{{#Wiki_filter:June 21, 2007LICENSEE:PPL Susquehanna, LLC (PPL)FACILITY:Susquehanna Steam Electric Station, Unit 1 and 2 (SSES 1 and 2)
{{#Wiki_filter:June 21, 2007 LICENSEE:               PPL Susquehanna, LLC (PPL)
FACILITY:               Susquehanna Steam Electric Station, Unit 1 and 2 (SSES 1 and 2)


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF JUNE 13, 2007, CATEGORY 1 WORKING-LEVELMEETING WITH PPL TO DISCUSS THE LICENSEE'S PROPOSED LICENSE AMENDMENT REQUEST REGARDING ELECTRICAL DISTRIBUTION SYSTEMS DATED MARCH 2, 2007 (AGENCYWIDE DOCUMENTS ACCESS AND MANAGEMENT SYSTEM (ADAMS)
OF JUNE 13, 2007, CATEGORY 1 WORKING-LEVEL MEETING WITH PPL TO DISCUSS THE LICENSEES PROPOSED LICENSE AMENDMENT REQUEST REGARDING ELECTRICAL DISTRIBUTION SYSTEMS DATED MARCH 2, 2007 (AGENCYWIDE DOCUMENTS ACCESS AND MANAGEMENT SYSTEM (ADAMS)
ACCESSION NO. ML070720545)On June 13, 2007, a public meeting was held between the U.S. Nuclear RegulatoryCommission (NRC), and representatives of PPL at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss PPL's March 2, 2007, amendment request to revise the SSES 2 Technical Specifications (TSs).PPL provided an overview of their proposed amendment request to revise TS 3.8.1, "AC(alternating current) Sources Operating," in order to support the 4.16 kilo-volt (kV) bus maintenance during the SSES 1 refueling outage scheduled for spring 2008. PPL presented various configurations of the SSES 1 and 2 electrical distribution system with respect to the proposed note to the SSES 2 TSs. It also discussed the interrelation of SSES 1 and 2 common loads and how maintenance on one unit affects the operation of the other. PPL indicated that the existing SSES 2 TS 3.8.1 requires that when a Unit 1 4.16 kV bus is de-energized for routine maintenance, limiting condition for operation (LCO) 3.8.1 Conditions A, B, and D are entered. Specifically, an offsite circuit (Condition A) and a diesel generator (Condition B) are declared inoperable, and TS 3.8.1 Condition D requires a 12-hour completion time to perform all the maintenance work on the bus. The time required to perform the planned maintenance is between 50 and 60 hours. PPL presented its proposed resolution to add a note to SSES 2 TS 3.8.1 which would effectively remove the requirement for entry into TS 3.8.1, but would retain entry into LCO 3.8.7 Condition C during the planned maintenance.PPL concluded that (1) since LCO 3.8.7 Condition C is the only affected TS LCO condition afterapplication of the proposed note to LCO 3.8.1, the 72 hours completion time is applicable, and sufficient time is provided to perform the necessary 4.16 kV bus maintenance, and (2) adding the proposed note to SSES 2 TS 3.8.1 precludes the need to enter any LCO 3.8.1 conditions for the planned SSES 1 4.16 kV bus configuration.The Pennsylvania state contact, Brad Fuller, was in attendance. No Public Meeting Feedbackforms were received. Enclosure 1 is a list of meeting attendees and Enclosure 2 is a copy of the licensee's slides presented at the meeting (ML071710427).
ACCESSION NO. ML070720545)
PPL Susquehanna, LLC-2-Please direct any inquiries to me at 301-415-1030, or rvg@nrc.gov./RA/Richard V. Guzman, Senior Project ManagerPlant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-387 and 50-388
On June 13, 2007, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC), and representatives of PPL at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss PPLs March 2, 2007, amendment request to revise the SSES 2 Technical Specifications (TSs).
PPL provided an overview of their proposed amendment request to revise TS 3.8.1, AC (alternating current) Sources Operating, in order to support the 4.16 kilo-volt (kV) bus maintenance during the SSES 1 refueling outage scheduled for spring 2008. PPL presented various configurations of the SSES 1 and 2 electrical distribution system with respect to the proposed note to the SSES 2 TSs. It also discussed the interrelation of SSES 1 and 2 common loads and how maintenance on one unit affects the operation of the other. PPL indicated that the existing SSES 2 TS 3.8.1 requires that when a Unit 1 4.16 kV bus is de-energized for routine maintenance, limiting condition for operation (LCO) 3.8.1 Conditions A, B, and D are entered. Specifically, an offsite circuit (Condition A) and a diesel generator (Condition B) are declared inoperable, and TS 3.8.1 Condition D requires a 12-hour completion time to perform all the maintenance work on the bus. The time required to perform the planned maintenance is between 50 and 60 hours. PPL presented its proposed resolution to add a note to SSES 2 TS 3.8.1 which would effectively remove the requirement for entry into TS 3.8.1, but would retain entry into LCO 3.8.7 Condition C during the planned maintenance.
PPL concluded that (1) since LCO 3.8.7 Condition C is the only affected TS LCO condition after application of the proposed note to LCO 3.8.1, the 72 hours completion time is applicable, and sufficient time is provided to perform the necessary 4.16 kV bus maintenance, and (2) adding the proposed note to SSES 2 TS 3.8.1 precludes the need to enter any LCO 3.8.1 conditions for the planned SSES 1 4.16 kV bus configuration.
The Pennsylvania state contact, Brad Fuller, was in attendance. No Public Meeting Feedback forms were received. Enclosure 1 is a list of meeting attendees and Enclosure 2 is a copy of the licensees slides presented at the meeting (ML071710427).
 
