ML13206A189: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter: July 25, 2013 Mr. Edward D. Halpin Senior Vice President and | ||
Chief Nuclear Officer | |||
Pacific Gas and Electric Company | |||
Mr. Edward D. Halpin Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424 | Diablo Canyon Power Plant | ||
P.O. Box 56, Mail Code 104/6 | |||
SUBJECT: DIABLO CANYON POWER PLANT - NOTIFICATION OF NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION (05000275/2013004 AND 05000323/2013004) AND REQUEST FOR INFORMATION Dear Mr. Halpin The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV staff will conduct a triennial heat sink performance inspection at your Diablo Canyon Power Plant. The inspection will be comprised of two reactor inspectors from the NRC Region IV office. The inspection will be conducted in accordance with NRC Inspection Procedure 71111.07, "Heat Sink Performance." The schedule for the inspection is as follows: | Avila Beach, CA 93424 SUBJECT: DIABLO CANYON POWER PLANT - NOTIFICATION OF NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION (05000275/2013004 AND 05000323/2013004) AND REQUEST FOR INFORMATION | ||
Dear Mr. Halpin | |||
Onsite Inspection Dates: September 9 - 12, 2013 Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. | The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV staff will conduct a triennial heat sink performance inspection at your Diablo Canyon Power Plant. The inspection will be comprised of two reactor inspectors from the NRC Region IV office. The inspection will be conducted in accordance with NRC Inspection Procedure | ||
71111.07, "Heat Sink Performance." The schedule for the inspection is as follows: | |||
Please note that the documents are requested to be provided by August 26, 2013. We request, that during the onsite inspection week, you ensure that copies of analyses, evaluations, or documentation regarding the implementation and maintenance of your heat exchanger program are available. Of specific interest are those documents that establish that your heat exchanger program satisfies NRC regulatory requirements and conforms to applicable NRC guidance. Also, appropriate personnel knowledgeable of safety-related heat exchangers should be available to support the inspector at the site during the inspection. | |||
Onsite Inspection Dates: September 9 - 12, 2013 Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. | |||
E. Halpin - 2 - We have discussed the schedule for this inspection activity with your staff and understand that our regulatory contact for this inspection will be Mike McCoy of your licensing organization. If there are any questions about this inspection or the material requested, please contact the inspectors, Wayne Sifre, at 817-200-1193 or by e-mail at Wayne.Sifre@nrc.gov, or Christie Hale at 650-479-5434 or e-mail at Christie.Hale@nrc.gov. | Please note that the documents are requested to be provided by August 26, 2013. We request, that during the onsite inspection week, you ensure that copies of analyses, evaluations, or | ||
documentation regarding the implementation and maintenance of your heat exchanger program are available. Of specific interest are those documents that establish that your heat exchanger program satisfies NRC regulatory requirements and conforms to applicable NRC guidance. Also, appropriate personnel knowledgeable of safety-related heat exchangers should be | |||
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. | available to support the inspector at the site during the inspection. | ||
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511 | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | E. Halpin - 2 - We have discussed the schedule for this inspection activity with your staff and understand that our regulatory contact for this inspection will be Mike McCoy of your licensing organization. If | ||
there are any questions about this inspection or the material requested, please contact the | |||
Sincerely,/RA/ Thomas R. Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety | inspectors, Wayne Sifre, at 817-200-1193 or by e-mail at Wayne.Sifre@nrc.gov, or Christie Hale at 650-479-5434 or e-mail at Christie.Hale@nrc.gov. | ||
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection | |||
Docket Nos.: 05000275, 05000323 License Nos.: DPR-80; DPR-82 | requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to | ||
respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. | |||
Triennial Heat Sink Performance Inspection Request for Information cc: Electronic Distribution for Diablo Canyon Power Plant | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its | ||
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, | |||
E. Halpin - 3 - | /RA/ Thomas R. Farnholtz, Chief | ||
ADAMS ACCESSION NUMBER: ML13206A189 SUNSI Review Complete Initials: WCS Non-Sensitive Sensitive Publicly Available Non-Publicly Available SRI:EB1 RI:EB1 C:EB1 WSifre CHale TFarnholtz /RA/ /RA/ /RA/ 7/24/13 7/25/13 7/25/13 OFFICIAL RECORD COPY Enclosure Request for Information Triennial Heat Sink Performance Inspection Diablo Canyon Power Plant Inspection Report: 05000275/2013004, 05000323/2013004 | Engineering Branch 1 Division of Reactor Safety | ||
