IR 07200044/2013401: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 20: Line 20:
{{#Wiki_filter:" " December 10, 2013  
{{#Wiki_filter:" " December 10, 2013  


Randall K. Edington, Executive Vice President, Nuclear/CNO Arizona Public Service Company P.O. Box 52034, Mail Stop 7602 Phoenix, AZ 85072-2034
Randall K. Edington, Executive Vice President, Nuclear/CNO  
 
Arizona Public Service Company P.O. Box 52034, Mail Stop 7602 Phoenix, AZ 85072-2034


SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, INDEPENDENT SPENT FUEL STORAGE FACILITY - NRC SECURITY INSPECTION REPORT 07200044/2013401
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, INDEPENDENT SPENT FUEL STORAGE FACILITY - NRC SECURITY INSPECTION REPORT 07200044/2013401
Line 31: Line 33:
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.


No findings were identified during this inspection. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
No findings were identified during this inspection.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be  
 
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
.  


Sincerely,/RA/
Sincerely,/RA/
Line 42: Line 49:


===w/Attachment:===
===w/Attachment:===
Supplemental Information
Supplemental Information  
 
ML13345B342 Cover Letter Only Non Sensitive Publicly Available: JMR SUNSI Review Complete: Sensitive Non-Publicly Available Cover Letter w/enclosure Non Sensitive Publicly Available JMR MD 3.4 Non-Public A.3 Sensitive Periodic Review Required Non-Publicly Available: PSI:PSB1 C:FCDB C:PSB-1 JRollins DBSpitzberg MHaire /RA/ /RA/ /RA/ 12/8/13 12/10/13 12/10/13
}}
}}

Revision as of 11:01, 3 July 2018

IR 07200044-13-401, on 11/21/2013, Palo Verde Nuclear Generating Station, Independent Spent Fuel Storage Facility
ML13345B342
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/10/2013
From: Haire M S
Plant Support Branch-1
To: Edington R K
Arizona Public Service Co
References
IR-13-401
Download: ML13345B342 (3)


Text

" " December 10, 2013

Randall K. Edington, Executive Vice President, Nuclear/CNO

Arizona Public Service Company P.O. Box 52034, Mail Stop 7602 Phoenix, AZ 85072-2034

SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, INDEPENDENT SPENT FUEL STORAGE FACILITY - NRC SECURITY INSPECTION REPORT 07200044/2013401

Dear Mr. Edington:

On November 21, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an Independent Spent Fuel Storage Installation Security Inspection at your Palo Verde Nuclear Generating Station. The enclosed inspection report documents the inspection results, which were discussed on November 21, 2013, with Mr. D. Mims, Senior Vice President, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings were identified during this inspection.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

.

Sincerely,/RA/

Mark S. Haire, Chief Plant Support Branch-1 Division of Reactor Safety Docket No.: 50-528, 50-529, 50-530, 72-44 License No.: NPF-41, NPF-51, NPF-74

Nonpublic

Enclosure:

NRC Inspection Report 072-44/2013401

w/Attachment:

Supplemental Information

ML13345B342 Cover Letter Only Non Sensitive Publicly Available: JMR SUNSI Review Complete: Sensitive Non-Publicly Available Cover Letter w/enclosure Non Sensitive Publicly Available JMR MD 3.4 Non-Public A.3 Sensitive Periodic Review Required Non-Publicly Available: PSI:PSB1 C:FCDB C:PSB-1 JRollins DBSpitzberg MHaire /RA/ /RA/ /RA/ 12/8/13 12/10/13 12/10/13