ML072430200
| ML072430200 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 08/31/2007 |
| From: | Kenneth Riemer NRC/RGN-III/DRP/RPB2 |
| To: | Crane C Exelon Generation Co, Exelon Nuclear |
| References | |
| Download: ML072430200 (7) | |
Text
August 31, 2007 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
LASALLE COUNTY STATION UNITS 1 AND 2
Dear Mr. Crane:
On August 14, 2007, the NRC staff completed its performance review of the LaSalle County Station Units 1 and 2 for the first half of the calendar year 2007 assessment cycle.
Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include the security cornerstone review and resultant inspection plan.
Plant performance for the most recent quarter at LaSalle County Station Units 1 and 2 was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.
Routine resident inspections are not listed due to their ongoing and continuous nature. Of note, the plan includes a component design bases inspection, a biennial PI&R inspection, and a triennial fire protection inspection. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
C. Crane The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9628 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Kenneth Riemer, Chief, Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18
Enclosure:
LaSalle County Station Units 1 and 2 Inspection/Activity Plan DISTRIBUTION:
See next page
C. Crane The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9628 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Kenneth Riemer, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18
Enclosure:
LaSalle County Station Units 1 and 2 Inspection/Activity Plan DISTRIBUTION:
See next page DOCUMENT NAME: G:\\Branch TSS\\ALL MOC\\midcycle 2006 to 2007\\LaSalle\\LASA 2007 MOC letter.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME KRiemer:dtp DATE 08/31/07 OFFICIAL RECORD COPY
Letter to C. Crane from K. Riemer dated August 31, 2007
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
LASALLE COUNTY STATION UNITS 1 AND 2 cc w/encl:
Site Vice President - LaSalle County Station LaSalle County Station Plant Manager Regulatory Assurance Manager - LaSalle County Station Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Clinton and LaSalle Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission Grundy County Board Chairman Mayor of Ottawa Mayor of Streator City Manager of Streator Director, Grundy County Emergency Management Agency Mayor of Seneca Mayor of Grand Ridge Mayor of Ransom Sheriff, LaSalle County LaSalle County Board Chairman Director, LaSalle County Emergency Management Agency Mayor of Marseilles Mayor of Verona Mayor of Kinsman INPO
Letter to C. Crane from K. Riemer dated August 31, 2007
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
LASALLE COUNTY STATION UNITS 1 AND 2 DISTRIBUTION:
RAG1 DMS6 TEB SPS1 RidsNrrDirslpab JLC1 MAS KGO JKH3 RML2 SAM9 DEK DRPIII DRSIII PLB1 TXN
LaSalle Inspection / Activity Plan 09/01/2007 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title 6
BI ENG
- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 08/27/2007 09/28/2007 7111121 IP Component Design Bases Inspection 2
BI OL
- BIENNIAL REQUAL. PROGRAM INSPECTION Baseline Inspections 11/26/2007 11/30/2007 7111111B IP Licensed Operator Requalification Program 3
BI PI&R
- BIENNIAL PI&R INSPECTION Baseline Inspections 11/26/2007 12/14/2007 71152B IP Identification and Resolution of Problems 1
BI ENG
- ENGINEERING INSERVICE INSPECTION Baseline Inspections 02/11/2008 03/07/2008 7111108G IP Inservice Inspection Activities - BWR 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 02/18/2008 02/22/2008 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 02/18/2008 02/22/2008 7112102 IP ALARA Planning and Controls 1
BI ENG
- BIENNIAL MAINTENANCE EFFECTIVENESS INSP.
Baseline Inspections 03/24/2008 03/28/2008 7111112B IP Maintenance Effectiveness 3
BI EP
- EP EXERCISE INSPECTION / PI VERIFICATION Baseline Inspections 04/28/2008 05/02/2008 7111401 IP Exercise Evaluation Baseline Inspections 04/28/2008 05/02/2008 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 04/28/2008 05/02/2008 71151-EP02 IP ERO Drill Participation Baseline Inspections 04/28/2008 05/02/2008 71151-EP03 IP Alert & Notification System 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 05/19/2008 05/23/2008 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 05/19/2008 05/23/2008 71151-BI01 IP Reactor Coolant System Activity Baseline Inspections 05/19/2008 05/23/2008 71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 05/19/2008 05/23/2008 71151-PR01 IP RETS/ODCM Radiological Effluent 1
BI ENG
- BIENNIAL HEAT SINK INSPECTION Baseline Inspections 05/26/2008 05/30/2008 7111107B IP Heat Sink Performance 3
OL EXAM
- LASALLE INITIAL LICENSE EXAM VALIDATION Not Applicable 07/28/2008 08/01/2008 W90184 LASALLE - INITIAL EXAM - JULY/AUG 2008 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 08/25/2008 08/29/2008 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 08/25/2008 08/29/2008 7112102 IP ALARA Planning and Controls 3
OL EXAM
- LASALLE INITIAL LICENSE EXAMINATION Not Applicable 08/18/2008 08/29/2008 W90184 LASALLE - INITIAL EXAM - JULY/AUG 2008 2
BI OL
- BIENNIAL REQUAL. PROGRAM INSPECTION Baseline Inspections 10/20/2008 10/24/2008 7111111B IP Licensed Operator Requalification Program
LaSalle Inspection / Activity Plan 09/01/2007 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title 3
BI ENG
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 12/01/2008 12/19/2008 7111105T IP Fire Protection [Triennial]
1 BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 12/08/2008 12/12/2008 7112202 IP Radioactive Material Processing and Transportation