Local power density shall be maintained less than 21KW/ft.
Local power density shall be maintained less than 21KW/ft.
Maximum cladding oxidation shall nowhere exceed 17% times the cladding thickness.
Maximum cladding oxidation shall nowhere exceed 17% times the cladding thickness.
B.      Peak cladding temperature shall not exceed 2200°F.
B.      Peak cladding temperature shall not exceed 2200°F.
Local power density shall be maintained less than 21KW/ft.
Local power density shall be maintained less than 21KW/ft.
Calculated changes in core geometry shall be such that the core remains amenable to cooling.
Calculated changes in core geometry shall be such that the core remains amenable to cooling.
C.      Local power density shall be maintained less than 21KW/ft.
C.      Local power density shall be maintained less than 21KW/ft.
Maximum cladding oxidation shall nowhere exceed 17% times the cladding thickness.
Maximum cladding oxidation shall nowhere exceed 17% times the cladding thickness.
Calculated changes in core geometry shall be such that the core remains amenable to cooling.
Calculated changes in core geometry shall be such that the core remains amenable to cooling.
D.      Peak cladding temperature shall not exceed 2200°F.
D.      Peak cladding temperature shall not exceed 2200°F.
Maximum cladding oxidation shall nowhere exceed 17% times the cladding thickness.
Maximum cladding oxidation shall nowhere exceed 17% times the cladding thickness.
Line 468: Line 465:
Simplified Drawings / LOIT lesson plan / 40AO-9ZZ16, RRS malfunctions K&A: Knowledge of the interrelations between the (Reactor Trip Recovery) and the following: Components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Simplified Drawings / LOIT lesson plan / 40AO-9ZZ16, RRS malfunctions K&A: Knowledge of the interrelations between the (Reactor Trip Recovery) and the following: Components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Justification: Examinee may thing that either A or B could be correct in the belief that one SG in a condition requires both to be the same, as is true for swapover. The examinee may also confuse feedrate for a failed T-ave instrument.
Justification: Examinee may thing that either A or B could be correct in the belief that one SG in a condition requires both to be the same, as is true for swapover. The examinee may also confuse feedrate for a failed T-ave instrument.
            .
A is Wrong - SG 2 level is low for single element control, 51.9% NR is when they come out of RTO B is Wrong - SG 1 is feeding at max rate in RTO but SG 2 is out of RTO, level > 51.6 %
A is Wrong - SG 2 level is low for single element control, 51.9% NR is when they come out of RTO B is Wrong - SG 1 is feeding at max rate in RTO but SG 2 is out of RTO, level > 51.6 %
NR C is Wrong - SG 2 feeding at the max rate with T-ave high D is Correct - SG 1 is out of RTO with level > 51.6 NR and SG 2 is feeding at max in RTO with Tave failed high OPTRNG_EXAM                  Page: 35 of 135                                                  09/30/09
NR C is Wrong - SG 2 feeding at the max rate with T-ave high D is Correct - SG 1 is out of RTO with level > 51.6 NR and SG 2 is feeding at max in RTO with Tave failed high OPTRNG_EXAM                  Page: 35 of 135                                                  09/30/09
Line 1,793: Line 1,789:
Containment temperature is 187°F and slowly increasing.
Containment temperature is 187°F and slowly increasing.
The STA is not available and the CRS has directed you to determine if Condition 1 of RCS Inventory Control is met in accordance with the following table.
The STA is not available and the CRS has directed you to determine if Condition 1 of RCS Inventory Control is met in accordance with the following table.
______________________________________________
SAFETY FUNCTION:
SAFETY FUNCTION:
: 3. RCS Inventory Control
: 3. RCS Inventory Control
------------------------------------------------------------ NOTE ---------------------------------------------------------
------------------------------------------------------------ NOTE ---------------------------------------------------------
Meeting the provisions of Condition 1 or Condition 2 will satisfy the RCS Inventory Control Safety Function.
Meeting the provisions of Condition 1 or Condition 2 will satisfy the RCS Inventory Control Safety Function.
-------------------------------------------------------------------------------------------------------------------------------
ACCEPTANCE CRITERIA:                                                                      CRITERIA SATISFIED Condition 1
ACCEPTANCE CRITERIA:                                                                      CRITERIA SATISFIED Condition 1
: a. Pressurizer level greater than 10% [15%].
: a. Pressurizer level greater than 10% [15%].
: b. RCS is 24°F [44°F] or more subcooled.
: b. RCS is 24°F [44°F] or more subcooled.
: c. RVLMS indicates that RVUH level is 16% or more.
: c. RVLMS indicates that RVUH level is 16% or more.
______________________________________
Which one of the following identifies the minimum required actions which would satisfy the RCS Inventory Control Safety Function, Condition 1?
Which one of the following identifies the minimum required actions which would satisfy the RCS Inventory Control Safety Function, Condition 1?
A.        Raise Pressurizer to 12% level and lower T-hot temperature to less than 568°F.
A.        Raise Pressurizer to 12% level and lower T-hot temperature to less than 568°F.

Latest revision as of 21:14, 11 March 2020

2009-11-Draft RO Written Exam
ML101960324
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/02/2009
From: Garchow S
NRC Region 4
To:
References
50-528/09-11, 50-529/09-11, 50-530/09-11
Download: ML101960324 (135)


Text

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 1

This Exam Level RO Apears on: 2009 SRO EXAM Tier 1 Group 1 K/A # 2.4.11 Importance 4.00 Rating:

Unit 1 is operating at 100% power with the following conditions:

RCP 1A Upper Thrust Bearing temperature is 190°F and stable.

RCP 1A seal #2 inlet pressure is 1270 psig and stable.

RCP 1A Seal Bleed Off flow is 2.6 gpm and stable.

RCS pressure is 2170 psia and stable.

Reactor Drain tank level is 55% and slowly increasing Pressurizer level is 54% and slowly increasing.

Letdown flow is 74 gpm and slowly increasing.

Nuclear Cooling water flow from the Letdown heat exchanger (NCN-FI-208) is slowly increasing.

The Crew should take actions per ....

A. 40AO-9ZZ04, RCP Emergencies due to abnormal RCP seal parameters.

B. 40AO-9ZZ04, RCP Emergencies due to abnormal RCP bearing parameters.

C. 40AO-9ZZ02, Excessive RCS Leakrate due to a small Pressurizer steam space leak.

D. 40AO-9ZZ02, Excessive RCS Leakrate due to a small RCS to Nuclear Cooling water leak.

Answer: C Associated KA:

L10166 Determine if the Excessive Leakage AOP should be executed Reference Id: Q22486 Difficulty: 3.00 Time to complete: 3 10CFR Category: CFR 55.41 (10) 55.41 (10) Administrative, normal, abnormal, and emergency operating procedures for the facility.

Cognitive Level: Comprehension / Anal Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

40AO-9ZZ02, Excessive RCS Leakrate K&A: Knowledge of abnormal condition procedures: Pressurizer Vapor Space Accident Justification:

A and B are Wrong - Examinee will have to determine normal Seal and Bearing parameters for the 1A RCP. In addition 2.6 gpm is a normal SBO flow rate to the RDT OPTRNG_EXAM Page: 1 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam C is Correct - Increasing pressurizer level above program band is a classic PZR steam space leak. RCS pressure may drop slightly but will remain essentially constant for a small RCS leak.

D is Wrong - Letdown increasing in response to PZR level increase will cause NCW flow to increase but examinee may believe that a leak to NCW will increase temperature requiring more NCW flow to provide cooling.

OPTRNG_EXAM Page: 2 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 2

This Exam Level RO Apears on: 2009 SRO EXAM Tier 1 Group 1 K/A # 41009ea1.07 Importance 3.70 Rating:

Given the following conditions:

Unit 2 was manually tripped per 40AO-9ZZ02, Excessive RCS Leakrate.

The CRS has implemented 40EP-9EO03, Loss of Coolant Accident.

Containment pressure peaked at 4.2 and is currently 3.8 psig.

All the required automatic ESFAS actuations have properly initiated.

What is the expected status and required actions (if any) to recover the Normal Containment Cooling ACUs?

A. The Containment Normal ACUs are running and Normal Chill Water (WC) is available.

B. The Containment Normal ACUs are tripped, go to start twice to restart. Normal Chill Water (WC) is available.

C. The Containment Normal ACUs are running but Normal Chill Water (WC) is isolated and the valves must be over-ridden to open.

D. The Containment Normal ACUs are tripped, go to stop then start to restart.

Normal Chill Water (WC) is isolated and the valves must be over-ridden to open.

Answer: D Associated KA:

L10469 Given conditions of a LOCA describe how the containment is cooled Reference Id: Q22594 Difficulty: 3.00 Time to complete: 2 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Comprehension / Anal Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

40EP-9EO10, Appendix 17 K&A: Ability to operate and monitor the following as they apply to a small break LOCA:

CCS Justification: Examinee will have to know that CIAS/SIAS initiates 3 psig. They will also need to know that the WC valves isolate and Containment ACUs trip on a SIAS/CIAS and require an override to start. Examinee may confuse NC isolation at CSAS setpoint with WC isolation.

OPTRNG_EXAM Page: 3 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam A is Wrong - ACUs are tripped and WC is isolated.

B is Wrong - Go to start twice is the required action to recover a CS pump following an inadvertant CSAS concurrent with a SIAS. WC is isolated.

C is Wrong - ACUs have tripped.

D is Correct - ACUs are tripped, WC is isolated both are recovered by going to over-ride.

OPTRNG_EXAM Page: 4 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 3

This Exam Level RO Apears on: 2009 SRO EXAM Tier 1 Group 1 K/A # 2.1.27 Importance 3.90 Rating:

Which one on the following correctly identifies the purpose or Design Criteria of the Safety Injection system as it relates to a Large Break LOCA event?

A. Peak cladding temperature shall not exceed 2200°F.

Local power density shall be maintained less than 21KW/ft.

Maximum cladding oxidation shall nowhere exceed 17% times the cladding thickness.

B. Peak cladding temperature shall not exceed 2200°F.

Local power density shall be maintained less than 21KW/ft.

Calculated changes in core geometry shall be such that the core remains amenable to cooling.

C. Local power density shall be maintained less than 21KW/ft.

Maximum cladding oxidation shall nowhere exceed 17% times the cladding thickness.

Calculated changes in core geometry shall be such that the core remains amenable to cooling.

D. Peak cladding temperature shall not exceed 2200°F.

Maximum cladding oxidation shall nowhere exceed 17% times the cladding thickness.

Calculated changes in core geometry shall be such that the core remains amenable to cooling.

Answer: D Associated KA:

L65084 Describe the design basis associated with the SI system.

Reference Id: Q22488 Difficulty: 2.00 Time to complete: 2 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Memory Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LOCA tech guideline, 40DP-9AP08 / 40EP-9EO03, LOCA K&A: Knowledge of system purpose and/or function. Large Break LOCA OPTRNG_EXAM Page: 5 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam Justification:

A, B and C all include 21 KW/ft this is in the design of CPC and is the old PVNGS safety function not a function of the ECCS system D is Correct - all design functions of the ECCS system during a LOCA OPTRNG_EXAM Page: 6 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 4

This Exam Level RO Apears on: 2009 SRO EXAM Tier 1 Group 1 K/A # 42015aa2.02 Importance 2.80 Rating:

Given the following conditions:

Unit 1 is operating at 100% power.

2A RCP Upper Thrust Bearing temperature is observed to be in alarm at 230 degrees and increasing.

In accordance with 40AO-9ZZ04 (RCP Emergencies) which one of the following actions can be performed to slow the rate of temperature rise?

A. Start the 2A hydraulic oil lift pump PO2C.

B. Start the standby Nuclear Cooling Water pump.

C. Increase the output of CHN-FIC-243, Seal Injection Flow Controller.

D. Stop all but one Normal Chiller, ensure that only one Nuclear Cooling Water outlet valve is open.

Answer: A Associated KA:

100866 Active Question Bank 2004 12077 Given RCP motor amps and Upper Thrust Bearing Temperature determine the appropriate action to take based on RCP motor amps and thrust bearing temperature 17327 Determine the Auxiliary Operator's actions for Reactor Coolant Pump Emergencies AOP.

L58304 RC Reference Id: Q9503 Difficulty: 3.00 Time to complete: 3 10CFR Category: CFR 55.41 (10) 55.41 (10) Administrative, normal, abnormal, and emergency operating procedures for the facility.

Cognitive Level: Memory Question Source: Modified PV Bank Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

40AO-9ZZ04, RCP Emergencies K&A: Ability to determine and interpret the following as they apply to the Reactor Coolant Pump Malfunctions (Loss of RC Flow): Abnormalities in RCP air vent flow paths and/or oil cooling system Justification:

A is Correct - procedurally directed for high temperature OPTRNG_EXAM Page: 7 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam B is Wrong - directed in the case of high temperature and loss of cooling water C is Wrong - These are reverse acting controllers, increasing ouput would cause a reduction in flow and increase temperature.

D is Wrong - directed in the case of high temperature and a loss of cooling water OPTRNG_EXAM Page: 8 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 5

This Exam Level RO Apears on: 2009 SRO EXAM Tier 1 Group 1 K/A # 42022ak1.02 Importance 2.70 Rating:

Given the following conditions:

Unit 1 is operating at 100% power.

CHN-UV-240, Charging Line to RC Loop 2A valve, has failed closed.

Which one of the following would be the effect on the Chemical and Volume Control system?

A. Auxiliary Spray flow is not available.

B. Seal Injection flow to the RCPs is lost.

C. Regen HX outlet valve CHB-UV-515 will close on high temperature, isolating Letdown flow.

D. Differential pressure between Charging and the RCS increases, charging flow to the loop is unchanged.

Answer: D Associated KA:

L67956 Explain the operation of the Charging Line Isolation Valve (CHN-HV-239), including the Control Room controls, under normal operating conditions.

Reference Id: Q22489 Difficulty: 2.00 Time to complete: 3 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Comprehension / Anal Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

CVCS LOIT Lesson Plan, ARP 40AL-9RK3A K&A: Knowledge of the operational implications of the following concepts as they apply to Loss of Reactor Coolant Makeup: Relationship of charging flow to pressure differential between charging and RCS.

Justification: If CHN-HV-240 closes then charging flow is forced thru the spring loaded check valve CHN-V435 raising dp to 200 psid. Since we have positive displacement charging pumps flow to the RCS remains constant. Aux spray is unaffected with 240 failed closed, seal Injection controllers will respond to maintain desired flow and since charging flow is maintained LD will not isolate on high temperature.

A is Wrong - CHN-HV-240 going closed maintains adequate pressure to the aux. spray valves B is Wrong - Seal Injection flow is isolated by either CHN-UV-231 or 255 OPTRNG_EXAM Page: 9 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam C is Wrong - CHB-UV-515 closes on high temp out of the Regen HX, this will not occur since charging flow is maintained.

D is Correct -

OPTRNG_EXAM Page: 10 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 6

This Exam Level RO Apears on: 2009 SRO EXAM Tier 1 Group 1 K/A # 42025ak2.02 Importance 3.20 Rating:

Given the following conditions:

Unit 1 is in Mode 6 LPSI pump "A" is in service providing Shutdown Cooling flow at 4200 gpm Subsequently: The 4160 vac class bus (PBA-S03) de-energizes when a fault occurs on the ESF transformer NBN-X03. Add comma 1 minute after the fault Shutdown Cooling (SDC) flow is ...

A. 0 gpm, LPSI pump "A" breaker is anti-pumped.

B. 0 gpm, LPSI pump "A" is available but did not receive a start signal.

C. 4200 gpm after the "A" DG started and sequenced the LPSI pump on.

D. 4200 gpm, after the Operator throttles the SDC injection valves back to their original position.

Answer: B Associated KA:

L65104 Describe the flowpath/s associated with the SDC system to include these major components:

  • Safety Injection Pumps
  • Refueling Water Tank
  • Injection valves Reference Id: Q22490 Difficulty: 3.00 Time to complete: 2 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Comprehension / Anal Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

01-E-PEB-001, DG output breaker P&ID K&A: Knowledge of the interrelations between the Loss of Residual Heat Removal System and the following: LPSI or Decay Heat Removal/RHR pumps Justification:

A is Wrong - examinee may confuse this condition sith similar events such as charging pumps which become anti-pumped following a LOP OPTRNG_EXAM Page: 11 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam B is Correct - DG output breaker will close and energize the bus but there is no ESFAS signal present to close the A LPSI pump breaker.

C is Wrong - The LPSI pump would sequence on with a SIAS present but ESFAS signals are jumperd out during an outage but RCS pressure is < the SIAS setpoint.

D is Wrong - Same as above but this also assumes that the valves would go full open and have to be positioned back to their original value.

