{{#Wiki_filter:August 31, 2007 Mr. Christopher M. Crane President and Chief Nuclear Officer
{{#Wiki_filter:August 31, 2007 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
 
Exelon Nuclear
 
Exelon Generation Company, LLC
 
4300 Winfield Road
 
Warrenville, IL 60555


==SUBJECT:==
==SUBJECT:==
Line 31: Line 23:
==Dear Mr. Crane:==
==Dear Mr. Crane:==


On August 14, 2007, the NRC staff completed its performance review of the LaSalle County Station Units 1 and 2 for the first half of the calendar year 2007 assessment cycle.  
On August 14, 2007, the NRC staff completed its performance review of the LaSalle County Station Units 1 and 2 for the first half of the calendar year 2007 assessment cycle.
 
Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
Our technical staff reviewed performance indicators (PIs) for the most recent quarter and
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include the security cornerstone review and resultant inspection plan.
 
Plant performance for the most recent quarter at LaSalle County Station Units 1 and 2 was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
inspection results over the previous 12 months.
The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.
The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at
Routine resident inspections are not listed due to their ongoing and continuous nature. Of note, the plan includes a component design bases inspection, a biennial PI&R inspection, and a triennial fire protection inspection. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
 
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include
 
the security cornerstone review and resultant inspection plan.
Plant performance for the most recent quarter at LaSalle County Station Units 1 and 2 was within the Licensee Response column of the NRC's Action Matrix, based on all inspection
 
findings being classified as having very low safety significance (Green) and all PIs indicating
 
performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to
 
conduct reactor oversight process (ROP) baseline inspections at your facility.
The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2008. The inspection plan is provided to allow for the resolution of any
 
scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.  
 
Routine resident inspections are not listed due to their ongoing and continuous nature. Of note, the plan includes a component design bases inspection, a biennial PI&R inspection, and a
 
triennial fire protection inspection. The inspections in the last nine months of the inspection plan
 
are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC
 
Public Document Room or from the Pub licly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at
 
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
C. Crane The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the


inspection plan, we will contact you to discuss the change as soon as possible. Please contact
C. Crane                                        The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9628 with any questions you may have regarding this letter or the inspection plan.
 
Sincerely,
me at (630) 829-9628 with any questions you may have regarding this letter or the inspection
                                      /RA/
 
Kenneth Riemer, Chief, Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18
plan.Sincerely, /RA/Kenneth Riemer, Chief, Reactor Projects Branch 2
 
Division of Reactor Projects Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18


==Enclosure:==
==Enclosure:==
LaSalle County Station Units 1 and 2 Inspection/Activity Plan DISTRIBUTION:
LaSalle County Station Units 1 and 2 Inspection/Activity Plan DISTRIBUTION:
See next page C. Crane The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the
See next page
 
inspection plan, we will contact you to discuss the change as soon as possible. Please contact
 
me at (630) 829-9628 with any questions you may have regarding this letter or the inspection
 
plan.Sincerely, /RA/Kenneth Riemer, Chief Reactor Projects Branch 2


Division of Reactor Projects Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18
C. Crane                                                                    The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9628 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
                                                              /RA/
Kenneth Riemer, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18


==Enclosure:==
==Enclosure:==
LaSalle County Station Units 1 and 2 Inspection/Activity Plan DISTRIBUTION:
LaSalle County Station Units 1 and 2 Inspection/Activity Plan DISTRIBUTION:
See next page DOCUMENT NAME: G:\Branch TSS\ALL MOC\midcycle 2006 to 2007\LaSalle\LASA 2007 MOC letter.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIINAMEKRiemer:dtpDATE08/31/07 OFFICIAL RECORD COPY Letter to C. Crane from K. Riemer dated August 31, 2007
See next page DOCUMENT NAME: G:\Branch TSS\ALL MOC\midcycle 2006 to 2007\LaSalle\LASA 2007 MOC letter.wpd G Publicly Available                       G Non-Publicly Available                 G Sensitive             G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE              RIII NAME                KRiemer:dtp DATE                08/31/07 OFFICIAL RECORD COPY
 
