A response to the same request has been submitted in a letter dated January 31, 1980 for the Oyster Creek Plant. Since the location of Forked River Station is less than a mile away from the Oyster Creek site, it is our position that the evacuation time as estimated in the Oyster Creek submittal holds good for the Forked River Station also within an acceptable tolerance.      It is to be noted, however, that due to a minor shift of the center of location, there will be an insignificant shift in the various areas and sectors shown on a map of Ocean County, New Jersey, in the Figure 1 of the attachment to the Oyster Creek submittal; but this chcnge would not affect the overall projected evacuation time estimate because of inherent conservativeness by a factor of 2.3 in the analysis. Therefore, it can be concluded that the evacuation time estimate for the Forked River Facility is also 13.9 hours which can be considered conservative.
A response to the same request has been submitted in a letter dated January 31, 1980 for the Oyster Creek Plant. Since the location of Forked River Station is less than a mile away from the Oyster Creek site, it is our position that the evacuation time as estimated in the Oyster Creek submittal holds good for the Forked River Station also within an acceptable tolerance.      It is to be noted, however, that due to a minor shift of the center of location, there will be an insignificant shift in the various areas and sectors shown on a map of Ocean County, New Jersey, in the Figure 1 of the attachment to the Oyster Creek submittal; but this chcnge would not affect the overall projected evacuation time estimate because of inherent conservativeness by a factor of 2.3 in the analysis. Therefore, it can be concluded that the evacuation time estimate for the Forked River Facility is also 13.9 hours which can be considered conservative.
If you should have any additional questions, please contact Mr. Gautam Sen at (201) 263-6425.
If you should have any additional questions, please contact Mr. Gautam Sen at (201) 263-6425.
Very truly yours, 9a .                                    ef 6
Very truly yours, 9a .                                    ef 6 Ivan R. Fin ock Jr.                                  ,        g g Vice President                                        ,,
                                                                        '
                                                                    .
Ivan R. Fin ock Jr.                                  ,        g g Vice President                                        ,,
(
(
9D jed                                                                                                    -
9D jed                                                                                                    -

Latest revision as of 14:42, 1 February 2020

Responds to NRC 791226 Ltr Re Estimated Evacuation Time for Plume Exposure Pathway Around Util.Evacuation Time Essentially Same as Oyster Creek,Submitted on 800131. Evacuation Time Estimate of 13.9-h Conservative
ML19294B142
Person / Time
Site: 05000363
Issue date: 02/20/1980
From: Finfrock I
JERSEY CENTRAL POWER & LIGHT CO.
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8002270297
Download: ML19294B142 (1)


Text

Jersey Central Power & Ught Compar*y

! kh ~

S N Madison Avenue at Punch Bowi Road Momstown. New Jersey 07960 (201)455-8200 February 20, 1980 Director Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

SUBJECT:

FORKED RIVER NUCLEAR GENERATING STATION DOCKET NO. 50- 363 ESTDtATE OF EVACUATION TIMES By letter dated December 26, 1979 from Brian K. Grimes to all Power Reactor Licensees, we were requested to submit evacuation time estimates for the plume exposure pathway surrounding the Forked River Plant.

A response to the same request has been submitted in a letter dated January 31, 1980 for the Oyster Creek Plant. Since the location of Forked River Station is less than a mile away from the Oyster Creek site, it is our position that the evacuation time as estimated in the Oyster Creek submittal holds good for the Forked River Station also within an acceptable tolerance. It is to be noted, however, that due to a minor shift of the center of location, there will be an insignificant shift in the various areas and sectors shown on a map of Ocean County, New Jersey, in the Figure 1 of the attachment to the Oyster Creek submittal; but this chcnge would not affect the overall projected evacuation time estimate because of inherent conservativeness by a factor of 2.3 in the analysis. Therefore, it can be concluded that the evacuation time estimate for the Forked River Facility is also 13.9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> which can be considered conservative.

If you should have any additional questions, please contact Mr. Gautam Sen at (201) 263-6425.

Very truly yours, 9a . ef 6 Ivan R. Fin ock Jr. , g g Vice President ,,

(

9D jed -

gG32270Aq]

s#

Jersey Central Power & L>ght Company is a Member of the Genera. Pubhc UtMos Systen