OPTRNG_EXAM Page: 12 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 7

This Exam Level RO Apears on: 2009 SRO EXAM Tier 1 Group 1 K/A # 42026aa1.01 Importance 3.10 Rating:

The following changes are observed in Nuclear Cooling water (NCW) temperatures while operating at full power. temperatures from Reactor Coolant Pumps are increasing NCW from Reactor Coolant pumps temperatures are increasing.

Control Element Drive Mechanisms ACUs outlet temperatures are increasing.

NCW temperature from Letdown heat exchanger is stable.

The "in-service" Fuel Pool heat exchanger NCW return temperature is stable.

Which one of the following events could have occurred?

A. Loss of Plant Cooling water (PW).

B. Inadvertant Containment Spray Actuation (CSAS).

C. Loss of Load Control Center PHB-M34 (de-energized).

D. Outside containment Instrument Air isolation valve IAA-UV-2 has failed closed.

Answer: B Associated KA:

64992 Describe the Control Room indications associated with the Nuclear Cooling Water system.

Reference Id: Q22565 Difficulty: 3.00 Time to complete: 3 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Comprehension / Anal Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LOIT lesson plans K&A: Ability to operate and / or monitor the following as they apply to the Loss of Component Cooling Water: CCW temperature indications Justification:

A is Wrong - Loss of PW would cause all NCW return temp to increase B is Correct - CSAS isolated containment C and D are Wrong - examinee could believe that the isolation valves fail closed on a loss of IA or Power OPTRNG_EXAM Page: 13 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam OPTRNG_EXAM Page: 14 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 8

This Exam Level RO Apears on: 2009 SRO EXAM Tier 1 Group 1 K/A # 42027aa1.03 Importance 3.60 Rating:

Given the following conditions:

Unit 1 is operating in Mode 1.

The controlling pressurizer pressure channel has failed high.

Assuming NO operator actions are taken, which one of the following conditions would you expect to occur?

A. RCS pressure increases until a reactor trip occurs from high pressurizer pressure.

B. RCS pressure decreases until a reactor trip occurs from low DNBR or low pressurizer pressure.

C. Backup heaters de-energize, pressurizer spray valves open, and pressurizer pressure stabilizes at a lower value than setpoint.

D. Backup heaters energize, pressurizer spray valves open, and pressurizer pressure stabilizes at a higher value than setpoint.

Answer: B Associated KA:

L75231 Describe the automatic features associated with the Pressurizer Pressure Control System Bistables.

Reference Id: Q2601 Difficulty: 4.00 Time to complete: 4 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Comprehension / Anal Question Source: PV Bank Not Modified Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LOIT lesson plan K&A: Ability to operate and / or monitor the following as they apply to the Pressurizer Pressure Control Malfunctions: Pressure control when on a steam bubble Justification:

A is Wrong - Examinee may confuse the operation of the PPCS and believe a malfunction could cause the high pressure trip. High pressure alarms will actuate B is Correct - The controlling channel failing high will cause all heaters to de-energize and spray vales to open driving the plant to a low pressure trip.

OPTRNG_EXAM Page: 15 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam C and D are Wrong - BU heaters will de-energize and spray valves will open but the plant will not stabilize either higher or lower than setpoint.

OPTRNG_EXAM Page: 16 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 9

This Exam Level RO Apears on: 2009 SRO EXAM Tier 1 Group 1 K/A # 41029ek1.03 Importance 3.60 Rating:

Given the following conditions:

Unit 1 is at 30% power while shutting down in preparations for a refueling outage.

Reactor Coolant pump 1A has tripped.

The reactor did not automatically trip.

All attempts to trip the reactor from the Control Room have failed.

Assuming no other operator actions, initiating an 80 gpm boration would add ...

A. positive reactivity to the core and cause RCS temperature to increase.

B. positive reactivity to the core and cause RCS temperature to decrease.

C. negative reactivity to the core and cause RCS temperature to increase.

D. negative reactivity to the core and cause RCS temperature to decrease.

Answer: D Associated KA:

56296 Given the FRP is being performed and given specific plant conditions determine if the selected Reactivity Control success path safety function status checks are being met L10403 Given plant conditions following a reactor trip analyze whether the Reactivity Control Safety Function is met and what contingency actions are required if it is not Reference Id: Q22491 Difficulty: 3.00 Time to complete: 3 10CFR Category: CFR 55.41 (1) 55.41 (1) Fundamentals of reactor theory, including fission process, neutron multiplication, source effects, control rod effects, criticality indications, reactivity coefficients, and poison effects.

Cognitive Level: Comprehension / Anal Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

SPTA tech guideline, 40DP-9AP06 K&A: Knowledge of the operational implications of the following concepts as they apply to the ATWS: Effects of boron on reactivity Justification: The examinee may confuse the purpose of boron and dilution as to which will add negative reactivity. Another consideration is that there is a time in core life (BOL, high boron concentration and low power) when a positive MTC could exist where the effects of temperature change don't follow the normal core dynamics.

A is Wrong -

OPTRNG_EXAM Page: 17 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam B is Wrong -

C is Wrong -

D is Correct -

OPTRNG_EXAM Page: 18 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 10 This Exam Level RO Apears on: 2009 SRO EXAM Tier 1 Group 1 K/A # 42040ak1.01 Importance 4.10 Rating:

During an Excessive Steam Demand event, why should safety injection be throttled as soon as the throttle criteria is met?

Align answers A. Prevents excessive cooldown.

B. Minimizes erosion damage to the injection valves.

C. Minimizes the possibility of pressurized thermal shock.

D. Minimizes the time SI pumps are running on mini-flow.

Answer: C Associated KA:

100866 Active Question Bank 2004 61779 Incease in Heat Removal TAA 30074 As an operating crew Respond to Steam Line ESD event(s)

L11206 Given an ESD in progress describe the potential impact of an uncontrolled temperature rebound L61356 Describe the potential impact of an uncontrolled temperature rebound during an ESD.

L61329 Given conditions of an ESD and appropriate reference material describe the mitigation strategy used during excessive steam demand accidents L89130 Given an ESD in progress describe the potential impact of an uncontrolled temperature rebound L62495 Given a ESD Event, Tailboard the guidance included in the ESD Emergency Procedure Technical Guideline.

Reference Id: Q3055 Difficulty: 3.00 Time to complete: 3 10CFR Category: CFR 55.41 (10) 55.41 (10) Administrative, normal, abnormal, and emergency operating procedures for the facility.

Cognitive Level: Memory Question Source: PV Bank Not Modified Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

ESD tech guideline, 40DP-9AP10 / LOIT lesson plan K&A: Knowledge of the operational implications of the following concepts as they apply to Steam Line Rupture: Consequences of PTS Justification:

A is Wrong - Throttling HPSI may help limit the cooldown but is not the event of concern OPTRNG_EXAM Page: 19 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam B is Wrong - Erosion may occur to the downstream piping C is Correct - As stated in the Tech Guideline limiting RCS repressuization will lessen PTS concerns D is Wrong - may be true but not the event of concern OPTRNG_EXAM Page: 20 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 11 This Exam Level RO Apears on: 2009 SRO EXAM Tier 1 Group 1 K/A # 42054ak3.01 Importance 4.10 Rating:

The Steam Generator "low level" trip setpoint is approximately WR and is designed to ...

A. 25.8%, prevent exceeding the design pressure of the RCS.

B. 44.2%, prevent exceeding the design pressure of the RCS.

C. 25.8%, protect against core damage due to the occurrence of locally saturated conditions in the limiting (hot) channel.

D. 44.2%, protect against core damage due to the occurrence of locally saturated conditions in the limiting (hot) channel.

Answer: B Associated KA:

L77058 Describe the PPS instrumentation associated with Wide range Steam generator Level including its function, bases, and setpoint (as described in the Technical Specifications).

Reference Id: Q22492 Difficulty: 4.00 Time to complete: 3 10CFR Category: CFR 55.41 (5) 55.41 (5) Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.

Cognitive Level: Memory Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

Tech Specs and Bases (3.3.1 & 3.3.5)

K&A: Knowledge of the reasons for the following responses as they apply to the Loss of Main Feedwater (MFW): Reactor and/or turbine trip, manual and automatic Justification: DNBR low can be caused by a loss primary coolant vs the loss of secondary cooling in a loss of MFW.

A is Wrong - AFAS setpoint B is Correct - Low SG trip setpoint is to prevent exceeding RCS design pressure C is Wrong - AFAS setpoint D is Wrong - DNB is caused by a loss of RCS water OPTRNG_EXAM Page: 21 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 12 This Exam Level RO Apears on: 2009 SRO EXAM Tier 1 Group 1 K/A # 41055ek3.01 Importance 2.70 Rating:

Given the following conditions:

Unit 1 has tripped from 100% power due to a Loss of Offsite power.

The "B" DG is out of service for scheduled maintenance.

The "A" DG failed to come up to speed.

Under these conditions the class (PK) batteries are designed to maintain rated voltage for ...

A. 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to provide continuous DC during a Design Basis Event.

B. 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to provide continuous DC during a Design Basis Event.

C. 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to provide sufficient power for the protection and control of transformers and switchgear.

D. 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to provide sufficient power for the protection and control of transformers and switchgear.

Answer: A Associated KA:

L74194 Discuss the purpose and conditions under which the 125 VDC Class IE Power System is designed to function.

Reference Id: Q22493 Difficulty: 2.00 Time to complete: 2 10CFR Category: CFR 55.41 (5) 55.41 (5) Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.

Cognitive Level: Memory Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

FSAR, LOIT lesson plans K&A: Knowledge of the reasons for the following responses as the apply to the Station Blackout: Length of time for which battery capacity is designed Justification:

A is Correct - 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and concurrent DBE-LOCA concurrent with BO as found in FSAR B is Wrong - 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> is the rating for the non-lass NK batteries OPTRNG_EXAM Page: 22 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam C is Wrong - power for the protection and control of transformers is for the non-class NK batteries, examinee may choose this believing that the ESF transformers use class power D is Wrong - 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> is the rating for the non-lass NK batteries OPTRNG_EXAM Page: 23 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 13 This Exam Level RO Apears on: 2009 SRO EXAM Tier 1 Group 1 K/A # 42056aa2.57 Importance 3.90 Rating:

Given the following conditions:

Unit 1 has tripped from 100% power due to a Loss of Offsite power.

The following report is made for B01 electric plant status:

13.8 and 4.16 kVAC non class buses are de-energized.

4.16 kVAC class busses are energized by their respective DGs Class and non-class DC buses are energized.

120 vac non class instrument buses were de-energized but have transferred to their class backup sources 120 vac class instrument buses are energized.

Assuming no Operator action, which one of following Reactor Coolant system temperature responses should the crew expect to see in the 10 minutes following the LOOP.

A. T-cold is stable at 564°F with T-hot approximately 3°F hotter.

B. T-cold is stable at 564°F with T-hot approximately 30°F hotter.

C. T-cold increases to 572°F with T-hot approximately 3°F hotter.

D. T-cold increases to 572°F with T-hot approximately 30°F hotter.

Answer: D Associated KA:

L67245 Describe the Control Room indications associated with monitoring the RCS.

Reference Id: Q22494 Difficulty: 4.00 Time to complete: 5 10CFR Category: CFR 55.41 (5) 55.41 (5) Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.

Cognitive Level: Comprehension / Anal Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LOOP, 40EP-9EO07 / Switchyard drawings / simplified drawings /

LOIT lesson plan K&A: Ability to determine and interpret the following as they apply to the Loss of Offsite Power: RCS hot-leg and cold-leg temperatures OPTRNG_EXAM Page: 24 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam Justification: On the loss of power the SBCS comes back in manual with 0% output.

With no operation action, Tcold will be controlled by the safeties at 1250 (572 degrees) as T hot increases in Natural Circulation conditions. If SBCS was working it maintains 1170 (564 degrees). 30 degree delta T is a reasonable number for nat'l circ conditions.

A is Wrong -

B is Wrong -

C is Wrong -

D is Correct -

OPTRNG_EXAM Page: 25 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 14 This Exam Level RO Apears on: 2009 SRO EXAM Tier 1 Group 1 K/A # 2.4.14 Importance 3.80 Rating:

Given the following conditions:

Unit 1 has tripped from 100% full power.

A total loss of offsite power has occurred.

Emergency diesel generator "A" tripped.

AFB-P01 is providing feedwater flow.

ADVs are in use for reactor coolant system heat removal.

There are no abnormal radiation trends or alarms.

PNA-D25, channel "A" 120 VAC, is deenergized.

All other systems are operating as designed.

WHICH ONE of the following correctly identifies the optimal recovery strategy for plant stabilization?

A. Enter the Functional Recovery Procedure due to the MVAC safety function being jeopardized.

B. Enter the Functional Recovery Procedure because no other EOP will mitigate the events in progress.

C. Complete the Loss of Forced Circulation (LOOP), only then may the Loss of Class Instrument Power procedure be addressed.

D. The CRS may elect to perform the Loss of Forced Circulation (LOOP) and Loss of Class Instrument Power procedures concurrently.

Answer: D Associated KA:

56294 Given the FRP is being performed and given specific plant conditions determine if the selected MVAC success path safety function status checks are being met Reference Id: Q22567 Difficulty: 3.00 Time to complete: 3 10CFR Category: CFR 55.41 (10) 55.41 (10) Administrative, normal, abnormal, and emergency operating procedures for the facility.

Cognitive Level: Memory Question Source: Modified PV Bank Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

40EP-9EO09, FRP / 40DP-9AP16, EOP Users Guide /

LOOP/LOFC K&A: Knowledge of general guidelines for EOP usage. Loss of Vital AC Instrument bus Justification:

OPTRNG_EXAM Page: 26 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam A is Wrong - MVAC is met for the LOFC/LOOP procedure B is Wrong - LOOP will mitigate the event C is Wrong - This action is allowed per the users guide.

D is Correct - EOP users guide the concurrent use of EOPs and AOPs Modified from Q8842 OPTRNG_EXAM Page: 27 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 15 This Exam Level RO Apears on: 2009 SRO EXAM Tier 1 Group 1 K/A # 42058ak3.01 Importance 3.40 Rating:

Given the following conditions:

Unit 1 is operating at 100% full power.

NBN-X04, ESF Transformer, trips on sudden pressure.

Emergency diesel generator "B" starts and loads.

What effect (if any) would a loss of the Class 1E 125 VDC bus, PKB-M42, have on the "B" DG?

The "B" DG ...

A. trips and it's output breaker opens.

B. trips and it's output breaker remains closed.

C. continues to run and it's output breaker opens.

D. continues to run and it's output breaker remains closed.

Answer: B Associated KA:

100866 Active Question Bank 2004 L11081 Given a loss of PKA or PKB with a DG that is connected to off-site power describe how a loss of its associated 125 Vdc control power impacts the DG operation, including operator action required to mitigate this impact L58139 Given a loss of PKA or PKB with a DG that is connected to off-site power describe how a loss of its associated 125 Vdc control power impacts the DG operation, including operator action required to mitigate this impact Reference Id: Q6854 Difficulty: 3.00 Time to complete: 3 10CFR Category: CFR 55.41 (10) 55.41 (10) Administrative, normal, abnormal, and emergency operating procedures for the facility.

Cognitive Level: Memory Question Source: PV Bank Not Modified Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LOIT lesson plan / 40AO-9ZZ13, Loss of Class Inst. or Control Power K&A: Knowledge of the reasons for the following responses as they apply to the Loss of DC Power: Use of dc control power by D/Gs Justification: If running the DG trips but its output breaker remains closed. Any combination of these conditions could be plausible.

OPTRNG_EXAM Page: 28 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam A is Wrong -

B is Correct -

C is Wrong -

D is Wrong -

OPTRNG_EXAM Page: 29 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 16 This Exam Level RO Apears on: 2009 SRO EXAM Tier 1 Group 1 K/A # 42065aa2.03 Importance 2.60 Rating:

Given the following conditions:

Unit 1 is operating at 100% power.

RCS pressure is being maintained at 2230 psia.

The pressurizer is in Boron Equalization.

Subsequently RCS pressure is slowly increasing.

Letdown flow goes to 0 gpm.

Main Spray valves RCN-PV-100E/F indicate closed.

CHB-UV-515, Letdown to Regen HX isolation valve, indicates closed.

CHA-UV-516, Letdown to Regen HX isolation valve, indicates closed.

Which one of the following is correct for these indications?

A. CIAS has actuated. Verify containment parameters.

B. Nuclear Cooling Water flow has been lost. Cross-tie Essential Cooling Water.

C. Instrument air leak in Containment. Close IAA-UV-2, Instrument Air Outside Containment Isolation.

D. NNN-D11 (Non-class instrument power) has de-energized. Align the instrument bus to it's alternate supply.

Answer: C Associated KA:

L56779 Determine what actions will be taken if IAA-UV-2, Outside Containment Isolation Valve has failed closed.

Reference Id: Q22572 Difficulty: 4.00 Time to complete: 3 10CFR Category: CFR 55.41 (5) 55.41 (5) Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.