Inspection Dates: September 9 - 12, 2013 Inspection Procedure: IP 71111.07, Triennial "Heat Sink Performance" Inspectors: Wayne Sifre, Senior Reactor Inspector Christie Hale, Reactor Inspector Information Requested for the In-Office Preparation Week The following information should be sent to the Region IV office in hard copy or electronic format (Certrec IMS preferred), to the attention of Wayne Sifre, by August 26, 2013. The inspector will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week. Also, we request that you categorize the documents in your response with the numbered list below. Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector, and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the lead inspector as soon as possible. | Docket Nos.: 05000275, 05000323 | ||
License Nos.: DPR-80; DPR-82 | |||
Enclosure: Triennial Heat Sink Performance Inspection Request for Information | |||
cc: Electronic Distribution for Diablo Canyon Power Plant | |||
E. Halpin - 3 - | |||
ADAMS ACCESSION NUMBER: ML13206A189 SUNSI Review Complete Initials: WCS Non-Sensitive Sensitive Publicly Available Non-Publicly Available SRI:EB1 RI:EB1 C:EB1 WSifre CHale TFarnholtz /RA/ /RA/ /RA/ 7/24/13 7/25/13 7/25/13 OFFICIAL RECORD COPY | |||
- 1 - Enclosure Request for Information Triennial Heat Sink Performance Inspection Diablo Canyon Power Plant | |||
Inspection Report: 05000275/2013004, 05000323/2013004 | |||
Inspection Dates: September 9 - 12, 2013 | |||
Inspection Procedure: IP 71111.07, Triennial "Heat Sink Performance" | |||
Inspectors: Wayne Sifre, Senior Reactor Inspector | |||
Christie Hale, Reactor Inspector | |||
Information Requested for the In-Office Preparation Week The following information should be sent to the Region IV office in hard copy or electronic | |||
format (Certrec IMS preferred), to the attention of Wayne Sifre, by August 26, 2013. The inspector will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week. Also, we request that you categorize the documents in your response with the numbered list below. Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector, and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the lead inspector as soon as possible. | |||
The following heat exchangers/heat sinks have been selected for inspection: | The following heat exchangers/heat sinks have been selected for inspection: | ||
* Residual Heat Removal Heat Exchangers (RHR HX 2-1, RHR HX 2-2) * Safety Injection Pump Lube Oil and Seal Water Coolers (2-2, 2-2A/B, 2-1, 2-1A/B) * Spent Fuel Pit Heat Exchanger (HX 2-1) * Component Cooling Water (CCW HX 2-1, CCW HX 2-2) For all Generic Letter 89-13 exchangers: 1. List of corrective action program documents (with a short description) associated with Generic Letter 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat exchanger cavitation, or heat exchanger testing, in the previous three years 2. System health report(s) and maintenance rule system notebooks for all the Generic Letter 89-13 heat exchangers 3. Copy of any self-assessments done on any Generic Letter 89-13 heat exchangers in the previous three years 4. Copies of any procedures developed to implement the recommendations of Generic Letter 89-13, e.g., the Generic Letter 89-13 Heat Exchanger Program description 5. Copies of any commitments to the Generic Letter 89-13 program Enclosure For the specific heat exchangers selected: Testing Documents 6. Copies of the two most recent completed tests confirming thermal performance for those heat exchangers which are performance tested 7. Instrument uncertainties of the instruments used during testing 8. Copy of any operability determinations or other documentation of degradation associated with the heat exchangers or the systems that support the operation for the selected heat exchangers 9. Documents that show the as-found results are recorded, evaluated, and appropriately dispositioned such that the as-left condition is acceptable Cleaning Documents 10. The cleaning and inspection maintenance schedule for each heat exchanger for the next five years 11. Copy of the document describing the inspection results for the last two cleaning and inspection activities completed on each heat exchanger 12. Cleaning procedures with acceptance criteria for the selected heat exchangers 13. Copies of the documents that verify the structural integrity of the heat exchanger, e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection results 14. Copies of those documents that describe the methods taken to control water chemistry in the heat exchangers Design Documents 15. Copies of the design basis documents and updated final safety analysis report pages for the selected heat exchangers 16. Provide a list of calculations with a description which currently apply to each heat exchanger 17. Copies of vendor data sheets and design basis data for the selected heat exchangers 18. Copy of the calculation which establishes the limiting (maximum) design basis heat load which is required to be removed by each of these heat exchangers 19. Copy of the calculation which correlates surveillance testing results from these heat exchangers with design basis heat removal capability (e.g., basis for surveillance test acceptance criteria) 20. Copy of the calculations or documents which evaluate the potential for water hammer or excessive tube vibration in the heat exchanger or associated piping Enclosure 21. Copy of the document which identifies the current number of tubes in service for each heat exchanger and the supporting calculation which establishes the maximum number of tubes which can be plugged in each heat exchanger 22. