| {{#Wiki_filter:AmerGen..AmerGen Energy Company www.exeloncorp.com An Exelon Company Oyster Creek US Route 9 South, P.O. Box 388 Forked River, NJ 08731-0388 July 24, 2006 2130-06-20365 2120-062-2840 US Nuclear Regulatory Commission Document Control Desk -NRC Washington, DC 20555 | | {{#Wiki_filter:AmerGen Energy Company www.exeloncorp.com AmerGen.. An Exelon Company Oyster Creek US Route 9 South, P.O. Box 388 Forked River, NJ 08731-0388 July 24, 2006 2130-06-20365 2120-062-2840 US Nuclear Regulatory Commission Document Control Desk - NRC Washington, DC 20555 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Oyster Creek Generating Station Docket 50-219 Sea Turtle Incidental Capture Report 2006-1 This report provides detailed information regarding the recent incidental capture of a juvenile Kemp's Ridley sea turtle at the Oyster Creek Generating Station. The turtle was captured live during the morning of June 30, 2006 after it was removed from the dilution water intake structure trash bars. As indicated on the attached incident report, the turtle was taken to the Marine Mammal Stranding Center in Brigantine, NJ for examination, feeding and eventual release. After confirming that the turtle was feeding and moving about normally, the turtle was released by Marine Mammal Stranding Center personnel into the Atlantic Ocean in Brigantine, NJ on July 5, 2006.If you have any questions or require additional information, please do not hesitate to contact Mr. Malcolm Browne at (609) 971-4124.Very truly yours, J es J. RandichY(9 Plant Manager JJR/KB/MEB Enclosure cc: Ms. Carrie Upite U.S. Department of Commerce National Oceanic & Atmospheric Administration National Marine Fisheries Service Northeast Region Protected Resources Division One Blackburn Drive Gloucester, MA 01930 Page 2 of 2 cc: Mr. Samuel Collins, Administrator, Region 1 US Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 US Nuclear Regulatory Commission Senior Project Manager Washington, DC 20555 Ms. Harriet Nash, Mailstop 0-11 -Fl US Nuclear Regulatory Commission Washington, DC 20555 Mr. Michael Masnik, Mailstop 0-1 -Fl US Nuclear Regulatory Commission Washington, DC 20555 Senior Resident Inspector Oyster Creek Generating Station PO Box 388 Forked River, NJ 08731 Ms. Jeanette Bowers-Altman NJ Department of Environmental Protection Division of Fish, Game, and Wildlife P.O. Box 400 Trenton, NJ 08625-0400 Regulatory Assurance File No. 06024 OYSTER CREEK GENERATING STATION Sea Turtle Incidental Capture Report 2006-1 At approximately 1100 hours on Friday June 30, 2006, an Oyster Creek Generating Station (OCGS) operator performing a routine cleaning of the trash racks noticed a sea turtle among the vegetation and debris removed from Bay # I of the dilution water intake structure. | | Oyster Creek Generating Station Docket 50-219 Sea Turtle Incidental Capture Report 2006-1 This report provides detailed information regarding the recent incidental capture of a juvenile Kemp's Ridley sea turtle at the Oyster Creek Generating Station. The turtle was captured live during the morning of June 30, 2006 after it was removed from the dilution water intake structure trash bars. As indicated on the attached incident report, the turtle was taken to the Marine Mammal Stranding Center in Brigantine, NJ for examination, feeding and eventual release. After confirming that the turtle was feeding and moving about normally, the turtle was released by Marine Mammal Stranding Center personnel into the Atlantic Ocean in Brigantine, NJ on July 5, 2006. |
| The turtle appeared to be alive and in good condition when captured. | | If you have any questions or require additional information, please do not hesitate to contact Mr. Malcolm Browne at (609) 971-4124. |
| OCGS Environmental personnel who took custody of the turtle confirmed it to be a juvenile Kemp's Ridley sea turtle (Lepidochelys kempi). The water temperature at the time of the incidental capture was approximately 78.1 F (25.6 C) and OCGS was in operation at 100% power with four circulating water pumps and two dilution pumps in operation. | | Very truly yours, J es J.RandichY(9 Plant Manager JJR/KB/MEB Enclosure cc: Ms. Carrie Upite U.S. Department of Commerce National Oceanic & Atmospheric Administration National Marine Fisheries Service Northeast Region Protected Resources Division One Blackburn Drive Gloucester, MA 01930 |
| Although it is impossible to say precisely how long the turtle had been on the trash bars prior to removal, the dilution water trash racks had been inspected earlier the same day at 0500 hours. The turtle was not observed during that trash rack inspection. | | |
