June 21, 2021

Mrs. Maria L. Lacal, Executive Vice President

and Chief Nuclear Officer

Arizona Public Service Company

P.O. Box 52034, MS 7602

Phoenix, AZ 85072-2034

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 - NRC

INITIAL EXAMINATION REPORT 05000528/2021301, 05000529/2021301, AND

05000530/2021301

Dear Mrs. Lacal:

On June 3, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination

at Palo Verde Nuclear Generating Station, Units 1, 2, and 3. The enclosed report documents the examination results

and licensing decisions. The preliminary examination results were discussed on April 29, 2021, with Mr. Thomas

Weber, Nuclear Regulatory Affairs Director, and other members of your staff. A telephonic exit meeting was

conducted on June 3, 2021, with Ms. Dusty Lowdermilk, Nuclear Operations Support Coordinator, and other

members of your staff.

The examination included the evaluation of thirteen applicants for instant reactor operator licenses, two applicants for

instant senior reactor operator licenses, and six applicants for upgrade senior reactor operator licenses. The license

examiners determined that all applicants satisfied the requirements of Title 10 of the Code of Federal Regulations (10

CFR) Part 55, and the appropriate licenses have been issued. There were no post-examination comments submitted

by your staff. The enclosure contains details of this report.

No findings were identified during this examination.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance

with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

Heather J. Gepford, Acting Chief

Operations Branch

Division of Reactor Safety

Docket Nos. 05000528, 05000529, and 05000530

License Nos. NPF-41, NPF-51, and NPF-74

Enclosures:

1.

Examination Report 05000528/2021301,

05000529/2021301, and 5000530/2021301

w/attachment: Supplemental Information

cc: Electronic Distribution to Palo Verde Nuclear

Generating Station

Digitally signed by Heather

J. Gepford

Date: 2021.06.21 08:56:18

-05'00'

2

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Numbers:

05000528, 05000529, and 05000530

License Numbers:

NPF-41, NPF-51, and NPF-74

Report Numbers:

05000528/2021301, 05000529/2021301, and 05000530/2021301

Enterprise Identifier:

L-2021-OLL-0013

Licensee:

Arizona Public Service Company

Facility: Palo Verde Nuclear Generating Station

Location:

Tonopah, Arizona

Inspection Dates:

April 26, 2021, to June 3, 2021

Inspectors:

C. Osterholtz, Senior Operations Engineer, Chief Examiner

T. Farina, Senior Operations Engineer

J. Kirkland, Senior Operations Engineer

B. Bergeon, Operations Engineer

M. Doyle, Operations Engineer

M. Hayes, Operations Engineer

S. Hedger, Emergency Preparedness Inspector

Approved By: Heather J. Gepford, Acting Chief

Operations Branch

Division of Reactor Safety

3

SUMMARY

ER 05000528/2021301; 05000529/2021301; 05000530/2021301; 6/3/2021; Palo Verde Nuclear Generating Station,

Units 1, 2, and 3; Initial Operator Licensing Examination Report

The NRC examiners evaluated the competency of thirteen applicants for reactor operator licenses, two applicants for

instant senior reactor operator licenses, and six applicants for upgrade senior reactor operator licenses at Palo Verde

Nuclear Generating Station, Units 1, 2, and 3.

The licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for

Power Reactors," Revision 11. The written examination was administered by the licensee on May 6, 2021. The NRC

examiners administered the operating tests during the week of April 26, 2021.

The NRC examiners determined that all 21 applicants satisfied the requirements of

10 CFR Part 55, and the appropriate licenses have been issued.

A.

NRC-Identified and Self-Revealing Findings

None.

B.

Licensee-Identified Violations

None.

4

REPORT DETAILS

OTHER ACTIVITIES - INITIAL LICENSE EXAMINATION

1.

License Applications

a.

Scope

The NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant

license eligibility requirements. The NRC examiners also audited three of the license applications in detail

to confirm that they accurately reflected the subject applicants qualifications. This audit focused on the

applicants experience and on-the-job training, including control manipulations that provided significant

reactivity changes.

b.

Findings

No findings were identified.

2.

Examination Development

a.

Scope

The NRC examiners reviewed integrated examination outlines and draft examinations submitted by the

licensee against the requirements of NUREG-1021. The NRC examiners conducted an onsite validation of

the operating tests.

b.