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes which are identified in each heat exchanger For the ultimate heat sink or safety-related service water system: 23. Dam inspections that monitor the integrity of the ultimate heat sink (if applicable) 24. Copies of calculations and surveillances that determine the ultimate heat sink reservoir capacity and heat transfer capability (if applicable) 25. Copies of any design changes performed on the ultimate heat sink or safety-related service water system 26. Copies of procedures for a loss of ultimate heat sink or safety-related service water system 27. Copies of inspections and/or maintenance related to macrofouling (silt, mussel shells, debris, etc.) and aquatic life 28. Copies of inspections and/or maintenance related to preventing biotic fouling 29. Copies of procedures and/or test results to survey or monitor interface valves between the safety-related section of the service water system and the nonsafety related section 30. Copy of the most recent service water flow balance test results, both as-found and as-left 31. History of any thru-wall pipe leaks on the safety-related service water system | * Residual Heat Removal Heat Exchangers (RHR HX 2-1, RHR HX 2-2) * Safety Injection Pump Lube Oil and Seal Water Coolers (2-2, 2-2A/B, 2-1, 2-1A/B) * Spent Fuel Pit Heat Exchanger (HX 2-1) * Component Cooling Water (CCW HX 2-1, CCW HX 2-2) For all Generic Letter 89-13 exchangers: 1. List of corrective action program documents (with a short description) associated with Generic Letter 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat | ||
exchanger cavitation, or heat exchanger testing, in the previous three years 2. System health report(s) and maintenance rule system notebooks for all the Generic Letter 89-13 heat exchangers 3. Copy of any self-assessments done on any Generic Letter 89-13 heat exchangers in the previous three years 4. Copies of any procedures developed to implement the recommendations of Generic Letter 89-13, e.g., the Generic Letter 89-13 Heat Exchanger Program description | |||
Inspector Contact Information: | 5. Copies of any commitments to the Generic Letter 89-13 program | ||
Wayne C. Sifre Christie Hale Senior Reactor Inspector Reactor Inspector 817-200-1193 650-479-5434 Wayne.Sifre@nrc.gov Christie.Hale@nrc.gov Mailing Address: | - 2 - Enclosure For the specific heat exchangers selected: Testing Documents 6. Copies of the two most recent completed tests confirming thermal performance for those heat exchangers which are performance tested 7. Instrument uncertainties of the instruments used during testing 8. Copy of any operability determinations or other documentation of degradation associated with the heat exchangers or the systems that support the operation for the | ||
selected heat exchangers 9. Documents that show the as-found results are recorded, evaluated, and appropriately dispositioned such that the as-left condition is acceptable Cleaning Documents 10. The cleaning and inspection maintenance schedule for each heat exchanger for the next five years 11. Copy of the document describing the inspection results for the last two cleaning and inspection activities completed on each heat exchanger 12. Cleaning procedures with acceptance criteria for the selected heat exchangers 13. Copies of the documents that verify the structural integrity of the heat exchanger, e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection results 14. Copies of those documents that describe the methods taken to control water chemistry in the heat exchangers Design Documents 15. Copies of the design basis documents and updated final safety analysis report pages for the selected heat exchangers 16. Provide a list of calculations with a description which currently apply to each heat exchanger 17. Copies of vendor data sheets and design basis data for the selected heat exchangers 18. Copy of the calculation which establishes the limiting (maximum) design basis heat load which is required to be removed by each of these heat exchangers 19. Copy of the calculation which correlates surveillance testing results from these heat exchangers with design basis heat removal capability (e.g., basis for surveillance test | |||
U.S. NRC, Region IV Attn: Wayne C. Sifre 1600 East Lamar Blvd. | acceptance criteria) 20. Copy of the calculations or documents which evaluate the potential for water hammer or excessive tube vibration in the heat exchanger or associated piping | ||
- 3 - Enclosure 21. Copy of the document which identifies the current number of tubes in service for each heat exchanger and the supporting calculation which establishes the maximum number | |||