Letter to C. Crane from K. Riemer dated August 31, 2007


==SUBJECT:==
==SUBJECT:==
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
LASALLE COUNTY STATION UNITS 1 AND 2cc w/encl:Site Vice President - LaSalle County Station LaSalle County Station Plant Manager
LASALLE COUNTY STATION UNITS 1 AND 2 cc w/encl:     Site Vice President - LaSalle County Station LaSalle County Station Plant Manager Regulatory Assurance Manager - LaSalle County Station Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Clinton and LaSalle Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission Grundy County Board Chairman Mayor of Ottawa Mayor of Streator City Manager of Streator Director, Grundy County Emergency Management Agency Mayor of Seneca Mayor of Grand Ridge Mayor of Ransom Sheriff, LaSalle County LaSalle County Board Chairman Director, LaSalle County Emergency Management Agency Mayor of Marseilles Mayor of Verona Mayor of Kinsman INPO
 
Regulatory Assurance Manager - LaSalle County Station
 
Chief Operating Officer
 
Senior Vice President - Nuclear Services
 
Senior Vice President - Mid-West Regional
 
Operating Group
 
Vice President - Mid-West Operations Support
 
Vice President - Licensing and Regulatory Affairs
 
Director Licensing - Mid-West Regional
 
Operating Group
 
Manager Licensing - Clinton and LaSalle
 
Senior Counsel, Nuclear, Mid-West Regional
 
Operating Group
 
Document Control Desk - Licensing
 
Assistant Attorney General
 
Illinois Emergency Management Agency
 
State Liaison Officer
 
Chairman, Illinois Commerce Commission
 
Grundy County Board Chairman
 
Mayor of Ottawa
 
Mayor of Streator
 
City Manager of Streator
 
Director, Grundy County Emergency Management
 
Agency Mayor of Seneca
 
Mayor of Grand Ridge
 
Mayor of Ransom
 
Sheriff, LaSalle County
 
LaSalle County Board Chairman
 
Director, LaSalle County Emergency Management


Agency Mayor of Marseilles
Letter to C. Crane from K. Riemer dated August 31, 2007
 
Mayor of Verona
 
Mayor of Kinsman
 
INPO Letter to C. Crane from K. Riemer dated August 31, 2007


==SUBJECT:==
==SUBJECT:==
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
LASALLE COUNTY STATION UNITS 1 AND 2 DISTRIBUTION
LASALLE COUNTY STATION UNITS 1 AND 2 DISTRIBUTION:
: RAG1 DMS6 TEB SPS1 RidsNrrDirslpab
RAG1 DMS6 TEB SPS1 RidsNrrDirslpab JLC1 MAS KGO JKH3 RML2 SAM9 DEK DRPIII DRSIII PLB1 TXN
 
