Line 69: |
Line 69: |
|
| |
|
| U.ftaWUALA RSUAMTQRY 4MUSUON APPOWMS3VaO NO.ms WWSWS I4U1 "4 AimI I bv of mm Ii bom b ~tayh VdWNYI I mi mU61N1 I hW, 't bI to pa bwl* d I s I nfft #- ------- | | U.ftaWUALA RSUAMTQRY 4MUSUON APPOWMS3VaO NO.ms WWSWS I4U1 "4 AimI I bv of mm Ii bom b ~tayh VdWNYI I mi mU61N1 I hW, 't bI to pa bwl* d I s I nfft #- ------- |
| -
| |
| om~~~~~- illw -3...--- | | om~~~~~- illw -3...--- |
| A.. minOIODmiy4XMuM M # tAM sw m mnd 0 05/121 04/601 01 oo )Y7 Y 2 ist 1Y199 | | A.. minOIODmiy4XMuM M # tAM sw m mnd 0 05/121 04/601 01 oo )Y7 Y 2 ist 1Y199 |
|
| |
|
| ~.~m O~4CY3017 ovrn cyaw 2 22 2 C06CYlm7 cy211 cyDI, 1066- - | | ~.~m O~4CY3017 ovrn cyaw 2 22 2 C06CYlm7 cy211 cyDI, 1066- - |
| -- W 0 | | -- W 0 0UWMPIM MO 43-)3 - 363 |
| - -
| |
| 0UWMPIM MO 43-)3 - 363 | |
| - M-sam040 | | - M-sam040 |
|
| |
|
Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing ExaminationsML14164A027 |
Person / Time |
---|
Site: |
Oconee, Mcguire, Catawba, Harris, Brunswick, Crystal River, Robinson, McGuire |
---|
Issue date: |
06/03/2014 |
---|
From: |
Waldrep B Duke Energy Corp |
---|
To: |
Document Control Desk, Office of Nuclear Reactor Regulation |
---|
References |
---|
RA-14-0012, RIS-14-005 |
Download: ML14164A027 (11) |
|
|
---|
Category:Letter type:RA
MONTHYEARRA-24-0012, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report2024-02-0505 February 2024 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report RA-23-0242, Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2)2024-01-10010 January 2024 Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) RA-24-0015, Submittal of 2023 Sea Turtle Annual Report2024-01-10010 January 2024 Submittal of 2023 Sea Turtle Annual Report RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX2024-01-0808 January 2024 Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX RA-23-0295, Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval2024-01-0404 January 2024 Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval RA-24-0006, 10 CFR 50.54(q) Evaluation2024-01-0404 January 2024 10 CFR 50.54(q) Evaluation RA-23-0313, Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation2023-12-14014 December 2023 Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation RA-23-0320, Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency2023-12-14014 December 2023 Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency RA-23-0306, Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of.2023-12-12012 December 2023 Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of. RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0404 December 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0288, End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report2023-11-16016 November 2023 End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0182, Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency2023-11-16016 November 2023 Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency RA-23-0304, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0)2023-11-14014 November 2023 Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0) RA-23-0276, Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific2023-11-0606 November 2023 Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific RA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power2023-11-0202 November 2023 Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes2023-11-0101 November 2023 Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes RA-23-0275, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-10-12012 October 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area2023-10-0505 October 2023 License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area RA-23-0268, Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan2023-09-29029 September 2023 Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan RA-23-0234, Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS)2023-09-28028 September 2023 Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS) RA-23-0230, Refuel 27 (C1 R27) Inservice Inspection (ISI) Report2023-09-25025 September 2023 Refuel 27 (C1 R27) Inservice Inspection (ISI) Report RA-23-0218, Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals2023-09-21021 September 2023 Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes2023-09-20020 