| {{#Wiki_filter:January 14, 2008 | | {{#Wiki_filter:January 14, 2008 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B) |
| | | ATTN: Supervisor, Licensing & Regulatory Programs 15760 W. Power Line Street Crystal River, Florida 34428-6708 |
| Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B) | |
| ATTN: Supervisor, Licensing & Regulatory Programs 15760 W. Power Line Street Crystal River, Florida 34428-6708 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| CRYSTAL RIVER UNIT 3 - ADMINISTRATIVE CORRECTION TO AMENDMENT REGARDING STEAM GENERATOR REPORTING REQUIREMENTS (TAC NO. MD7453) | | CRYSTAL RIVER UNIT 3 - ADMINISTRATIVE CORRECTION TO AMENDMENT REGARDING STEAM GENERATOR REPORTING REQUIREMENTS (TAC NO. MD7453) |
|
| |
|
| ==Dear Mr. Young:== | | ==Dear Mr. Young:== |
|
| |
|
| On June 28, 1999, the Co mmission issued Amendm ent No. 180 to Facility Operating License No. DPR-72 for Crystal River Unit 3. This amendment changed the Technical Specifications (TSs) regarding inservice inspection and reporting requirements for the steam generator tubes. It was recently discovered that TS Page 5.0-29A was not deleted as intended during issuance of Amendment No. 180. This letter deletes TS Page 5.0-29A. Enclosed is a corrected list of effected pages for Amendment No. 180. We regret any inconvenience this may have caused. Sincerely, /RA/ | | On June 28, 1999, the Commission issued Amendment No. 180 to Facility Operating License No. DPR-72 for Crystal River Unit 3. This amendment changed the Technical Specifications (TSs) regarding inservice inspection and reporting requirements for the steam generator tubes. It was recently discovered that TS Page 5.0-29A was not deleted as intended during issuance of Amendment No. 180. This letter deletes TS Page 5.0-29A. Enclosed is a corrected list of effected pages for Amendment No. 180. We regret any inconvenience this may have caused. |
| Stewart N. Bailey, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | | Sincerely, |
| | | /RA/ |
| Docket No. 50-302 | | Stewart N. Bailey, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-302 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| As stated | | As stated cc w/enclosure: See next page |
| | |
| cc w/enclosure: See next page Florida Power Corporation Crystal River Nuclear Plant, Unit 3 | |
| | |
| cc:
| |
| | |
| Mr. R. Alexander Glenn Associate General Counsel (MAC-BT15A)
| |
| Florida Power Corporation P.O. Box 14042 St. Petersburg, Florida 33733-4042
| |
| | |
| Mr. Michael J. Annacone Plant General Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708
| |
| | |
| Mr. Jim Mallay Framatome ANP 1911 North Ft. Myer Drive, Suite 705 Rosslyn, Virginia 22209
| |
| | |
| Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741
| |
| | |
| Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304
| |
| | |
| Mr. Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100
| |
| | |
| Chairman Board of County Commissioners Citrus County 110 North Apopka Avenue Inverness, Florida 34450-4245
| |
| | |
| Mr. Stephen J. Cahill Engineering Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. Jon A. Franke Director Site Operations Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708
| |
| | |
| Senior Resident Inspector Crystal River Unit 3 U.S. Nuclear Regulatory Commission 6745 N. Tallahassee Road Crystal River, Florida 34428
| |
| | |
| Ms. Phyllis Dixon Manager, Nuclear Assessment Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708
| |
| | |
| David T. Conley Associate General Counsel II - Legal Dept.
| |
| Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, North Carolina 27602-1551
| |
| | |
| Mr. Daniel L. Roderick Vice President, Nuclear Projects & Construction Crystal River Nuclear Plant (SA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708
| |
| | |
| Mr. David Varner Manager, Support Services - Nuclear Crystal River Nuclear Plant (SA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708
| |
| | |
| ATTACHMENT TO LICENSE AMENDMEN NO. 180 TO FACILITY OPERATING LICENSE NO. DPR-72 DOCKET NO. 50-302
| |
| | |
| Replace the following pages of the Appendix "A" Technical Specifications with the attached pages. The revised pages are identified by amendment number and contain vertical lines indicating the area of change.