PPL Susquehanna, LLC                       Please direct any inquiries to me at 301-415-1030, or rvg@nrc.gov.
                                            /RA/
Richard V. Guzman, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388


==Enclosures:==
==Enclosures:==
: 1. List of Attendees
: 1. List of Attendees
: 2. Licensee's Handouts/Slidescc w/encls: See next page
: 2. Licensees Handouts/Slides cc w/encls: See next page
 
ML071710019 OFFICE LPLI-1/PM                LPLI-1/LA            LPLI-1/BC NAME RGuzman                    SLittle              MKowal DATE      6/21/07              6/21/07              6/21/07
 
LIST OF ATTENDEES NUCLEAR REGULATORY COMMISSION (NRC)
NUCLEAR REACTOR REGULATION (NRR) CATEGORY 1 MEETING WITH PPL SUSQUEHANNA, LLC (PPL)
LICENSE AMENDMENT APPLICATION FOR TECHNICAL SPECIFICATION 3.8.1, AC SOURCES OPERATING, SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 1 AND 2 JUNE 13, 2007 NAME                          ORGANIZATION
: 1. Richard Guzman              NRC/NRR/Plant Licensing Branch I-1
: 2. Sheila Ray                  NRC/NRR/Division of Engineering
: 3. Yoira Diaz                  NRC/NRR/Division of License Renewal
: 4. Drew Stuyvenberg            NRC/NRR/Division of License Renewal
: 5. Patrick Boughan            NRC/NRR/Division of Engiineering
: 6. Duane Filchner              PPL
: 7. Todd Creasy                PPL
: 8. Philip Brady                PPL
: 9. Brad Fuller                Pennsylvania Bureau of Radiation Protection Enclosure 1


