Person / Time
Site: Palo Verde  
Issue date: 12/10/2020
From: Greg Werner
Operations Branch IV
To:
Arizona Public Service Co
References
Download: ML21020A104 (26)


Text

Clyde Osterholtz/

7/9/2020 07/14/2020 Gregory E. Werner/

C. Osterholtz/

11/19/2020 11/20/2020 Gregory E. Werner /

C. Osterholtz/

11/19/2020 Gregory E. Werner /

11/20/2020 PVNGS 11/30/2020

Gregory/E. Werner /

01/20/2021

2020 PVNGS NRC Initial Exam Form ES-301-5 Rev 2 ES-301 Transient and Event Checklist Form ES-301-5 Facility: PVNGS Date of Exam: 11/30/2020 Operating Test No.: 2020 A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios 1

2 (spare) 3 4

T O

T A

L M

I N

I M

U M(*)

CREW POSITION CREW POSITION CREW POSITION CREW POSITION S

R O

O A

T C

B O

P S

R O

O A

T C

B O

P S

R O

O A

T C

B O

P S

R O

O A

T C

B O

P R

I U

I1 RX 0

1 NOR 0

1 I/C 2,3,6 2,4,5, 6,7 3,5,6 7

1,4,5 1,3,4, 5,6 3,4 10 4

MAJ 4

8 8

8 7

5,6 4

2 TS 2,5 1,6 2

2 I2 RX 0

1 NOR 0

1 I/C 1,2,3, 5

2,3,4, 6,8 1,3,4 12 4

MAJ 4

7 5,6 4

2 TS 1,3 2

2 I3 RX 0

1 NOR 0

1 I/C 1,2,3, 5

1,5 2,3,7 9

4 MAJ 4

7 5,6 4

2 TS 1,2,3 3

2 I4 RX 0

1 NOR 0

1 I/C 2,3,6 1,3,4, 5,6 3,4 10 4

MAJ 4

7 5,6 4

2 TS 1,6 2

2 Instructions:

1.

Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.

2.

Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.

3.

Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

4.

For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

2020 PVNGS NRC Initial Exam Form ES-301-5 Rev 2 ES-301 Transient and Event Checklist Form ES-301-5 Facility: PVNGS Date of Exam: 11/30/2020 Operating Test No.: 2020 A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios 1

2 (spare) 3 4

T O

T A

L M

I N

I M

U M(*)

CREW POSITION CREW POSITION CREW POSITION CREW POSITION S

R O

O A

T C

B O

P S

R O

O A

T C

B O

P S

R O

O A

T C

B O

P S

R O

O A

T C

B O

P R

I U

I5 RX 0

1 NOR 0

1 I/C 1,2,3, 5

2,3,4,6

,8 1,3,4 12 4

MAJ 4

7 5,6 4

2 TS 1,3 2

2 I6 RX 0

1 NOR 0

1 I/C 1,2,3, 5

1,5 2,3,7 9

4 MAJ 4

7 5,6 4

2 TS 1,2,3 3

2 I7 RX 0

1 NOR 0

1 I/C 2,3,6 1,3,4,5,6 3,4 10 4

MAJ 4

7 5,6 4

2 TS 1,6 2

2 I8 RX 0

1 NOR 0

1 I/C 1,2,3, 5

2,3,4,6

,8 1,3,4 12 4

MAJ 4

7 5,6 4

2 TS 1,3 2

2 Instructions:

1.

Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.

2.

Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.

3.

Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

4.

For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

2020 PVNGS NRC Initial Exam Form ES-301-5 Rev 2 ES-301 Transient and Event Checklist Form ES-301-5 Facility: PVNGS Date of Exam: 11/30/2020 Operating Test No.: 2020 A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios 1

2 (spare) 3 4

T O

T A

L M

I N

I M

U M(*)

CREW POSITION CREW POSITION CREW POSITION CREW POSITION S

R O

O A

T C

B O

P S

R O

O A

T C

B O

P S

R O

O A

T C

B O

P S

R O

O A

T C

B O

P R

I U

I9 RX 0

1 NOR 0

1 I/C 1,2,3,5 1,5 2,3,7 9

4 MAJ 4

7 5,6 4

2 TS 1,2,3 3

2 I10 RX 0

1 NOR 0

1 I/C 2,3, 6

1,3,4,5,6 3,4 10 4

MAJ 4

7 5,6 4

2 TS 1,6 2

2 I11 RX 0

1 NOR 0

1 I/C 1,2,3,5 2,3,4

,6,8 1,3,4 12 4

MAJ 4

7 5,6 4

2 TS 1,3 2

2 I12 RX 0

1 NOR 0

1 I/C 1,2,3,5 1,5 2,3,7 9

4 MAJ 4

7 5,6 4

2 TS 1,2,3 3

2 Instructions:

1.

Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.

2.

Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.

3.

Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

4.

For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

2020 PVNGS NRC Initial Exam Form ES-301-5 Rev 2 ES-301 Transient and Event Checklist Form ES-301-5 Facility: PVNGS Date of Exam: 11/30/2020 Operating Test No.: 2020 A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios 1

2 (spare) 3 4

T O

T A

L M

I N

I M

U M(*)

CREW POSITION CREW POSITION CREW POSITION CREW POSITION S

R O

O A

T C

B O

P S

R O

O A

T C

B O

P S

R O

O A

T C

B O

P S

R O

O A

T C

B O

P R

I U

I13 RX 0

1 NOR 0

1 I/C 1,3,4, 5,6 2,3,7 8

4 MAJ 7

5,6 3

2 TS 1,6 2

2 I14 RX 0

1 NOR 0

1 I/C 2,3,4, 6,8 1,3,4 8

4 MAJ 7

5,6 3

2 TS 1,3 2

2 Instructions:

1.

Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.

2.

Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.

3.

Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

4.

For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Competencies Checklist Form ES-301-6 Instructions:

Check the applicants license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant. (This includes all rating factors for each competency.) (Forms ES 303 1 and ES 303 3 describe the competency rating factors.)

Facility: PVNGS Date of Examination: 11/30/2020 Operating Test No.: 2020 APPLICANTS RO SRO-I 1 SRO-U RO SRO-I 2 SRO-U RO SRO-I 3 SRO-U RO SRO-I 4 SRO-U Competencies SCENARIO SCENARIO SCENARIO SCENARIO 1

2 3

4 1

2 3

4 1

2 3

4 1

2 3

4 Interpret/Diagnose Events and Conditions 2,3, 4,6 ALL 3,4, 5,6 2,3, 4,5.

7 2,3, 4,6, 7,8 ALL ALL 1,5, 7

2,3, 5,6, 7

2,3, 4,6 ALL 3,4,5, 6

Comply with and Use Procedures (1) 2,3, 4,6 ALL 3,4, 5,6 2,3, 4,5, 7

2,3, 4,6, 7,8 ALL ALL 1,5, 7

2,3, 5,6, 7

2,3, 4,6 ALL 3,4,5, 6

Operate Control Boards (2) 2,3, 4,6 ALL 3,4, 5,6 2,3, 4,5, 7

2,3, 4,6, 7,8 ALL ALL 1,5, 7

2,3, 5,6, 7

2,3, 4,6 ALL 3,4,5, 6

Communicate and Interact ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL Demonstrate Supervisory Ability (3)

ALL ALL ALL ALL Comply with and Use TS (3) 1,6 1,3 1,2, 3

1,6 Notes:

(1)

Includes TS compliance for an RO.

(2)

Optional for an SRO-U.

(3)

Only applicable to SROs.

ES-301 Competencies Checklist Form ES-301-6 Facility: PVNGS Date of Examination: 11/30/2020 Operating Test No.: 2020 APPLICANTS RO SRO-I 5 SRO-U RO SRO-I 6 SRO-U RO SRO-I 7 SRO-U RO SRO-I 8 SRO-U Competencies SCENARIO SCENARIO SCENARIO SCENARIO 1

2 3

4 1

2 3

4 1

2 3

4 1

2 3

4 Interpret/Diagnose Events and Conditions 2,3, 4,5.

7 2,3, 4,6, 7,8 ALL ALL 1,5, 7

2,3,5

,6,7 2,3, 4,6 ALL 3,4, 5,6 2,3, 4,5.

7 2,3, 4,6, 7,8 ALL Comply with and Use Procedures (1) 2,3, 4,5, 7

2,3, 4,6, 7,8 ALL ALL 1,5, 7

2,3,5

,6,7 2,3, 4,6 ALL 3,4, 5,6 2,3, 4,5, 7

2,3, 4,6, 7,8 ALL Operate Control Boards (2) 2,3, 4,5, 7

2,3, 4,6, 7,8 ALL ALL 1,5, 7

2,3,5

,6,7 2,3, 4,6 ALL 3,4, 5,6 2,3, 4,5, 7

2,3, 4,6, 7,8 ALL Communicate and Interact ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL Demonstrate Supervisory Ability (3)

ALL ALL ALL ALL Comply with and Use TS (3) 1,3 1,2, 3

1,6 1,3 Notes:

(1)

Includes TS compliance for an RO.

(2)

Optional for an SRO-U.

(3)

Only applicable to SROs.