LaSalle Inspection / Activity Plan 09/01/2007 - 12/31/2008 No. of Staff    Planned Dates          Inspection Inspection Activity                                              Title                        on Site        Start    End            Type BI ENG        - COMPONENT DESIGN BASES INSPECTION                                                      6 IP 7111121          Component Design Bases Inspection                                                    08/27/2007 09/28/2007 Baseline Inspections BI OL        - BIENNIAL REQUAL. PROGRAM INSPECTION                                                    2 IP 7111111B        Licensed Operator Requalification Program                                            11/26/2007 11/30/2007 Baseline Inspections BI PI&R      - BIENNIAL PI&R INSPECTION                                                              3 IP 71152B          Identification and Resolution of Problems                                            11/26/2007 12/14/2007 Baseline Inspections BI ENG        - ENGINEERING INSERVICE INSPECTION                                                      1 IP 7111108G        Inservice Inspection Activities - BWR                                                02/11/2008 03/07/2008 Baseline Inspections BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                              1 IP 7112101          Access Control to Radiologically Significant Areas                                    02/18/2008 02/22/2008 Baseline Inspections IP 7112102          ALARA Planning and Controls                                                          02/18/2008 02/22/2008 Baseline Inspections BI ENG        - BIENNIAL MAINTENANCE EFFECTIVENESS INSP.                                              1 IP 7111112B        Maintenance Effectiveness                                                            03/24/2008 03/28/2008 Baseline Inspections BI EP        - EP EXERCISE INSPECTION / PI VERIFICATION                                              3 IP 7111401          Exercise Evaluation                                                                  04/28/2008 05/02/2008 Baseline Inspections IP 71151-EP01      Drill/Exercise Performance                                                            04/28/2008 05/02/2008 Baseline Inspections IP 71151-EP02      ERO Drill Participation                                                              04/28/2008 05/02/2008 Baseline Inspections IP 71151-EP03      Alert & Notification System                                                          04/28/2008 05/02/2008 Baseline Inspections BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                              1 IP 7112103          Radiation Monitoring Instrumentation and Protective Equipment                        05/19/2008 05/23/2008 Baseline Inspections IP 71151-BI01      Reactor Coolant System Activity                                                      05/19/2008 05/23/2008 Baseline Inspections IP 71151-OR01      Occupational Exposure Control Effectiveness                                          05/19/2008 05/23/2008 Baseline Inspections IP 71151-PR01      RETS/ODCM Radiological Effluent                                                      05/19/2008 05/23/2008 Baseline Inspections BI ENG        - BIENNIAL HEAT SINK INSPECTION                                                          1 IP 7111107B        Heat Sink Performance                                                                05/26/2008 05/30/2008 Baseline Inspections OL EXAM      - LASALLE INITIAL LICENSE EXAM VALIDATION                                                3 W90184          LASALLE - INITIAL EXAM - JULY/AUG 2008                                                07/28/2008 08/01/2008 Not Applicable BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                              1 IP 7112101          Access Control to Radiologically Significant Areas                                    08/25/2008 08/29/2008 Baseline Inspections IP 7112102          ALARA Planning and Controls                                                          08/25/2008 08/29/2008 Baseline Inspections OL EXAM      - LASALLE INITIAL LICENSE EXAMINATION                                                    3 W90184          LASALLE - INITIAL EXAM - JULY/AUG 2008                                                08/18/2008 08/29/2008 Not Applicable BI OL        - BIENNIAL REQUAL. PROGRAM INSPECTION                                                    2 IP 7111111B        Licensed Operator Requalification Program                                            10/20/2008 10/24/2008 Baseline Inspections