| |
|
| |
|
| Remove Page Insert Page
| | Florida Power Corporation Crystal River Nuclear Plant, Unit 3 cc: |
| | Mr. R. Alexander Glenn Mr. Jon A. Franke Associate General Counsel (MAC-BT15A) Director Site Operations Florida Power Corporation Crystal River Nuclear Plant (NA2C) |
| | P.O. Box 14042 15760 W. Power Line Street St. Petersburg, Florida 33733-4042 Crystal River, Florida 34428-6708 Mr. Michael J. Annacone Senior Resident Inspector Plant General Manager Crystal River Unit 3 Crystal River Nuclear Plant (NA2C) U.S. Nuclear Regulatory Commission 15760 W. Power Line Street 6745 N. Tallahassee Road Crystal River, Florida 34428-6708 Crystal River, Florida 34428 Mr. Jim Mallay Ms. Phyllis Dixon Framatome ANP Manager, Nuclear Assessment 1911 North Ft. Myer Drive, Suite 705 Crystal River Nuclear Plant (NA2C) |
| | Rosslyn, Virginia 22209 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. William A. Passetti, Chief Department of Health David T. Conley Bureau of Radiation Control Associate General Counsel II - Legal Dept. |
| | 2020 Capital Circle, SE, Bin #C21 Progress Energy Service Company, LLC Tallahassee, Florida 32399-1741 Post Office Box 1551 Raleigh, North Carolina 27602-1551 Attorney General Department of Legal Affairs Mr. Daniel L. Roderick The Capitol Vice President, Nuclear Projects & |
| | Tallahassee, Florida 32304 Construction Crystal River Nuclear Plant (SA2C) |
| | Mr. Craig Fugate, Director 15760 W. Power Line Street Division of Emergency Preparedness Crystal River, Florida 34428-6708 Department of Community Affairs 2740 Centerview Drive Mr. David Varner Tallahassee, Florida 32399-2100 Manager, Support Services - Nuclear Crystal River Nuclear Plant (SA2C) |
| | Chairman 15760 W. Power Line Street Board of County Commissioners Crystal River, Florida 34428-6708 Citrus County 110 North Apopka Avenue Inverness, Florida 34450-4245 Mr. Stephen J. Cahill Engineering Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 |
|
| |
|
| 5.0-16 5.0-16 5.0-17 5.0-17 | | ATTACHMENT TO LICENSE AMENDMEN NO. 180 TO FACILITY OPERATING LICENSE NO. DPR-72 DOCKET NO. 50-302 Replace the following pages of the Appendix A Technical Specifications with the attached pages. The revised pages are identified by amendment number and contain vertical lines indicating the area of change. |
| ----- 5.0-17A 5.0-25 5.0-25 5.0-26 5.0-26 5.0-29 5.0-29 5.0-29A -----
| | Remove Page Insert Page 5.0-16 5.0-16 5.0-17 5.0-17 |
| | ----- 5.0-17A 5.0-25 5.0-25 5.0-26 5.0-26 5.0-29 5.0-29 5.0-29A ----- |
|
| |
|
| January 14, 2008 | | January 14, 2008 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B) |
| | | ATTN: Supervisor, Licensing & Regulatory Programs 15760 W. Power Line Street Crystal River, Florida 34428-6708 |
| Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B) | |
| ATTN: Supervisor, Licensing & Regulatory Programs 15760 W. Power Line Street Crystal River, Florida 34428-6708 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| CRYSTAL RIVER UNIT 3 - ADMINISTRATIVE CORRECTION TO AMENDMENT REGARDING STEAM GENERATOR REPORTING REQUIREMENTS (TAC NO. MD7453) | | CRYSTAL RIVER UNIT 3 - ADMINISTRATIVE CORRECTION TO AMENDMENT REGARDING STEAM GENERATOR REPORTING REQUIREMENTS (TAC NO. MD7453) |
|
| |
|
| ==Dear Mr. Young:== | | ==Dear Mr. Young:== |
|
| |
|
| On June 28, 1999, the Co mmission issued Amendm ent No. 180 to Facility Operating License No. DPR-72 for Crystal River Unit 3. This amendment changed the Technical Specifications (TSs) regarding inservice inspection and reporting requirements for the steam generator tubes. It was recently discovered that TS Page 5.0-29A was not deleted as intended during issuance of Amendment No. 180. This letter deletes TS Page 5.0-29A. Enclosed is a corrected list of effected pages for Amendment No. 180. We regret any inconvenience this may have caused. Sincerely, /RA/ Stewart N. Bailey, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | | On June 28, 1999, the Commission issued Amendment No. 180 to Facility Operating License No. DPR-72 for Crystal River Unit 3. This amendment changed the Technical Specifications (TSs) regarding inservice inspection and reporting requirements for the steam generator tubes. It was recently discovered that TS Page 5.0-29A was not deleted as intended during issuance of Amendment No. 180. This letter deletes TS Page 5.0-29A. Enclosed is a corrected list of effected pages for Amendment No. 180. We regret any inconvenience this may have caused. |
