ML19309C826: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 32: Line 32:
: 10. Reasons For Restrictions.lf Any:        None This Month          Yr..to.Date          Cumulative i1. Hours in Reporting Period                              744.0              2,184.0            50,425.0
: 10. Reasons For Restrictions.lf Any:        None This Month          Yr..to.Date          Cumulative i1. Hours in Reporting Period                              744.0              2,184.0            50,425.0
: 12. Number Of Hours Reactor Was Critical                      22.0-              1,447.0            42,684.3
: 12. Number Of Hours Reactor Was Critical                      22.0-              1,447.0            42,684.3
                                                                                                        -
: 13. Reactor Reserve Shutdown Hours                            0.0                    0.0                0.0
: 13. Reactor Reserve Shutdown Hours                            0.0                    0.0                0.0
: 14. Hours Generator On.Line                                  22.0              1.437.7            41.913.3
: 14. Hours Generator On.Line                                  22.0              1.437.7            41.913.3
Line 48: Line 47:
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:    May 15. 1980
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:    May 15. 1980
: 26. Units In Test Status iPrior to Commercial Operationi:                    Forecast            Achieved INITIA L CRITICALITY INITIAL ELECTRICITY C0\lMERCIAL OPER AT10N                                                                        I l
: 26. Units In Test Status iPrior to Commercial Operationi:                    Forecast            Achieved INITIA L CRITICALITY INITIAL ELECTRICITY C0\lMERCIAL OPER AT10N                                                                        I l
l
l 8 00409 0 k("A
                                                                                                                        '
8 00409 0 k("A
                                                                                                                         ;
                                                                                                                         ;


      .        .                    _-                  __    ._ _                                          _ _ .            .-  _.
              ,
O AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.        050-0298 UNIT Cooper Nuclear Station:
O AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.        050-0298 UNIT Cooper Nuclear Station:
i                                                                                                      DATE      4-3-80
i                                                                                                      DATE      4-3-80
.                                                                                          COMPLE1TD BY          P. L. Ballinger
.                                                                                          COMPLE1TD BY          P. L. Ballinger TELEPHONE 402-825-3811 i                                          .
'
TELEPHONE 402-825-3811 i                                          .
.,
'
yog g}g          Ma rch DAY        AVERAGE DAILY POWER LEVEL                          DAY      AVERAGE DAILY POWER LEVEL (MWe Net)                                                  t MWe-Net) 1                          466                              l7                          0 2                            0                              33                          0 3
yog g}g          Ma rch DAY        AVERAGE DAILY POWER LEVEL                          DAY      AVERAGE DAILY POWER LEVEL (MWe Net)                                                  t MWe-Net) 1                          466                              l7                          0 2                            0                              33                          0 3
0                              19                          0 4                            0                              20                          0 5                            n                                :                        0 6                            0                              ::                          0 7                            0                                                          0 23 3                            0                                                          0 34 9                            0                                $                        0 10                              0                              26                          0 11                              0                              27                          0 12                            0                              g                          0 13-                            0                              29                          0                                  ,
0                              19                          0 4                            0                              20                          0 5                            n                                :                        0 6                            0                              ::                          0 7                            0                                                          0 23 3                            0                                                          0 34 9                            0                                $                        0 10                              0                              26                          0 11                              0                              27                          0 12                            0                              g                          0 13-                            0                              29                          0                                  ,
  ;                                        0                                                          n 14                                                            30                                                            '
  ;                                        0                                                          n 14                                                            30                                                            '
15                              0                              33                          0 16 0
15                              0                              33                          0 16 0
                                                                                                                                        ,
                              ,
INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting month. Campute to the nearest whole megawatt.
INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting month. Campute to the nearest whole megawatt.
                                                                                                                           . (9/77) i
                                                                                                                           . (9/77) i
            -
  ,.                              _                            -        _                    ._.                    -          ,