JLC1 MAS KGO JKH3 RML2 SAM9 DEK DRPIII DRSIII PLB1 TXN LaSalle Inspection / Activity Plan 09/01/2007
LaSalle Inspection / Activity Plan 09/01/2007 - 12/31/2008 No. of Staff   Planned Dates        Inspection Inspection Activity                                            Title                        on Site       Start     End            Type BI ENG       - TRIENNIAL FIRE PROTECTION INSPECTION                                               3 IP 7111105T        Fire Protection [Triennial]                                                        12/01/2008 12/19/2008 Baseline Inspections BI RP         - RADIATION PROTECTION BASELINE INSPECTION                                           1 IP 7112202          Radioactive Material Processing and Transportation                                12/08/2008 12/12/2008 Baseline Inspections}}
-12/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 1 of 2 08/28/2007 Report 22 6 BI ENG-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 08/27/2007 09/28/2007 1     7111121 IP Component Design Bases Inspection 2 BI OL-BIENNIAL REQUAL. PROGRAM INSPECTION Baseline Inspections 11/26/2007 11/30/2007 1    7111111B IP Licensed Operator Requalification Program 3 BI PI&R-BIENNIAL PI&R INSPECTION Baseline Inspections 11/26/2007 12/14/2007 1    71152B IP Identification and Resolution of Problems 1 BI ENG-ENGINEERING INSERVICE INSPECTION Baseline Inspections 02/11/2008 03/07/2008 1    7111108G IP Inservice Inspection Activities - BWR 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 02/18/2008 02/22/2008 1    7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 02/18/2008 02/22/2008 1    7112102 IP A LARA Planning and Controls 1 BI ENG-BIENNIAL MAINTENANCE EFFECTIVENESS INSP.
Baseline Inspections 03/24/2008 03/28/2008 1    7111112B IP Maintenance Effectiveness 3 BI EP-EP EXERCISE INSPECTION / PI VERIFICATION Baseline Inspections 04/28/2008 05/02/2008 1    7111401 IP Exercise Evaluation Baseline Inspections 04/28/2008 05/02/2008 1    71151-EP01 IP Drill/Exercise Performance Baseline Inspections 04/28/2008 05/02/2008 1    71151-EP02 IP ERO Drill Participation Baseline Inspections 04/28/2008 05/02/2008 1    71151-EP03 IP A lert & Notification System 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 05/19/2008 05/23/2008 1    7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 05/19/2008 05/23/2008 1    71151-BI01 IP Reactor Coolant System Activity Baseline Inspections 05/19/2008 05/23/2008 1    71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 05/19/2008 05/23/2008 1    71151-PR01 IP RETS/ODCM Radiological Effluent 1 BI ENG-BIENNIAL HEAT SINK INSPECTION Baseline Inspections 05/26/2008 05/30/2008 1    7111107B IP Heat Sink Performance 3 OL EXAM-LASALLE INITIAL LICENSE EXAM VALIDATION Not Applicable 07/28/2008 08/01/2008 1    W90184 LASALLE - INITIAL EXAM - JULY/AUG 2008 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 08/25/2008 08/29/2008 1     7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 08/25/2008 08/29/2008 1    7112102 IP A LARA Planning and Controls 3 OL EXAM-LASALLE INITIAL LICENSE EXAMINATION Not Applicable 08/18/2008 08/29/2008 1    W90184 LASALLE - INITIAL EXAM - JULY/AUG 2008 2 BI OL-BIENNIAL REQUAL. PROGRAM INSPECTION Baseline Inspections 10/20/2008 10/24/2008 1    7111111B IP Licensed Operator Requalification Program This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
LaSalle Inspection / Activity Plan 09/01/2007
-12/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 2 of 2 08/28/2007 Report 22 3 BI ENG-TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 12/01/2008 12/19/2008 1    7111105T IP Fire Protection [Triennial]
1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 12/08/2008 12/12/2008 1    7112202 IP Radioactive Material Processing and Transportation This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 04:05, 23 November 2019

Mid-Cycle Performance Review and Inspection Plan - LaSalle County Station, Units 1 and 2
ML072430200
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 08/31/2007
From: Kenneth Riemer
NRC/RGN-III/DRP/RPB2
To: Crane C
Exelon Generation Co, Exelon Nuclear
References
Download: ML072430200 (7)


Text

August 31, 2007 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

LASALLE COUNTY STATION UNITS 1 AND 2

Dear Mr. Crane:

On August 14, 2007, the NRC staff completed its performance review of the LaSalle County Station Units 1 and 2 for the first half of the calendar year 2007 assessment cycle.

Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter at LaSalle County Station Units 1 and 2 was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.

Routine resident inspections are not listed due to their ongoing and continuous nature. Of note, the plan includes a component design bases inspection, a biennial PI&R inspection, and a triennial fire protection inspection. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

C. Crane The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9628 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Kenneth Riemer, Chief, Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18

Enclosure:

LaSalle County Station Units 1 and 2 Inspection/Activity Plan DISTRIBUTION:

See next page

C. Crane The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9628 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Kenneth Riemer, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18

Enclosure:

LaSalle County Station Units 1 and 2 Inspection/Activity Plan DISTRIBUTION:

See next page DOCUMENT NAME: G:\Branch TSS\ALL MOC\midcycle 2006 to 2007\LaSalle\LASA 2007 MOC letter.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME KRiemer:dtp DATE 08/31/07 OFFICIAL RECORD COPY

Letter to C. Crane from K. Riemer dated August 31, 2007

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

LASALLE COUNTY STATION UNITS 1 AND 2 cc w/encl: Site Vice President - LaSalle County Station LaSalle County Station Plant Manager Regulatory Assurance Manager - LaSalle County Station Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Clinton and LaSalle Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission Grundy County Board Chairman Mayor of Ottawa Mayor of Streator City Manager of Streator Director, Grundy County Emergency Management Agency Mayor of Seneca Mayor of Grand Ridge Mayor of Ransom Sheriff, LaSalle County LaSalle County Board Chairman Director, LaSalle County Emergency Management Agency Mayor of Marseilles Mayor of Verona Mayor of Kinsman INPO