Cognitive Level: Comprehension / Anal Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

40AO-9ZZ16, Loss of Instrument Air OPTRNG_EXAM Page: 30 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam K&A: Ability to determine and interpret the following as they apply to the Loss of Instrument Air: Location and isolation of leaks Justification:

A is Wrong - CIAS closes CHA-UV-516 not both B is Wrong - A loss of NCW causes CH-HV-523 to close but would not account for the remaining events C is Correct - A loss of IA closes the spray valve and containment Isolation valves D is Wrong - A loss of D-11 has many effects on CVCS, PPCS and PLCS but with pressure increasing with spray valves closed the examinee should realize a loss of D-11 would not cause this combination of conditions.

OPTRNG_EXAM Page: 31 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 17 This Exam Level RO Apears on: 2009 SRO EXAM Tier 1 Group 1 K/A # 42077ak2.07 Importance 3.60 Rating:

Given the following conditions:

Unit 1 is operating at 100% power.

A grid disturbance has occured which has caused grid voltage to drop.

Grid frequency is stable at 60 Hz.

The Main Generator is responding per design and attempting to raise voltage.

Which one of the following automatic actions is designed to protect the Main Generator under these degraded grid conditions?

A. The Power System Stabilizer (PSS) will activate.

B. The Maximum Excitation Limit (MEL) circuit will activate.

C. The Main Generator will shift to the DC mode of regulation.

D. The Underexcited Reactive Ampere Limit (URAL) will activate.

Answer: B Associated KA:

L75019 Explain the operation of the Maximum Excitation Limit (MEL) circuit under normal operating conditions.

Reference Id: Q22496 Difficulty: 4.00 Time to complete: 4 10CFR Category: CFR 55.41 (4) 55.41 (4) Secondary coolant and auxiliary systems that affect the facility.

Cognitive Level: Memory Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LOIT lesson plan / 40OP-9MB01, Main Generator and Excitation K&A: Knowledge of the interrelations between Generator Voltage and Electric Grid Disturbances and the following: Turbine / generator control Justification: each of the distracters is an automatic function of the Main Generator regulation system thus the examinee may consider any one of these as a plausible answer A is Wrong - The PSS only activates to control voltage during frequency disturbances B is Correct - The MEL is designed to protect against low grid voltage events to prevent over excitation of the main generator when trying to increase output to raise system voltage C is Wrong - Only shifts to the DC mode on a loss of AC regulator input OPTRNG_EXAM Page: 32 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam D is Wrong - URAL acts to maintain generator excitation at an acceptable level if dropping to low OPTRNG_EXAM Page: 33 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 18 This Exam Level RO Apears on: 2009 SRO EXAM Tier 1 Group 1 K/A # 44E02ek2.1 Importance 3.30 Rating:

Unit 1 tripped from 100% power due to a trip of Reactor Coolant Pump 1B and has the following conditions:

DFWCS is in a normal line up (no transmitters in maintenance)

The Reactor Regulating System (RRS) T-avg has failed high.

SG 1 level is recovering and currently 54% NR .

SG 2 level is recovering and currently 45% NR.

Which one of the following describes the status of the Digital Feedwater Control System (DFWCS)?

A. SG 1 and SG 2 are each feeding in single element control.

B. SG 1 and SG 2 are each feeding at the maximum rate as allowed by Reactor Trip Override (RTO).

C. SG 1 is feeding in single element control, SG 2 is feeding at the minimum rate as allowed by Reactor Trip Override (RTO).

D. SG 1 is feeding in single element control, SG 2 is feeding at the maximum rate as allowed by Reactor Trip Override (RTO).

Answer: D Associated KA:

30008 Given the new DFWCS simplified print describe the processing of inputs of the DFWCS and what happens on input failures L82264 Describe the response of the DFWCS to a Reactor trip condition.

L60974 Given classroom instruction and reference material demonstrate the mastery of knowledge necessary to operate the feedwater control system.

L60974 Given classroom instruction and reference material demonstrate the mastery of knowledge necessary to operate the feedwater control system.

100866 Active Question Bank 2004 Reference Id: Q8221 Difficulty: 4.00 Time to complete: 5 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Comprehension / Anal Question Source: Modified PV Bank Comment:

Proposed reference to be provided to applicant during examination: NONE OPTRNG_EXAM Page: 34 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam Technical

Reference:

Simplified Drawings / LOIT lesson plan / 40AO-9ZZ16, RRS malfunctions K&A: Knowledge of the interrelations between the (Reactor Trip Recovery) and the following: Components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Justification: Examinee may thing that either A or B could be correct in the belief that one SG in a condition requires both to be the same, as is true for swapover. The examinee may also confuse feedrate for a failed T-ave instrument.

A is Wrong - SG 2 level is low for single element control, 51.9% NR is when they come out of RTO B is Wrong - SG 1 is feeding at max rate in RTO but SG 2 is out of RTO, level > 51.6 %

NR C is Wrong - SG 2 feeding at the max rate with T-ave high D is Correct - SG 1 is out of RTO with level > 51.6 NR and SG 2 is feeding at max in RTO with Tave failed high OPTRNG_EXAM Page: 35 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 19 This Exam Level RO Apears on: 2009 SRO EXAM Tier 1 Group 2 K/A # 42001ak3.02 Importance 3.20 Rating:

Given the following conditions:

Don't need any of Unit 3 is operating at rated power. this to answer Regulating group 5 CEAs are inserted to 115 inches for ASI control.

CEA 17 (group 5) begins withdrawing with no Operator action. TS bases is SRO The crew has placed CEDMCS in standby. knowledge.

CEA motion has stopped.

Reword.

What is the maximum acceptable CEA deviation and bases per LCO 3.1.5, CEA Alignment?

A. Any uncontrolled outward deviation requires an immediate reactor trip due to the potential loss of Shutdown Margin.

B. 5.25 inches to ensure acceptable core power distributions are maintained.

C. 6.6 inches to ensure acceptable core power distributions are maintained.

D. 9.9 inches to ensure Shutdown Margin is maintained.

Answer: C Associated KA:

L78796 Describe LCO 3.1.5, Control Element Assembly (CEA) Alignment, including its bases.

Reference Id: Q22604 Difficulty: 4.00 Time to complete: 3 10CFR Category: CFR 55.41 (10) 55.41 (10) Administrative, normal, abnormal, and emergency operating procedures for the facility.

Cognitive Level: Memory Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LCO 3.1.5 and Bases / 40AO-9ZZ11, CEA Malfunctions K&A: Knowledge of the reasons for the following responses as they apply to the Continuous Rod Withdrawal : Tech-Spec limits on rod operability Justification:

A is Wrong - some outward deviation is allowed per the LCO and the CEA malfunction AOP, it will be treated as a slipped CEA B is Wrong - 5.25 is the alarm setpoint for major group deviation C is Correct - per LCO 3.1.5 and bases OPTRNG_EXAM Page: 36 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam D is Wrong - 9.9 is the limit for tripping the reactor if 2 CEAs are deviating. In addition the loss of SDM is not greatly affected by mis-aligned but tripable CEAs.

OPTRNG_EXAM Page: 37 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 20 This Exam Level RO Apears on: 2009 SRO EXAM Tier 1 Group 2 K/A # 42024aa2.05 Importance 3.30 Rating:

Given the following conditions:

Unit 1 is in Mode 3 following a refueling outage.

72ST-9RX14, Shutdown Margin - Modes 3, 4 and 5 is in progress.

It has been determined that Shutdown Margin is not being met.

In order to meet the minimum required actions, the crew must borate the RCS at ...

A. 26 gpm with a solution containing 3000 ppm Boron.

B. 26 gpm with a solution containing 4000 ppm Boron.

C. 44 gpm with a solution containing 2300 ppm Boron.

D. 44 gpm with a solution containing 4400 ppm Boron.

Answer: B Associated KA:

L11752 Given that plant conditions warrant describe how SDM is ensured procedurally Reference Id: Q22571 Difficulty: 3.00 Time to complete: 3 10CFR Category: CFR 55.41 (10) 55.41 (10) Administrative, normal, abnormal, and emergency operating procedures for the facility.

Cognitive Level: Memory Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

72ST-9RX14, Shutdown Margin Modes 3, 4 and 5 / 40AO-9ZZ01, Emergency Boration / TS bases K&A: Ability to determine and interpret the following as they apply to the Emergency Boration: Amount of boron to add to achieve required SDM Justification: Per Tech Specs and as found in 9RX14 the minimum requirement is 26 gpm of greater than a 4000 ppm solution. The upper RWT limit is 4400 ppm and the required flow rate for SA 103 which is used to post trip to establish SDM is 44 gpm A is Wrong - 3000 is the refueling pool lower limit B is Correct -

C is Wrong - 2300 is the lower SIT limit, 44 gpm is per SA-103 D is Wrong - 4400 is the upper RWT limit, 44 gpm is per SA-103 OPTRNG_EXAM Page: 38 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 21 This Exam Level RO Apears on: 2009 SRO EXAM Tier 1 Group 2 K/A # 2.1.28 Importance 4.10 Rating:

Given the following conditions:

Unit 1 is maintaining 52% power following a Main Turbine trip.

Pressurizer level control is in LOCAL-AUTO with a setpoint of 50%.

Heater Control Selector Level Trip Channel X/Y (RCN-HS-100-3) is positioned to BOTH Level Control Channel X/Y selector (RCN-HS-110) is positioned to CH-Y Which one of the following correctly identifies the results of RCN-LT-110X failing low?

A. Standby Charging pump starts.

B. All Pressurizer heaters de-energize.

C. Pressurizer Backup heaters energize.

D. Letdown flow goes to minimum, 35 gpm.

Answer: B Associated KA:

L18799 Describe the function of the Function Generator input to the Pressurizer Level Control System.

L75122 Describe the response of the Pressurizer Level Control System to a failure of a Pressurizer Level Transmitter.

Reference Id: Q22499 Difficulty: 3.00 Time to complete: 3 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Comprehension / Anal Question Source: Modified PV Bank Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

40AO-9ZZ16, RRS Malfunctions / LOIT Lesson plan / Simplified Drawings K&A: Knowledge of the purpose and function of major system components and l controls. Pressurizer Level Malfunctions Justification:

A is Wrong - Standby pump would start if the selected channel failed low B is Correct - even though the "Level Trip Selector" is on both either channel failing low will interlock all heaters OFF OPTRNG_EXAM Page: 39 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam C is Wrong - heaters energize on a 3% PZR level deviation high of the selected channel D is Wrong - Letdown flow goes to minimum if selected channel fails low OPTRNG_EXAM Page: 40 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 22 This Exam Level RO Apears on: 2009 SRO EXAM EOP step 9 has the Tier 1 Group 2 operators K/A # 42037aa2.16 commence a cool Importance 4.10 Rating:

down to <540 Th.

Given the following conditions: So a cooldown should be in A SGTR has occurred on SG 2. progress before RCS pressure is 1500 psia.

Thot is 551°F.

depressing.

Tcold is 549°F.

REP CET is 554°F.

RCPs 1B and 2B are in service.

SBCS is controlling SG pressure at 1050 psia.

The CRS directs depressurizing the RCS while maintaining pressurizer pressure within ALL of the following criteria per the Steam Generator Tube Rupture procedure.

Less than 1135 psia Approximately equal to the pressure of the ruptured SG (+/- 50 psia)

Within the PT limits Based on current conditions (assume temperatures remain constant), which one of the following is the minimum acceptable pressure which will meet the SGTR guidance?

A. 1050 psia B. 1100 psia C. 1200 psia D. 1325 psia Answer: D Associated KA:

100866 Active Question Bank 2004 LOCT 2004-04 A large tube rupture, with full HPSI available, but on natural circulation L11226 Given the SGTR EOP is being used and given plant conditions determine an appropriate pressure target for depressurization and state the basis for this value L61098 Given conditions of a SGTR and appropriate reference material describe the mitigation strategy used during steam generator tube ruptures L61309 Determine an appropriate pressure target for depressurization durign a SGTR and state the basis for this value.

L61301 Describe the SGTR EOP mitigation strategy.

L61309 Determine an appropriate RCS target pressure for depressurization during a SGTR and state the OPTRNG_EXAM Page: 41 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam basis for this value.

L62497 Given an SGTR Event, Tailboard the guidance included in the SGTR ORP.

Reference Id: Q9224 Difficulty: 3.00 Time to complete: 4 10CFR Category: CFR 55.41 (10) 55.41 (10) Administrative, normal, abnormal, and emergency operating procedures for the facility.

Cognitive Level: Comprehension / Anal Question Source: PV Bank Not Modified Comment:

Proposed reference to be provided to applicant during examination: Standard Appendix 2 / PT curves / Steam Tables Technical

Reference:

SGTR, 40EP-9EO04 K&A: Ability to determine and interpret the following as they apply to the Steam Generator Tube Leak: Pressure at which to maintain RCS during S/G cooldown Justification: Any pressure below 1300 psia is to low for continued RCP operation A is Wrong - with no RCPs running it would meet the PT curve for normal Cntmt conditions and +/- 50 psia of SG criteria B is Wrong - as stated in the SGTR procedure < 1135 and +/- 50 psia C is Wrong - meets the PT curve for harsh Cntmt conditions but still low for RCPs in operation D is Correct - min pressure for continued RCP operation OPTRNG_EXAM Page: 42 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 23 This Exam Level RO Apears on: 2009 SRO EXAM Tier 1 Group 2 K/A # 42068ak2.01 Importance 3.90 Rating:

Which of the following describes the nuclear instruments that are available at the Remote Shutdown Panel to monitor the Reactivity Safety Function?

A. Two Linear Channels.

B. Both Startup Channels.

C. Two Log Safety Channels.

D. Two "Rate of Change" Channels.

Answer: C Associated KA:

L11130 State the indications available to the operator at the Remote Shutdown Panel (RSP).

Reference Id: Q0662 Difficulty: 2.00 Time to complete: 3 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Memory Question Source: PV Bank Not Modified Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

Simplified Drawings / LOIT lesson plan K&A: Knowledge of the interrelations between the Control Room Evacuation and the following: Auxiliary shutdown panel layout Justification: only the A & B Log Channels are available at the RSD Panel A is Wrong -

B is Wrong -

C is Correct -

D is Wrong -

OPTRNG_EXAM Page: 43 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 24 This Exam Level RO Apears on: 2009 SRO EXAM Tier 1 Group 2 K/A # 42069aa1.03 Importance 2.80 Rating:

Given the following plant conditions:

Unit 1 is at 100% power.

Charging pump "A", CHA-P01 is out of service.

Pressurizer level is 52% and stable.

ERFDADS indicates a 20 gpm RCS leakrate.

The CRS enters the Excessive RCS Leakrate AOP, 40AO-9ZZ02.

Readings on RU-6, Nuclear Cooling Water, is trending up.

Letdown flow is slowly lowering.

Letdown Heat Exchanger Outlet Temperature Controller, CHN-TIC-223, output has stabilized at a new lower value RCP 1A NCW temperature, NCN-TI-471 is slowly increasing.

The Area Operator informs the Control Room that Nuclear Cooling Water Surge Tank Level is slowly rising.

Which one of the following actions should be taken to mitigate these conditions?

A. Cross connect Essential Cooling Water to Nuclear Cooling water.

B. Trip the reactor and initiate a Containment Isolation Actuation Signal (CIAS).

C. Trip the reactor, stop the 1A RCP, secure seal bleedoff and isolate the high pressure seal coolers for the 1A RCP.

D. Close CHB-UV-515 (Letdown to Regen HX Isolation Valve) and take actions per appendix C (Extended Operations without Letdown) of 40AO-9ZZ05.

Answer: C Associated KA:

L10169 Given indications of RCS or a Steam Generator Tube Leak, describe the basic procedure methodology, including Reactor Trip is thresholds, Reference Id: Q22592 Difficulty: 3.00 Time to complete: 3 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Comprehension / Anal Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

40AO-9zz02, Excessive RCS leakrate / 40AL-9RK4A RCP alarm response OPTRNG_EXAM Page: 44 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam K&A: Ability to operate and / or monitor the following as they apply to the Loss of Containment Integrity: Fluid systems penetrating containment Justification:

A is Wrong - This could be appropriate for some NCW leaks but not for High Pressure Seal Coolers.

B is Wrong - Tripping the reactor is correct for a loss of containment integrity but CIAS will not isolate the leak in this case.

C is Correct - per 40AO-9ZZ02 D is Wrong - This would be correct for an NC leak into the Letdown Heat Exchanger OPTRNG_EXAM Page: 45 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 25 This Exam Level RO Apears on: 2009 SRO EXAM Tier 1 Group 2 K/A # 42076ak2.01 Importance 2.60 Rating:

A high alarm on RU-155D, RCS Letdown monitor, is indicative of ...