| The turtle measured 10.8 in (27.3 cm) carapace length straight line and weighed 7.7 lb (3.5 kg).Some small scrapes were observed on the dorsal and ventral (top and bottom) surfaces of the carapace. | | Page 2 of 2 cc: Mr. Samuel Collins, Administrator, Region 1 US Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 US Nuclear Regulatory Commission Senior Project Manager Washington, DC 20555 Ms. Harriet Nash, Mailstop 0-11 -Fl US Nuclear Regulatory Commission Washington, DC 20555 Mr. Michael Masnik, Mailstop 0-1 -Fl US Nuclear Regulatory Commission Washington, DC 20555 Senior Resident Inspector Oyster Creek Generating Station PO Box 388 Forked River, NJ 08731 Ms. Jeanette Bowers-Altman NJ Department of Environmental Protection Division of Fish, Game, and Wildlife P.O. Box 400 Trenton, NJ 08625-0400 Regulatory Assurance File No. 06024 |
| No tags were present on the turtle when captured. | | |
| USNRC and NMFS personnel were notified of the capture within 24 hours on June 30, 2006.The turtle was taken to the Marine Mammal Stranding Center (MMSC) in Brigantine, NJ at approximately 1300 hours on June 30, 2006. At the MMSC, the turtle was examined, fed and observed. | | OYSTER CREEK GENERATING STATION Sea Turtle Incidental Capture Report 2006-1 At approximately 1100 hours on Friday June 30, 2006, an Oyster Creek Generating Station (OCGS) operator performing a routine cleaning of the trash racks noticed a sea turtle among the vegetation and debris removed from Bay # I of the dilution water intake structure. The turtle appeared to be alive and in good condition when captured. OCGS Environmental personnel who took custody of the turtle confirmed it to be a juvenile Kemp's Ridley sea turtle (Lepidochelys kempi). The water temperature at the time of the incidental capture was approximately 78.1 F (25.6 C) and OCGS was in operation at 100% power with four circulating water pumps and two dilution pumps in operation. Although it is impossible to say precisely how long the turtle had been on the trash bars prior to removal, the dilution water trash racks had been inspected earlier the same day at 0500 hours. The turtle was not observed during that trash rack inspection. |
| After confirming that the turtle was feeding and moving normally, the turtle was released into the Atlantic Ocean by MMSC personnel at 3 8 th Street Beach, Brigantine, NJ on July 5, 2006. | | The turtle measured 10.8 in (27.3 cm) carapace length straight line and weighed 7.7 lb (3.5 kg). |
| £0'd lzlaL SEA TURTLE STRANDING AND SALVAGE NETWORK -STRANDING REPORT OBSERVER'S NAME IADDRESS I PHONE: Fir.qt PAI. M.I._ Last Deere AWff .on Marie ?Aarnnl Strandina Confr Aclros _ Eox 773.3625 Blvd.. Brilantne, NJ 05233 STRANDING DATE;Year 20 06 Monlh 06 [ Day J&'Turle number by day _31.Field ID -.MUSC-O807 Coordforwmustl#e nWdwhf 24 hr; utha was done by Won# paq)M-,30 QdmahI CPUx Area code/Phone numter f69) 266-0539 SPECIES: {check anal o W = =K Konri RA cy'chLI t.OfdlveNOdW | | Some small scrapes were observed on the dorsal and ventral (top and bottom) surfaces of the carapace. No tags were present on the turtle when captured. USNRC and NMFS personnel were notified of the capture within 24 hours on June 30, 2006. |
| 'poshive.
| | The turtle was taken to the Marine Mammal Stranding Center (MMSC) in Brigantine, NJ at approximately 1300 hours on June 30, 2006. At the MMSC, the turtle was examined, fed and observed. After confirming that the turtle was feeding and moving normally, the turtle was released into the Atlantic Ocean by MMSC personnel at 3 8 th Street Beach, Brigantine, NJ on July 5, 2006. |
| DO -ltUGum.STRANDNG LOCATION:
| | |
| DO0fsho (MAwidc Gvui beCE: Ejle 4bay, Over, nlMai, e.State .mJaerey County Oc.La Coun ,.Descrpttive | | £0'd lzlaL SEA TURTLE STRANDING AND SALVAGE NETWORK - STRANDING REPORT OBSERVER'S NAME IADDRESS I PHONE: STRANDING DATE; Fir.qt PAI. M.I._ Last Deere Year 20 06 Monlh 06 Day |
| [p aion (b' )_Forkod Rivr, Oster Creek Nuclea'I'ower PLnrt.tIvnded on wader Intak..I ntbude 3O.S417"N Longi.ude 74.2070,lO F~jU1Carc: | | [ J& |
| W~ocltIhas UN-,§ia 6 'veni.d by ccoaranrrl 1Yus '2 Na CONDITION: (check one}0f U =*Mte El I = Friaii dkd' 2 = rModumt4.1f d.,r.TwrzpM f3; 8a','er~y 1El 4 Drk;d 5 u oVeel bonis c.nly TAGS: oantac- cowvdiaofr~t ftpous o(any taggeda, nmAil ClmimuJl -y re U Nih Chec~k IIII4i1"qf5 ffOLnd rectrdtag rumb0~) I -ag bca~m ireluni udtuss FINAL DISPOSITION: (check)Ell -Lefllti bdIL wIkrk ntid; parOd ed] OVer 1D]No(51]2 -Bad" [] ,m nnnc,..,h
| | AWff .on Marie ?Aarnnl Strandina Confr 'Turle number by day _31. |