September 2023 Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes RA-23-0228, Registration for Use of General License Spent Fuel Cask Number 1752023-09-14014 September 2023 Registration for Use of General License Spent Fuel Cask Number 175 RA-22-0290, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2023-08-30030 August 2023 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology RA-23-0215, Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks2023-08-28028 August 2023 Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks RA-23-0223, Registration for Use of General License Spent Fuel Cask Numbers 173 and 1742023-08-23023 August 2023 Registration for Use of General License Spent Fuel Cask Numbers 173 and 174 RA-23-0222, On-Shift Staffing Analysis (Ossa), Revision 12023-08-23023 August 2023 On-Shift Staffing Analysis (Ossa), Revision 1 RA-23-0216, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks2023-08-22022 August 2023 Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks RA-23-0199, Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner2023-08-18018 August 2023 Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner RA-23-0211, Reply to a Notice of Violation (NOV) 05000270/2023010-022023-08-17017 August 2023 Reply to a Notice of Violation (NOV) 05000270/2023010-02 RA-23-0122, License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to .2023-08-17017 August 2023 License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to . RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0195, Notice of Intentions Regarding Apparent Violation Response; (EA-23-060)2023-07-20020 July 2023 Notice of Intentions Regarding Apparent Violation Response; (EA-23-060) RA-23-0186, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 31 (Revision 3)2023-07-18018 July 2023 Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 31 (Revision 3) RA-23-0141, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule2023-07-12012 July 2023 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule RA-23-0184, Registration for Use of General License Spent Fuel Cask Numbers 171 and 1722023-07-10010 July 2023 Registration for Use of General License Spent Fuel Cask Numbers 171 and 172 RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require2023-07-0707 July 2023 Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require RA-23-0045, Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 262023-06-28028 June 2023 Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 26 RA-23-0127, 10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record2023-06-28028 June 2023 10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record RA-23-0146, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-06-20020 June 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-18-0007, License Amendment Application to Revise Control Room Cooling Technical Specifications2023-06-19019 June 2023 License Amendment Application to Revise Control Room Cooling Technical Specifications RA-23-0145, Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Casks2023-06-15015 June 2023 Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Casks RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory2023-06-0707 June 2023 Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory RA-23-0139, Registration for Use of General License Spent Fuel Casks2023-06-0606 June 2023 Registration for Use of General License Spent Fuel Casks RA-23-0005, License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications2023-05-31031 May 2023 License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications RA-23-0120, Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.22023-05-31031 May 2023 Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-30030 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations 2024-02-05
[Table view] Category:License-Operator