A. RCS fuel cladding failure.

B. high activity levels in the Purification IX area.

C. RCS leakage into the Nuclear Cooling Water system.

D. high activity levels in the Letdown heat exchanger area.

Answer: A Associated KA:

L67628 Explain the operation of the Letdown Process Radiation Monitor (SQN-RE-155D) under normal operating conditions.

Reference Id: Q22501 Difficulty: 3.00 Time to complete: 2 10CFR Category: CFR 55.41 (11) 55.41 (11) Purpose and operation of radiation monitoring systems, including alarms and survey equipment.

Cognitive Level: Memory Question Source: PV Bank Not Modified Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

Radiation Monitoring System Alarm Response, 74RM-9EF41 / LOIT lesson plan K&A: Knowledge of the interrelations between the High Reactor Coolant Activity and the following: Process radiation monitors Justification: Letdown monitor is a process rad monitor A is Correct - design of the Letdown process rad monitor B is Wrong - This function would be performed by Aux Building area monitors RU-8, 9 or 10 C is Wrong - This function would be performed by RU-6, NCW D is Wrong - This function would be performed by Aux Building area monitors RU-8, 9 or 10 OPTRNG_EXAM Page: 46 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 26 This Exam Level RO Apears on: 2009 SRO EXAM Tier 1 Group 2 K/A # 44A16aa1.3 Importance 3.00 Rating:

Given the following conditions:

Unit 1 is operating at 100% power.

A 22 gpm leakrate has been verified.

Pressurizer level is 52% and stable.

Charging pumps A and B are running.

Letdown flow is 50 gpm.

The leak is at the discharge of the Charging pumps.

In accordance with 40AO-9ZZ02, Excessive RCS Leakrate, the CRS has directed that all charging pumps be stopped.

Which one of the following actions or requirements must be performed?

A. An immediate Reactor trip is required.

B. Ensure letdown is isolated in order to prevent purification IX resin damage.

C. Seal Injection must be restored within 10 minutes or the Reactor Coolant pumps must be secured.

D. Comply with the actions of LCO 3.4.14, RCS Operational Leakage due to "identified leakage" being in excess of 10 gpm.

Answer: B Associated KA:

L10173 Describe the impact that the Charging Pump alternate discharge has on plant operations.

Reference Id: Q22502 Difficulty: 3.00 Time to complete: 3 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Comprehension / Anal Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

Excessive RCS Leakrate AOP / 40ST-9RC02, RCS Water Inventory

/ TRM / Tech Specs K&A: Ability to operate and / or monitor the following as they apply to the (Excess RCS Leakage) Desired operating results during abnormal and emergency situations.

Justification:

OPTRNG_EXAM Page: 47 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam A is Wrong - TRIP is required for a more severe leak. Pzr level dropping with all available charging pumps running and LD isolated. Which is where Examinee may believe they are headed B is Correct - CH-515 will auto close at approx. 450 °F if the crew doesn't perform actions first C is Wrong - This the action for a loss NCW to the RCPs D is Wrong - This is a connecting system and not part of RCS leakage.

OPTRNG_EXAM Page: 48 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 27 This Exam Level RO Apears on: 2009 SRO EXAM Tier 1 Group 2 K/A # 45E09ek1.1 Importance 3.40 Rating:

Given the following conditions:

Unit 1 is in Mode 3 following an automatic Reactor trip.

A manual SIAS/CIAS has been initiated.

Pressurizer level is 35% and slowly lowering.

Pressurizer pressure is 1900 psia and slowly lowering.

Safety Injection flow is 0 gpm.

HPSI pump "A" breaker tripped due to a ground fault and 86 lockout.

DG "B" is running unloaded.

PBB-S04 normal supply breaker, PBB-S04K, has a brighter than normal green light illuminated.

Containment pressure is 1.5 psig and slowly increasing In the current condition Safety Injection flow can be ...

A. established by energizing PBB-S04 with the "A" DG.

B. established by manually closing the "B" DG output breaker PBB-S04B.

C. verified adequate when RCS pressure lowers to approximately 1600 psia.

D. established by performing an RCS cooldown and de-pressurization to below LPSI pump shut-off head.

Answer: D Associated KA:

56280 Given the FRP is being performed and RC-3 (HPSI Boration) is in progress describe the conditions that would require RCS depressurization Reference Id: Q22503 Difficulty: 4.00 Time to complete: 3 10CFR Category: CFR 55.41 (8) 55.41 (8) Components, capacity, and functions of emergency systems.

Cognitive Level: Comprehension / Anal Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

FRP, 40EP-9EO09 / Electrical print, 01-PEB-001 K&A: Knowledge of the operational implications of the following concepts as they apply to the (Functional Recovery) Components, capacity, and function of emergency systems.

Justification:

A is Wrong - A DG breaker will not close on bus with an 86 on the normal supply breaker OPTRNG_EXAM Page: 49 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam B is Wrong - B DG output breaker will not close on the PBB-S04 bus with a faulted normal supply breaker C is Wrong - There is no HPSI pump available under these conditions. HPSI A has an 86 and PBB-S04 will not energize. At 1600 psia when HPSI would normally inject flow will be 0 gpm.

D is Correct - per the FRP Depressurize the RCS by RCS Heat Removal (IC-2, step 3b)

OPTRNG_EXAM Page: 50 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 28 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 1 K/A # 34003k5.02 Importance 2.80 Rating:

Given the following conditions:

Unit 1 has been manually tripped in preparations for a refueling outage.

The plant is currently being maintained in Mode 3, normal operating pressure and temperatures.

A Loss of Offsite Power occurs.

Which one of the following correctly represents RCS parameters while the Reactor Coolant pumps are in COASTDOWN?

A. Steam Generator DPs lower and Core DP lowers.

B. Steam Generator DPs lower and Core DP is unchanged.

DPs C. Steam Generator DP are unchanged and Core DP lowers.

D. Steam Generator DPs are unchanged and Core DP is unchanged.

Answer: A Associated KA:

67761 State the RCS conditions used to verify subcooled natural circulation is occurring in the RCS.

Reference Id: Q22504 Difficulty: 2.00 Time to complete: 2 10CFR Category: CFR 55.41 (5) 55.41 (5) Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.

Cognitive Level: Comprehension / Anal Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LOIT lesson plan K&A: Knowledge of the operational implications of the following concepts as they apply to the RCPS: Effects of RCP coastdown on RCS parameters Justification: SG and Core DPs are driven by RCP flow. T-cold will remain constant since it is controlled by the SBCS. Examinee may choose any of the distracters if they do not understand the relationships between SG/core DP and RCP flow. Tcold increase from 555 to 564 degrees on Rx trip.

A is Correct -

B is Wrong -

OPTRNG_EXAM Page: 51 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam C is Wrong -

D is Wrong -

OPTRNG_EXAM Page: 52 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 29 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 1 K/A # 32004k3.08 Importance 3.60 Rating:

Given the following plant conditions:

Unit 1 is at 100% power in a normal lineup.

All RCP seal injection controllers (CHN-FIC-241-244) are in automatic.

2 charging pumps are in operation.

Which one of the following would cause the output signal of CHN-FIC-244, 2B RCP controller, to lower?

A. A charging pump trips.

B. An inadvertent CIAS has occurred.

C. A different RCP's seal injection control valve has failed closed.

D. A loss of instrument air to the CHN-FIC-244, 2B RCP controller.

Answer: A Associated KA:

L68108 Explain the operation of the RCP Seal Injection Flow Control Valves (CHE-FV-241,242,243, and 244), including their Control Room controls, under normal operating conditions.

Reference Id: Q22605 Difficulty: 4.00 Time to complete: 3 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Comprehension / Anal Question Source: Modified PV Bank Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LOIT lesson plan / print 01-E-CHB-0053 K&A: Knowledge of the effect that a loss or malfunction of the CVCS will have on the following: RCP seal injection Justification: These controllers are reverse acting so a lowering output means it is looking to raise seal injection flow to that RCP.

A is Correct - A loss of a charging pump will cause all RCP's seal Injection flow to lower and each controller including CHN-FIC-244 will lower output to increase flow back to setpoint.

B is Wrong - CIAS closes various Letdown valves but will have no effect on charging.

OPTRNG_EXAM Page: 53 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam C is Wrong - A different RCP's Seal Injection control valve failing closed will cause the remaining Injection flow to rise and the controller will increase output to lower flow.

D is Wrong - CHN-FIC-244 fails open on a loss of IA therefore the controller to raise output in an attempt to lower Seal Injection flow.

OPTRNG_EXAM Page: 54 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 30 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 1 K/A # 32004k6.22 Importance 2.60 Rating:

Given the following conditions:

Unit 1 is currently at 20% power.

All control systems are in their normal automatic alignment.

Pressurizer level control is selected to Channel "Y".

T-hot instrument, RCN-TT-111X fails high.

Which one of the following conditions will or could occur?

A. A continuous turbine runback demand to the Reactor Cutback System would be generated in case of a main feedpump trip.

B. A Quick Open signal is blocked in the Steam Bypass Control System to prevent an excessive cooldown if a reactor trip were to occur.

C. A high rate insertion demand will be generated by the Control Element Drive Mechanism Control System and will drive CEAs inward if CEDMCS is in Auto Sequential.

D. A high level error signal will be generated by the Pressurizer Level Control System, letdown control valves will maintain a minimum flow to avoid thermal shock of the RCS charging nozzle.

Answer: D Associated KA:

L75121 Describe the response of the Pressurizer Level Control System to a failure of a Temperature transmitter.

Reference Id: Q22506 Difficulty: 4.00 Time to complete: 4 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Comprehension / Anal Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LOIT lesson plan / PLCS drawing / 40AO-9ZZ16, RRS malfunctions K&A: Knowledge of the effect of a loss or malfunction on the following CVCS components:

Design minimum and maximum flow rates for letdown system.

Justification:

A is Wrong - High T-ave prevents Turbine Runback OPTRNG_EXAM Page: 55 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam B is Wrong - High T-ave prevents a Quick Open block C is Wrong - High insertion demand will be generated but the AMI (5°F T-ave deviation) will prevent CEA movement if in Auto Sequential D is Correct - High Tave generates a high level program setpoint. Level at 20% power is approximately 34% pzr level so letdown will go to minimum flow to raise level.

Letdown flow must be maintained high enough to pre-heat charging flow injecting to the 2A loop.

OPTRNG_EXAM Page: 56 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 31 This Exam Level RO Apears on: RO EXAM 20082009 SRO EXAM K/A # 3.4005K2.03 Importance Rating:

What are the power supplies to the Shutdown Cooling Isolation valves, SIA-HV-651 (a) and SIC-HV-653 (b) ?

A. (a) 480 VAC Class LC, PG (b) 480 VAC Class LC, PG B. (a) 480 VAC Class LC, PG (b) 125 VDC Class MCC, PK C. (a) 480 VAC Class MCC, PH (b) 480 VAC Class MCC, PH D. (a) 480 VAC Class MCC, PH (b) 125 VDC Class MCC, PK Answer: D Associated KA:

65136 Identify the power supplies to SI related equipment.

Reference Id: Q10504 Difficulty: 2.00 Time to complete: 2 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Memory Question Source: PV Bank Not Modified Comment:

Proposed reference to be provided to applicant during examination: None Technical

Reference:

Electrical prints, 01-E-SIB-013 & 014 K&A: Knowledge of bus power supplies to the following: RCS pressure boundary motor-operated valves Justification:

A is wrong -

B is wrong -

C is wrong -

D is CORRECT - SI-651 is supplied by a class MCC (PH) and SI-654 is supplied by class DC (PK) thru an inverter N43 OPTRNG_EXAM Page: 57 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 32 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 1 K/A # 32006k1.02 Importance 4.30 Rating:

Given the following plant conditions:

Containment pressure (NR) Channel A 3.2 psig.

Containment pressure (NR) Channel B 2.7 psig.

Containment pressure (NR) Channel C 3.1 psig.

Containment pressure (NR) Channel D 2.6 psig.

What is the effect on the Emergency Core Cooling System?

A. No CIAS/SIAS actuation, no Safety Injection pumps or valves have gone to their actuated condition.

B. Full CIAS/SIAS actuation, both trains of Safety Injection pumps and valves are in their actuated condition.

C. "A" train CIAS/SIAS actuation, only the "A" train Safety Injection pumps and valves have gone to their actuated condition.

D. "A" train 1-3 Half Leg CIAS/SIAS actuation, only the "A" train Safety Injection valves have gone to their actuated condition, no pumps are running.

Answer: B Associated KA:

L77167 Describe what automatically initiates the Containment Isolation Actuation System (CIAS) and its function.

Reference Id: Q22508 Difficulty: 3.00 Time to complete: 3 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Comprehension / Anal Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

Simplified drawings, ESFAS overview K&A: Knowledge of the physical connections and/or cause effect relationships between the ECCS and the following systems: ESFAS Justification: CIAS/SIAS setpoint is 3.0 psig, channels A and C have exceeded setpoint A is Wrong - If this had been actuation relays instead of matrix relays this would be a correct answer OPTRNG_EXAM Page: 58 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam B is Correct - Any 2 of 4 matrix relays will cause full actuation of CIAS/SIAS C is Wrong - Examinee may believe that an A and C signal will create only an "A" train actuation D is Wrong - This condition can occur on a loss of power to the initiation circuits OPTRNG_EXAM Page: 59 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 33 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 1 K/A # 35007a4.09 Importance 2.50 Rating:

Given the following conditions:

Unit 1 is operating at 100% power.

Reactor Coolant pump 1A has a degraded 3rd seal.

The crew has verified a 12 gpm leakrate per the Excessive RCS Leakrate procedure.

Referring to the table below which set of trends would you expect to observe over the next 15 minutes?

Volume Control Reactor Drain Pressurizer Containment Tank level Tank level level temperature (42%) (61%) (52.5%) (90°F) and humidity (4%)

A stable increasing lowering stable B lowering increasing stable stable C stable stable stable increasing D lowering stable lowering increasing A. A B. B C. C D. D Answer: B Associated KA:

L57131 Given a loss of letdown describe the PZR level response when the plant is aligned for extended operations without letdown L68040 Explain the operation of the Reactor Drain Tank (CHN-X02) under normal operating conditions.

Reference Id: Q22578 Difficulty: 4.00 Time to complete: 5 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Comprehension / Anal Question Source: New OPTRNG_EXAM Page: 60 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LOIT lesson plan / RCP emergencies 40AO-9ZZ04 K&A: Ability to manually operate and/or monitor in the control room: Relationships between PZR level and changing levels of the PRT and bleed holdup tank Justification: VCT level will drop due to the loss of inventory. Pzr level will remain stable as letdown flow lowers. RDT level will increase as the RCS fluid flows past the failed seal. Containment temp and humidity are unaffected as failed RCP seal flow is collected in the RDT. 12 gpm is not enough to cause the RDT rupture disc to release in 15 minutes.

A is Wrong -

B is Correct -

C is Wrong -

D is Wrong -

OPTRNG_EXAM Page: 61 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 34 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 1 K/A # 35007a2.03 Importance 3.60 Rating:

Given the following plant conditions:

The reactor is tripped due to an Excessive Steam Demand event.

HPSI pumps are running, with Safety Injection valves full open.

The "always running" charging pump continues to run.

Pressurize pressure is 2280 psia and increasing.

RCPs 1A and 2A were secured when RCS pressure dropped below the SIAS setpoint.

Pressurizer level is now above the indicated range.

indicating?

With no Operator action, these conditions will result in a high pressure in the ....

A. Equipment Drain Tank but can be mitigated by initiating auxiliary spray to lower RCS pressure.

B. Equipment Drain Tank but can be mitigated by venting the pressurizer utilizing Reactor Coolant Gas Vent System.

C. Reactor Drain Tank but can be mitigated by throttling closed the HPSI injection valves to reduce RCS makeup flow.

D. Reactor Drain Tank but can be mitigated by increasing secondary plant heat removal to control RCS temperature.

Answer: D Associated KA:

L11208 Given the EOPs are being performed and the plant is water solid describe how and why RCS pressure control differs from pressure control with a PZR bubble Reference Id: Q22509 Difficulty: 4.00 Time to complete: 4 10CFR Category: CFR 55.41 (5) 55.41 (5) Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.

Cognitive Level: Comprehension / Anal Question Source: Modified PV Bank Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

40EP-9EO05, ESD /

K&A: Ability to (a) predict the impacts of the following malfunctions or operations on the P S; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Overpressurization of the PZR OPTRNG_EXAM Page: 62 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam Justification: The Pzr must be solid or Pressure would not be increasing. The safeties relieve to the RDT. The EDT does collect coolant from primary systems, so it is plausible as a distracter A is Wrong - EDT is incorrect. A solid RCS means auxiliary spray is not an effective means of pressure control B is Wrong - EDT wrong but physically venting the PZR could work and can be found in procedures C is Wrong - RDT is correct and examinee may want to apply the normal level control of throttling HPSI valves but the running charging pump is increasing RCS pressure.