| ! ::]n bch: CNCMS -4lf,, '.fote azried? FlYer rf No= Siw~gd; fl al.' ,S Dp~rt[). 014 u Pilied Up on teacdfflJne pa'ned? QYcs' N.r PW=Av.urasased I 0Ew..hb~mnorn~hritinIlflyyr, wN? MMSC rTB = LeIL " u. 1 t a,'-mwred; painid, E,, real fINu[O = Disp.ki1on uvikMownt eJirn I I I --anipwatcrr P.TItugg cn? 1Yc EWNa If ftw;nd, reoed nurrbr'!11: | | Aclros _ Eox 773.3625 Bda*lnr* Blvd.. Brilantne, NJ 05233 Field ID -.MUSC-O807 Coordforwmustl#e nWdwhf 24 hr; utha was done by Won#paq)M-,30 Area code/Phone numter f69) 266-0539 QdmahI CPUx SPECIES: {check anal STRANDNG LOCATION: DO0fsho (MAwidc Gvui beCE: Ejle 4bay, Over, s*,.d, nlMai, e. |
| IDCliIm OC.eJ,-gIv ,U =V E Yes No If Mq.dve reIamra' remr7 (ftIrNor: Cit~rhea for livng togNUB, u No If Iuma. r9=4~ bctiou (imlI. mjiibus & idio CARAPACE MEASUREMENTS: | | o W= LWCa-*t State .mJaerey County Oc.La Coun ,. |
| t(seae gf UsirLg calipers Circle ,mk SoMight Iength (NOTCH-TIP)
| | Descrpttive [p aion (b' *s.;fl )_Forkod Rivr, Oster Creek Nuclea'I'ower PLnrt. |
| -.27.3 tIn'Minimum lingth (NOTCH.N OTCH). cm. in Stmight vidch a'Jldma Pofrt) 25 5}ij iij Using non-metal mwesuring tape ircle, untit'Cw rd le" (NOTCH-TIP) | | tIvnded on wader Intak.. |
| -.cM I in IFLr0ol ItNOTCH NOTCH) _ vn I brllin COved yjiddl Pain-) .cnl 'lb.clole Junk Weight Ei vt les. -.7 kg !]1 Mark wounds! tnorarnities Dn diagrams at I' nnd d4Roribe below (notf tr oril, 9.pa ordebais rtanrtemf-nt. | | =KKonri RA cy' I ntbude 3O.S417"N Longi.ude 74.2070,lO chLIt.OfdlveNOdW |
| pinprlirr dam~je, epibi,.u, papillomas, afnf;alvni, ek.}. Please note if no wounds I nbnobrnitaifl arm found.miont abrasions on carapace and plast-un frorr water intakl urate: observed for several days: ealn well on own and diving with out difficulty: | | 'poshive. DO |
| tgeg.LFF With metal tag #bSL17Bzreleaad07(0512006 at2a St. bach, Boantine, NJ LW--9-.38917 "N LornA: 74,3W67 "N ENINUI..S 7h1t,:W 3 ,[tticB-I ,,c-:at 77ri I I IN(I lImN SCI.}} | | -ltUGum. CONDITION: (check one} FINAL DISPOSITION: (check) 0f U=*Mte Ell - Lefllti bdIL wIkrk ntid; parOd ed] OVer 1D]No(51 El I = Friaii dkd ]2-Bad" [] ,mnnnc,..,h ! ::]n bch: |
| | F~jU1Carc: W~ocltIhas UN-, ' 2 =rModumt4.1f d.,r.TwrzpM CNCMS -4lf,, '.fote azried? FlYer rf No f3; 8a','er~yd*exW.To |
| | §ia 6 'veni.d by ccoaranrrl 1El 4 73.J* = Siw~gd; fl al.',SDp~rt[). *ht'hy? |
| | * 1Yus '2 Na [.*_ 5 uDrk;d oVeel ,*,nru bonis c.nly 014u Pilied Up on teacdfflJne pa'ned? QYcs' N.r TAGS: oantac- cowvdiaofr~t ftpous o(any taggeda,nmAil I PW=Av.urasased 0Ew..hb~mnorn~hritinIlflyyr,wN? MMSC ClmimuJl -yFppthtopfl*v re U Nih rTB = LeIL 1" u. t a,'-mwred; painid, E,,real fINu Chec~k IIII4i1"qf5 ffOLnd rectrdtag [O = Disp.ki1on uvikMownt eJirn rumb0~)I-ag bca~m ireluni udtuss I II anipwatcrr -- |
| | CARAPACE MEASUREMENTS: t(seae gf P.TItuggcn? 1Yc EWNa UsirLg calipers Circle ,mk Ifftw;nd, reoed nurrbr'!11: IDCliIm SoMight Iength (NOTCH-TIP) -. 27.3 tIn' Minimum lingth (NOTCH.N OTCH). cm. in OC.eJ,-gIv =V E Yes |
| | ,U No Stmight vidch a'Jldma Pofrt) 25 5}ij iij If Mq.dve reIamra' remr7sIom*n (ftIrNor: Using non-metal mwesuring tape ircle, untit' Cw le" rd (NOTCH-TIP) - . cM I in Cit~rhea for livng togNUB, u No M*lurLuni IFLr0ol ItNOTCH NOTCH) _ vn I brllin If Iuma. r9=4~ bctiou (imlI. mjiibus &idio COved yjiddl (Wid4*s Pain-) .cnl 'lb. |
| | clole Junk Weight Ei vt les. -. 7 kg !] |
| | 1 Mark wounds! tnorarnities Dn diagrams at I' nnd d4Roribe below (notf tr oril,9.pa ordebais rtanrtemf-nt. pinprlirr dam~je, epibi,.u, papillomas, afnf;alvni, ek.}. Please note if no wounds I nbnobrnitaifl arm found. |
| | miont abrasions on carapace and plast-un frorr water intakl urate: |
| | observed for several days: ealn well on own and diving with out difficulty: |
| | tgeg.LFF With metal tag #bSL17Bzreleaad07(0512006at2a St. bach, Boantine, NJ LW--9-.38917 "N LornA: 74,3W67 "N ENINUI..S 7h1t,:W 3 ,[tticB-I ,,c-:at wn?.Z*-r 77ri |
| | |
| | I I IN(I lImNSCI.}} |
|
---|
Category:Letter
MONTHYEARML24274A0822024-09-25025 September 2024 Independent Spent Fuel Storage Installation Security Plan, Training Qualification Plan, Safeguards Contingency Plan, Revisions 1 and 2 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000219/20240022024-09-0505 September 2024 – NRC Inspection Report 05000219/2024002 and 07200015/2024001 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24214A0372024-08-0101 August 2024 License Amendment Request to Revise Renewed Facility Operating License to Add License Condition 2.C.