ML20063B751: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20063B751
| number = ML20063B751
| issue date = 08/20/1982
| issue date = 08/20/1982
| title = Responds to 820623 Ltr Requesting Schedule for Addressing Humphrey Concerns Re Mark III Containments.Owners Group Established Program to Review Generic Work by GE for BWR Owners Group.Rept to Be Submitted by 821101
| title = Responds to Requesting Schedule for Addressing Humphrey Concerns Re Mark III Containments.Owners Group Established Program to Review Generic Work by GE for BWR Owners Group.Rept to Be Submitted by 821101
| author name = Wuller G
| author name = Wuller G
| author affiliation = ILLINOIS POWER CO.
| author affiliation = ILLINOIS POWER CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = U-0528, U-528, NUDOCS 8208260176
| document report number = U-0528, U-528, NUDOCS 8208260176
| title reference date = 06-23-1982
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 2
| page count = 2

Latest revision as of 04:12, 1 June 2023

Responds to Requesting Schedule for Addressing Humphrey Concerns Re Mark III Containments.Owners Group Established Program to Review Generic Work by GE for BWR Owners Group.Rept to Be Submitted by 821101
ML20063B751
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/20/1982
From: Wuller G
ILLINOIS POWER CO.
To: Bernard H
Office of Nuclear Reactor Regulation
References
U-0528, U-528, NUDOCS 8208260176
Download: ML20063B751 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

U-0528

/LL/NOIS POWER 00MPANY '

N82-82(08-20)6 g3 500 SOUTH 27TH STREET, DECATUR, ILLIN0ls 62525 August 20, 1982 Mr. Harold Bernard Acting Branch Chief Standardization & Special Projects Branch Division of Licensing U. S. Nuclear Regulatory Commission

. Washington, D. C. 20555

Reference:

1) Letter, H. Bernard to G. Wuller dated June 23, 1982 "Humphrey's concerns regarding Mark III Containments"
2) IP Letter (U-0516), J. D. Geier to H. Bernard dated July 6, 1982 1

Dear Mr. Bernard:

Clinton Power Station Unit 1 Docket No. 50-461 This letter is in response to your letter of June 23, 1982 (reference 1) requesting a schedule for addressing the Humphrey concerns. Our initial response to this request was forwarded in reference 2 and indicated that IP was persuing work with the other BWR Owners to address these concerns generically. We have proceeded with this effort and have established an owners group to develop responses to these issues. The owners group consists of Mississippi Power and Light Co., Illinois Power Company, Cleveland Electric Illuminating Co., Gulf States Utilities, and General Electric Co. The group is chaired by Mississippi Power and Light and has developed a program to address these issues.

The Owners Group program to address the Humphrey concerns is based on the Mississippi Power and Light responses to these concerns. General Electric Co. is conducting the majority of the analysis and computer code development required to determine the containment response to the concerns in question. This work is being sponsored by the Owners Group to determine the effect of these issues on a typical Mark III reactor. The Mississippi Power and Light specific work is expected to demonstrate that no safety concern will exist as a result of these issues. The MP&L work is generic and bounding for Illinois Power because of the following:

1) The close similarity between Grand Gulf and Clinton hdCMCI!

Containments.

/

2) The smaller size of the Clinton reactor with respect to the Grand Gulf.

l 8208260176 820820 l PDR ADOCK 05000461 l

A PDR

U-0528 N82-82(08-20)6 '

August 20, 1982 Page #2

3) The smaller pool enroachments for Clinton than for Grand Gulf.

As a result of the above, our program for addressing these issues is closely linked to the MPSL submittals. The current date for the final MP&L submittal is November 1, 1982.

The Owners Group has selected a peer review panel to perform an independent review of our responses to the questions at hand.

This panel is expected to complete their review function by April 1, 1983.

In summary the Illinois Power Company program to address the Humphrey concerns will focus on the generic work done by General Electric Company for the BWR Owners Group. The final transmittal of this work is anticipated to be November 1, 1982. An independent review of this work is expected to be completed by April 1, 1983.

Please contact myself or Erich Kant at (217) 424-6580 for any ad-ditional information you may require on this matter.

Sin erely,

~

,/

G. E. Wuller Supervisor-Licensing GEW/j a cc: J. H. Williams, NRC Clinton Project Manager H. H. Livermore, NRC Resident Inspector i

Illinois Department of Nuclear Safety l

l l

t L