{{#Wiki_filter:Calvert Cliffs Nuclear Power Plant CENG.a joint venture of 0Constellation4"#, eDF CALVERT CLIFFS NUCLEAR POWER PLANT 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 June 30, 2011 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
{{#Wiki_filter:Calvert Cliffs Nuclear Power Plant                               1650 Calvert Cliffs Parkway Lusby, Maryland 20657 CENG.
a joint venture of 0Constellation Ener*y,              4"#, eDF CALVERT CLIFFS NUCLEAR POWER PLANT June 30, 2011 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:                 Document Control Desk


==SUBJECT:==
==SUBJECT:==
Document Control Desk Calvert Cliffs Nuclear Power Plant Unit No. 2; Docket No. 50-318 Spring 2011 -180 Day Steam Generator Report (a) Calvert Cliffs Nuclear Power Plant Units 1 and 2 Technical Specification 5.6.9
Calvert Cliffs Nuclear Power Plant Unit No. 2; Docket No. 50-318 Spring 2011 - 180 Day Steam Generator Report


==REFERENCE:==
==REFERENCE:==
(a)    Calvert Cliffs Nuclear      Power Plant    Units  1 and      2  Technical Specification 5.6.9 In accordance with Reference (a), Attachment (1) provides the results of the steam generator tube inspection conducted on Calvert Cliffs Unit 2 in 2011. This report includes the number and extent of tubes examined and indications identified.
Should you have questions regarding this matter, please contact Mr. Douglas E. Lauver at (410) 495-5219.
                                                            - Engineering Services JJS/PSF/bjd


In accordance with Reference (a), Attachment (1) provides the results of the steam generator tube inspection conducted on Calvert Cliffs Unit 2 in 2011. This report includes the number and extent of tubes examined and indications identified.
==Attachment:==
Should you have questions regarding this matter, please contact Mr. Douglas E. Lauver at (410) 495-5219.-Engineering Services JJS/PSF/bjd
(1)   Calvert Cliffs Unit 2, Spring 2011 - 180 Day Steam Generator Report cc:      D. V. Pickett, NRC                                Resident Inspector, NRC W. M. Dean, NRC                                    S. Gray, DNR AwlI
 
ATTACHMENT (1)
CALVERT CLIFFS UNIT 2, SPRING 2011 -
180 DAY STEAM GENERATOR REPORT Calvert Cliffs Nuclear Power Plant, LLC June 30, 2011
 
A 20004-018 (10/18/2010)
AREVA AREVA NP Inc.
ENGINEERING INFORMATION RECORD Document No.:      51  - 9156712 - 000 Calvert Cliffs Unit 2 -- U2R19 180-Day Report Page 1 of 28


==Attachment:==
A                                                                                  20004-018 (10/18/2010)
Document No.: 51-9156712-000 AREVA Calvert Cliffs Unit 2 -- U2R19 180-Day Report Safety Related?  [:] YES    ONO Does this document contain assumptions requiring verification?      [-] YES  E NO Does this document contain Customer Required Format?          -- YES    0  NO Signature Block Note:  P/LP designates Preparer (P), Lead Preparer (LP)
R/LR designates Reviewer (R), Lead Reviewer (LR)
A/A-CRF designates Approver (A), Approver of Customer Requested Format (A-CRF)
A/A-CRI designates Approver (A), Approver - Confirming Reviewer Independence (A-CRI)
Page 2
 
A                                                        20004-018 (10/18/2010)
Document No.: 51-9156712-000 AREVA Calvert Cliffs Unit 2 -- U2R19 180-Day Report Record of Revision Page 3
 
A                                                                                                              Document No.: 51-9156712-000 AR EVA Calvert Cliffs Unit 2            --  U2R19 180-Day Report Table of Contents Page SIG NATURE BLOCK ................................................................................................................................          2 RECO RD O F REVISIO N ..........................................................................................................................          3 LIST O F TABLES .....................................................................................................................................      5 LIST O F FIG URES ...................................................................................................................................      6 1.0    180-DAY REPO RT ........................................................................................................................            7
 