| | | Sincerely, |
| Docket No. 50-302 | | /RA/ |
| | Stewart N. Bailey, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-302 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| As stated | | As stated cc w/enclosure: See next page Distribution: |
| | | PUBLIC LPL2-2 R/F RidsNrrDorlLpl2-2 RidsNrrPMSBailey RidsOgcRp RidsNrrLABClayton (Hard Copy) |
| cc w/enclosure: See next page | | RidsAcrsAcnwMailCenter RidsRgn2MailCenter RidsNrrDorlDpr G. Hill, OIS (2 Hard Copies) |
| | | ADAMS ACCESSION NO.: ML080140372 NRR-058 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC NAME SBailey BClayton TBoyce DATE 1/ 11 /08 1/ 11 /08 1/ 14 /08 OFFICIAL RECORD COPY}} |
| Distribution: | |
| PUBLIC LPL2-2 R/F RidsNrrDorlLpl2-2 RidsNrrPMSBailey RidsOgcRp RidsNrrLABClayton (Hard Copy) | |
| RidsAcrsAcnwMailCenter RidsRgn2MailCenter RidsNrrDorlDpr G. Hill, OIS (2 Hard Copies) | |
| | |
| ADAMS ACCESSION NO.: ML080140372 NRR-058 OFFICE LPL2-2/PM LPL2-2/LALPL2-2/BC NAME SBailey BClayton TBoyce DATE 1/ 11 /08 1/ 11 /08 1/ 14 /08 OFFICIAL RECORD COPY}} | |
Letter Sequence Other |
---|
|
|
MONTHYEARML0801403722008-01-14014 January 2008 Cyrstal River Unit 3 - Administrative Correction to Amendment Steam Generator Reporting Requirements (Tac. MD7453) Project stage: Other 2008-01-14
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000302/20240012024-09-23023 September 2024 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3, NRC Inspection Report No. 05000302/2024001 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24226B2392024-08-27027 August 2024 Application for License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Acknowledgement of Withdrawal ML24179A0702024-07-26026 July 2024 SHPO S106 Completion Crystal River Unit 3 ML24205A2192024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3: Muscogee Nation ML24205A2182024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3: Seminole Nation of Oklahoma ML24179A0912024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3: Seminole Tribe of Florida ML24205A2202024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3_Miccosukee Tribe of Florida ML24190A1912024-07-0808 July 2024 Fws Concurrence for Crystal River Unit 3 ML24172A2552024-06-20020 June 2024 Fws to NRC Species List: Florida Ecological Services Field Office 06/20/2024 ML24170A9242024-06-18018 June 2024 024-0023697 Crystal River License Termination Plan Unit 3 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24114A2262024-04-24024 April 2024 Amended Special Package Authorization for the Cr3 Middle Package (Crystal River 3 Middle Package - Docket No. 71-9393) IR 05000302/20230022024-04-17017 April 2024 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2023002 ML24054A0612024-04-0202 April 2024 Request to Initiate Section 106 Consultation Regarding the License Termination Plan for Crystal River Unit 3 in Citrus County, Florida ML24079A2492024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Johnson, Lewis Johnson ML24054A0582024-04-0202 April 2024 Achp S106 Initiation Crystal River Unit 3 - Letter 1 ML24079A2472024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Cypress, Talbert ML24079A2482024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Hill, David Hill ML24054A0812024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Osceola, Marcellus ML24089A0362024-03-29029 March 2024 Response to Audit