ML071710019OFFICELPLI-1/PMLPLI-1/LALPLI-1/BCNAMERGuzmanSLittleMKowalDATE6/21/076/21/076/21/07 LIST OF ATTENDEESNUCLEAR REGULATORY COMMISSION (NRC)NUCLEAR REACTOR REGULATION (NRR) CATEGORY 1 MEETINGWITH PPL SUSQUEHANNA, LLC (PPL)LICENSE AMENDMENT APPLICATION FORTECHNICAL SPECIFICATION 3.8.1,  "AC SOURCES OPERATING,"SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 1 AND 2JUNE 13, 2007NAME ORGANIZATION1. Richard GuzmanNRC/NRR/Plant Licensing Branch I-12. Sheila RayNRC/NRR/Division of Engineering
MEETING SLIDES Enclosure 2
: 3. Yoira DiazNRC/NRR/Division of License Renewal
: 4. Drew StuyvenbergNRC/NRR/Division of License Renewal
: 5. Patrick BoughanNRC/NRR/Division of Engiineering
: 6. Duane FilchnerPPL
: 7. Todd CreasyPPL
: 8. Philip BradyPPL
: 9. Brad FullerPennsylvania Bureau of Radiation ProtectionEnclosure 1 MEETING SLIDESEnclosure 2 Susquehanna Steam Electric Station, Units 1 and 2 cc:
Britt T. McKinneySr. Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA  18603-0467Robert A. SacconeGeneral Manager - Nuclear Operations PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA  18603-0467Terry L. HarpsterGeneral Manager - Plant Support PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467Rocco R. SgarroManager - Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179Supervisor - Nuclear Regulatory Affairs PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467Michael H. CrowthersSupervising Engineer Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179Steven M. CookManager - Quality Assurance PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467Luis A. RamosCommunity Relations Manager, Susquehanna PPL Susquehanna, LLC 634 Salem Blvd., SSO Berwick, PA  18603-0467Bryan A. Snapp, EsqAssoc. General Counsel PPL Services Corporation Two North Ninth Street, GENTW3 Allentown, PA  18101-1179Supervisor - Document Control ServicesPPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179Richard W. OsborneAllegheny Electric Cooperative, Inc.
212 Locust Street P.O. Box 1266 Harrisburg, PA  17108-1266Director - Bureau of Radiation ProtectionPennsylvania Department of Environmental Protection P.O. Box 8469 Harrisburg, PA 17105-8469Senior Resident InspectorU.S. Nuclear Regulatory Commission P.O. Box 35, NUCSA4Berwick, PA 18603-0035Regional Administrator, Region 1U.S. Nuclear Regulatory Commission


475 Allendale Road King of Prussia, PA 19406Board of SupervisorsSalem Township P.O. Box 405 Berwick, PA 18603-0035Dr. Judith JohnsrudNational Energy Committee Sierra Club 443 Orlando Avenue State College, PA 16803}}
Susquehanna Steam Electric Station, Units 1 and 2 cc:
Britt T. McKinney                                Bryan A. Snapp, Esq Sr. Vice President and                            Assoc. General Counsel Chief Nuclear Officer                            PPL Services Corporation PPL Susquehanna, LLC                              Two North Ninth Street, GENTW3 769 Salem Blvd., NUCSB3                          Allentown, PA 18101-1179 Berwick, PA 18603-0467 Supervisor - Document Control Services Robert A. Saccone                                PPL Susquehanna, LLC General Manager - Nuclear Operations              Two North Ninth Street, GENPL4 PPL Susquehanna, LLC                              Allentown, PA 18101-1179 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467                            Richard W. Osborne Allegheny Electric Cooperative, Inc.
Terry L. Harpster                                212 Locust Street General Manager - Plant Support                  P.O. Box 1266 PPL Susquehanna, LLC                              Harrisburg, PA 17108-1266 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467                            Director - Bureau of Radiation Protection Pennsylvania Department of Rocco R. Sgarro                                    Environmental Protection Manager - Nuclear Regulatory Affairs              P.O. Box 8469 PPL Susquehanna, LLC                              Harrisburg, PA 17105-8469 Two North Ninth Street, GENPL4 Allentown, PA 18101-1179                          Senior Resident Inspector U.S. Nuclear Regulatory Commission Supervisor -                                      P.O. Box 35, NUCSA4 Nuclear Regulatory Affairs                        Berwick, PA 18603-0035 PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4                          Regional Administrator, Region 1 Berwick, PA 18603-0467                            U.S. Nuclear Regulatory Commission 475 Allendale Road Michael H. Crowthers                              King of Prussia, PA 19406 Supervising Engineer Nuclear Regulatory Affairs                        Board of Supervisors PPL Susquehanna, LLC                              Salem Township Two North Ninth Street, GENPL4                    P.O. Box 405 Allentown, PA 18101-1179                          Berwick, PA 18603-0035 Steven M. Cook                                    Dr. Judith Johnsrud Manager - Quality Assurance                      National Energy Committee PPL Susquehanna, LLC                              Sierra Club 769 Salem Blvd., NUCSB2                          443 Orlando Avenue Berwick, PA 18603-0467                            State College, PA 16803 Luis A. Ramos Community Relations Manager, Susquehanna PPL Susquehanna, LLC 634 Salem Blvd., SSO Berwick, PA 18603-0467}}