                                                                                                                              .
O IMX' AET NO.          050-0298 UNIT SilUIIK)WNS AND POWER REDUCllONS                                        Cooper Nuclear Stat.
O IMX' AET NO.          050-0298 UNIT SilUIIK)WNS AND POWER REDUCllONS                                        Cooper Nuclear Stat.
UNIT N AME DATE  4-3-80 COMPLETED BY              P. L. bilinc ar REPORI MONill y_.-g 1930                        1ELErilONE          402-825-1911
UNIT N AME DATE  4-3-80 COMPLETED BY              P. L. bilinc ar REPORI MONill y_.-g 1930                        1ELErilONE          402-825-1911 g
                                                                                      '':-
                                                        ,
g
[E        'h  h$
[E        'h  h$
jgy Licensee    h          *l,                Came A Cosicitive Attson to No.          Date              3g          i y
jgy Licensee    h          *l,                Came A Cosicitive Attson to No.          Date              3g          i y
Event      39        pO
Event      39        pO
* y:              3 g =!
* y:              3 g =!
                                                                                -
Repost e    in U      o u
Repost e    in U      o u
Present itecurrente  ~
Present itecurrente  ~
6 80-5        800301    S      722          C      2          N/A      N/A        N/A    1980 Refueling and Maintenance Outage
6 80-5        800301    S      722          C      2          N/A      N/A        N/A    1980 Refueling and Maintenance Outage I                    2                                                  3                              4 F: Lorced            Reason:                                            Method:                            Eshibit G -Instanttiims S: St heduled        A. Equipment railure(Esplain)                      1-Manual                          for Picparation of Dat.:
                                                .
                                                                                                                '
I                    2                                                  3                              4 F: Lorced            Reason:                                            Method:                            Eshibit G -Instanttiims S: St heduled        A. Equipment railure(Esplain)                      1-Manual                          for Picparation of Dat.:
H. Maintenance of Tee                              2-Manual Scram.                  Entsy Sheets for Licensee C Refueling                                        3 Automatic Scram-                Event Repost (LE R) Eile (NURI G.
H. Maintenance of Tee                              2-Manual Scram.                  Entsy Sheets for Licensee C Refueling                                        3 Automatic Scram-                Event Repost (LE R) Eile (NURI G.
D Regulatory Restriction                          4 Other (Explain)                  0161)
D Regulatory Restriction                          4 Other (Explain)                  0161)
E-Operator Training & License Exainination F.Administralise                                                                5 G Operational Eirus (Emplain)                                                        Eshibit I - Same Source 08/77)                  II-Olhes (E xplain)
E-Operator Training & License Exainination F.Administralise                                                                5 G Operational Eirus (Emplain)                                                        Eshibit I - Same Source 08/77)                  II-Olhes (E xplain)
                                                                                                                                    -              .- - _          . - .
- _ _ _ _ _ _ _ _ _ _ _ _ _ _                        .      _


a
a o      .
      .
    .
o      .
COOPER NUCLEAR STATION OPERATIONS NARRATIVE March 1980 The reactor was shutdown at 2200 hours, March 1,1980, to start the 1980 Refueling and Maintenance Outage. A ten week outage is planned with a startup date of May 15, 1980.
COOPER NUCLEAR STATION OPERATIONS NARRATIVE March 1980 The reactor was shutdown at 2200 hours, March 1,1980, to start the 1980 Refueling and Maintenance Outage. A ten week outage is planned with a startup date of May 15, 1980.
L}}
L}}

Revision as of 11:46, 1 February 2020

Monthly Operating Rept for Mar 1980
ML19309C826
Person / Time
Site: Cooper Entergy icon.png
Issue date: 04/03/1980
From: Ballinger P
NEBRASKA PUBLIC POWER DISTRICT
To:
Shared Package
ML19309C825 List:
References
NUDOCS 8004090304
Download: ML19309C826 (4)


Text

.