Plan in Support of Accelerated Decommissioning Partners and Request to Add License Condition to Include License Termination Plan Requirements. W/Enclosures 1 to 5 ML24073A1922024-03-11011 March 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML24054A6452024-02-29029 February 2024 Letter - Reply to Request for RAI Extension Related to the Crystal River License Termination Plan ML24030A7482024-02-12012 February 2024 Audit Report Cover Letter and Report - Crystal River Unit 3 Nuclear Generating Plant LTP ML23342A0942024-01-0909 January 2024 – Independent Spent Fuel Storage Installation Security Inspection Plan ML23354A0632023-12-22022 December 2023 Cover Letter - Crystal River License Termination Plan Request for Additional Information ML23345A1882023-12-0606 December 2023 Fws to NRC Crystal River Species List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML23320A2592023-11-17017 November 2023 STC-23 077 Notification of the Crystal River Unit 3 Generating Plant License Termination Plan Public Meeting and Federal Register Notice ML23313A1322023-11-15015 November 2023 Request for Additional Information for the Environmental Assessment of the License Termination Plan for Crystal River Unit 3 Nuclear Generating Plant ML23310A0712023-11-0707 November 2023 Audit Plan Cover Letter - Crystal River Unit 3 Nuclear Generating Plant LTP ML23187A1112023-07-25025 July 2023 Acceptance of Requested Licensing Action License Request to Add License Condition to Include License Termination Plan Requirements ML23107A2722023-06-13013 June 2023 Letter Transmitting NRC Survey Results for East Settling Pond ML23160A2962023-06-0909 June 2023 Response to Crystal River, Unit 3 – Supplemental Information Needed for Acceptance on the Application for a License Amendment Regarding Approval of the License Termination Plan ML23107A2732023-06-0707 June 2023 Orise Independent Survey Report Dcn 5366-SR-01-0 IR 05000302/20220032023-05-25025 May 2023 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2022003 ML23103A1902023-04-19019 April 2023 Request for Supplemental Information Cover Letter ML23058A2532023-03-22022 March 2023 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River, Unit 3 - NRC Inspection Report No. 05000302/2022003 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22265A0192022-09-26026 September 2022 Nuclear Generating Plant - U.S. Nuclear Regulatory Commission'S Analysis of ADP CR3, Llc'S Decommissioning Funding Status Report (License No. DPR-72, Docket Nos. 50-302 and 72-1035) IR 05000302/20220022022-08-0909 August 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report 05000302/2022002 IR 05000302/20220012022-05-0303 May 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report 05000302/2022001 ML22116A1752022-04-27027 April 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3- Independent Spent Fuel Storage Installation Security Inspection Report 07201035/2022401 ML22105A3992022-04-18018 April 2022 Nuclear Generating Plant - Change in NRC Project Manager ML22011A1362022-01-31031 January 2022 Independent Spent Fuel Storage Installation Security Inspection Plan ML22024A2142022-01-24024 January 2022 Nuclear Generating Plant - NMFS NRC Letter - Crystal River Energy Complex Biological Opinion Status (License No. DPR-72, Docket Nos. 50-302 and 72-1035) IR 05000302/20210042022-01-24024 January 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2021004 ML21351A0052021-12-20020 December 2021 NRC Analysis of ADP CR3, LLC Decommissioning Funding Status Report for the Crystal River Unit 3 Nuclear Generating Plant (License No. DPR-72, Docket Nos. 50-302 and 72-1035) ML21322A2702021-11-24024 November 2021 Nuclear Generating Plant - Issuance of Amendment No. 260 Approving the Independent Spent Fuel Storage Installation Only Security Plan, Rev 3 IR 05000302/20210032021-11-0909 November 2021 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report Nos. 05000302/2021003 and 07201035/2021001 ML21288A4292021-10-18018 October 2021 Letter - Crystal River Unit 3 Nuclear Generating Plant - Correction to Safety Evaluation Related to the Issuance of Amendment No. 259 Approving the Independent Spent Fuel Storage Installation Only Emergency Plan 2024-09-23