(18) to Include License Termination Plan Requirements ML24179A1842024-07-23023 July 2024 June 20, 2024, Clarification Call on Preapplication Readiness Assessment of the Holtec Decommissioning International License Termination Plan ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000219/20240012024-05-14014 May 2024 Decommissioning Intl, LLC Oyster Creek Nuclear Generating Station - NRC Inspection Report No. 05000219/2024001 ML24120A0412024-04-29029 April 2024 Annual Radioactive Environmental Operating Report for 2023 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24120A0402024-04-29029 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24094A2142024-04-19019 April 2024 Preapplication Readiness Assessment of the Holtec Decommissioning International License Termination Plan ML24089A2492024-03-29029 March 2024 Reply to Notice of Violation EA-2024-024 L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML24085A7902024-03-28028 March 2024 – Preapplication Readiness Assessment of the License Termination Plan ML24081A2882024-03-21021 March 2024 Request Preliminary Review and Feedback on Chapter 6 of the Draft License Termination Plan ML24046A1242024-02-29029 February 2024 – NRC Inspection Report 05000219/2023003 ML24033A3272024-02-0202 February 2024 Request Preliminary Review and Feedback on Chapter 5 of the Draft License Termination Plan ML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 IR 05000219/20230022023-11-0909 November 2023 EA-23-076 Oyster Creek Nuclear Generating Station - Notice of Violation and Proposed Imposition of Civil Penalty - $43,750 - NRC Inspection Report No. 05000219/2023002 ML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML23249A1212023-09-0606 September 2023 NRC Inspection Report 05000219/2023002, Apparent Violation (EA-23-076) ML23242A1162023-08-30030 August 2023 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Report January 1, 2021 Through December 31, 2022 ML23214A2472023-08-22022 August 2023 NRC Inspection Report 05000219/2023002 IR 05000219/20230012023-05-31031 May 2023 NRC Inspection Report No. 05000219/2023001 IR 07200015/20234012023-05-16016 May 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2023401 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 ML23114A0912023-04-24024 April 2023 Annual Radioactive Effluent Release Report for 2022 ML23114A0872023-04-24024 April 2023 Annual Radioactive Environmental Operating Report for 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000219/20220022023-02-0909 February 2023 NRC Inspection Report No. 05000219/2022002 ML23031A3012023-02-0808 February 2023 Discontinuation of Radiological Effluent Monitoring Location in the Sewerage System ML23033A5052023-02-0202 February 2023 First Use Notification of NRC Approved Cask RT-100 ML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22297A1432022-12-15015 December 2022 Part 20 App G Exemption Letter L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 IR 07200015/20224012022-12-0606 December 2022 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2022401 (Letter & Enclosure 1) ML22280A0762022-11-0202 November 2022 Us NRC Analysis of Holtec Decommissioning Internationals Funding Status Report for Oyster Creek, Indian Point and Pilgrim Nuclear Power Station ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22286A1402022-10-13013 October 2022 NRC Confirmatory Order EA-21-041 IR 05000219/20220012022-08-11011 August 2022 NRC Inspection Report 05000219/2022001 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22214A1732022-08-0202 August 2022 Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML22207B8382022-07-26026 July 2022 NRC Confirmatory Order EA-21-041 ML22130A6882022-05-10010 May 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 2024-09-05
[Table view] Category:Report
MONTHYEARML24214A0782024-08-0101 August 2024 Enclosure 22: Tsd 24-055, Basement Fill Model: Probabilistic Analysis for Instantaneous Release Scenario Assuming Industrial Use Exposure Pathways, Revision 0 ML24214A0612024-08-0101 August 2024 Enclosure 15: ENG-OCS-014 Revision: 0, Basement Fill Model: Probabilistic Analysis for Embedded Pipes Scenario Oyster Creek Station, January 2024 ML24214A0692024-08-0101 August 2024 Enclosure 18: Technical Basis Document No. 24-01-12-2888 Revision 1, Dose Contribution from Insignificant Radionuclides in the Oyster Creek Site-Specific Suite of Radiological Nuclides, February 14, 2024 ML24214A0702024-08-0101 August 2024 Enclosure 19: Technical Basis Document, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Surveys at OCNGS Revision 0, February 14, 2024 ML24214A0372024-08-0101 August 2024 License Amendment Request to Revise Renewed Facility Operating License to Add License Condition 2.C.