FORCED OUTAGE RATE O 3.8 8.5
24. SHUTDOWNS SCllEDULED OVER NEXT 6 MONTilS (TYPE, DATE, bURATION OF EACH):

Refueling: Starts September 12, 1992: Duration 50 days.

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACilIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l

4 AVERACE DAILY UNIT POWEH LEVEL DOCKET NO. 50-341 UNIT FERMI 2 DATE June 15, 1992 COMPLETED BY E. Dawson TELEPHONE (313) 586-5027 Honth May, 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWe-Net) (HWe-Net) 1 1070 17 1056 2 1053 __ 18 1073 3 1076 19 1078 4 1086 20 1069 5 1087 21 1064 6 1084 22 1057 7 1083 23 1057 8 1075 24 927 9 1070- 25 1083 10 1073 26 1083 11 1063 27 1080 12 1058 28 1077 __

13 1064 29 1071 14 1080 30 1070 15 __ 1079- 31 1072 16 1073

e o

UNIT SHUTDOWN 5 AND POWER REDUCTIONS

. . . DOCKET NO. 50-341 DATE June 15. 1992

  • IfNIT NAME Fermi 2 COMPLETED eV B. J. Stone TELEPHONE (313) 586-514e REPORT WONTH May, 1992 i i i l . , I l l II J l l METHOD OF LER SYS ' COMP l CAUSE & CORRECTIVE l l

} NO. DATE TYPE l DUR , REASON 5 HUTTING DOWN NO. CODE CO2E ACTION TO PREVENT l l (1) (HRS)

(2) THE REACTOR (4) (S) RECURRENCE I l l (6) (3) i I f I i

None --- - -- -~~ - - -


l ---------~~~-------- l l  ! i i

i I (1) F: FORCED (2) REASON: (3) METHOD: (4) EpHIBIT G- INSTRUCTIONS 5: SCHEDULED A - EOUIPMENT FAILURE (EMPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOn LICENSEE C - REFUELING 3 - AUTOUATIC SCRAW EVENT REPORT (LER) FILE-D - REGULATORY RESTRICTION 4 - CONTINUED (NUREG-0161)

E - OP~RATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G.- OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EMPLAIN) (5) EXHIBIT 1 - SAME SOURCE (6) R - PREFIX INDICATES POmER REDUCTION.

5 - PREFIX INDICATES PLANT SHUTDOWN.

l m , . ,-- ,