MONTHYEARML23307A0772023-11-0303 November 2023 301 ADAMS 2B ML23079A0902023-03-20020 March 2023 1B- Post Exam Comments ML23065A0702023-03-0606 March 2023 Bru 2022301 2B Exam Administrative Items IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 ML23045A1842023-02-14014 February 2023 Post Examination Comment - Revised Simulator JPM B ML22350A1022022-12-16016 December 2022 301 Exam Administrative Items (Normal release)(ADAMS-2B) ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) ML22258A1262022-09-14014 September 2022 NRC Operator Licensing Examination Approval 05000400/2022301 ML22217A0792022-08-0303 August 2022 301, Corporate Notification Letter (210-day Ltr) ML22199A2552022-07-0606 July 2022 Ds Catawba 2022 RQ Inspection Notification Letter ML22089A1642022-03-30030 March 2022 301 ADAMS 2B ML22070B0512022-03-11011 March 2022 301 Post Exam Comments ML22066B0612022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 IR 05000269/20223012022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 ML22047A1812022-02-0909 February 2022 301 Written Exam Approval Letter ML22034A5352022-02-0202 February 2022 Notification of Licensed Operator Initial Examination 05000400/2022301 ML22031A2542022-01-25025 January 2022 301 Corporate Notification Letter ML21321A0882021-11-17017 November 2021 301 File 2B Exam Draft Items ML21320A3282021-11-16016 November 2021 301 File 2A2 Exam Draft Items (1).pdf ML21320A3312021-11-16016 November 2021 301 File 2A3 Exam Draft Items ML21286A5252021-10-13013 October 2021 1A Final SRO Exam, Answer Key, References ML21286A3632021-10-13013 October 2021 1A Final RO Exam, Answer Key, References ML21260A1402021-09-15015 September 2021 Operator Licensing Examination Approval 05000261/2021301 ML21258A3892021-09-15015 September 2021 Operating Licensing Examination Approval 05000413/2021301 and 05000414/2021301 ML21218A0952021-08-0606 August 2021 301 ADAMS 2B IR 05000269/20213012021-07-0606 July 2021 NRC Operator License Examination Report 05000269/2021301, 05000270/2021301, and 05000287/2021301 ML21167A3272021-06-16016 June 2021 301 ADAMS 2A-2 ML21167A3162021-06-16016 June 2021 301 ADAMS 2A-1 ML21167A3352021-06-16016 June 2021 301 ADAMS 2A-3 ML21167A2922021-06-16016 June 2021 301 ADAMS 2B IR 05000324/20213642021-06-11011 June 2021 Exam Approval Letter 05000348/2021-301 and 05000324/2021-364 ML21111A3502021-04-21021 April 2021 March 2021 GFE- Public.Docx ML21111A3422021-04-16016 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Oconee Nuclear Station ML21106A2142021-04-0707 April 2021 301 Retake Approval Letter ML21062A0762021-03-0303 March 2021 301 Corporate Notification Letter ML21060B1762021-03-0101 March 2021 301 Retake Corporate Notification Letter ML21055A6072021-02-23023 February 2021 301 Exam Corporate Notification Letter ML21054A1872021-02-23023 February 2021 302 (Normal release)2B Exam Administrative Items ML21054A1272021-02-23023 February 2021 302 Exam Final Items 2A-2 (2 Year Delayed Release) ML21054A1342021-02-23023 February 2021 302 Exam Administrative Items 2A-3 (2 Year Delayed Release) ML21034A6212021-02-0303 February 2021 301 2B (Normal Release) Exam Administrative Items ML21034A6102021-02-0303 February 2021 302 1A Final RO Written Exam & Key (2-Year Delayed Release) ML21034A6252021-02-0303 February 2021 301 2A Exam Final Items (2 Year Delayed Release) ML21034A6142021-02-0303 February 2021 302 1A Final SRO Written Exam & Key (2-Year Delayed Release) ML21034A6222021-02-0303 February 2021 301 2A Exam Administrative Items (2 Year Delayed Release) ML21028A3392021-01-25025 January 2021 301 ADAMS 2A-1 ML21028A4052021-01-25025 January 2021 301 ADAMS 2A-2 ML21028A4472021-01-25025 January 2021 301 ADAMS 2A-3 ML21028A1002021-01-18018 January 2021 301 ADAMS 2B 2023-03-06
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23307A0772023-11-0303 November 2023 301 ADAMS 2B ML23079A0902023-03-20020 March 2023 1B- Post Exam Comments ML23065A0702023-03-0606 March 2023 Bru 2022301 2B Exam Administrative Items IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 ML23045A1842023-02-14014 February 2023 Post Examination Comment - Revised Simulator JPM B ML22350A1022022-12-16016 December 2022 301 Exam Administrative Items (Normal release)(ADAMS-2B) ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) ML22258A1262022-09-14014 September 2022 NRC Operator Licensing Examination Approval 05000400/2022301 ML22217A0792022-08-0303 August 2022 301, Corporate Notification Letter (210-day Ltr) ML22089A1642022-03-30030 March 2022 301 ADAMS 2B IR 05000269/20223012022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 ML22066B0612022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 ML22047A1812022-02-0909 February 2022 301 Written Exam Approval Letter ML22034A5352022-02-0202 February 2022 Notification of Licensed