D is Correct - Reliefs go to the RDT and then ESD provides guidance to control RCS temperature OPTRNG_EXAM Page: 63 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 35 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 1 K/A # 2.1.1 Importance 3.80 Rating:

Given the following conditions:

Unit 1 is in Mode 3 following a Reactor trip.

You are a "license trainee" on shift.

Nuclear Cooling Water pump, NCN-P01A needs to be tagged out for scheduled maintenance.

As a license trainee you may manipulate NCN-HS-1 ...

A. only under the direct supervision of a licensed operator.

B. in the current mode since this is not an "Irretrievable Action".

C. at any time since this action does not directly affect reactivity or power level.

D. provided that this action causes no change in system status, NCN-P01B already is in service.

Answer: A Associated KA:

72275 Routine Shift Operations Reference Id: Q22511 Difficulty: 2.00 Time to complete: 2 10CFR Category: CFR 55.41 (10) 55.41 (10) Administrative, normal, abnormal, and emergency operating procedures for the facility.

Cognitive Level: Memory Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

Conduct of Shift OPS, 40DP-9OP02 K&A: Knowledge of conduct of operations requirements. Component Cooling Water Justification:

A is Correct - step 5.1.6 B is Wrong - there is procedure guidance for these actions examinee may believe manipulations are permitted in mode 3 C is Wrong - this action never directly affects power level D is Wrong - no change in system status examinee may believe this is permitted.

OPTRNG_EXAM Page: 64 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 36 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 1 K/A # 33010k6.03 Importance 3.20 Rating:

Given the following conditions:

Unit 1 is at 100% power.

Pressurizer pressure is 2100 psia and lowering.

Pressurizer backup heaters are energized.

Pressurizer Pressure Master Controller RCN-PIC-100 is in AUTO with 0% output.

Pressure Control Channel X/Y selector, RCN-HS-100 is selected to channel X .

Which one of the following malfunctions or conditions would cause these conditions in the Pressurizer Pressure Control system?

A. Pressurizer main spray valves have failed open.

B. Pressure transmitter RCN-PT-100X has failed high.

C. Pressure Spray Control RCN-PIK-100 has failed low.

D. Pressurizer Pressure Master Controller RCN-PIC-100 has failed low.

Answer: A Associated KA:

L75344 Describe the response of the Pressurizer Pressure Control System to a failure of an input transmitter.

Reference Id: Q22512 Difficulty: 3.00 Time to complete: 3 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Comprehension / Anal Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LOIT lesson plan / Simplified drawings K&A: Knowledge of the effect of a loss or malfunction of the following will have on the PZR PCS: PZR sprays and heaters Justification:

A is Correct - spray valves failed open = low pressure and full 0% output of master controller B is Wrong - 100X failing high would cause low pressure conditions but the RCN-PIC-100, master controller, would have 50% output for full spray OPTRNG_EXAM Page: 65 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam C is Wrong - failing low would be no output = no spray flow D is Wrong - examinee could believe that 0% output is correct for full spray flow vs full proportional heater output OPTRNG_EXAM Page: 66 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 37 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 1 K/A # 37012k5.01 Importance 3.30 Rating:

Which one of the following conditions will cause the calculated value of Departure from Nucleate Boiling Ratio (DNBR) to come closer to the Reactor Trip setpoint.

Dilution does not A. Grid frequency increases slightly. raise power although it is done B. Pressurizer pressure is increased by 15 psia.

in conjunction with C. Power is increased by dilution with CEAs remaining ARO. a power ascension D. RCS temperature is lowered while maintaining power constant.

Answer: C Associated KA:

L78284 Explain how DNBR is calculated in the Core Protection Calculators.

100866 Active Question Bank 2004 L78284 Explain how DNBR is calculated in the Core Protection Calculators.

29616 Describe the process by which CPCs determine Core Delta-T power Reference Id: Q63823 Difficulty: 3.00 Time to complete: 4 10CFR Category: CFR 55.41 (5) 55.41 (5) Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.

Cognitive Level: Comprehension / Anal Question Source: PV Bank Not Modified Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LOIT lesson plan K&A: Knowledge of the operational implications of the following concepts as the apply to the RPS: DNB Justification:

A is Wrong - Freq. increases flow increases DNBR better B is Wrong - Pressure increases DNBR better C is Correct - power increases, CEAs unchanged DNBR worse D is Wrong - temperature lowers DNBR better OPTRNG_EXAM Page: 67 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam OPTRNG_EXAM Page: 68 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 38 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 1 K/A # 2.2.44 Importance 4.20 Rating:

Given the following conditions:

Unit 1 is at 100% power.

Channel "C" parameter 5 HI PZR PRESS is bypassed for I&C maintenance.

Channel "B" HI PZR PRESS has just tripped due to an instrument failure.

Which one of the following correctly describes the status of the Reactor Protection System if the Channel "B" parameter 5 bypass pushbutton is depressed?

A. Both Channels "B & C" are in bypass.

B. Neither Channel "B or C" is in bypass.

C. Channel "B" parameter 5 goes in bypass, Channel "C" comes out of bypass.

D. Channel "C" parameter 5 stays in bypass, Channel "B" parameter 5 is not in bypass.

Answer: C Associated KA:

L77088 Describe the RPS Trip Channel bypass interlock.

Reference Id: Q22514 Difficulty: 2.00 Time to complete: 2 10CFR Category: CFR 55.41 (5) 55.41 (5) Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.

Cognitive Level: Comprehension / Anal Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LOIT lesson plan K&A: Ability to interpret control room indications to verify the status and operation of l a system, and understand how operator actions and directives affect plant and l system conditions. Reactor Protection Justification: The highest priority channel is the only one that will be in bypass. The Lower channel "C" will come out of bypass A is Wrong -

B is Wrong -

OPTRNG_EXAM Page: 69 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam C is Correct -

D is Wrong -

39 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 1 K/A # 32013k2.01 Importance 3.60 Rating:

The "A" train BOP/ESFAS cabinet, SAA-C02A, has two power supplies which are ...

A. PHA-M31 and PNC-D27 B. PHA-M31 and PKA-D21.

C. PNA-D25 and PNC-D27 D. PNA-D25 and PKA-D21.

Answer: D Associated KA:

65032 Explain the operation of the BOP ESFAS Cabinets under normal operating conditions.

Reference Id: Q22538 Difficulty: 3.00 Time to complete: 2 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Memory Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LOIT lesson Plan / Board 5 ARP 41AL-1RK5A K&A: Knowledge of bus power supplies to the following: ESFAS/safeguards equipment control Justification: employee could believe any combination of class power supplies from different sources could power the cabinets A is Wrong -

B is Wrong -

C is Wrong -

D is Correct - PNA and PKA are correct OPTRNG_EXAM Page: 70 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 40 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 1 K/A # 32013k4.03 Importance 3.90 Rating:

Which one of the following combination of setpoints/interlocks will ALL initiate a Main Steam Isolation Signal (MSIS).

A. SG pressure 920 psia, Containment pressure 3.5 psig, SG level 46% WR.

B. SG level 89% NR, SG pressure 920 psia and Pressurizer pressure 1850 psia.

C. Containment pressure 3.1 psig, SG level 92% NR and SG pressure 950 psia.

D. SG level 40% WR, Containment pressure 3.5 psig and Pressurizer pressure 1800 psia.

Answer: C Associated KA:

L77170 Describe what will automatically initiate a Main Steam Isolation Signal (MSIS) and its function.

Reference Id: Q22539 Difficulty: 3.00 Time to complete: 2 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Memory Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LOIT lesson plan / 40AO-9ZZ17, Inadvertant PPS-ESFAS Actuations K&A: Knowledge of ESFAS design feature(s) and/or interlock(s) which provide for the following: Main Steam Isolation System Justification: MSIS is generated by:

SG NR level 91% or more Ctmt pressure 3.0 psig or more SG pressure 960 psia or less Pressurizer pressure of 1837 psia will generate a SIAS, SG level of 45% WR generates a Reactor trip.

A is Wrong -

B is Wrong -

C is Correct -

D is Wrong -

OPTRNG_EXAM Page: 71 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam OPTRNG_EXAM Page: 72 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 41 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 1 K/A # 35022k4.01 Importance 2.50 Rating:

Which one of the following correctly describes the operation of the Main Steam Support Structure (MSSS)

Penetration Cooling system?

A. One MSSS Penetration AFU Fan in operation, two MSSS Penetration Exhaust Fans in operation. The other MSSS Penetration AFU fan will auto-start on low D/P.

B. Two MSSS Penetration AFU Fans in operation, one MSSS Penetration Exhaust Fan in operation. The other MSSS Penetration AHU fan will auto-start on low D/P.

C. One MSSS Penetration AFU Fan in operation, one MSSS Penetration Exhaust Fans in operation. There are no auto-start features associated with the MSSS Penetration Cooling system.

D. Two MSSS Penetration AFU Fans in operation, two MSSS Penetration Exhaust Fans in operation. A low D/P on the MSSS Penetration AFU fan will initiate a trip of the associated MSSS AHU fan.

Answer: A Associated KA:

74478 Explain the operation of the MSSS Ventilation Supply Fans (HCN-A05-A, & B) under normal operating conditions.

Reference Id: Q22540 Difficulty: 3.00 Time to complete: 3 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Memory Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

40OP-9HC01, Cntmt HVAC / 40AL-9RK7A, B07A Alarm Response K&A: Knowledge of CCS design feature(s) and/or interlock(s) which provide for the following: Cooling of containment penetrations Justification:

A is Correct - One AFU and two AHU is the normal alignment. The standby AFU auto starts on low D/P B, C and D are all Wrong but could be reasonable alignments for the MSSS penetration cooling system. Standby starts, trips or lack of auto functions are reasonable for a non-class system OPTRNG_EXAM Page: 73 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam OPTRNG_EXAM Page: 74 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 42 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 1 K/A # 2.2.41 Importance 3.50 Rating:

Given the following conditions:

Unit 1 is operating at 100% power.

Containment Spray pump "A" is going to be run on miniflow for surveillance testing.

Refer to the provided electrical print 01-E-SIB-003.

Which one of the following is true regarding alarm window 2B06A, SDC Train A/B Flow LO?

Alarm window 2B06A ...

A. is only active when shutdown cooling flow is in service.

B. will annunciate immediately after CS pump "A" is started.

C. will annunciate 20 seconds after CS pump "A" is started.

D. will annunciate 50 seconds after CS pump "A" is started.

Answer: C Associated KA:

15946 Check of print logic Reference Id: Q22576 Difficulty: 3.00 Time to complete: 3 10CFR Category: CFR 55.41 (10) 55.41 (10) Administrative, normal, abnormal, and emergency operating procedures for the facility.

Cognitive Level: Comprehension / Anal Question Source: New Comment:

Proposed reference to be provided to applicant during examination: 01-E-SIB-003 Technical

Reference:

electrical print and 2B06A K&A: Ability to obtain and interpret station electrical and mechanical drawings.

Justification: Per the print the time delay is set for 20 seconds A is Wrong - this alarm is not de-activated when not in SDC operations. Examinee may believe that since this alarm is designed for a Loss of SDC that it is disabled when at power. (SIAS alarms are disabled below 400#, LOG trips are bypassed at power)

B is Wrong - there is a time delay C is Correct -

OPTRNG_EXAM Page: 75 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam D is Wrong - 50 seconds is the max TD available OPTRNG_EXAM Page: 76 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 43 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 1 K/A # 35026a1.06 Importance 2.70 Rating:

Given the following Unit 2 conditions:

Time 0 - The 120 VAC control circuit fuse for the CS pump room essential ACU (PHA-M3533) blows.

Time 1 - An inadvertent "A" train CSAS actuates.

blown Assuming that the blow fuse has not been replaced, which one of the following is correct regarding the White (SEAS) and Blue (SEAS) lights on the Safety Equipment Status System ESA-UA-2A alarm panel?

A. Time 0 - White light off, Blue light on.

Time 1 - White light on, Blue light on.

B. Time 0 - White light on, Blue light off.

Time 1 - White light on, Blue light off.

C. Time 0 - White light on, Blue light off.

Time 1 - White light on, Blue light on.

D. Time 0 - White light off, Blue light on.

Time 1 - White light off, Blue light on.

Answer: C Associated KA:

74567 Describe the conditions required to generate the following SESS alarms associated with the Auxiliary Building HVAC System:

  • Aux Bldg Basement Pmp Rms HVAC Isol Dmprs
  • HPSI Pmp Rm ESS ACU Z01
  • LPSI Pmp Rm ESS ACU Z02
  • CS Pmp Rm ESS ACU Z03
  • Aux FW Pmp Rm ESS ACU Z04
  • ECW Pmp Rm ESS ACU Z05
  • Elect Pen Rm ESS ACU Z06 Reference Id: Q22606 Difficulty: 3.00 Time to complete: 2 10CFR Category: CFR 55.41 (5) 55.41 (5) Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.

Cognitive Level: Comprehension / Anal Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LOIT lesson plan / 41AL-1ES2A, SESS alarm response OPTRNG_EXAM Page: 77 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam K&A: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the CSS controls including: Containment spray pump cooling Justification: White is for Inoperable and blue is for an ESFAS start signal has been generated and the equipment (fan) did not start.

A is Wrong - White light should be on at t-0, blue light off B is Wrong - White and Blue light should be on at t-1 C is Correct -

D is Wrong - White light should be on at t-0 and t-1 OPTRNG_EXAM Page: 78 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 44 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 1 K/A # 34039a1.06 Importance 3.00 Rating:

Given the following conditions:

Unit 1 is operating at 100% power.

Steam pressure transmitter SGN-PT-1027 has failed low.

The Steam Bypass Control System (SBCS) is aligned for Remote/Auto operation.

The Main Turbine trips.

After the Quick Open has cleared and assuming NO operation action, which one of the following is correct regarding the SBCS and main steam pressure?

A. The SBCS will not function and the main steam header pressure will increase to Main Steam Safety setpoint.

B. Only SBCVs 7 and 8 will function and the main steam header pressure will be controlled at the automatic setpoint.

C. All SBCVs will function and the main steam header pressure will be controlled at a slightly higher than normal setpoint due to the bias applied by the failure of SGN-PT-1027.

D. All SBCVs will function and the main steam header will be controlled approximately 20 psia below the automatic setpoint due to the "locked in" permissive signal.

Answer: A Associated KA:

L65645 Describe how the SBCS generates its demand and permissive setpoints.

L65649 Describe the response of the SBCS to a failure of the following transmitters:

  • PT-1024 (Steam header pressure)
  • PT-1027 (Steam header pressure)
  • Pressurizer pressure
  • TLI from RRS Reference Id: Q22573 Difficulty: 4.00 Time to complete: 4 10CFR Category: CFR 55.41 (5) 55.41 (5) Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.

Cognitive Level: Comprehension / Anal Question Source: New Comment:

OPTRNG_EXAM Page: 79 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LOIT lesson plan / Operations simplified drawings K&A: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the MRSS controls including: Main steam pressure Justification:

A is Correct - SBCVs are locked out due to a loss of permissive signal pressure increases to MSSV setpoint B is Wrong - no valves will function but this is similar to how SBCVs function with a loss of vacuum C is Wrong - No valves will function but this is similar to how the SBCVs function with a failed high PZR instrument applying the BIAS to the automatic setpoint D is Wrong - No valves will function but the permissive setpoint has a minus 20 psia signal applied to ensure it is below the modulation setpoint.

OPTRNG_EXAM Page: 80 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 45 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 1 K/A # 34059a4.03 Importance 2.90 Rating:

Assume that all Digital Feedwater Control System (DFWCS) input transmitters are in service and selected to AVERAGE.

An increase to 20% power is in progress.

The plant is currently at 14.5% power by control channel indication.

Steam Generator #1 downcomer valve position is 80% and is opening slowly.

Steam Generator #2 downcomer valve position is 70% and is opening slowly.

Under these conditions which one of the following is the expected response of the DFWCS system?

A. Only SG 1 should now go through swapover.

B. Both SGs 1 and 2 should now go through swapover.

C. Neither SG will go through swapover until > 15% power is reached.

D. Neither SG will go through swapover until both SG downcomer valves are > 80%

open.

Answer: C Associated KA:

L82255 Describe the response of the DFWCS to an increase in reactor power to include the following:

  • Swapover
  • Single - three element control change
  • Downcomer reopening Reference Id: Q22542 Difficulty: 3.00 Time to complete: 3 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Memory Question Source: Modified PV Bank Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LOIT lesson plan / OPS simplified drawings K&A: Ability to manually operate and monitor in the control room: Feedwater control during power increase and decrease Justification:

A is Wrong - when setpoint is reached both SG act together, 80% is one of the interlocks OPTRNG_EXAM Page: 81 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam B is Wrong - do not meet setpoints at this time of control channels > 15%

C is Correct - as soon as 15% is reached with either SG downcomer greater than 80%

open then swapover occurs D is Wrong - even if both valves are 80% open > 15% power is required.