O-OPERATING DATA REPORT DOCKET NO. 050-0298 DATE 4-3-80 COMPLETED BY P. L. Ballinger TELEPHONE 402-R25-3811 OPERATING STATUS Notes

!. Unit Name: Coooer Nuclear Station

2. Reporting Period: March 1980 2381
3. Licensed Thermal Power (MWt):
4. Namepiste Rating (Gross MWe):

836

5. Design Electrical Rating (Net MWe): 778
6. Maximum Dependable Capacity (Gross MWe): 787
7. Maximum Denendable Capacity (Net MWe):

764

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report. Give Reasons:
9. Power Level To Which Restricted. lf Any (Net MWe): None
10. Reasons For Restrictions.lf Any: None This Month Yr..to.Date Cumulative i1. Hours in Reporting Period 744.0 2,184.0 50,425.0
12. Number Of Hours Reactor Was Critical 22.0- 1,447.0 42,684.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On.Line 22.0 1.437.7 41.913.3
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 39.504.0 3.077.520.0 79.260,246.0 17 Gross Electrical Energy Generated (MWH) 11.639.0 _,

1.018,195.0 25,557,043.0

18. Net Electrical Energy Generated (MWH) 11.181.0 981.128.0 24.639.405.0
19. Unit Service Factor 3.0 65.8 83.1
20. Unit Availability Factor 3.0 65.8 83.1
21. Unit Capacity Factor (Using MDC Net) 2.0 58.8 64.0
22. Unit Capacity Factor (Using DER Net) 1.9 57.7 62.8
23. Unit Forced Outage Rate 0.0 1.7 4.5 i
24. Shutdowns Scheduled Over Next 6 Months tType. Date.and Duration of Each t:

Refueline and Maintenance Outage started March 1, 1980 and will continue for ten weeks.

25. If Shut Down At End Of Report Period. Estimated Date of Startup: May 15. 1980
26. Units In Test Status iPrior to Commercial Operationi: Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY C0\lMERCIAL OPER AT10N I l

l 8 00409 0 k("A

O AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 050-0298 UNIT Cooper Nuclear Station:

i DATE 4-3-80

. COMPLE1TD BY P. L. Ballinger TELEPHONE 402-825-3811 i .

yog g}g Ma rch DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) t MWe-Net) 1 466 l7 0 2 0 33 0 3

0 19 0 4 0 20 0 5 n  : 0 6 0  :: 0 7 0 0 23 3 0 0 34 9 0 $ 0 10 0 26 0 11 0 27 0 12 0 g 0 13- 0 29 0 ,

0 n 14 30 '

15 0 33 0 16 0

INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting month. Campute to the nearest whole megawatt.

. (9/77) i

O IMX' AET NO. 050-0298 UNIT SilUIIK)WNS AND POWER REDUCllONS Cooper Nuclear Stat.

UNIT N AME DATE 4-3-80 COMPLETED BY P. L. bilinc ar REPORI MONill y_.-g 1930 1ELErilONE 402-825-1911 g

[E 'h h$

jgy Licensee h *l, Came A Cosicitive Attson to No. Date 3g i y

Event 39 pO

  • y: 3 g =!

Repost e in U o u

Present itecurrente ~

6 80-5 800301 S 722 C 2 N/A N/A N/A 1980 Refueling and Maintenance Outage I 2 3 4 F: Lorced Reason: Method: Eshibit G -Instanttiims S: St heduled A. Equipment railure(Esplain) 1-Manual for Picparation of Dat.:

H. Maintenance of Tee 2-Manual Scram. Entsy Sheets for Licensee C Refueling 3 Automatic Scram- Event Repost (LE R) Eile (NURI G.

D Regulatory Restriction 4 Other (Explain) 0161)

E-Operator Training & License Exainination F.Administralise 5 G Operational Eirus (Emplain) Eshibit I - Same Source 08/77) II-Olhes (E xplain)

a o .

COOPER NUCLEAR STATION OPERATIONS NARRATIVE March 1980 The reactor was shutdown at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />, March 1,1980, to start the 1980 Refueling and Maintenance Outage. A ten week outage is planned with a startup date of May 15, 1980.

L