(18) to Include License Termination Plan Requirements ML24214A0792024-07-0808 July 2024 Enclosure 23: Tsd 24-063, Basement Fill Model: Calculation of Dcglw/F Values Assuming Industrial Use Scenario Exposure Pathways, Revision 0 ML24214A0482024-03-31031 March 2024 Enclosure 6: Oyster Creek Nuclear Generating Station Below Grade Structures Radiological Characterization Report Revision 1, March 2024 ML24214A0492024-03-0606 March 2024 Enclosure 7: ENG-OCS-002 Revision 1, RESRAD-Build Input Parameter Sensitivity Analysis - Ocs, March 6, 2024 ML24214A0642024-03-0606 March 2024 Enclosure 16: ENG-OCS-015 Revision: 1, Basement Fill Model: Calculation of Embedded Pipe Dcgl Values Oyster Creek Station, March 6, 2024 ML24214A0602024-03-0606 March 2024 Enclosure 14: ENG-OCS-013 Revision: 1, Basement Fill Model: Calculation of Dcglw/F Values Assuming Industrial Use Scenario Exposure Pathways Oyster Creek Station, March 6, 2024 ML24214A0652024-02-20020 February 2024 Enclosure 17: ENG-OCS-016 Revision: 0, Calculation of Buried Pipe Dcgl Values Oyster Creek Station, February 20, 2024 ML24214A0722024-02-14014 February 2024 Enclosure 20, Oyster Creek 100 Year Land Use Outlook - Categorization and Justification, Ghd, February 9, 2024 ML24214A0582023-11-0101 November 2023 Enclosure 13: ENG-OCS-012 Revision: 0, Basement Fill Model Probabilistic Analysis for Instantaneous Release Scenario Assuming Industrial Use Exposure Pathways Oyster Creek, November 1, 2023 ML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML24214A0542023-07-26026 July 2023 Enclosure 11: ENG-OCS-008 Revision: 0, Derived Concentration Guideline Levels Values for Soil – Industrial Use Scenario Oyster Creek, July 26, 2023 ML24214A0532023-07-25025 July 2023 Enclosure 10: ENG-OCS-007 Revision 0, RESRAD-Onsite Probabilistic Analysis - Industrial Use Scenario Oyster Creek Station, July 25, 2023 ML24214A0442023-04-24024 April 2023 Enclosure 5: Oyster Creek Generating Station Radiological Characterization Report Revision 1, April 24, 2023 ML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML24214A0752022-09-0808 September 2022 Enclosure 21: Oyster Creek Hydrogeologic Investigation Report, September 8, 2022 ML24214A0572022-08-0404 August 2022 Enclosure 12, ENG-OCS-009 Revision: 0, Area Factors for Soil – Industrial Use Scenario, August 4, 2022 ML22130A6882022-05-10010 May 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML24214A0522022-04-14014 April 2022 Enclosure 9: ENG-OCS-006 Revision: 1, Area Factors for Use with Oyster Creek Dcgl Values for Buildings/Structures, April 14, 2022 ML24214A0512022-04-12012 April 2022 Enclosure 8: ENG-OCS-004 Revision 0, Resrad Building Surface Dcgl Values Oyster Creek, April 12, 2022 ML24214A0432022-01-17017 January 2022 Enclosure 4: Radionuclide Selection for Dcgl Development Oyster Creek Station Site Characterization Project, Revision 1, January 17, 2022 ML24214A0392021-11-30030 November 2021 Enclosure 3: Oyster Creek Station, Historical Site Assessment (Hsa) Revision 2, November 2021 ML21036A1692021-01-29029 January 2021 ISFSI Only Security Plan, Training Qualification Plan, Safeguards Contingency Plan Supplemental Information ML20153A2282020-05-29029 May 2020 Biological Opinion for Oyster Creek Shutdown and Decommissioning ML19214A0452019-08-0202 August 2019 NRC to NMFS, Revised Proposed Action for Oyster Creek Endangered Species Act Section 7 Consultation ML19029B3332019-01-29029 January 2019 Security Inspection Plan for Oyster Creek Station - 2019 RA-18-084, Secondary Containment Capability Test2018-09-14014 September 2018 Secondary Containment Capability Test ML18033B7442018-02-21021 February 2018 Staff Assessment of the Response to 10 CFR 50.54(F) Information Request Flood-Causing Mechanism Reevaluation RA-17-032, Submittal of Biennial 10 CFR 50.59 and 1 O CFR 72.48 Change Summary Reports - January 1, 2015 Through December 31, 20162017-05-16016 May 2017 Submittal of Biennial 10 CFR 50.59 and 1 O CFR 72.48 Change Summary Reports - January 1, 2015 Through December 31, 2016 ML15350A3532016-02-17017 February 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near Term Task Force... RA-15-042, Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Reports - January 1, 2013 Through December 31, 20142015-05-26026 May 2015 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Reports - January 1, 2013 Through December 31, 2014 ML15093A2842015-02-23023 February 2015 Enclosure 2: Flood Hazard Reevaluation Report for Oyster Creek Nuclear Generating Station, Rev. 1 RA-14-078, Secondary Containment Capability Test2014-10-24024 October 2014 Secondary Containment Capability Test RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 RA-14-068, Sea Turtle Incidental Take Report 2014-32014-08-0101 August 2014 Sea Turtle Incidental Take Report 2014-3 ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14065A2322014-06-16016 June 2014 Staff Assessment of Response to Enclosure 4 of the March 12, 2012, 10 CFR 50.54(F) Information Request - Flooding Walkdowns ML14030A5132014-02-19019 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14038A1112014-02-11011 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Oyster Creek Nuclear Generating Station, TAC No.: MF0824 NEI 99-04, Oyster Creek Nuclear Generating