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML21322A2702021-11-24024 November 2021 Nuclear Generating Plant - Issuance of Amendment No. 260 Approving the Independent Spent Fuel Storage Installation Only Security Plan, Rev 3 ML21238A0952021-10-13013 October 2021 Issuance of Amendment No. 259 Approving the ISFSI-Only Emergency Plan, Revision Draft a ML20069A0262020-04-0101 April 2020 CR-3 License Transfer Enc 2 Att 1 FOL Amnd 258.doc ML20069A0252020-04-0101 April 2020 CR-3 License Transfer Enc 2 Amendment ML19129A1412019-05-15015 May 2019 Corrected Page for Amendment No. 257 to License No. DPR-072 for Duke Energy Florida, Inc ML19080A1872019-05-0303 May 2019 Enclosure 1 Amendment No. 257 to License No. DPR-72 Duke Energy Florida, Inc., Crystal River, Unit 3, Docket No. 50-302 ML18017A9882018-02-14014 February 2018 Amendment No. 256 to License No. DPR-72 Duke Energy Florida, LLC Crystal River Unit 3 Nuclear Generating Plant Docket No. 50-302 ML17027A1612017-06-27027 June 2017 Enclosure 1, Amendment to Crystal River License No. DPR-72 ML17027A1632017-06-27027 June 2017 Permanently Defueled Tech Specs Amendment 254, Table of Contents ML17027A1642017-06-27027 June 2017 Permanently Defueled Tech Specs Amendment 254, Section 4.0 ML17027A1652017-06-27027 June 2017 Permanently Defueled Tech Specs Amendment 254 Section 5.0 ML17027A1602017-06-27027 June 2017 Ltr to T. Hobbs re: Crystal River Unit 3 Nuclear Generating Plant - Amendment to Permanently Defueled Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pools ML17027A1622017-06-27027 June 2017 Facility Operating License Pages ML17096A2812017-06-22022 June 2017 Amendment to License No. DPR-72 Duke Energy Florida, LLC Crystal River Unit 3 Nuclear Generating Plant Docket No. 50-302 ML17096A2822017-06-22022 June 2017 FOL Amnd 254 ML17048A4782017-03-22022 March 2017 Amendment to License No. DPR-72 for ISFSI Emergency Plan and EAL Bases Manual ML16244A1012016-12-0505 December 2016 Amendment Approving ISFSI Emergency Plan ML16293A2002016-11-30030 November 2016 Operating License Amendment 251 Changed Pages ML16173A0232016-08-10010 August 2016 Revised License Pages for License Transfer, Crystal River Unit 3 ML16173A0212016-08-10010 August 2016 Conforming Amendment for License Transfer, Crystal River Unit 3 ML15261A4522015-11-27027 November 2015 Nuclear Generating Plant - Issuance of Amendment No. 249 Regarding Technical Specification Change of Management Titles to General Manager Decommissioning ML15224B2862015-09-0404 September 2015 Nuclear Generating Plant - Issuance of Amendment for Operating License and Technical Specification Based on Permanently Shutdown and Defueled Status ML15121A5702015-05-29029 May 2015 Letter, Safety Evaluation for Order Approving Transfer of Licenses and Conforming Amendments ML15027A2092015-03-31031 March 2015 Issuance of Amendment Regarding Changes to the Emergency Plan and Emergency Action Levels ML14318A9292014-12-19019 December 2014 H. B. Robinson; Shearon Harris Nuclear Power Plant; and Crystal River, Unit 3 - Issuance of License Amendments Regarding Revision to Cyber Security Plan Implementation Schedule Completion Date (TAC Nos. MF3263 - MF3267) ML14097A1452014-07-11011 July 2014 Nuclear Generating Plant - Issuance of Amendment No. 244, Revise Technical Specifications to Remove Certain Requirements from Section 5, Administrative Controls ML13158A2772013-10-18018 October 2013 Issuance of Amendment Regarding the Request to Change the Licensee'S Name ML12339A0672012-12-18018 December 2012 Issuance of License Amendments Regarding Cyber Security ML12136A3922012-06-26026 June 2012 Issuance of Amendment