Findings

The NRC examiners provided outline, draft examination and post-validation comments to the licensee. The

licensee satisfactorily completed comment resolution prior to examination administration.

The NRC examiners determined the written examinations and operating tests initially submitted by the

licensee were within the range of acceptability expected for a proposed examination.

3.

Operator Knowledge and Performance

a.

Scope

On May 6, 2021, the licensee proctored the administration of the written examinations to all 21 applicants.

The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the

NRC on May 14, 2021.

The NRC examination team administered the various portions of the operating tests to all applicants on

April 26-29, 2021.

b.

Findings

No findings were identified.

All applicants passed the written examination and all parts of the operating tests. The final written

examinations and post-examination analysis may be accessed in the ADAMS system under the accession

numbers noted in the attachment. There were no post-examination comments as indicated in the licensee

submittal.

The examination team noted no generic weaknesses associated with applicant performance on the

operating tests. Post-examination analysis revealed no generic weaknesses associated with applicant

performance on the written examination.

5

4.

Simulation Facility Performance

a.

Scope

The NRC examiners observed simulator performance with regard to plant fidelity during examination

validation and administration.

b.

Findings

No findings were identified.

5.

Examination Security

a.

Scope

The NRC examiners reviewed examination security for examination development during both the onsite

preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-

1021. Plans for examination security and applicant control were reviewed and discussed with licensee

personnel.

b. Findings

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

Exit Meeting Summary

The chief examiner presented the preliminary examination results to Mr. Thomas Weber, Nuclear Regulatory Affairs

Director, and other members of the staff on April 29, 2021. A telephonic exit was conducted on June 3, 2021,

between Mr. Clyde Osterholtz, chief examiner, and Ms. Dusty Lowdermilk, Nuclear Operations Support Coordinator.

The licensee did not identify any information or materials used during the examination as proprietary.

6

attachement

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

Nawaporn Aaronscooke, Senior Engineer, Licensing

Brian Cable, Site General Plant Manager

Chuck Clark, Operations Manager, Training

Matthew Cox, Section Leader, Licensing

Michael Dilorenzo, Department Leader, Regulatory Affairs

Sean Dornseif, Senior Regulatory Affairs Consultant

Delbert Elkington, Section Leader, Compliance

Jeff Fearn, Director, Nuclear Training Brian Garrettson, Senior Instructor, Operations Training

Zach Goldwasser, Department Leader, Operations Training

Matt Harkins, Senior Instructor, Operations Training

Todd Horton, Senior Vice President, Site Operations

Sarah Kane, Senior Engineer, Licensing

Matt Kura, Department Leader, Regulator Affairs

Dallon Lott, Director, Operations

Dusty Lowdermilk, Nuclear Operations Support Coordinator

Diane Mohammed, Senior Regulatory Affairs Consultant

Bruce Rash, Vice President, Engineering/Regulatory

John Rodgers, Senior Instructor, Operations Training

Jarred Shaver, Section Leader, Operations Training

Beth Spisak, Executive Assistant

Carl Stephenson, Regulatory Affairs Advisor

Justin Stewart, Section Leader, Operations Training

Kimberlie Sylvester, Executive Assistant

Lorraine Weaver, Senior Regulatory Affairs Consultant

Thomas Weber, Director, Regulatory Affairs

NRC Personnel

C. Peabody, Senior Resident Inspector

ADAMS DOCUMENTS REFERENCED

Accession No. ML21147A542 - FINAL WRITTEN EXAMS

Accession No. ML21147A540 - FINAL OPERATING TEST

Accession No. ML21147A544 - POST-EXAMINATION ANALYSIS

ML21160A083

SUNSI Review:

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

By: CCO

Yes No
Publicly Available

Sensitive

NRC-002

OFFICE

SOE:OB

SOE:OB

SOE:OB

OE:OB

OE:OB

EPI:RCB

NAME

COsterholtz

JKirkland

TFarina

BBergeon

MDoyle

SHedger

SIGNATURE

CCO

JCK

TJF

BAB

MSD

SDH

DATE

6-9-2021

6-9-2021

6-9-2021

6-9-2021

6/17/2021

6-9-2021

OFFICE

OE:OB

BC:PBD

BC:OB

NAME

MHayes

JDixon

HGepford

SIGNATURE

MOH

JLD

HJG

DATE

6-9-2021

6-9-2021

6/21/21