Revision as of 06:13, 23 November 2019

06/13/2007 Summary of Category 1 Working-Level Meeting with PPL Susquehanna, LLC (PPL) to Discuss the Licensee'S Proposed License Amendment Request Regarding Electrical Distribution Systems Dated March 2, 2007
ML071710019
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 06/21/2007
From: Richard Guzman
NRC/NRR/ADRO/DORL/LPLI-1
To:
Guzman R, NRR/DORL, 415-1030
References
Download: ML071710019 (6)


Text

June 21, 2007 LICENSEE: PPL Susquehanna, LLC (PPL)

FACILITY: Susquehanna Steam Electric Station, Unit 1 and 2 (SSES 1 and 2)

SUBJECT:

SUMMARY

OF JUNE 13, 2007, CATEGORY 1 WORKING-LEVEL MEETING WITH PPL TO DISCUSS THE LICENSEES PROPOSED LICENSE AMENDMENT REQUEST REGARDING ELECTRICAL DISTRIBUTION SYSTEMS DATED MARCH 2, 2007 (AGENCYWIDE DOCUMENTS ACCESS AND MANAGEMENT SYSTEM (ADAMS)

ACCESSION NO. ML070720545)

On June 13, 2007, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC), and representatives of PPL at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss PPLs March 2, 2007, amendment request to revise the SSES 2 Technical Specifications (TSs).

PPL provided an overview of their proposed amendment request to revise TS 3.8.1, AC (alternating current) Sources Operating, in order to support the 4.16 kilo-volt (kV) bus maintenance during the SSES 1 refueling outage scheduled for spring 2008. PPL presented various configurations of the SSES 1 and 2 electrical distribution system with respect to the proposed note to the SSES 2 TSs. It also discussed the interrelation of SSES 1 and 2 common loads and how maintenance on one unit affects the operation of the other. PPL indicated that the existing SSES 2 TS 3.8.1 requires that when a Unit 1 4.16 kV bus is de-energized for routine maintenance, limiting condition for operation (LCO) 3.8.1 Conditions A, B, and D are entered. Specifically, an offsite circuit (Condition A) and a diesel generator (Condition B) are declared inoperable, and TS 3.8.1 Condition D requires a 12-hour completion time to perform all the maintenance work on the bus. The time required to perform the planned maintenance is between 50 and 60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br />. PPL presented its proposed resolution to add a note to SSES 2 TS 3.8.1 which would effectively remove the requirement for entry into TS 3.8.1, but would retain entry into LCO 3.8.7 Condition C during the planned maintenance.

PPL concluded that (1) since LCO 3.8.7 Condition C is the only affected TS LCO condition after application of the proposed note to LCO 3.8.1, the 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time is applicable, and sufficient time is provided to perform the necessary 4.16 kV bus maintenance, and (2) adding the proposed note to SSES 2 TS 3.8.1 precludes the need to enter any LCO 3.8.1 conditions for the planned SSES 1 4.16 kV bus configuration.