Regarding Departure from a Method for Evaluating the Auxiliary Building Overhead Crane and Revisions to Associated Commitments ML12081A2792012-03-19019 March 2012 License Amendment Request #312, Revision 0, Departure from a Method of Evaluation for the Auxiliary Building Overhead Crane - Implementation Schedule Change Request ML11292A0412012-02-24024 February 2012 Nuclear Generating Plant - Issuance of Amendment 240 Regarding Improved Technical Specifications 3.7.19 Diesel Drive Emergency Feedwater Pump Fuel Oil, Lube Oil, and Starting Air ML11321A1652011-12-27027 December 2011 Nuclear Generating Plant - Issuance of Amendment 239 Regarding Departure from a Method for Evaluating the Auxiliary Building Overhead Crane and Revisions to Associated Commitments ML11193A0282011-07-29029 July 2011 Issuance of Amendments Approval of Cyber Security Plan ML0911000562009-05-29029 May 2009 License Amendment, Issuance of Amendment Regarding the Revision of the Steam Generator Portion of the Technical Specifications to Replacement of the Steam Generators ML0834704912009-01-0909 January 2009 Issuance of Amendment Regarding Revisions to Improved Technical Specification Surveillance Requirement 3.7.5.2, Emergency Feedwater System ML0820200062008-07-30030 July 2008 Issuance of Amendment 230 Regarding Control Room Envelope Habitability in Accordance with TSTF-448 ML0801403722008-01-14014 January 2008 Cyrstal River Unit 3 - Administrative Correction to Amendment Steam Generator Reporting Requirements (Tac. MD7453) ML0729103172007-10-25025 October 2007 License Amendment 227 Fuel Storage Patterns in the Spent Fuel Pool ML0725501372007-10-24024 October 2007 Issuance of Amendment Regarding Spent Fuel Pool Missile Shields ML0728508942007-10-23023 October 2007 License Amendment 225 Regarding Nuclear Services Closed Cycle Cooling Water System ML0723400102007-08-23023 August 2007 Revised Pages of Facility Operating License DPR-72 B.5.b ML0715004662007-06-15015 June 2007 License Amendment, Issuance of Amendment to Adopt TSTF-372 ML0713401122007-05-16016 May 2007 Issuance of License Amendment 223 Regarding Steam Generator Tube Inspection Program ML0709401402007-03-27027 March 2007 Administrative Amendment for EA-06-037 ML0529401792005-10-31031 October 2005 License Amendment, Probabilistic Methodology for Tube End Crack Alternate Repair Criteria, TAC No. MC5813 ML0525900462005-09-15015 September 2005 License Amendment, Temporary Extension of the Nuclear Services Seawater System Train Completion Time ML0522101892005-09-0606 September 2005 License Amendment No. 220 Regarding Removal of Obsolete Footnotes from the Technical Specifications ML0517103812005-08-0404 August 2005 License Amendment, Reactor Building Spray Nozzle Surveillance Requirement ML0518903482005-07-27027 July 2005 Amendment 218, Surveillance Requirements for RCP Flywheel Inspection ML0511104972005-04-19019 April 2005 Amendment 217, TS Revision to Eliminate Monthly Operating and Annual Occupational Radiation Exposure Reports Requirements 2021-11-24
[Table view] |
Text
January 14, 2008 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B)
ATTN: Supervisor, Licensing & Regulatory Programs 15760 W. Power Line Street Crystal River, Florida 34428-6708
SUBJECT:
CRYSTAL RIVER UNIT 3 - ADMINISTRATIVE CORRECTION TO AMENDMENT REGARDING STEAM GENERATOR REPORTING REQUIREMENTS (TAC NO. MD7453)
Dear Mr. Young:
On June 28, 1999, the Commission issued Amendment No. 180 to Facility Operating License No. DPR-72 for Crystal River Unit 3. This amendment changed the Technical Specifications (TSs) regarding inservice inspection and reporting requirements for the steam generator tubes. It was recently discovered that TS Page 5.0-29A was not deleted as intended during issuance of Amendment No. 180. This letter deletes TS Page 5.0-29A. Enclosed is a corrected list of effected pages for Amendment No. 180. We regret any inconvenience this may have caused.
