O-OPERATING DATA REPORT 050-0298 DOCKET NO.
DATE 4-3-80 COMPLETED BY P. L.
Ballinger TELEPHONE 402-R25-3811 OPERATING STATUS Notes
!. Unit Name:
Coooer Nuclear Station March 1980
- 2. Reporting Period:
2381
- 3. Licensed Thermal Power (MWt):
836
- 4. Namepiste Rating (Gross MWe):
778
- 5. Design Electrical Rating (Net MWe):
787
- 6. Maximum Dependable Capacity (Gross MWe):
764
- 7. Maximum Denendable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted. lf Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
This Month Yr..to.Date Cumulative i1. Hours in Reporting Period 744.0 2,184.0 50,425.0
- 12. Number Of Hours Reactor Was Critical 22.0-1,447.0 42,684.3 0.0
- 13. Reactor Reserve Shutdown Hours 0.0 0.0
- 14. Hours Generator On.Line 22.0 1.437.7 41.913.3
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 39.504.0 3.077.520.0 79.260,246.0 17 Gross Electrical Energy Generated (MWH) 11.639.0 1.018,195.0 25,557,043.0
- 18. Net Electrical Energy Generated (MWH) 11.181.0 981.128.0 24.639.405.0
- 19. Unit Service Factor 3.0 65.8 83.1
- 20. Unit Availability Factor 3.0 65.8 83.1
- 21. Unit Capacity Factor (Using MDC Net) 2.0 58.8 64.0 1.9 57.7 62.8
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 0.0 1.7 4.5 i
- 24. Shutdowns Scheduled Over Next 6 Months tType. Date.and Duration of Each t:
Refueline and Maintenance Outage started March 1, 1980 and will continue for ten weeks.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
May 15. 1980
- 26. Units In Test Status iPrior to Commercial Operationi:
Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY C0\\lMERCIAL OPER AT10N I
8 00409 0 k("A
O AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
050-0298 UNIT Cooper Nuclear Station:
i DATE 4-3-80 COMPLE1TD BY P. L. Ballinger 402-825-3811 TELEPHONE i
yog g}g Ma rch DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) t MWe-Net) 1 466 l7 0
2 0
33 0
0 3
19 0
4 0
20 0
5 n
0 6
0 0
7 0
23 0
0 3
34 0
9 0
0 26 0
10 0
11 0
27 0
0 12 0
g 13-0 29 0
0 14 30 n
15 0
33 0
0 16 INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting month. Campute to the nearest whole megawatt.
. (9/77) i
O 050-0298 IMX' AET NO.
UNIT SilUIIK)WNS AND POWER REDUCllONS UNIT N AME Cooper Nuclear Stat.
DATE 4-3-80 COMPLETED BY P. L.
bilinc ar REPORI MONill y_.-g 1930 1ELErilONE 402-825-1911
[E
'h h$
Licensee h
- l, Came A Cosicitive No.
Date g
3g i
jgy Event 39 pO Attson to y:
y 3 g =!
Repost e in U Present itecurrente o
~
u 6
80-5 800301 S
722 C
2 N/A N/A N/A 1980 Refueling and Maintenance Outage I
2 3
4 F: Lorced Reason:
Method:
Eshibit G -Instanttiims S: St heduled A. Equipment railure(Esplain) 1-Manual for Picparation of Dat.:
H. Maintenance of Tee 2-Manual Scram.
Entsy Sheets for Licensee C Refueling 3 Automatic Scram-Event Repost (LE R) Eile (NURI G.
D Regulatory Restriction 4 Other (Explain) 0161)
E-Operator Training & License Exainination F.Administralise 5
G Operational Eirus (Emplain)
Eshibit I - Same Source 08/77)
II-Olhes (E xplain)
a o
COOPER NUCLEAR STATION OPERATIONS NARRATIVE March 1980 The reactor was shutdown at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />, March 1,1980, to start the 1980 Refueling and Maintenance Outage. A ten week outage is planned with a startup date of May 15, 1980.