Letter to C. Crane from K. Riemer dated August 31, 2007

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

LASALLE COUNTY STATION UNITS 1 AND 2 DISTRIBUTION:

RAG1 DMS6 TEB SPS1 RidsNrrDirslpab JLC1 MAS KGO JKH3 RML2 SAM9 DEK DRPIII DRSIII PLB1 TXN

LaSalle Inspection / Activity Plan 09/01/2007 - 12/31/2008 No. of Staff Planned Dates Inspection Inspection Activity Title on Site Start End Type BI ENG - COMPONENT DESIGN BASES INSPECTION 6 IP 7111121 Component Design Bases Inspection 08/27/2007 09/28/2007 Baseline Inspections BI OL - BIENNIAL REQUAL. PROGRAM INSPECTION 2 IP 7111111B Licensed Operator Requalification Program 11/26/2007 11/30/2007 Baseline Inspections BI PI&R - BIENNIAL PI&R INSPECTION 3 IP 71152B Identification and Resolution of Problems 11/26/2007 12/14/2007 Baseline Inspections BI ENG - ENGINEERING INSERVICE INSPECTION 1 IP 7111108G Inservice Inspection Activities - BWR 02/11/2008 03/07/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112101 Access Control to Radiologically Significant Areas 02/18/2008 02/22/2008 Baseline Inspections IP 7112102 ALARA Planning and Controls 02/18/2008 02/22/2008 Baseline Inspections BI ENG - BIENNIAL MAINTENANCE EFFECTIVENESS INSP. 1 IP 7111112B Maintenance Effectiveness 03/24/2008 03/28/2008 Baseline Inspections BI EP - EP EXERCISE INSPECTION / PI VERIFICATION 3 IP 7111401 Exercise Evaluation 04/28/2008 05/02/2008 Baseline Inspections IP 71151-EP01 Drill/Exercise Performance 04/28/2008 05/02/2008 Baseline Inspections IP 71151-EP02 ERO Drill Participation 04/28/2008 05/02/2008 Baseline Inspections IP 71151-EP03 Alert & Notification System 04/28/2008 05/02/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 05/19/2008 05/23/2008 Baseline Inspections IP 71151-BI01 Reactor Coolant System Activity 05/19/2008 05/23/2008 Baseline Inspections IP 71151-OR01 Occupational Exposure Control Effectiveness 05/19/2008 05/23/2008 Baseline Inspections IP 71151-PR01 RETS/ODCM Radiological Effluent 05/19/2008 05/23/2008 Baseline Inspections BI ENG - BIENNIAL HEAT SINK INSPECTION 1 IP 7111107B Heat Sink Performance 05/26/2008 05/30/2008 Baseline Inspections OL EXAM - LASALLE INITIAL LICENSE EXAM VALIDATION 3 W90184 LASALLE - INITIAL EXAM - JULY/AUG 2008 07/28/2008 08/01/2008 Not Applicable BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112101 Access Control to Radiologically Significant Areas 08/25/2008 08/29/2008 Baseline Inspections IP 7112102 ALARA Planning and Controls 08/25/2008 08/29/2008 Baseline Inspections OL EXAM - LASALLE INITIAL LICENSE EXAMINATION 3 W90184 LASALLE - INITIAL EXAM - JULY/AUG 2008 08/18/2008 08/29/2008 Not Applicable BI OL - BIENNIAL REQUAL. PROGRAM INSPECTION 2 IP 7111111B Licensed Operator Requalification Program 10/20/2008 10/24/2008 Baseline Inspections

LaSalle Inspection / Activity Plan 09/01/2007 - 12/31/2008 No. of Staff Planned Dates Inspection Inspection Activity Title on Site Start End Type BI ENG - TRIENNIAL FIRE PROTECTION INSPECTION 3 IP 7111105T Fire Protection [Triennial] 12/01/2008 12/19/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112202 Radioactive Material Processing and Transportation 12/08/2008 12/12/2008 Baseline Inspections