ML20063L673: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20063L673
| number = ML20063L673
| issue date = 02/24/1994
| issue date = 02/24/1994
| title = Rev 2 to MCEI-0400-46, McGuire Unit 1 Cycle 9 Core Operating Limits Rept.
| title = Rev 2 to MCEI-0400-46, McGuire Unit 1 Cycle 9 Core Operating Limits Rept
| author name =  
| author name =  
| author affiliation = DUKE POWER CO.
| author affiliation = DUKE POWER CO.

Latest revision as of 16:04, 6 January 2021

Rev 2 to MCEI-0400-46, McGuire Unit 1 Cycle 9 Core Operating Limits Rept
ML20063L673
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 02/24/1994
From:
DUKE POWER CO.
To:
Shared Package
ML20063L665 List:
References
MCEI-0400-46, MCEI-0400-46-R02, MCEI-400-46, MCEI-400-46-R2, NUDOCS 9403070272
Download: ML20063L673 (5)


Text

_-

1 DOCUMENT CONTROL NO. MCEl-0400-46 REVISION NO. 002 PAGE NO. 1 OF 153 TITLE MCGUIRE UNIT 1 CYCLE 9 CORE OPERATING LIMITS REPORT SIGNOFF DATE PREPARED llY -

J'/ Feb 7'/

(- t/

CIIECKED llY Tsd / yLdf p A ,.,y j9,y 0 '

Q APPROVED llY '//u fi a / M [ A 4 2yre,/, Py l

l MPns??M8sjir P

MCE!4M00-46 2 0f 153 Rcvision 2 1

McGuire Nuclear Station COLR l 1

McGuire Unit 1 Cycle 9 Core Operating Limits Report February 1994 Revision 2

( Duke Power Company NOTE The contents of this document have been reviewed to verify that no material herein either directly or indirectly changes or affects the results and conclusions presented

.( in the 10CFR50.59 M1C9 Reload Safety Evaluation (calculation file: MCC-1552.08-00 0184).

MCEl-MXM6 1 3 0f 153  !

Revisien 2

)

(' l McGuire 1 Cycic 9 Core Operating Limits Report l l

REVISION LOG Revision Effective Date Effective Pages OriginalIssue May 24,1993 Pages 4-8,10,12,13, &

,15-153 Revision 1 May 27,1993 Pages 9,11, & 14 Revision 2 February 24,1994 Pages 1-3,3A,8 i

~

.I 1

l

MCEl-040046 3A of 153 Revision 2

'l McGuire 1 Cycle 9 Core Operating 1.irnits Report INSERTION SIlEET FOR REVISION 2 Hernove pages Insert Rev.2 pages Pages 1-3,3A,8 Pages 1-3,3A,8

(

1 l

\

l 5, .

l i

J

'i

MCEI4MG446  ;

8 of 153 Itevision 2 McGuire I Cycle 9 Core Operating Limits Repo:t l

(Fully Withdrawn min - 222, max 230) 220 =

d(29.1%,230)

]Nh9.6%,230) 5 200 / ,'

Bank B ,

180 -/- ,

/ -f (100 %,161):

160' f 2 (0%,163) ,

/

Rod 140 / '

/

Insertion / Bank C -

Position 120 /- -

(Steps 100 ,

/

Withdrawn) g /

80

/ z' Bank D 60 f'- -

/

7/- -

l

( 40 (0%,47) ,

~

(30%,0)

_ j 0 10 20 30 40 50 60 70 80 90 100 (Fully inserted)

Relativo Power (Percent)

Figure 2 Control Rod llank Insertion Limits Versus Percent Rated Thermal Power NOTES:

1) Compliance with Technical Specification 3.1.1.3 may require nxi withdrawal limits.

Refer to OP/1/A/6100/22 Unit i Data 13cok for details. ,

2) If reactor power is turbine limited, a penalty of 2.3 steps for each percent power below l 100% to which the reactor is limited will be required. Refer to OP/1/A/6100/22 Unit 1 Data llook for details.

l J