of tubes which can be plugged in each heat exchanger 22. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes which are identified in each heat exchanger For the ultimate heat sink or safety-related service water system: 23. Dam inspections that monitor the integrity of the ultimate heat sink (if applicable) 24. Copies of calculations and surveillances that determine the ultimate heat sink reservoir capacity and heat transfer capability (if applicable) 25. Copies of any design changes performed on the ultimate heat sink or safety-related service water system 26. Copies of procedures for a loss of ultimate heat sink or safety-related service water system 27. Copies of inspections and/or maintenance related to macrofouling (silt, mussel shells, debris, etc.) and aquatic life 28. Copies of inspections and/or maintenance related to preventing biotic fouling 29. Copies of procedures and/or test results to survey or monitor interface valves between the safety-related section of the service water system and the nonsafety related section 30. Copy of the most recent service water flow balance test results, both as-found and as-left 31. History of any thru-wall pipe leaks on the safety-related service water system | |||
Inspector Contact Information: | |||
Wayne C. Sifre Christie Hale Senior Reactor Inspector Reactor Inspector | |||
817-200-1193 650-479-5434 Wayne.Sifre@nrc.gov Christie.Hale@nrc.gov | |||
Mailing Address: | |||
U.S. NRC, Region IV Attn: Wayne C. Sifre 1600 East Lamar Blvd. | |||
Arlington, TX 76011-4511 | |||
}} | }} |
Revision as of 15:12, 22 March 2018
ML13206A189 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 07/25/2013 |
From: | Thomas Farnholtz Region 4 Engineering Branch 1 |
To: | Halpin E D Pacific Gas & Electric Co |
References | |
IR-13-004 | |
Download: ML13206A189 (6) | |
See also: IR 05000275/2013004
Text
July 25, 2013 Mr. Edward D. Halpin Senior Vice President and
Chief Nuclear Officer
Pacific Gas and Electric Company
Diablo Canyon Power Plant
P.O. Box 56, Mail Code 104/6
Avila Beach, CA 93424 SUBJECT: DIABLO CANYON POWER PLANT - NOTIFICATION OF NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION (05000275/2013004 AND 05000323/2013004) AND REQUEST FOR INFORMATION
Dear Mr. Halpin
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV staff will conduct a triennial heat sink performance inspection at your Diablo Canyon Power Plant. The inspection will be comprised of two reactor inspectors from the NRC Region IV office. The inspection will be conducted in accordance with NRC Inspection Procedure
71111.07, "Heat Sink Performance." The schedule for the inspection is as follows:
Onsite Inspection Dates: September 9 - 12, 2013 Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.
Please note that the documents are requested to be provided by August 26, 2013. We request, that during the onsite inspection week, you ensure that copies of analyses, evaluations, or
documentation regarding the implementation and maintenance of your heat exchanger program are available. Of specific interest are those documents that establish that your heat exchanger program satisfies NRC regulatory requirements and conforms to applicable NRC guidance. Also, appropriate personnel knowledgeable of safety-related heat exchangers should be
available to support the inspector at the site during the inspection.
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
E. Halpin - 2 - We have discussed the schedule for this inspection activity with your staff and understand that our regulatory contact for this inspection will be Mike McCoy of your licensing organization. If
there are any questions about this inspection or the material requested, please contact the
inspectors, Wayne Sifre, at 817-200-1193 or by e-mail at Wayne.Sifre@nrc.gov, or Christie Hale at 650-479-5434 or e-mail at Christie.Hale@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely,
/RA/ Thomas R. Farnholtz, Chief
Engineering Branch 1 Division of Reactor Safety
Docket Nos.: 05000275, 05000323
Enclosure: Triennial Heat Sink Performance Inspection Request for Information
cc: Electronic Distribution for Diablo Canyon Power Plant
E. Halpin - 3 -
ADAMS ACCESSION NUMBER: ML13206A189 SUNSI Review Complete Initials: WCS Non-Sensitive Sensitive Publicly Available Non-Publicly Available SRI:EB1 RI:EB1 C:EB1 WSifre CHale TFarnholtz /RA/ /RA/ /RA/ 7/24/13 7/25/13 7/25/13 OFFICIAL RECORD COPY
- 1 - Enclosure Request for Information Triennial Heat Sink Performance Inspection Diablo Canyon Power Plant
Inspection Report: 05000275/2013004, 05000323/2013004
Inspection Dates: September 9 - 12, 2013
Inspection Procedure: IP 71111.07, Triennial "Heat Sink Performance"
Inspectors: Wayne Sifre, Senior Reactor Inspector
Christie Hale, Reactor Inspector
Information Requested for the In-Office Preparation Week The following information should be sent to the Region IV office in hard copy or electronic
format (Certrec IMS preferred), to the attention of Wayne Sifre, by August 26, 2013. The inspector will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week. Also, we request that you categorize the documents in your response with the numbered list below. Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector, and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the lead inspector as soon as possible.