Operator Initial Examination 05000400/2022301 ML22031A2542022-01-25025 January 2022 301 Corporate Notification Letter ML21321A0882021-11-17017 November 2021 301 File 2B Exam Draft Items ML21320A3312021-11-16016 November 2021 301 File 2A3 Exam Draft Items ML21320A3282021-11-16016 November 2021 301 File 2A2 Exam Draft Items (1).pdf ML21286A5252021-10-13013 October 2021 1A Final SRO Exam, Answer Key, References ML21286A3632021-10-13013 October 2021 1A Final RO Exam, Answer Key, References ML21258A3892021-09-15015 September 2021 Operating Licensing Examination Approval 05000413/2021301 and 05000414/2021301 ML21260A1402021-09-15015 September 2021 Operator Licensing Examination Approval 05000261/2021301 ML21218A0952021-08-0606 August 2021 301 ADAMS 2B IR 05000269/20213012021-07-0606 July 2021 NRC Operator License Examination Report 05000269/2021301, 05000270/2021301, and 05000287/2021301 ML21167A2922021-06-16016 June 2021 301 ADAMS 2B ML21167A3352021-06-16016 June 2021 301 ADAMS 2A-3 ML21167A3162021-06-16016 June 2021 301 ADAMS 2A-1 ML21167A3272021-06-16016 June 2021 301 ADAMS 2A-2 IR 05000324/20213642021-06-11011 June 2021 Exam Approval Letter 05000348/2021-301 and 05000324/2021-364 ML21106A2142021-04-0707 April 2021 301 Retake Approval Letter ML21062A0762021-03-0303 March 2021 301 Corporate Notification Letter ML21060B1762021-03-0101 March 2021 301 Retake Corporate Notification Letter ML21054A1872021-02-23023 February 2021 302 (Normal release)2B Exam Administrative Items ML21054A1342021-02-23023 February 2021 302 Exam Administrative Items 2A-3 (2 Year Delayed Release) ML21054A1272021-02-23023 February 2021 302 Exam Final Items 2A-2 (2 Year Delayed Release) ML21055A6072021-02-23023 February 2021 301 Exam Corporate Notification Letter ML21034A6102021-02-0303 February 2021 302 1A Final RO Written Exam & Key (2-Year Delayed Release) ML21034A6142021-02-0303 February 2021 302 1A Final SRO Written Exam & Key (2-Year Delayed Release) ML21034A6222021-02-0303 February 2021 301 2A Exam Administrative Items (2 Year Delayed Release) ML21034A6212021-02-0303 February 2021 301 2B (Normal Release) Exam Administrative Items ML21034A6252021-02-0303 February 2021 301 2A Exam Final Items (2 Year Delayed Release) ML21028A3392021-01-25025 January 2021 301 ADAMS 2A-1 ML21028A4052021-01-25025 January 2021 301 ADAMS 2A-2 ML21028A4472021-01-25025 January 2021 301 ADAMS 2A-3 ML21015A0202021-01-15015 January 2021 301 1A Final SRO Written Exam (2-Year Delayed Release) ML21015A0162021-01-15015 January 2021 301 1A Final RO Written Exam (2-Year Delayed Release) ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML21004A2352021-01-0404 January 2021 301 Exam Report Items - RO as Given Written Exam ML21004A2362021-01-0404 January 2021 301 Exam Report Items - SRO as Given Written Exam 2023-03-06
[Table view] |
Text
Al "Vo a ft"SW Ch,*NCm AldIbWV/PO, 0* fO Jun 3,2014'5.
JwwS,014I00FIR 50,4 U.S. Nucer Reultoy Commsion ATTN: Documnt C r Desk WMitnon, DC 20550001 Docket NMS.80-325, 50-34/snwe Licens W&B DPR &nd0PR402 Catlawbe Mwlear Station Unts I &Wd 2 Bru'nsik8 DocktM lEler "60-13, Noil~ow enewed 80414* Plant. Units Liee I i 2 NOS.' NPF-5 wand NPF-12 ShwcnBsRtsmn8 aowoaPst,Unit I Do tNO.
GrXW raN iR.ow-Rive.Unt Licav 1, tingdNO. uNPV-3O uclw dGends leaon I Poke N. O4Ct6es.*d-O NO.ZO
- 0R,-*72 O.* P.7 l Mons rN *i stimn, Units I arid
Docket NO&8GO-=, 12 ),Amew. License NOS8. NPF-9 and NPF-17 Cons Nuca Settion, Units 1,2*aid 8 Dodo WSh.5W- ,50-2M P0-o7/wRenwed Lics NOS. DP4So, DPOe47, nd DPR-5 S&Rbison, Sen El.tr Pati Uni" 2 Docket NO. 50-281/renewd Liew N0. WPR-23
,abmetResons toNRCRegl bs.ummery 2M1406 bowy On Aprll 29,2014, the Nuclear Regulatory Commisson issued Regulatoy Issue Summary (RIS) 201406,OP~repaaton and SchedLin of Operator Lienig xalstonV The RIS reqests soe vohiunary suýlts of inoense me lo provid updated IrtiormAton on ftftre Ucensin exmnain for aperators for fte calendar year 2018 throug 2019 on Form 53, 'Operato LicesingExa*ialo Data.' Irtcluded we fte aseiMes for Proposed Generic Fundaimental AttchdW are fte W4 536 forms for Mie Wrunsick Steam Electric Plart, Caftab Nuclea Staton, Shearonw Hanla Nuclea Power Pbst McGuire Nuclea Stalmo, Ocons. Nulear Station, and 8.&. WRobiso Stiem Soefti Plart Crys"a Rive U"~ 3 dd not subm NRC Form 5S6 as new operaftos are not ardlck.*te for Othi site.