OPTRNG_EXAM Page: 82 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 46 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 1 K/A # 34061k3.02 Importance 4.20 Rating:

Given the following conditions:

Unit 1 has tripped from 100% power due to a failure of a condenser vacuum breaker.

Condenser vacuum is degrading rapidly.

Aux. Feedwater pump "B" is tagged out.

Class 4.160 kV bus PBA-S03 has faulted and is de-energized.

Aux. Feedpump "A" has tripped on overspeed and will not reset.

SG levels are 40% WR and lowering.

RCS T-ave is 560°F and rising.

SG levels will continue to lower until ...

A. Condensate pumps are aligned.

B. Aux. Feedwater pump AFN-P01 is aligned.

C. SG levels reach 25.8% WR level then AFAS will actuate.

D. T-ave is greater than 564°F then Main Feedwater will feed in Reactor Trip Override (RT0).

Answer: A Associated KA:

78325 Discuss the purpose and conditions under which the Auxiliary Feedwater System is designed to function.

Reference Id: Q22547 Difficulty: 3.00 Time to complete: 3 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Comprehension / Anal Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

40AO-9ZZ07, Loss of Vacuum K&A: Knowledge of the effect that a loss or malfunction of the AFW will have on the following: S/G Justification: No AFW pumps are available; AFB is OOS, AFN-P01 bus is de-energized and AFA tripped on overspeed. MFW pumps trip on vacuum greater than 13.5 inches HgA OPTRNG_EXAM Page: 83 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam A is Correct - Condensate pumps are the only available FW source B is Wrong - could believe that manual alignment is available C is Wrong - NO AFW pumps are available D is Wrong - 564 is the RTO feed interlock, below 564 feed would be 0 gpm in RTO OPTRNG_EXAM Page: 84 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 47 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 1 K/A # 34061k3.02 Importance 3.60 Rating:

Given the following Unit 1 conditions:

Main condenser vacuum has degraded rapidly.

A manual reactor trip has been initiated.

The Crew is proceeding through the SPTAs.

ADVs are being used to maintain SG pressure.

SG pressures are 1190 psia and increasing slowly.

Tcold is 568°F and increasing slowly.

AFB-P01 is feeding each SG at 250 gpm.

SG levels are 52% WR and slowly lowering.

Per the EOP Operations Expectations, which one of the following is the recommended method to control/maintain the RCS heat transfer rate?

A. Raise AFB-P01 feedwater flow rate to restore both SGs to within the level band.

B. Increase ADV demand position and reduce SG pressures to the low end of the control band.

C. Lower RCS temperature to the low end of the band to allow Main Feedwater to restore SG levels in "RTO".

D. No action should be taken as long as both RCS temperature and SG pressure are within their control bands.

Answer: A Associated KA:

L10441 Given a reactor trip describe the EOP expectation concerning feeding and steaming as they relate to RCS heat removal Reference Id: Q22569 Difficulty: 2.00 Time to complete: 3 10CFR Category: CFR 55.41 (5) 55.41 (5) Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.

Cognitive Level: Comprehension / Anal Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

EOP Operations Expectations OPTRNG_EXAM Page: 85 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam K&A: Knowledge of the operational implications of the following concepts as the apply to the AFW: Relationship between AFW flow and RCS heat transfer Justification:

A is Correct - OPS Expectations is feed over steam B is Wrong - this would increase the heat transfer rate but not preferred and still need to increase AFW flow C is Wrong - RTO will not work with loss of Condenser vacuum D is Wrong - ROs are permitted to take actions in the SPTAs based on trend to maintain the plant OPTRNG_EXAM Page: 86 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 48 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 1 K/A # 36062a2.04 Importance 3.10 Rating:

Given the following conditions:

Unit 1 is operating at 100% power.

The electric plant is in a normal alignment.

The local handswitch for 13.8kV breaker NAN-S01A, S01 Normal Supply, has been inadvertently taken to OFF.

Which one of the following conditions is correct?

A. both NAN-S01 and NBN-S01 will de-energize. Take actions per the Reactor trip procedure.

B. NAN-S01 will undergo a fast bus transfer to NAN-S03. Take actions per the alarm response procedure.

C. only NAN-S01 will de-energize, NBN-S01 will fast bus transfer to NBN-S02. Take actions per the Large Load Reject procedure.

D. only NAN-S01 will de-energize, NBN-S01 remains energized from its normal source. Take actions per the Degraded Electrical procedure.

Answer: A Associated KA:

L73616 Explain the operation of Switchgear NAN-S01 and NAN-S02 under normal operating conditions.

Reference Id: Q22546 Difficulty: 4.00 Time to complete: 3 10CFR Category: CFR 55.41 (5) 55.41 (5) Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.

Cognitive Level: Comprehension / Anal Question Source: Modified PV Bank Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LOIT lesson plans K&A: Ability to (a) predict the impacts of the following malfunctions or operations on the ac distribution system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Effect on plant of de-energizing a bus Justification:

OPTRNG_EXAM Page: 87 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam A is Correct - neither bus will auto transfer due to no transformer faults. Reactor trip will occur due to loss of 2 RCPs B is Wrong - there is a fast bus transfer function that activates on a Main Turbine trip C is Wrong - NAN-S01 will de-energize but NBN-S01 will not transfer to S02 without an associated transformer fault D is Wrong - NAN-S01 is the normal source but an examinee may confuse the proper alignments OPTRNG_EXAM Page: 88 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 49 This Exam Level RO Apears on: RO EXAM 20072009 SRO EXAM K/A # 36062K104 Importance Rating:

Given the following conditions:

Unit 2 is operating at rated power.

All Startup Transformers are initially in a normal lineup.

Startup Transformer #1, NAN-X01, experiences a fault causing it to lockout.

30 seconds later, which of the following describes the condition of Unit 2?

A. PBA-S03 is energized by its respective DG.

B. PBB-S04 is energized by its respective DG.

C. PBA-S03 and PBB-S04 are both energized by offsite power.

D. Both PBA-S03 and PBB-S04 are both energized by their respective DGs.

Answer: A Associated KA:

100866 Active Question Bank 2004 L73566 Explain the operation of the Startup Transformers under normal operating conditions.

L73566 Explain the operation of the Startup Transformers under normal operating conditions.

Reference Id: Q66163 Difficulty: 3.00 Time to complete: 2 10CFR Category: CFR 55.41 (5) 55.41 (5) Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.

Cognitive Level: Comprehension / Anal Question Source: PV Bank Not Modified Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

simplified drawings K&A: Knowledge of the physical connections and/or cause-effect relationships between the ac distribution system and the following systems: Off-site power sources Justification:

OPTRNG_EXAM Page: 89 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam A is the correct answer. Referring to drawing 1-E-MAA-001, Startup Transformer 1 is the normal offsite supply to Unit 3 SO6 and Unit 2 SO5, as well as Alternate supply to Unit 1's SO5 and SO6. Therefore, if this transformer is lost, only PBA-S03 will lose power in Unit 2 and have its Diesel Generator start and energize the bus. PBB-SO4 will be unaffected, making distracters B, C, and D incorrect.

OPTRNG_EXAM Page: 90 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 50 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 1 K/A # 36063a4.02 Importance 2.80 Rating:

Given the following B01 indications:

Which one of the following conditions is indicated?

A. The "A" PK train is in a normal alignment.

B. The "A" Battery output breaker has tripped.

C. The "A" Battery charger output breaker has tripped.

D. The "A" Battery charger AC supply voltage has been lost.

Answer: A OPTRNG_EXAM Page: 91 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam Associated KA:

L74229 Describe the Control Room indications associated with the Class IE 125 VDC Power system.

100866 Active Question Bank 2004 Reference Id: Q19151 Difficulty: 2.00 Time to complete: 2 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Comprehension / Anal Question Source: PV Bank Not Modified Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LOIT lesson plans / Simulator and CR normal readings K&A: Ability to monitor automatic operation of the DC electrical system, including: Battery voltage indicator Justification: This is a picture of a normal PK "A" alignment in the simulator which was verified to match the unit 1 readings.

A is Correct -

B is Wrong -

C is Wrong -

D is Wrong -

OPTRNG_EXAM Page: 92 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 51 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 1 K/A # 36064k402 Importance 3.90 Rating:

When the Diesel Generator is running in the EMERGENCY MODE after a Loss of Power (LOP), what trips are enabled to protect it?

A. Overspeed, reverse power, crankcase overpressure.

B. Low lube oil pressure, overspeed, generator differential.

C. Excess engine vibration, low lube oil pressure, overspeed.

D. Main bearing high temperature, turbocharger bearing failure, overspeed.

Answer: B Associated KA:

L75068 List and Describe the Emergency Mode Shutdowns associated with the Diesel Generators.

L75068 List and Describe the Emergency Mode Shutdowns associated with the Diesel Generators.

L75068 List and Describe the Emergency Mode Shutdowns associated with the Diesel Generators.

L75141 List and Describe the Emergency Mode Shutdowns associated with the Diesel Generators.

100866 Active Question Bank 2004 Reference Id: Q11991 Difficulty: 2.00 Time to complete: 2 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Memory Question Source: PV Bank Not Modified Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LOIT lesson plan K&A: Knowledge of ED/G system design feature(s) and/or interlock(s) which provide for the following: Trips for ED/G while operating (normal or emergency)

Justification: the 3 emergency shutdowns are:

Overspeed Low Engine Oil pressure Generator Differential The others are test run trips A is Wrong -

OPTRNG_EXAM Page: 93 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam B is Correct -

C is Wrong -

D is Wrong -

OPTRNG_EXAM Page: 94 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 52 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 1 K/A # 37073k1.01 Importance 3.60 Rating:

Given the following conditions:

Unit 1 has entered 40AO-9ZZ03. Loss of Cooling Water.

Essential Cooling Water train "A" has been cross-tied to the Nuclear Cooling Water system.

An RCS leak into the Nuclear Cooling Water system now occurs.

The Process Radiation Monitoring system will respond by ...

A. no monitors going into alarm.

B. alarming RU-6 Nuclear Cooling Water only.

C. alarming RU-2, "A" Essential Cooling Water only.

D. alarming RU-2, "A" Essential Cooling Water and RU-6 Nuclear Cooling Water.

Answer: C Associated KA:

67128 Explain the operation of the Process Radiation Monitors under normal operating conditions.

Reference Id: Q22549 Difficulty: 3.00 Time to complete: 3 10CFR Category: CFR 55.41 (4) 55.41 (4) Secondary coolant and auxiliary systems that affect the facility.

Cognitive Level: Comprehension / Anal Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

RMS Alarm Response, 74RM-9EF41 K&A: Knowledge of the physical connections and/or causeeffect relationships between the PRM system and the following systems: Those systems served by PRMs Justification: Only the essential loads of NCW are supplied by the EW system when x-tied. Examinee may not understand this physical relationship. Only RU-2 would be expected to alarm.

A is Wrong -

B is Wrong -

C is Correct -

D is Wrong -

OPTRNG_EXAM Page: 95 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam OPTRNG_EXAM Page: 96 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 53 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 1 K/A # 34076a1.02 Importance 2.60 Rating:

Given the following conditions:

Circulating Water pumps CWN-P01A - D are all in service.

Plant Cooling Water pump, PWN-P01A is in service with PWN-P01B tagged out.

Nuclear Cooling Water (NCW) pump, NCN-P01B is in service with NCN-P01A in standby.

Turbine Cooling Water (TCW) pump, TCN-P01B is in service with TCN-P01A in standby.

An 86 bus fault relay is accidently tripped on NBN-S01A, 4160 non class bus.

Which of the following is correct?

A. There will be no change in CW or PW pump status because the NBN cross tie breaker, NBN-S01C, will close maintaining power to NBN-S01A.

B. NCW and TCW temperatures will increase. The 86 Lockout can only be reset locally. PWN-P01A pump will auto start when PWN-HS-5 is taken out of the PTL position and power has been restored to NBN-S01A.

C. 2 Circulating Water pumps will trip causing a degradation of Main Condenser vacuum. The 86 Lockout can be reset from the Control Room. The Circulating Water pumps must be manually started once power is restored to NBN-S01A.

D. 2 CW pumps and PWN-P01A will trip causing a degraded Main Condenser Vacuum as well as increasing temperatures in the NCW and TCW systems. All 3 pumps must be manually started once power is restored to NBN-S01A.

Answer: B Associated KA:

74244 Describe the automatic functions associated with the Plant Cooling Water Pumps.

Reference Id: Q22590 Difficulty: 3.00 Time to complete: 3 10CFR Category: CFR 55.41 (5) 55.41 (5) Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.

Cognitive Level: Comprehension / Anal Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LOIT lesson plan / Electric prints OPTRNG_EXAM Page: 97 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam K&A: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the SWS controls including: Reactor and turbine building closed cooling water temperatures.

Justification:

A is Wrong - NBN-S01C will not close with an 86 trip on the bus. It also requires a transformer fault in conjunction with the Loss of power to meet closing requirements.

B is Correct - NC/TC temp will increase with no PCW flow. NO 86 lockout reset from the control room on non-class buses (only class components have this ability) and PW/NC/TC do have time delay auto starts once the bus is recovered C is Wrong - CW is supplied by NAN buses 13.8 kV No 86 from CR but must be manually started D is Wrong - CW is from 13.8 kV buses.

OPTRNG_EXAM Page: 98 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 54 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 1 K/A # 38078k3.02 Importance 3.40 Rating:

Given the following conditions:

Unit in mode 1.

A Loss of Instrument Air is occurring.

Nitrogen backup has failed.

IA header pressure currently 40 psig NO operator action has been taken.

Based on these conditions, the Main Steam Isolation Valves fail...

A. AS-IS, but can be fast closed.

B. AS-IS, but can be slow closed.

C. fully OPEN and can not be closed.

D. fully SHUT and can not be opened.

Answer: A Associated KA:

100866 Active Question Bank 2004 L56751 Determine the major effects on plant operation as instrument air pressure degrades.

L105694 Respond to a reactor trip with a total loss of instrument air L58190 Determine the major effects on plant operation as instrument air pressure degrades.

Reference Id: Q15890 Difficulty: 3.00 Time to complete: 2 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Memory Question Source: PV Bank Not Modified Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

Loss of Instrument Air, 40AO-9ZZ06 K&A: Knowledge of the effect that a loss or malfunction of the IAS will have on the following: Systems having pneumatic valves and controls Justification: Examines may make any of the other choices since these would be true for another valve in another system A is Correct - MSIVs fail AS-IS with fast close available OPTRNG_EXAM Page: 99 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam B is Wrong -

C is Wrong -

D is Wrong -

OPTRNG_EXAM Page: 100 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 55 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 1 K/A # 35103a3.01 Importance 3.90 Rating:

Given the following conditions:

HPSI pump "A" is out of service.

RCS Hot Leg sample valves SSA-UV-203 and SSB-UV-200 are open for Chemistry sampling.

Subsequently Unit 1 automatically trips due to a large steam line break.

4.160 kV bus PBB-S04 faulted and is de-energized.

Containment pressure is 3.2 psig and increasing.

Containment temperature is 140°F and increasing.

Pressurizer pressure is 1900 psia and lowering.

Pressurizer level is 24% and lowering.

Any required ESFAS signals have initiated.

The CRS has directed you to verify the RCS Hot Leg sample valves status.

Which one of the following conditions is correct?

A. Both Hot Leg sample will be open. No SESS lights will be initiated.

B. The "A" train Hot Leg sample valves will be closed, the "B" train valve will be open and the associated white SEIS lights will be illuminated for the "B" train sample valve.

C. Both Hot Leg sample valves will be closed and can be opened by positioning their handswitch to close then open. A blue SEAS light will initiate when the valves are opened.

D. Both Hot Leg sample valves will be closed and can be opened by positioning their handswitch to open. No blue or white SESS lights will initiate when the valves are opened.

Answer: C Associated KA:

L77229 Explain the operation of the Safety Equipment Status System under normal operating conditions.

Reference Id: Q22550 Difficulty: 3.00 Time to complete: 3 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Comprehension / Anal OPTRNG_EXAM Page: 101 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LOIT lesson plan K&A: Ability to monitor automatic operation of the containment system, including:

Containment isolation Justification: Greater than 3.0 psia in contmt will generate a CIAS, RCS Hot Leg sample valves close A is Wrong - valves will close, if open their would be a SEAS light B is Wrong - Valves will be closed on the CIAS signal. The loss of "B" class power may confuse the examinee C is Correct - Going to over-ride will open valves and the blue SEAS light will alarm D is Wrong - Must go to over-ride OPTRNG_EXAM Page: 102 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 56 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 2 K/A # 31001a1.09 Importance 4.20 Rating:

Given the following conditions:

The Reactor is stable at 50% power.