Station, Commitment Change Summary Report - 20122013-12-23023 December 2013 Oyster Creek Nuclear Generating Station, Commitment Change Summary Report - 2012 RA-13-127, Commitment Change Summary Report - 20122013-12-23023 December 2013 Commitment Change Summary Report - 2012 RA-13-088, Sea Turtle Incidental Take Report 2013-52013-09-0909 September 2013 Sea Turtle Incidental Take Report 2013-5 RA-13-074, Sea Turtle Incidental Take Reports 2013-1 and 2013-22013-08-0909 August 2013 Sea Turtle Incidental Take Reports 2013-1 and 2013-2 ML15093A2832013-07-0303 July 2013 Enclosure 1: Local Intense Precipitation Evaluation Report for Oyster Creek, Rev. 6 RS-12-177, E Plan for Future Seismic Walkdown of Inaccessible Equipment2013-04-26026 April 2013 E Plan for Future Seismic Walkdown of Inaccessible Equipment ML13120A1862013-04-0909 April 2013 Enclosure 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic Updated Transmittal # 1 for the Oyster Creek Generating Station Correspondence No. RS- ML13098A2092013-04-0505 April 2013 2.206 Petition by New Jersey Environmental Federation (Et.Al.) for Oyster Creek Nuclear Generating Station Exelon Generation Company, LLC 2024-08-01
[Table view] Category:Miscellaneous
MONTHYEARML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML19029B3332019-01-29029 January 2019 Security Inspection Plan for Oyster Creek Station - 2019 ML18033B7442018-02-21021 February 2018 Staff Assessment of the Response to 10 CFR 50.54(F) Information Request Flood-Causing Mechanism Reevaluation RA-17-032, Submittal of Biennial 10 CFR 50.59 and 1 O CFR 72.48 Change Summary Reports - January 1, 2015 Through December 31, 20162017-05-16016 May 2017 Submittal of Biennial 10 CFR 50.59 and 1 O CFR 72.48 Change Summary Reports - January 1, 2015 Through December 31, 2016 ML15350A3532016-02-17017 February 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near Term Task Force... RA-15-042, Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Reports - January 1, 2013 Through December 31, 20142015-05-26026 May 2015 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Reports - January 1, 2013 Through December 31, 2014 RA-14-068, Sea Turtle Incidental Take Report 2014-32014-08-0101 August 2014 Sea Turtle Incidental Take Report 2014-3 ML14065A2322014-06-16016 June 2014 Staff Assessment of Response to Enclosure 4 of the March 12, 2012, 10 CFR 50.54(F) Information Request - Flooding Walkdowns NEI 99-04, Oyster Creek Nuclear Generating Station, Commitment Change Summary Report - 20122013-12-23023 December 2013 Oyster Creek Nuclear Generating Station, Commitment Change Summary Report - 2012 RA-13-127, Commitment Change Summary Report - 20122013-12-23023 December 2013 Commitment Change Summary Report - 2012 RA-13-088, Sea Turtle Incidental Take Report 2013-52013-09-0909 September 2013 Sea Turtle Incidental Take Report 2013-5 RA-13-074, Sea Turtle Incidental Take Reports 2013-1 and 2013-22013-08-0909 August 2013 Sea Turtle Incidental Take Reports 2013-1 and 2013-2 ML13098A2092013-04-0505 April 2013 2.206 Petition by New Jersey Environmental Federation (Et.Al.) for Oyster Creek Nuclear Generating Station Exelon Generation Company, LLC IR 05000454/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000456/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee ML13008A2192013-01-31031 January 2013 U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000461/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000289/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000272/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000254/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000277/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000219/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000352/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000373/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000237/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee ML12178A2152012-08-0202 August 2012 Closeout of Bulletin 2011-01 Migrating Strategies. ML12166A5042012-07-0505 July 2012 Operating Station Review of Committment Submittal for License Renewal Regarding Thermal Aging Irradiation Embrittlement of Cast Austenitic Stainless Steel ML1127000692011-09-26026 September 2011 Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants RA-11-031, Oyster Creek - Submittal of Commitment Change Summary Report - 20102011-08-12012 August 2011 Oyster Creek - Submittal of Commitment Change Summary Report - 2010 NEI 99-04, Oyster Creek - Submittal of Commitment Change Summary Report - 20102011-08-12012 August 2011 Oyster Creek - Submittal of Commitment Change Summary Report - 2010 RA-11-005, Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Reports - January 1, 2009 Though December 