ML18122A372

From kanterella
Jump to navigation Jump to search
Response to Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations
ML18122A372
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/01/2018
From: Elkinton D
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-07686-MEK/DJH, RIS 2018-02
Download: ML18122A372 (3)


Text

RIS 2018-02 Oaps Palo Verde Nuclear Generating Station 102-07686-MEK/DJH P.O. Box 52034 May 1, 2018 Phoenix, AZ 85072 Mail Station 7636 Tel: 623-363-4972 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sir:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Response to Regulatory Issue Summary (RIS) 2018-02^

Preparation and Scheduling of Operator Licensing Examinations This letter provides Arizona Public Service Company's voluntary response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations.

Enclosed with this letter is NRC Form 536, which provides the proposed schedule of operator licensing examinations at PVNGS for calendar years 2020 through 2023.

There are no commitments made to the NRC by this letter.

If you have any questions or require additional information, please contact Matt Kura, Regulatory Affairs Department Leader, at (623) 393-5379.

Sincerely, Elkinton, Digitally signed by Elkinton, Delbert C(Z34657)

Delbert DN: cn=Elkinton, Delbert C(Z34657)

Reason: Per Delegation C(Z34657) Date: 2018.05.01 12:56:33-0700' Matthew E. Kura Regulatory Affairs Department Leader

Enclosure:

NRC Form 536, Operator Licensing Examination Data cc: w/enclosure V. G. Gaddy NRC Region IV, Chief, Operations Branch J. A. Bridges NRC Region IV, Licensing Assistant C. A. Peabody NRC Senior Resident Inspector PVNGS A member of STARS Alliance LLC Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Enclosure NRC Form 536 Operator Licensing Examination Data

NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160-0131 EXPIRES: 11/30/2020 (11-2017)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This OPERATOR LICENSING information collecfion is used to plan budgets and resources for operator examinations. Send comments regarding burden esUmate te the Information Services Branch (T-2 F43), U.S. Nuclear EXAMINATION DATA Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of InformaBon and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. It a means used to impose an informaUon collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collecbon.

FACILITY NRC REGION Palo Verde Nuclear Generating Station 50-528, 50-529, 50-530 IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 NUMBER OF REACTOR OPERATORS 12 12 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 6 6 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 6 6 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 04/26/2021 10/17/2022 ALTERNATE DATE 05/24/2021 10/24/2022 NRC FORM 536 (11-2017)

RIS 2018-02 Oaps Palo Verde Nuclear Generating Station 102-07686-MEK/DJH P.O. Box 52034 May 1, 2018 Phoenix, AZ 85072 Mail Station 7636 Tel: 623-363-4972 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sir:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Response to Regulatory Issue Summary (RIS) 2018-02^

Preparation and Scheduling of Operator Licensing Examinations This letter provides Arizona Public Service Company's voluntary response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations.

Enclosed with this letter is NRC Form 536, which provides the proposed schedule of operator licensing examinations at PVNGS for calendar years 2020 through 2023.

There are no commitments made to the NRC by this letter.

If you have any questions or require additional information, please contact Matt Kura, Regulatory Affairs Department Leader, at (623) 393-5379.

Sincerely, Elkinton, Digitally signed by Elkinton, Delbert C(Z34657)

Delbert DN: cn=Elkinton, Delbert C(Z34657)

Reason: Per Delegation C(Z34657) Date: 2018.05.01 12:56:33-0700' Matthew E. Kura Regulatory Affairs Department Leader

Enclosure:

NRC Form 536, Operator Licensing Examination Data cc: w/enclosure V. G. Gaddy NRC Region IV, Chief, Operations Branch J. A. Bridges NRC Region IV, Licensing Assistant C. A. Peabody NRC Senior Resident Inspector PVNGS A member of STARS Alliance LLC Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Enclosure NRC Form 536 Operator Licensing Examination Data

NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160-0131 EXPIRES: 11/30/2020 (11-2017)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This OPERATOR LICENSING information collecfion is used to plan budgets and resources for operator examinations. Send comments regarding burden esUmate te the Information Services Branch (T-2 F43), U.S. Nuclear EXAMINATION DATA Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of InformaBon and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. It a means used to impose an informaUon collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collecbon.

FACILITY NRC REGION Palo Verde Nuclear Generating Station 50-528, 50-529, 50-530 IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 20 CY 21 CY 22 CY 23 NUMBER OF REACTOR OPERATORS 12 12 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 6 6 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 6 6 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 04/26/2021 10/17/2022 ALTERNATE DATE 05/24/2021 10/24/2022 NRC FORM 536 (11-2017)