The Pennsylvania state contact, Brad Fuller, was in attendance. No Public Meeting Feedback forms were received. Enclosure 1 is a list of meeting attendees and Enclosure 2 is a copy of the licensees slides presented at the meeting (ML071710427).

PPL Susquehanna, LLC Please direct any inquiries to me at 301-415-1030, or rvg@nrc.gov.

/RA/

Richard V. Guzman, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388

Enclosures:

1. List of Attendees
2. Licensees Handouts/Slides cc w/encls: See next page

ML071710019 OFFICE LPLI-1/PM LPLI-1/LA LPLI-1/BC NAME RGuzman SLittle MKowal DATE 6/21/07 6/21/07 6/21/07

LIST OF ATTENDEES NUCLEAR REGULATORY COMMISSION (NRC)

NUCLEAR REACTOR REGULATION (NRR) CATEGORY 1 MEETING WITH PPL SUSQUEHANNA, LLC (PPL)

LICENSE AMENDMENT APPLICATION FOR TECHNICAL SPECIFICATION 3.8.1, AC SOURCES OPERATING, SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 1 AND 2 JUNE 13, 2007 NAME ORGANIZATION

1. Richard Guzman NRC/NRR/Plant Licensing Branch I-1
2. Sheila Ray NRC/NRR/Division of Engineering
3. Yoira Diaz NRC/NRR/Division of License Renewal
4. Drew Stuyvenberg NRC/NRR/Division of License Renewal
5. Patrick Boughan NRC/NRR/Division of Engiineering
6. Duane Filchner PPL
7. Todd Creasy PPL
8. Philip Brady PPL
9. Brad Fuller Pennsylvania Bureau of Radiation Protection Enclosure 1

MEETING SLIDES Enclosure 2

Susquehanna Steam Electric Station, Units 1 and 2 cc:

Britt T. McKinney Bryan A. Snapp, Esq Sr. Vice President and Assoc. General Counsel Chief Nuclear Officer PPL Services Corporation PPL Susquehanna, LLC Two North Ninth Street, GENTW3 769 Salem Blvd., NUCSB3 Allentown, PA 18101-1179 Berwick, PA 18603-0467 Supervisor - Document Control Services Robert A. Saccone PPL Susquehanna, LLC General Manager - Nuclear Operations Two North Ninth Street, GENPL4 PPL Susquehanna, LLC Allentown, PA 18101-1179 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467 Richard W. Osborne Allegheny Electric Cooperative, Inc.

Terry L. Harpster 212 Locust Street General Manager - Plant Support P.O. Box 1266 PPL Susquehanna, LLC Harrisburg, PA 17108-1266 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Director - Bureau of Radiation Protection Pennsylvania Department of Rocco R. Sgarro Environmental Protection Manager - Nuclear Regulatory Affairs P.O. Box 8469 PPL Susquehanna, LLC Harrisburg, PA 17105-8469 Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Senior Resident Inspector U.S. Nuclear Regulatory Commission Supervisor - P.O. Box 35, NUCSA4 Nuclear Regulatory Affairs Berwick, PA 18603-0035 PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Regional Administrator, Region 1 Berwick, PA 18603-0467 U.S. Nuclear Regulatory Commission 475 Allendale Road Michael H. Crowthers King of Prussia, PA 19406 Supervising Engineer Nuclear Regulatory Affairs Board of Supervisors PPL Susquehanna, LLC Salem Township Two North Ninth Street, GENPL4 P.O. Box 405 Allentown, PA 18101-1179 Berwick, PA 18603-0035 Steven M. Cook Dr. Judith Johnsrud Manager - Quality Assurance National Energy Committee PPL Susquehanna, LLC Sierra Club 769 Salem Blvd., NUCSB2 443 Orlando Avenue Berwick, PA 18603-0467 State College, PA 16803 Luis A. Ramos Community Relations Manager, Susquehanna PPL Susquehanna, LLC 634 Salem Blvd., SSO Berwick, PA 18603-0467