31, 20102011-06-24024 June 2011 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Reports - January 1, 2009 Though December 31, 2010 RA-10-023, Submittal of Commitment Change Summary Report - 20092010-08-0606 August 2010 Submittal of Commitment Change Summary Report - 2009 NEI 99-04, Oyster Creek, Submittal of Commitment Change Summary Report - 20092010-08-0606 August 2010 Oyster Creek, Submittal of Commitment Change Summary Report - 2009 ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants ML1007402512009-08-0707 August 2009 AR 00916938 Report ML0934208122009-06-29029 June 2009 Root Cause Evaluation Report: Tritium Identified in Emergency Service Water (ESW) Vault ML1020203712009-06-25025 June 2009 Assignment Report #00907846 ML1007402602009-06-24024 June 2009 Issue - Statement of Confirmation ML1007402612009-06-24024 June 2009 AR 00934636 Report ML1020203682009-06-23023 June 2009 Assignment Report #009128267 ML1007402592009-06-21021 June 2009 Stable Standard-Fixed Target Hot Lab ML1007402192009-06-14014 June 2009 AR 00931098 Report ML1007402562009-06-0505 June 2009 AR 00928211 Report ML1020203672009-06-0404 June 2009 Assignment Report #00928211 ML1020203662009-06-0303 June 2009 Assignment Report #00927310 ML1007402572009-06-0101 June 2009 AR 00926251 Report ML1020203652009-05-26026 May 2009 Assignment Report #00907846 ML1007402162009-05-22022 May 2009 AR 00922841 Report ML1007402552009-05-22022 May 2009 AR 00922841 Report ML1020203302009-05-14014 May 2009 Assignment Report #00919392 2023-01-24
[Table view] |
Text
AmerGen Energy Company www.exeloncorp.com AmerGen.. An Exelon Company Oyster Creek US Route 9 South, P.O. Box 388 Forked River, NJ 08731-0388 July 24, 2006 2130-06-20365 2120-062-2840 US Nuclear Regulatory Commission Document Control Desk - NRC Washington, DC 20555
Subject:
Oyster Creek Generating Station Docket 50-219 Sea Turtle Incidental Capture Report 2006-1 This report provides detailed information regarding the recent incidental capture of a juvenile Kemp's Ridley sea turtle at the Oyster Creek Generating Station. The turtle was captured live during the morning of June 30, 2006 after it was removed from the dilution water intake structure trash bars. As indicated on the attached incident report, the turtle was taken to the Marine Mammal Stranding Center in Brigantine, NJ for examination, feeding and eventual release. After confirming that the turtle was feeding and moving about normally, the turtle was released by Marine Mammal Stranding Center personnel into the Atlantic Ocean in Brigantine, NJ on July 5, 2006.
If you have any questions or require additional information, please do not hesitate to contact Mr. Malcolm Browne at (609) 971-4124.
Very truly yours, J es J.RandichY(9 Plant Manager JJR/KB/MEB Enclosure cc: Ms. Carrie Upite U.S. Department of Commerce National Oceanic & Atmospheric Administration National Marine Fisheries Service Northeast Region Protected Resources Division One Blackburn Drive Gloucester, MA 01930
Page 2 of 2 cc: Mr. Samuel Collins, Administrator, Region 1 US Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 US Nuclear Regulatory Commission Senior Project Manager Washington, DC 20555 Ms. Harriet Nash, Mailstop 0-11 -Fl US Nuclear Regulatory Commission Washington, DC 20555 Mr. Michael Masnik, Mailstop 0-1 -Fl US Nuclear Regulatory Commission Washington, DC 20555 Senior Resident Inspector Oyster Creek Generating Station PO Box 388 Forked River, NJ 08731 Ms. Jeanette Bowers-Altman NJ Department of Environmental Protection Division of Fish, Game, and Wildlife P.O. Box 400 Trenton, NJ 08625-0400 Regulatory Assurance File No. 06024
OYSTER CREEK GENERATING STATION Sea Turtle Incidental Capture Report 2006-1 At approximately 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br /> on Friday June 30, 2006, an Oyster Creek Generating Station (OCGS) operator performing a routine cleaning of the trash racks noticed a sea turtle among the vegetation and debris removed from Bay # I of the dilution water intake structure. The turtle appeared to be alive and in good condition when captured. OCGS Environmental personnel who took custody of the turtle confirmed it to be a juvenile Kemp's Ridley sea turtle (Lepidochelys kempi). The water temperature at the time of the incidental capture was approximately 78.1 F (25.6 C) and OCGS was in operation at 100% power with four circulating water pumps and two dilution pumps in operation. Although it is impossible to say precisely how long the turtle had been on the trash bars prior to removal, the dilution water trash racks had been inspected earlier the same day at 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />. The turtle was not observed during that trash rack inspection.