K003
Seil: RA-14-0012 Junes3,2014 Page2 This submittal omli no new reguladty oonlmevn or changes to previox co l mentr s Plneae dire-any
&Wuti to Jota Ouw at (O00) 373-2011.
Wie Prasldwt Cprorat. Govemanuce &Operetlon ftport, Nuclea I -NAC Fonr6S3 Operato Ucevin Exa mn Data, 8nmi SMam Esctr PkM 2 -NRC Form 8, Opaor Ucensing Er=mnrao Oal, Cetsawb Nucmr Station 3- NRC Fognii 68 Operr* Unsn Eo Data Sharon w*s Nuclear Power Plant 4 - NRC Frm666V Operato Uobefiskeg Exmnination- Data, McGuir* Nuclear Station s - NAG fcbovh M3,&Operato Uicensing xalminaio Data, Oconee Nuclear Station 0.-Rk orh $36,mOperat orUenin E amiaton Data, H.S. Robinson Steam Elecbtr Plan
Seil PA-14-0012 June 3, 2014 Pop 3 me(wNh 4*omow,*:
Victor K MW>re, Rsgkmns ItAdmkiutrtormi U.S. Nuclea Regtdutoy Cmno~mmis Mrquis One Tower 246 Pe Ceter Avenu NE. Suit 1200 AUof GA 3ý08125 7 uA. er R *y Comm"Nui Rocle, lMD 20062",%8 AL Hot, ProjetMmhe (SUP&m)
U. Nuew B CoART 11G6Ao*
I**ckVf PI~m I1es PU RohVil. MD 2o0-2"M8 B.
E.oha.,
Mfe, Proec ProjW~ieger Mwn (*NdP)&MNS) .,
(04P U.S. Nudw PAWN" CoWmo 115*6 Rodw Ppow Mdal StopS GD1 mom stop a GMA R*gdom, MD 2o0S2.27-"
C.Grafto Project Mwtwig (CRNGP, tUnl 3)
U.& Nuclear PeWgmosy c ow 11665RFodwek n MAN stop a 01 Rockveb, MD 20862-2738 M.C. Barlias Prjoje Manqa (I4SRSEP, Unki 2 and BW4NPP, Unit 1)
U.S. Nucler Reguisory Co wmmiso 11IBM Rockvbs PU.
Mal Stop 8GGA Rociwis, MD 2086-2738 NRC SwierPkkkRm rWector
&UWO illok steun Swcf Plot
Serial: RA-14-0012 A.uns'3. 2014 NRC Senior R~k~ -npco Ooons Nuclear Sbl NRC Senio Raket ~co Mour Nuclar 8101w NRC Senio Rw~w npco Cdowbok,~ er SNO NRC SoiuPW Rm i wp~ r Crystal Aivw Unk 3 Nudes, Oenestln Plant NRC Senior Rtekldnt
- 4.8. Robbiso StaM Ble~r PWK 0* No. 2 NRC Senior RwaskenM #Uor SteamMw* Nr w PwerPlanUn1I
Swmd-m RA-14-0012W June 3.20 14 S .'e.*
'Nt *# 4 LEma, .. ~4flI~I
~
I Vr OEAT Ua..k
.~-
ale!