Sincerely,
/RA/
Stewart N. Bailey, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-302
Enclosure:
As stated cc w/enclosure: See next page
Florida Power Corporation Crystal River Nuclear Plant, Unit 3 cc:
Mr. R. Alexander Glenn Mr. Jon A. Franke Associate General Counsel (MAC-BT15A) Director Site Operations Florida Power Corporation Crystal River Nuclear Plant (NA2C)
P.O. Box 14042 15760 W. Power Line Street St. Petersburg, Florida 33733-4042 Crystal River, Florida 34428-6708 Mr. Michael J. Annacone Senior Resident Inspector Plant General Manager Crystal River Unit 3 Crystal River Nuclear Plant (NA2C) U.S. Nuclear Regulatory Commission 15760 W. Power Line Street 6745 N. Tallahassee Road Crystal River, Florida 34428-6708 Crystal River, Florida 34428 Mr. Jim Mallay Ms. Phyllis Dixon Framatome ANP Manager, Nuclear Assessment 1911 North Ft. Myer Drive, Suite 705 Crystal River Nuclear Plant (NA2C)
Rosslyn, Virginia 22209 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. William A. Passetti, Chief Department of Health David T. Conley Bureau of Radiation Control Associate General Counsel II - Legal Dept.
2020 Capital Circle, SE, Bin #C21 Progress Energy Service Company, LLC Tallahassee, Florida 32399-1741 Post Office Box 1551 Raleigh, North Carolina 27602-1551 Attorney General Department of Legal Affairs Mr. Daniel L. Roderick The Capitol Vice President, Nuclear Projects &
Tallahassee, Florida 32304 Construction Crystal River Nuclear Plant (SA2C)
Mr. Craig Fugate, Director 15760 W. Power Line Street Division of Emergency Preparedness Crystal River, Florida 34428-6708 Department of Community Affairs 2740 Centerview Drive Mr. David Varner Tallahassee, Florida 32399-2100 Manager, Support Services - Nuclear Crystal River Nuclear Plant (SA2C)
Chairman 15760 W. Power Line Street Board of County Commissioners Crystal River, Florida 34428-6708 Citrus County 110 North Apopka Avenue Inverness, Florida 34450-4245 Mr. Stephen J. Cahill Engineering Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708
ATTACHMENT TO LICENSE AMENDMEN NO. 180 TO FACILITY OPERATING LICENSE NO. DPR-72 DOCKET NO. 50-302 Replace the following pages of the Appendix A Technical Specifications with the attached pages. The revised pages are identified by amendment number and contain vertical lines indicating the area of change.
Remove Page Insert Page 5.0-16 5.0-16 5.0-17 5.0-17
5.0-17A 5.0-25 5.0-25 5.0-26 5.0-26 5.0-29 5.0-29 5.0-29A -----
January 14, 2008 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B)
ATTN: Supervisor, Licensing & Regulatory Programs 15760 W. Power Line Street Crystal River, Florida 34428-6708
SUBJECT:
CRYSTAL RIVER UNIT 3 - ADMINISTRATIVE CORRECTION TO AMENDMENT REGARDING STEAM GENERATOR REPORTING REQUIREMENTS (TAC NO. MD7453)
Dear Mr. Young:
On June 28, 1999, the Commission issued Amendment No. 180 to Facility Operating License No. DPR-72 for Crystal River Unit 3. This amendment changed the Technical Specifications (TSs) regarding inservice inspection and reporting requirements for the steam generator tubes. It was recently discovered that TS Page 5.0-29A was not deleted as intended during issuance of Amendment No. 180. This letter deletes TS Page 5.0-29A. Enclosed is a corrected list of effected pages for Amendment No. 180. We regret any inconvenience this may have caused.
Sincerely,
/RA/
Stewart N. Bailey, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-302
Enclosure:
As stated cc w/enclosure: See next page Distribution:
PUBLIC LPL2-2 R/F RidsNrrDorlLpl2-2 RidsNrrPMSBailey RidsOgcRp RidsNrrLABClayton (Hard Copy)
RidsAcrsAcnwMailCenter RidsRgn2MailCenter RidsNrrDorlDpr G. Hill, OIS (2 Hard Copies)
ADAMS ACCESSION NO.: ML080140372 NRR-058 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC NAME SBailey BClayton TBoyce DATE 1/ 11 /08 1/ 11 /08 1/ 14 /08 OFFICIAL RECORD COPY