The Main Turbine has tripped.

The Steam Bypass Master controller, SGN-PIC-1010, is in Auto/Remote operation.

Normal CEA overlap has been established.

Subsequently CEAs are withdrawn 10 inches in Manual Sequential.

You have been directed to monitor the "D" channel instrumentation for RCS temperature, pressure and power.

Which one of the following correctly describes the expected response and location of these instruments?

A. Reactor power increases, RCS T-cold increases but returns to program, Pressurizer pressure remains unchanged. The "D" channel indications can be monitored from B05 only.

B. Reactor power increases slightly but returns to 50%, RCS T-cold increases and remains higher, Pressurizer pressure increases and remains higher. These indications can be found on B05 only.

C. Reactor power increases, RCS T-cold increases and remains higher, Pressurizer pressure increases and remains higher. The "D" channel indications can be monitored from either QSPDS or B05.

D. Reactor power increases slightly but returns to 50%, RCS T-cold increases but returns to program, Pressurizer pressure remains unchanged. The "D" channel indications can be monitored from either QSPDS or B05.

Answer: A Associated KA:

L67245 Describe the Control Room indications associated with monitoring the RCS.

Reference Id: Q22551 Difficulty: 4.00 Time to complete: 4 10CFR Category: CFR 55.41 (5) 55.41 (5) Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.

Cognitive Level: Comprehension / Anal Question Source: New OPTRNG_EXAM Page: 103 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

Board Layout /

K&A: Ability to predict and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the CRDS controls including: Location and interpretation of RCS temperature and pressure indications Justification:

SBCS in auto means it is controlling temperature not power. Examines may confuse 100% power response with what happens when SBCS is maintaining the plant. This is an old PVNGS event, in an attempt to raise temp post cutback the RO pulled CEAs until a VOPT trip occurred. Only A and B instruments feed the QSPDS system.

A is Correct -

B is Wrong -

C is Wrong -

D is Wrong -

OPTRNG_EXAM Page: 104 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 57 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 2 K/A # 32002k4.02 Importance 3.50 Rating:

Which one of the following accurately describes the Reactor Vessel Level Monitoring system (RVLMS)?

A. Two trains with four (4) sets of heated and unheated thermocouples, 2 located in the Upper Head and 2 located in the Outlet Plenum.

B. Two trains with eight (8) sets of heated and unheated thermocouples, 4 located in the Upper Head and 4 located in the Outlet Plenum.

C. Four trains with four (4) sets of heated and unheated thermocouples, 2 located in the Upper Head and 2 located in the Outlet Plenum.

D. Four trains with eight (8) sets of heated and unheated thermocouples, 4 located in the Upper Head and 4 located in the Outlet Plenum.

Answer: B Associated KA:

L76532 Describe the operation of the Reactor Vessel Level Monitoring System (RVLMS).

Reference Id: Q73263 Difficulty: 3.00 Time to complete: 2 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Memory Question Source: Modified PV Bank Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

SA 101, Reactor Vessel Level Monitoring K&A: Knowledge of the RCS design feature(s) and/or interlocks that provide for the following: Monitoring reactor vessel level Justification: RVLMS is made of two trains with 8 probes A is Wrong - 4 sets could seem reasonable if the examine does know the system B is Correct -

C and D are Wrong - 4 trains is the normal configuration for class instrumentation OPTRNG_EXAM Page: 105 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 58 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 2 K/A # 32011k2.02 Importance 3.10 Rating:

Which one of the following correctly identifies the power supplies to the Pressurizer heaters?

A. Proportional Heaters, 480 Load Centers (NG), Backup heaters, 480 Load Centers (NG and PG)

B. Proportional Heaters, 480 Motor Control Centers (NH), Backup heaters, 480 Load Centers (NG and PG)

C. Proportional Heaters, 480 Motor Control Centers (NH), Backup heaters, 480 Motor Control Centers (NH and PH)

D. Proportional heaters, 480 Motor Control Centers (NH), Class Backup heaters, 480 Motor Control Centers (PH) and Non class Backup heaters 480 Load Centers (NG)

Answer: A Associated KA:

L75210 Describe the interrelationship between the Pressurizer Pressurizer Control System and the following systems:

  • Instrument Air System
  • 480 VAC Class IE Power
  • 480 VAC Non-Class IE Power
  • 125 VDC Non-Class IE Power
  • 125 VDC Class IE Power
  • 120 VAC Non-Class IE Power
  • Pressurizer Level Control System
  • Chemical and Volume Control System
  • Bypass Control Reference Id: Q22552 Difficulty: 2.00 Time to complete: 3 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Memory Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LOIT lesson plan K&A: Knowledge of bus power supplies to the following: PZR heaters Justification: Non-class heaters (prop and backup) NGN-L11 & 12, Class backups PGA-L33 & 34 A is Correct -

OPTRNG_EXAM Page: 106 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam B is Wrong -

C is Wrong -

D is Wrong -

OPTRNG_EXAM Page: 107 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 59 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 2 K/A # 31014k5.01 Importance 2.70 Rating:

Given the following conditions:

Unit 1 is operating at 100% power.

Rod testing is in progress.

CEA-18 has been inserted and then withdrawn 5 inches.

Plant Monitoring System (PMS) computer indicates CEA-18 position at 148.5 inches Control Element Assembly Calculators (CEACs) indicate CEA-18 position at 144 inches.

CEA-18 is at ...

A. 148.5 inches. The PMS computer uses the reed switch position indication system giving actual CEA position while the CEACs use the pulse counters which indicate demand input.

B. 144 inches. The CEACs indicate actual CEA positions using the pulse counters while the PMS computer uses the Reed Switch Position Indication system which uses CEA demand input.

C. 148.5 inches. The PMS computer uses the pulse counters which indicate actual CEA position while the CEACs use the reed switch position indication system which indicate demand input.

D. 144 inches. The CEACs indicate actual CEA positions using the reed switch position indication system while the PMS computer uses the pulse counters which indicate demand input.

Answer: D Associated KA:

L78791 Describe the Control Room indications associated with the Control Element Drive Mechanism Control System (CEDMCS).

Reference Id: Q22553 Difficulty: 3.00 Time to complete: 3 10CFR Category: CFR 55.41 (5) 55.41 (5) Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.

Cognitive Level: Memory Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LOIT lesson plan OPTRNG_EXAM Page: 108 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam K&A: Knowledge of the operational implications of the following concepts as they apply to the RPIS: Reasons for differences between RPIS and step counter Justification: RSPTs signals are from the CEA extension shaft using actual CEA position to generate CEA position indication, this is used by CPCs and CEACs. The pulse counters derive CEA position based on demand signal not actual position and this information is sent to the Plant Computer.

A is Wrong -

B is Wrong -

C is Wrong -

D is Correct -

OPTRNG_EXAM Page: 109 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 60 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 2 K/A # 37015k1.03 Importance 3.10 Rating:

Given the following plant conditions:

Unit is operating at 100% power.

Regulating Group 5 is at 135" for ASI control.

RRS selected to Control Channel #1.

Control Channel #1 fails high.

Which one of the following is correct?

A. CEAs may insert a few steps.

B. CEAs may withdraw a few steps.

C. CEAs will insert until CEDMCS is taken out of automatic.

D. No CEA motion will occur due to an AMI being generated.

Answer: A Associated KA:

100866 Active Question Bank 2004 L75467 Describe the response of the Reactor Regulating System to a failure of a Control Channel Power input.

LOCT 91321 As an operating crew mitigate various failures to the Reactor Regulating System L75467 Describe the response of the Reactor Regulating System to a failure of a Control Channel Power input.

Reference Id: Q6159 Difficulty: 3.00 Time to complete: 5 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Comprehension / Anal Question Source: PV Bank Not Modified Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LOIT lesson plan K&A: Knowledge of the physical connections and/or causeeffect relationships between the NIS and the following systems: CRDS Justification:

A is Correct - CEAs will insert until the rate of change signal is gone OPTRNG_EXAM Page: 110 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam B is Wrong - wrong direction for failed high C is Wrong - CEA motion stops when the rate of change decays away.

D is Wrong - AMI only occurs when selected to average OPTRNG_EXAM Page: 111 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 61 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 2 K/A # 35028k6.01 Importance 2.60 Rating:

Which one (if any) of the following actions should be taken to control containment hydrogen levels if no Hydrogen Recombiners are available during a Loss of Coolant Accident?

A. Place the Hydrogen Purge unit in service.

B. Place the Containment Purge system in service.

C. No action required unless hydrogen concentration approaches 4%.

D. Ensure the Containment Spray system is in service and providing greater than 4350 gpm flow.

Answer: A Associated KA:

L75177 Describe the flowpaths of the Hydrogen Control System to include these major components:

  • Containment Isolation Valves
  • Hydrogen Purge Unit Air Regulators Reference Id: Q22554 Difficulty: 3.00 Time to complete: 3 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Comprehension / Anal Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LOCA tech guideline, 40DP-9AP08 / LOIT lesson plan K&A: Knowledge of the effect of a loss or malfunction on the following will have on the HRPS: Hydrogen recombiners Justification:

A is Correct - Purge units are placed is service as directed by Tech Support Center B is Wrong - This would get the H2 out of containment but is an untreated pathway C is Wrong - If CS has actuated or H2 concentration is > 0.7% Hydrogen control is required D is Wrong - Containment spray is used for Iodine removal not H2 control OPTRNG_EXAM Page: 112 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam OPTRNG_EXAM Page: 113 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 62 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 2 K/A # 2.4.31 Importance 4.20 Rating:

Given the following Unit 1 post trip conditions:

SG 1 level is 42% WR and lowering.

SG 1 pressure is 760 psig and lowering.

SG 2 level is 60% WR and lowering.

SG 2 pressure is 950 psig and rising.

Containment pressure is 1.8 psig and rising.

RCS T-ave is 535°F and lowering.

Alarm window 5B08C "SG-2 > SG-1 CH TRIP" has locked in.

Any required ESFAS signals have properly actuated.

The Digital Feedwater Control system (DFWCS) is in Reactor Trip Override (RTO) and ...

A. neither SG is currently being fed. AFAS-1 will not initiate but AFAS-2 will at the required level.

B. only SG 2 is currently being fed. AFAS-1 will not initiate but AFAS-2 will at the required level.

C. neither SG is currently being fed. Neither AFAS-1 or AFAS-2 will initiate at the required level.

D. both SGs are currently being fed. Neither AFAS-1 or AFAS-2 will initiate at the required level.

Answer: A Associated KA:

72281 SG alarms Reference Id: Q22555 Difficulty: 3.00 Time to complete: 4 10CFR Category: CFR 55.41 (10) 55.41 (10) Administrative, normal, abnormal, and emergency operating procedures for the facility.

Cognitive Level: Comprehension / Anal Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

40AL-9RK5B, Board ARP K&A: Knowledge of annunciator alarms, indications, or response procedures. Steam Generator OPTRNG_EXAM Page: 114 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam Justification: neither SG is being fed in RTO due SG 1 pressure below MSIS setpoint of 960 psia and RTO does not feed at RCS < 564 degrees. The DP inhibits AFAS if not already actuated.

A is Correct -

B is Wrong - neither SG is being fed in RTO C is Wrong - AFAS-2 will initiate if required D is Wrong - neither SG is being fed in RTO and AFAS-2 will initiate as required OPTRNG_EXAM Page: 115 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 63 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 2 K/A # 34041A2.02 Importance 3.60 Rating:

Given the following conditions:

Reactor power is stable at 99%.

ECC Directed Turbine Unloading, 40AO-9ZZ25, is in progress.

Turbine load has been lowered approximately 11%.

SBCS Master Controller SGN-PIC-1010 is in Local Auto with it's setpoint lowered to 1075 psia.

CEDMCS is in manual sequential.

Reg Group 5 is 120 inches withdrawn.

SBCV #1 is 70% open in automatic with a manual permissive.

SBCV #4 is 30% open in manual with a manual permissive.

Subsequently SBCV #4 fails 100% open.

Tavg-Tref Hi-Lo window is in alarm (4A08B).

COLSS CMC (5B01C) & PC (5B01D) windows are in alarm.

CEA insertion demand (green lights) are present on Board 5.

SBCV 1001 will ...

A. fast close. Withdraw CEAs to clear the Tavg - Tref alarm window.

B. modulate closed. Reduce power to clear the COLSS Master alarm window.

C. not close until the manual permissive is removed. Reduce power to clear the COLSS Master alarm window.

D. only modulate closed if SGN-PIC-1010 is returned to Auto/Auto control. Withdraw CEAs to clear the Tavg - Tref alarm window.

Answer: B Associated KA:

L65679 Describe the Control Room controls associated with the indivdual SBCS valves including:

  • Emergency Off Reset
  • Valve Mode Select Reference Id: Q10487 Difficulty: 4.00 Time to complete: 5 10CFR Category: CFR 55.41 (5) 55.41 (5) Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating OPTRNG_EXAM Page: 116 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam characteristics.

Cognitive Level: Comprehension / Anal Question Source: Modified PV Bank Comment:

Proposed reference to be provided to applicant during examination: None Technical

Reference:

40AL-9RK5B, ARPs / 40AO-9ZZ25, ECC Directed Turbine Unloading K&A: Ability to (a) predict the impacts of the following malfunctions or operations on the SDS; and (b) based on those predictions or mitigate the consequences of those malfunctions or operations: Steam valve stuck open Justification:

A is Wrong - Tavg/Tref is a low alarm due to 1004 coming open. CEA wd demand would be expected for turbine power > reactor power.

B is Correct - 1001 will modulate closed. manual permissive and Local/Auto will not effect valve operation. COLSS alarms need to be cleared.

C is Wrong - SBCV 1001 will modulate closed as 1004 comes open D is Wrong - SBCV 1001 will modulate close as 1004 comes open OPTRNG_EXAM Page: 117 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 64 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 2 K/A # 34045a3.07 Importance 3.50 Rating:

Given the following conditions:

The CRS has implemented 40AO-9ZZ07, Loss of Condenser Vacuum.

Reactor power is currently 92% and lowering due to a boration.

Condenser Vacuum has suddenly degraded to 8 inches HgA.

The Main Turbine is expected to ...

A. have not tripped. The main stop, control and combined intercept valves will be open.

B. have tripped. The main stop. control and combined intercept valves all indicating closed.

C. have tripped. The main stop valves will be closed while the control and combined intercept valves remain open.

D. have tripped. The main stop and control vales are closed but the combined intercept valves remain open.

Answer: B Associated KA:

L65971 Identify the Main Turbine trips.

Reference Id: Q22556 Difficulty: 2.00 Time to complete: 2 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Comprehension / Anal Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

40AO-9ZZ07, Loss of Condenser Vacuum K&A: Ability to monitor automatic operation of the MT/G system, including: Turbine stop/governor valve closure on turbine trip Justification:

A is Wrong - MT trips at 7.5 inches HgA B is Correct -

C is Wrong - Stop, Control and Intercept valves will all be closed OPTRNG_EXAM Page: 118 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam D is Wrong - Stop, Control and Intercept valves will all be closed 65 This Exam Level RO Apears on: 2009 SRO EXAM Tier 2 Group 2 K/A # 37017k3.01 Importance 3.50 Rating:

A loss of the Core Exit Thermocouples (CETs) would result in a ...

A. Core Protection Calculators (CPCs) losing the ability to calculate Quality Margin.

B. a loss of the ability to monitor outlet plenum levels during a Design Bases Accident.

C. reduced ability to verify adequate RCS subcooling during Natural Circulation conditions.

D. loss of the ability of the Core Operating Limits Supervisory System (COLSS) to perform a primary power calculation, NKBDELT.

Answer: C Associated KA:

L77368 Explain the operation of the Core Exit Thermocouples (CETs) associated with the Incore Instrumentation System.

Reference Id: Q22570 Difficulty: 4.00 Time to complete: 5 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Memory Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

LOCA, 40EP-9EO03 / LOIT lesson plan K&A: Knowledge of the effect that a loss or malfunction of the ITM system will have on the following: Natural circulation indications Justification:

A is Wrong - CETs are not an input to CPCs they use Thot B is Wrong - RVLMS uses the HJTC system for level indication C is Correct - CETs are needed during Nat'l Circ conditions D is Wrong - COLSS uses the in-cores for power indications but does not use the CETs for temperature inputs OPTRNG_EXAM Page: 119 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam OPTRNG_EXAM Page: 120 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 66 This Exam Level RO Apears on: 2009 SRO EXAM Tier 3 K/A # 2.1.17 Importance 3.90 Rating:

Given the following conditions:

Unit 1 has automatically tripped from 100% power.

Standard Post Trip Actions (SPTAs) are in progress.

You are the "At the Controls" operator.

SIAS/CIAS have just actuated.