'VtM"'t-r
~Pu1iw UO"
-, ~ ~ N~sn
.40 ý "Ky~u(p It I -
-- KW~wwf1JJ&,mw O (PIe CN 811.01) 5 U) GPWPIPC IFU R." F ALS k-OMINA IVIP'oi(5 {F 1 1. 14E 'u 1`7n 7 ` T q x' - ' W - 1-. ~ '
A WI ill-il' 0s "-
13 0 S ON-W EI ~ MUM HawJU 0 _-M _M,
- 0) w Elbouw bmor"am sm to ft y mos. agf w I hm. I* honosmm b no 0 00 bub am mus In oWs OPERATO - I"WSMm OP4bd N-. tt -~ - owd a" OPMA~C K.I-mu- 3C 3SMWj Catswbs Nudge St~an, liits Mm. I and 2 A. PR6OPOIlED I-2W pMTiW PEARATMO OL PWPO NWuU CY2016 CY2017 CY2018 CY2019 ISTSAWS uin IOU=
00 0 0 IgamN CY2016 MOP01 CV2O18 CY2019 NWNNO ILM9 6 6 WIRO USOR RACO mmoP RoomSAN memo 3 3 3 3 NAIOFEmRcw 3 3 6 6 MJIPNTN -La l 0 0 0 0 PORAAY WX1 05116/2016 05/15/217 05/14=208 05/13/2019 ALTEW4TE DATE 0553012016 0519/217 05/23i W21 5/27/2019 POO CVr 2016 CY 2017 NUMUIRý JUNE. 8ETEBE DEC WUEK MARCH JUNE SEPTIMSR DCME ANWMSOP 12 0 ~ 0 0 12 0 0
how. *AWkdml af b wd 6 Owm Mlob admomf up Noq OPOAMRIN&~s OPIRAT~~~t Sad Oein4 Moft MO N tfWmf 0 "Au bIM~
(t4ft%U.S. 1WiWlN I COM WNAOC aus*M,. 0O MWmlW DX#A' ATIA "b-" -,-- , MuIhD ftftaoe. a" d, k -. O Nudsw Muf_ _
p~poSUWik~ CY2016 CY2017 CY2018 CY2019 UEUIWMEDNUMKROF NR.WW0 0 0 0 PROOM maIn CY2016 CY2017 CY2018 CY2019 WWW RECMO 6 9 0 6 OPMATOM-I4TI 3 4 0 HLA F80"MN 3 4 0 3
"~OSo f"0 0 00 Pft"YOA1t 6//16 11iJ27/17 W/A [2t2/19 ALT~1fDA~fTE 6/13/16 12/4/17 N/A 12/9/19 CV2016 Cy 2017 CANDIMTB wruu
U.ftaWUALA RSUAMTQRY 4MUSUON APPOWMS3VaO NO.ms WWSWS I4U1 "4 AimI I bv of mm Ii bom b ~tayh VdWNYI I mi mU61N1 I hW, 't bI to pa bwl* d I s I nfft #- -------
om~~~~~- illw -3...---
A.. minOIODmiy4XMuM M # tAM sw m mnd 0 05/121 04/601 01 oo )Y7 Y 2 ist 1Y199
~.~m O~4CY3017 ovrn cyaw 2 22 2 C06CYlm7 cy211 cyDI, 1066- -
-- W 0 0UWMPIM MO 43-)3 - 363
- M-sam040
WAd inow ON"* mim imm a"i om b so w W-(MFf U&a PAOICMiif -
bW$f CUNOW W&YKing. W DATATO awew Uad - b 00uk NW 00s 4uikbWA 1"maouomsinm CY 16 CY 17 CY is CV 19 UC84IK4W4W*M 01 1 ESTUAEDNL OF WI4ipm0 0 0 0 lOPOUDWU CY 16 CY 17 CV is CVJ19 NUIMU OF NPCTOR 0 6 6 6 opmWTos
-imOF 160m RCOAM WMiMSOFSlORRSAOIO 0 4 4 4
-PWTN - UMWIC PrWARY DATE N(A 0=f712017 02r26l01 02/25/219 ALTOM4A1 DAM N/A 03t=72017 03r26201 03W252019 CV 16 CV 17
-u -_c~ E B N M R HA LP O W D_C _
NMudSKOF r 14 II 14 CANDIOATES