Attachment 6 OBDI 202 - IOLE Process Rev 3 PROPOSED OUTLINE COMMENTS Facility:

Palo Verde First Exam Date:

11/30/2020 Written Exam Outline (7/09/20)

Comment Resolution 1 NRC Generated 2

3 4

5 Administrative JPM Outline (7/09/20)

Comment Resolution 1 None 2

3 4

5 Control Room / In-Plant System JPM Outline (7/09/20)

Comment Resolution 1 None 2

3 4

5 Simulator Scenario Outline Comments (7/09/20)

Comment Resolution 1

Sc. 1: CT 2: Where does 30 minutes come from? Could there be better bounding criteria?

Modify to specify that the 30 minutes is based on twice the 15 minute STA requirement for safety function status checks and to ensure adequate margin from exceeding containment pressure limits.

2 Sc. 1: No EOP Contingency none

OBDI 202 - IOLE Process Rev 3 3

Sc. 2: Ensure event 7 not too similar to Sc 2 event 7 on the 2019 exam Modify to have to manually open the normal supply breaker to satisfy the interlock for the EDG breaker to automatically close.

4 Sc. 3 CT 1: Where does 30 minutes come from? Could there be better bounding criteria?

Modify to specify that the 30 minutes is based on twice the 15 minute STA requirement for safety function status checks and to ensure adequate subcooling margin.

5 Sc. 3: No EOP Contingency none 6 Sc. 4: Low power none