The turtle measured 10.8 in (27.3 cm) carapace length straight line and weighed 7.7 lb (3.5 kg).
Some small scrapes were observed on the dorsal and ventral (top and bottom) surfaces of the carapace. No tags were present on the turtle when captured. USNRC and NMFS personnel were notified of the capture within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> on June 30, 2006.
The turtle was taken to the Marine Mammal Stranding Center (MMSC) in Brigantine, NJ at approximately 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br /> on June 30, 2006. At the MMSC, the turtle was examined, fed and observed. After confirming that the turtle was feeding and moving normally, the turtle was released into the Atlantic Ocean by MMSC personnel at 3 8 th Street Beach, Brigantine, NJ on July 5, 2006.
£0'd lzlaL SEA TURTLE STRANDING AND SALVAGE NETWORK - STRANDING REPORT OBSERVER'S NAME IADDRESS I PHONE: STRANDING DATE; Fir.qt PAI. M.I._ Last Deere Year 20 06 Monlh 06 Day
[ J&
AWff .on Marie ?Aarnnl Strandina Confr 'Turle number by day _31.
Aclros _ Eox 773.3625 Bda*lnr* Blvd.. Brilantne, NJ 05233 Field ID -.MUSC-O807 Coordforwmustl#e nWdwhf 24 hr; utha was done by Won#paq)M-,30 Area code/Phone numter f69) 266-0539 QdmahI CPUx SPECIES: {check anal STRANDNG LOCATION: DO0fsho (MAwidc Gvui beCE: Ejle 4bay, Over, s*,.d, nlMai, e.
o W= LWCa-*t State .mJaerey County Oc.La Coun ,.
Descrpttive [p aion (b' *s.;fl )_Forkod Rivr, Oster Creek Nuclea'I'ower PLnrt.
tIvnded on wader Intak..
=KKonri RA cy' I ntbude 3O.S417"N Longi.ude 74.2070,lO chLIt.OfdlveNOdW
'poshive. DO
-ltUGum. CONDITION: (check one} FINAL DISPOSITION: (check) 0f U=*Mte Ell - Lefllti bdIL wIkrk ntid; parOd ed] OVer 1D]No(51 El I = Friaii dkd ]2-Bad" [] ,mnnnc,..,h ! ::]n bch:
F~jU1Carc: W~ocltIhas UN-, ' 2 =rModumt4.1f d.,r.TwrzpM CNCMS -4lf,, '.fote azried? FlYer rf No f3; 8a','er~yd*exW.To
§ia 6 'veni.d by ccoaranrrl 1El 4 73.J* = Siw~gd; fl al.',SDp~rt[). *ht'hy?
- 1Yus '2 Na [.*_ 5 uDrk;d oVeel ,*,nru bonis c.nly 014u Pilied Up on teacdfflJne pa'ned? QYcs' N.r TAGS: oantac- cowvdiaofr~t ftpous o(any taggeda,nmAil I PW=Av.urasased 0Ew..hb~mnorn~hritinIlflyyr,wN? MMSC ClmimuJl -yFppthtopfl*v re U Nih rTB = LeIL 1" u. t a,'-mwred; painid, E,,real fINu Chec~k IIII4i1"qf5 ffOLnd rectrdtag [O = Disp.ki1on uvikMownt eJirn rumb0~)I-ag bca~m ireluni udtuss I II anipwatcrr --
CARAPACE MEASUREMENTS: t(seae gf P.TItuggcn? 1Yc EWNa UsirLg calipers Circle ,mk Ifftw;nd, reoed nurrbr'!11: IDCliIm SoMight Iength (NOTCH-TIP) -. 27.3 tIn' Minimum lingth (NOTCH.N OTCH). cm. in OC.eJ,-gIv =V E Yes
,U No Stmight vidch a'Jldma Pofrt) 25 5}ij iij If Mq.dve reIamra' remr7sIom*n (ftIrNor: Using non-metal mwesuring tape ircle, untit' Cw le" rd (NOTCH-TIP) - . cM I in Cit~rhea for livng togNUB, u No M*lurLuni IFLr0ol ItNOTCH NOTCH) _ vn I brllin If Iuma. r9=4~ bctiou (imlI. mjiibus &idio COved yjiddl (Wid4*s Pain-) .cnl 'lb.
clole Junk Weight Ei vt les. -. 7 kg !]
1 Mark wounds! tnorarnities Dn diagrams at I' nnd d4Roribe below (notf tr oril,9.pa ordebais rtanrtemf-nt. pinprlirr dam~je, epibi,.u, papillomas, afnf;alvni, ek.}. Please note if no wounds I nbnobrnitaifl arm found.
miont abrasions on carapace and plast-un frorr water intakl urate:
observed for several days: ealn well on own and diving with out difficulty:
tgeg.LFF With metal tag #bSL17Bzreleaad07(0512006at2a St. bach, Boantine, NJ LW--9-.38917 "N LornA: 74,3W67 "N ENINUI..S 7h1t,:W 3 ,[tticB-I ,,c-:at wn?.Z*-r 77ri
I I IN(I lImNSCI.