ES-301 Competencies Checklist Form ES-301-6 Facility: PVNGS Date of Examination: 11/30/2020 Operating Test No.: 2020 APPLICANTS RO SRO-I 9 SRO-U RO SRO-I 10 SRO-U RO SRO-I 11 SRO-U RO SRO-I 12 SRO-U Competencies SCENARIO SCENARIO SCENARIO SCENARIO 1

2 3

4 1

2 3

4 1

2 3

4 1

2 3

4 Interpret/Diagnose Events and Conditions ALL 1,5,7 2,3,5, 6,7 2,3, 4,6 ALL 3,4, 5,6 2,3, 4,5.

7 2,3, 4,6, 7,8 AL L

ALL 1,5, 7

2,3,5, 6,7 Comply with and Use Procedures (1)

ALL 1,5,7 2,3,5, 6,7 2,3, 4,6 ALL 3,4, 5,6 2,3, 4,5, 7

2,3, 4,6, 7,8 AL L

ALL 1,5, 7

2,3,5, 6,7 Operate Control Boards (2)

ALL 1,5,7 2,3,5, 6,7 2,3, 4,6 ALL 3,4, 5,6 2,3, 4,5, 7

2,3, 4,6, 7,8 AL L

ALL 1,5, 7

2,3,5, 6,7 Communicate and Interact ALL ALL ALL ALL ALL ALL ALL ALL AL L

ALL ALL ALL Demonstrate Supervisory Ability (3)

ALL ALL AL L

ALL Comply with and Use TS (3) 1,2, 3

1,6 1,3 1,2, 3

Notes:

(1)

Includes TS compliance for an RO.

(2)

Optional for an SRO-U.

(3)

Only applicable to SROs.

ES-301 Competencies Checklist Form ES-301-6 Facility: PVNGS Date of Examination: 11/30/2020 Operating Test No.: 2020 APPLICANTS RO SRO-I 13 SRO-U RO SRO-I 14 SRO-U RO SRO-I SRO-U RO SRO-I SRO-U Competencies SCENARIO SCENARIO SCENARIO SCENARIO 1

2 3

4 1

2 3

4 1

2 3

4 1

2 3

4 Interpret/Diagnose Events and Conditions ALL 3,4, 5,6 2,3,4

,6,7, 8

ALL Comply with and Use Procedures (1)

ALL 3,4, 5,6 2,3,4

,6,7, 8

ALL Operate Control Boards (2)

ALL 3,4, 5,6 2,3,4

,6,7, 8

ALL Communicate and Interact ALL ALL ALL ALL Demonstrate Supervisory Ability (3)

ALL ALL Comply with and Use TS (3) 1,6 1,3 Notes:

(1)

Includes TS compliance for an RO.

(2)

Optional for an SRO-U.

(3)

Only applicable to SROs.

  1. Candidates Exam Week Site / Docket # / Insp Rpt #

RO LSRO SROI SROU Type Exam Author Chief Examiner Examiners Assigned 11/29/2020 Palo Verde / 05000528, 05000529, 05000530

/ 2020301 CAC #: 000500 0

0 14 0

FB-OR-INITIAL LICENSE EXAM ADMINIS TRATION (EXAD)

NFF Osterholtz, Clyde Bergeon,Bryan Doyle,Matthew Farina,Thomas Hedger,Sean Kirkland,John Osterholtz,Clyde Page 1 of 4 1/13/2021 7:03:30 PM Orgs: ALL Sites: PALO Exam Author: NFF Activity Codes: EXAD, NEXAD, NOV, OV IP 21 Operator Licensing Exam Schedule Phase Code: 2 - Construction, 5 - Operational Region: 4 From 10/01/2020 to 04/02/2021

Summary by Date RO SROI SROU LSRO Total 11/2020 0

14 0

0 14 Page 2 of 4 1/13/2021 7:03:30 PM Orgs: ALL Sites: PALO Exam Author: NFF Activity Codes: EXAD, NEXAD, NOV, OV IP 21 Operator Licensing Exam Schedule Phase Code: 2 - Construction, 5 - Operational Region: 4 From 10/01/2020 to 04/02/2021

Summary by Site RO SROI SROU LSRO Total Palo Verde 0

14 0

0 14 Page 3 of 4 1/13/2021 7:03:30 PM Orgs: ALL Sites: PALO Exam Author: NFF Activity Codes: EXAD, NEXAD, NOV, OV IP 21 Operator Licensing Exam Schedule Phase Code: 2 - Construction, 5 - Operational Region: 4 From 10/01/2020 to 04/02/2021

Summary by Region RO SROI SROU LSRO Total Region 4 0

14 0