The following heat exchangers/heat sinks have been selected for inspection:
- Residual Heat Removal Heat Exchangers (RHR HX 2-1, RHR HX 2-2) * Safety Injection Pump Lube Oil and Seal Water Coolers (2-2, 2-2A/B, 2-1, 2-1A/B) * Spent Fuel Pit Heat Exchanger (HX 2-1) * Component Cooling Water (CCW HX 2-1, CCW HX 2-2) For all Generic Letter 89-13 exchangers: 1. List of corrective action program documents (with a short description) associated with Generic Letter 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat
exchanger cavitation, or heat exchanger testing, in the previous three years 2. System health report(s) and maintenance rule system notebooks for all the Generic Letter 89-13 heat exchangers 3. Copy of any self-assessments done on any Generic Letter 89-13 heat exchangers in the previous three years 4. Copies of any procedures developed to implement the recommendations of Generic Letter 89-13, e.g., the Generic Letter 89-13 Heat Exchanger Program description
5. Copies of any commitments to the Generic Letter 89-13 program
- 2 - Enclosure For the specific heat exchangers selected: Testing Documents 6. Copies of the two most recent completed tests confirming thermal performance for those heat exchangers which are performance tested 7. Instrument uncertainties of the instruments used during testing 8. Copy of any operability determinations or other documentation of degradation associated with the heat exchangers or the systems that support the operation for the
selected heat exchangers 9. Documents that show the as-found results are recorded, evaluated, and appropriately dispositioned such that the as-left condition is acceptable Cleaning Documents 10. The cleaning and inspection maintenance schedule for each heat exchanger for the next five years 11. Copy of the document describing the inspection results for the last two cleaning and inspection activities completed on each heat exchanger 12. Cleaning procedures with acceptance criteria for the selected heat exchangers 13. Copies of the documents that verify the structural integrity of the heat exchanger, e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection results 14. Copies of those documents that describe the methods taken to control water chemistry in the heat exchangers Design Documents 15. Copies of the design basis documents and updated final safety analysis report pages for the selected heat exchangers 16. Provide a list of calculations with a description which currently apply to each heat exchanger 17. Copies of vendor data sheets and design basis data for the selected heat exchangers 18. Copy of the calculation which establishes the limiting (maximum) design basis heat load which is required to be removed by each of these heat exchangers 19. Copy of the calculation which correlates surveillance testing results from these heat exchangers with design basis heat removal capability (e.g., basis for surveillance test
acceptance criteria) 20. Copy of the calculations or documents which evaluate the potential for water hammer or excessive tube vibration in the heat exchanger or associated piping
- 3 - Enclosure 21. Copy of the document which identifies the current number of tubes in service for each heat exchanger and the supporting calculation which establishes the maximum number
of tubes which can be plugged in each heat exchanger 22. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes which are identified in each heat exchanger For the ultimate heat sink or safety-related service water system: 23. Dam inspections that monitor the integrity of the ultimate heat sink (if applicable) 24. Copies of calculations and surveillances that determine the ultimate heat sink reservoir capacity and heat transfer capability (if applicable) 25. Copies of any design changes performed on the ultimate heat sink or safety-related service water system 26. Copies of procedures for a loss of ultimate heat sink or safety-related service water system 27. Copies of inspections and/or maintenance related to macrofouling (silt, mussel shells, debris, etc.) and aquatic life 28. Copies of inspections and/or maintenance related to preventing biotic fouling 29. Copies of procedures and/or test results to survey or monitor interface valves between the safety-related section of the service water system and the nonsafety related section 30. Copy of the most recent service water flow balance test results, both as-found and as-left 31. History of any thru-wall pipe leaks on the safety-related service water system
Inspector Contact Information:
Wayne C. Sifre Christie Hale Senior Reactor Inspector Reactor Inspector
817-200-1193 650-479-5434 Wayne.Sifre@nrc.gov Christie.Hale@nrc.gov
Mailing Address:
U.S. NRC, Region IV Attn: Wayne C. Sifre 1600 East Lamar Blvd.
Arlington, TX 76011-4511