In accordance with Operations Department Practices (ODP-1) which one of the following is the correct method to communicate this information to the "Crew"?

A. Inform the CRS of the SIAS/CIAS, then wait for a Control Room Brief to inform the remaining crew members.

B. Announce "Crew Update" wait for all crew members to respond ready then announce the SIAS/CIAS. State "End of Update".

C. Wait for SPTAs to be completed, then ensure that the CRS is aware of the SIAS/CIAS prior to them choosing which EOP to implement.

D. Announce "Attention for a Brief". The CRS will wait for all crew members to report ready, you can then inform the crew of the SIAS/CIAS when the CRS asks you to report any problems or concerns. CRS announces "End of Brief".

Answer: B Associated KA:

L59592 Provide accurate, clear and concise verbal communications.

Reference Id: Q22557 Difficulty: 2.00 Time to complete: 2 10CFR Category: CFR 55.41 (10) 55.41 (10) Administrative, normal, abnormal, and emergency operating procedures for the facility.

Cognitive Level: Memory Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

ODP-1 K&A: Ability to make accurate, clear, and concise verbal reports.

Justification:

A is Wrong - It is important for the CRS to know this information and this is how it was done prior to implementation of the current communication standards.

B is Correct - The entire crew needs of know of the plant status as it occurs. Making a "Crew Update" is the directed method iaw ODP-1.

OPTRNG_EXAM Page: 121 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam C is Wrong - This is the correct practice for minor information such as which AFP is being used.

D is Wrong - This would be a "Transient Brief" but the CRS calls for one as needed to inform the crew of plant status or information gathering.

OPTRNG_EXAM Page: 122 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 67 This Exam Level RO Apears on: 2009 SRO EXAM Tier 3 K/A # 2.1.23 Importance 4.30 Rating:

Given the following condition:

A reactor startup is in progress per 40OP-9ZZ02, Initial Reactor Startup following Refueling.

RK window 4A12A, SU and CONT CH TRB is alarming, Alarm pt SEJS1, Start-Up Control Channel 1 Hi Counts Per Second is in alarm.

Which one of the following actions should be taken?

A. This is an expected alarm, bypass the high log power trips.

B. This is an unexpected alarm, manually trip the reactor before an automatic trip occurs.

C. This is an expected alarm, remove the operational bypass on the Core Protection Calculators.

D. This is an expected alarm, verify proper overlap then turn off high voltage to the startup detectors.

Answer: D Associated KA:

L75653 Explain the operation of the Start-Up Channels under normal operating conditions.

100866 Active Question Bank 2004 Reference Id: Q3733 Difficulty: 3.00 Time to complete: 4 10CFR Category: CFR 55.41 (10) 55.41 (10) Administrative, normal, abnormal, and emergency operating procedures for the facility.

Cognitive Level: Memory Question Source: Modified PV Bank Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

40OP-9ZZ02, Rx startup following refueling K&A: Ability to perform specific system and integrated plant procedures during all modes of plant operation.

Justification:

A is Wrong - This action would be taken for the HI Log permissive alarm B is Wrong - Examine could could this with a number of alarms that require a reactor trip C is Wrong - this action is taken at 10 E-6% power OPTRNG_EXAM Page: 123 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam D is Correct - per the procedure OPTRNG_EXAM Page: 124 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 68 This Exam Level RO Apears on: 2009 SRO EXAM Tier 3 K/A # 2.1.29 Importance 4.10 Rating:

Per 40AC-0ZZ06, (Locked Valve, Breaker, and Component Control), when verifying the position of a locked throttled valve, the second checker must:

A. check the valve closed and return it to throttled position and install lock.

B. independently verify the valve is throttled by position indication then lock it.

C. concurrently verify the correct throttled position and verify the lock installed correctly.

D. verifies proper position by redundant means (proper flow, temperature, or pressure).

Answer: C Associated KA:

100866 Active Question Bank 2004 L10563 From memory describe how independent verification (IV) is accomplished with locked valves, breakers or components N74569 From memory describe how independent verification (IV) is accomplished with locked valves, breakers or components Reference Id: Q7885 Difficulty: 3.00 Time to complete: 2 10CFR Category: CFR 55.41 (10) 55.41 (10) Administrative, normal, abnormal, and emergency operating procedures for the facility.

Cognitive Level: Memory Question Source: PV Bank Not Modified Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

40AC-0ZZ06, Locked Valve, Breaker, and Component Control K&A: Knowledge of how to conduct system lineups, such as valves, breakers, switches, etc.

Justification: Any of these methods could seem reasonable to the examine but only the concurrent verification is permitted for a locked valve.

A is Wrong -

B is Wrong -

C is Correct -

D is Wrong -

OPTRNG_EXAM Page: 125 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 69 This Exam Level RO Apears on: 2009 SRO EXAM Tier 3 K/A # 2.2.22 Importance 4.00 Rating:

Pressurizer Safety Valves are designed to maintain the Reactor Coolant System less than or equal to (a) psia and Core Protection Calculators are designed to prevent the Reactor Coolant System from exceeding a Departure from Nucleate Boiling Ration (DNBR) of less than or equal to (b) .

A. (a) 2500 (b) 1.30 B. (a) 2500 (b) 1.34 C. (a) 2750 (b) 1.30 D. (a) 2750 (b) 1.34 Answer: D Associated KA:

72283 What are the Safety Limits Reference Id: Q22558 Difficulty: 3.00 Time to complete: 3 10CFR Category: CFR 55.41 (5) 55.41 (5) Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.

Cognitive Level: Memory Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

Tech Specs and Bases K&A: Knowledge of limiting conditions for operations and safety limits.

Justification:

A is Wrong - RCS pressure design limit with old (<11 EFPY) DNBR SL B is Wrong - RCS pressure design limit with correct DNBR SL C is Wrong - RCS pressure design limit is correct but with old (<11 EFPY) DNBR SL D is Correct - Pressure SL is design 2500 psia + 10%. DNBR is 1.34 OPTRNG_EXAM Page: 126 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 70 This Exam Level RO Apears on: 2009 SRO EXAM Tier 3 K/A # 2.2.36 Importance 3.10 Rating:

Given the following conditions:

Unit 2 is operating at 100% power The "C" class inverter, PNC-N13, is being removed from service for scheduled maintenance.

The "C" class instrument bus has been transferred to the Voltage Regulator, PNC-V27.

What impact (if any) does this maintenance have on LCO 3.8.7, Inverters - Operating? LCO is provided.

A. Immediate entry into LCO 3.8.7 is required.

B. No impact, this LCO applies to the class "A & B" train inverters only.

C. No entry into LCO 3.8.7 is required as long as the "C" instrument bus remains energized by PNC-V27.

D. Entry into LCO 3.8.7 may be delayed up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> provided that the "C" instrument bus remains energized by PNC-V27.

Answer: A Associated KA:

L74145 Describe LCO 3.8.7, Inverters - Operating, including it's bases.

Reference Id: Q22559 Difficulty: 4.00 Time to complete: 3 10CFR Category: CFR 55.41 (10) 55.41 (10) Administrative, normal, abnormal, and emergency operating procedures for the facility.

Cognitive Level: Memory Question Source: New Comment:

Proposed reference to be provided to applicant during examination: LCO 3.8.7 Technical

Reference:

Tech Specs K&A: Ability to analyze the effect of maintenance activities, such as degraded power sources, on the status of limiting conditions for operations.

Justification:

A is Correct -

B is Wrong - The LCO statement reads required Train A and B inverters. Examinee may not understand that the "A" train includes "A & C" inverters C is Wrong - Examinee may believe that an energized PN bus meets TS requirements D is Wrong - This exception is used Battery equalizing charge OPTRNG_EXAM Page: 127 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 71 This Exam Level RO Apears on: 2009 SRO EXAM Tier 3 K/A # 2.2.39 Importance 3.90 Rating:

Which one of the following would require entry into a one hour or less LCO condition while in Mode 1, steady state conditions?

A. Pressurizer level is 57%.

B. Reactor Coolant system T-cold is 540°F.

C. An 86 lockout of SIA-P01, High Pressure Safety Injection pump "A".

D. WCB-UV-63, chill water supply header outside cntmt isolation valve, has failed it's stroke time surveillance test.

Answer: B Associated KA:

L89788 Given a set of plant conditions apply the one hour or less actions statements of T.S. 3.6 L89782 Given a set of plant conditions apply the one hour or less actions statements of T.S. 3.5 Reference Id: Q22560 Difficulty: 3.00 Time to complete: 3 10CFR Category: CFR 55.41 (10) 55.41 (10) Administrative, normal, abnormal, and emergency operating procedures for the facility.

Cognitive Level: Memory Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

Tech Specs K&A: Knowledge of less than or equal to one hour Technical Specification action statements for systems.

Justification:

A is Wrong - LCO 3.4.9 - 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> action B is Correct - LCO 3.4.2 - 30 minute action C is Wrong - LCO 3.5.3 - 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. one hour if its the only HPSI pump in Mode 5/6 D is Wrong - LCO 3.6.3 - 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for cntmt isolation valves OPTRNG_EXAM Page: 128 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 72 This Exam Level RO Apears on: 2009 SRO EXAM Tier 3 K/A # 2.3.12 Importance 3.20 Rating:

You have been directed to perform a valve lineup on the Purification filters with the following conditions:

General area dose rate is 90 mrem/hr.

Airborne Radioactivity exists due to ongoing maintenance activities.

No environmental conditions exist that preclude the use of a respirator.

Internal dose rate if respirator is worn is 0 mrem/hour.

Internal dose rate without respirator is 22 mrem/hour.

Time to complete job while wearing a respirator is 3.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />.

Time to complete job without a respirator is 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

Which one of the following describes whether a respirator will be worn and why?

A. No, wearing a respirator will raise total exposure.

B. Yes, wearing a respirator will lower total exposure.

C. No, wearing a respirator will make no difference to the total exposure.

D. Yes, a respirator must be worn anytime that airborne radiation is present.

Answer: B Associated KA:

72284 Radiological questions Reference Id: Q22577 Difficulty: 3.00 Time to complete: 3 10CFR Category: CFR 55.41 (12) 55.41 (12) Radiological safety principles and procedures.

Cognitive Level: Memory Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

Radworker Practices, ALARA principles K&A: Knowledge of radiological safety principles pertaining to licensed operator duties, such as containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc.

Justification: with respirator 270 mrem, without respirator 280 mrem A is Wrong - exposure will be lower by wearing Respirator B is Correct -

C is Wrong - exposure will be lower by wearing Respirator OPTRNG_EXAM Page: 129 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam D is Wrong - not required if exposure would be lower 73 This Exam Level RO Apears on: 2009 SRO EXAM Tier 3 K/A # 2.3.14 Importance 3.40 Rating:

The following information is posted on a survey map outside a room you are about to enter.

General Area Radiation levels of 75 mrem/hr.

Swipes of 75,000 dpm/100cm2.

The posting of this room should be a ...

A. Radiation Area only.

B. Radiation Area and Contamination Area.

C. Radiation Area and High Contamination Area.

D. High Radiation Area and High Contamination Area.

Answer: B Associated KA:

72284 Radiological questions Reference Id: Q22574 Difficulty: 3.00 Time to complete: 3 10CFR Category: CFR 55.41 (12) 55.41 (12) Radiological safety principles and procedures.

Cognitive Level: Memory Question Source: New Comment:

Proposed reference to be provided to applicant during examination: NONE Technical

Reference:

Rad Worker Training K&A: Knowledge of radiation or contamination hazards that may arise during normal, abnormal, or emergency conditions or activities.

Justification:

Radiation areas are 5 to 100 mrem/hr Contamination areas are 1000 to 100,000 dpm/100cm2 A is Wrong -

B is Correct -

C is Wrong -

D is Wrong -

OPTRNG_EXAM Page: 130 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam OPTRNG_EXAM Page: 131 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 74 This Exam Level RO Apears on: 2009 SRO EXAM Tier 3 K/A # 2.4.21 Importance 4.00 Rating:

Given the following conditions:

Unit 1 has automatically tripped from 100% power.

The CRS has implemented 40EP-9EO03, LOCA.

Both trains of "Fast Bus Transfer" failed following the Main Turbine trip.

Pressurizer pressure is 1460 psia and slowly lowering.

RCS T-hot is 570°F and rising.

Rep CET is 575°F and rising.

Pressurizer level is 8% and stable.

RVLMS indicates 100% level in the RVUH.

Containment temperature is 187°F and slowly increasing.

The STA is not available and the CRS has directed you to determine if Condition 1 of RCS Inventory Control is met in accordance with the following table.

SAFETY FUNCTION:

3. RCS Inventory Control

NOTE ---------------------------------------------------------

Meeting the provisions of Condition 1 or Condition 2 will satisfy the RCS Inventory Control Safety Function.

ACCEPTANCE CRITERIA: CRITERIA SATISFIED Condition 1

a. Pressurizer level greater than 10% [15%].
b. RCS is 24°F [44°F] or more subcooled.
c. RVLMS indicates that RVUH level is 16% or more.

Which one of the following identifies the minimum required actions which would satisfy the RCS Inventory Control Safety Function, Condition 1?

A. Raise Pressurizer to 12% level and lower T-hot temperature to less than 568°F.

OPTRNG_EXAM Page: 132 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam B. Raise Pressurizer to 16% level and lower T-hot temperature to less than 568°F.

C. Raise Pressurizer to 12% level and lower Rep CET temperature to less than 548°F.

D. Raise Pressurizer to 16% level and lower Rep CET temperature to less than 548°F.

Answer: D Associated KA:

93004 Given the plant is in Mode 3 or 4 Determine whether or not entry into the FRP is appropriate Reference Id: Q22593 Difficulty: 4.00 Time to complete: 5 10CFR Category: CFR 55.41 (7) 55.41 (7) Design, components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Cognitive Level: Comprehension / Anal Question Source: New Comment:

Proposed reference to be provided to applicant during examination: Steam Tables Technical

Reference:

40EP-9EO03, LOCA Safety Function Status Checks K&A: Knowledge of the parameters and logic used to assess the status of safety functions, such as reactivity control, core cooling and heat removal, reactor coolant system integrity, containment conditions, radioactivity release control, etc.

Justification: Harsh containment exists values must be used [ ] at greater than 170 degrees and a failure of fast bus transfer causes a loss of all RCPs.

1460 psia = 592.6 degrees - 44 = 548 / minus 24 degrees = 568 A is Wrong - must be > 15% and T-hot may not be used B is Wrong - 16% is correct, but T-hot may not be used C is Wrong - 12% is wrong, but CET is correct D is Correct - 16% and CET temperatures OPTRNG_EXAM Page: 133 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam 75 This Exam Level RO Apears on: 2009 SRO EXAM Tier 3 K/A # 2.4.45 Importance 4.10 Rating:

Unit 1 is operating at 100% power when the following 3 alarm windows annunciate. (Refer to the attached picture of Annunciator Window Box 6B).

The highest priority colored window is the .....

A. Green window. The Main Turbine should have tripped and immediate operator action is required.

B. Amber window. The Main Turbine should have tripped and immediate operator action is required.

C. Green window. The Main Turbine will trip if Stator Cooling Water flow is not restored within 70 seconds.

D. Amber window. The Main Turbine will trip if Stator Cooling Water flow is not restored within 70 seconds.

Answer: C Associated KA:

L78799 Given an alarm condition respond to a Plant Annunciator alarm L12042 Describe the alarm response expectations.

Reference Id: Q22564 Difficulty: 3.00 Time to complete: 3 10CFR Category: CFR 55.41 (10) 55.41 (10) Administrative, normal, abnormal, and emergency operating procedures for the facility.

Cognitive Level: Comprehension / Anal Question Source: New Comment:

Proposed reference to be provided to applicant during examination: Picture of alarm window box 6B Technical

Reference:

40AL-9RK6B, Panel 6B alarm responses / LOIT lesson plan K&A: Ability to prioritize and interpret the significance of each annunciator or alarm.

Justification: All the alarm points that bring in window 6B07B have a 70 second time delay to Main Turbine trip. The Amber alarm window 6B07C alarm points has a higher threshold value and does not require a manual trip.

A is Wrong -

B is Wrong -

C is Correct -

D is Wrong -

OPTRNG_EXAM Page: 134 of 135 09/30/09

ES-401 Sample Written Examination Form ES 401 - 5 Question Worksheet 2009 Reactor Operator Exam Cognitive Level Summary Number of questions linked: 75 Percentage Memory 32 32 Comprehension 0 0 Analysis 0 0 Question Source Summary Number of questions linked to source: 75 Percentage New New 50 50 Modified INPO Bank Modified 0 PV Bank Modified 11 Total Modified 11 11 Bank INPO Bank Not Modified 0 PV Bank Not Modified 14 PV NRC Exam Question Not Modified 0 Total BANK 14 14 OPTRNG_EXAM Page: 135 of 135 09/30/09