==2.0    REFERENCES==
............................................................................................................................            19 APPENDIX A : SG21 FBW INDICATIONS ............................................................................................................            20 APPENDIX B1: SG22 FBW INDICATIONS ......................................................................................................                  23 Page 4


(1) Calvert Cliffs Unit 2, Spring 2011 -180 Day Steam Generator Report cc: D. V. Pickett, NRC W. M. Dean, NRC Resident Inspector, NRC S. Gray, DNR AwlI ATTACHMENT (1)CALVERT CLIFFS UNIT 2, SPRING 2011 -180 DAY STEAM GENERATOR REPORT Calvert Cliffs Nuclear Power Plant, LLC June 30, 2011 A 20004-018 (10/18/2010)
A                                                                                       Document No.: 51-9156712-000 AR EVA Calvert Cliffs Unit 2 -- U2R19 180-Day Report List of Tables Page TABLE 1 - NDE TECHNIQUES UTILIZED FOR IDENTIFIED DEGRADATION ................................ 9 TABLE 2 - FOREIGN OBJECT W EAR ............................................................................................ 14 TABLE 3 - LIST OF TUBES PLUGGED DURING U2R19 .................................................................                 15 TABLE 4 - TUBE PLUGG ING SUM MARY ......................................................................................... 15 Page 5
AREVA AREVA NP Inc.ENGINEERING INFORMATION RECORD Document No.: 51 -9156712 -000 Calvert Cliffs Unit 2 -- U2R19 180-Day Report Page 1 of 28 A AREVA 20004-018 (10/18/2010)
Document No.: 51-9156712-000 Calvert Cliffs Unit 2 -- U2R19 180-Day Report Safety Related? [:] YES ONO Does this document contain assumptions requiring verification?
[-] YES E NO Does this document contain Customer Required Format? -- YES 0 NO Signature Block Note: P/LP designates Preparer (P), Lead Preparer (LP)R/LR designates Reviewer (R), Lead Reviewer (LR)A/A-CRF designates Approver (A), Approver of Customer Requested Format (A-CRF)A/A-CRI designates Approver (A), Approver -Confirming Reviewer Independence (A-CRI)Page 2 A AREVA 20004-018 (10/18/2010)
Document No.: 51-9156712-000 Calvert Cliffs Unit 2 -- U2R19 180-Day Report Record of Revision Page 3 A AR EVA Document No.: 51-9156712-000 Calvert Cliffs Unit 2 -- U2R19 180-Day Report Table of Contents Page SIG NATURE BLOCK ................................................................................................................................
2 RECO RD O F REVISIO N ..........................................................................................................................
3 LIST O F TABLES .....................................................................................................................................
5 LIST O F FIG URES ...................................................................................................................................
6 1.0 180-DAY REPO RT ........................................................................................................................
7


==2.0 REFERENCES==
A                                                                          Document No.: 51-9156712-000 AREVA Calvert Cliffs Unit 2 -- U2R19 180-Day Report List of Figures Page FIGURE 1 - FAN BAR WEAR THROUGHWALL DEPTH DISTRIBUTION ....................................... 10 FIGURE 2 - SG21 FAN BAR WEAR LOCATIONS ............................................................................ 11 FIGURE 3 - SG22 FAN BAR WEAR LOCATIONS ............................................................................ 12 FIGURE 4 - SG21 FAN BAR WEAR CONDITION MONITORING .................................................... 17 FIGURE 5 - SG22 FAN BAR WEAR CONDITION MONITORING .................................................... 17 FIGURE 6 - SG21 AND SG22 LP WEAR CONDITION MONITORING ............................................ 18 Page 6


............................................................................................................................
A ARE VA                                                                           Document No.: 51-9156712-000 AREVA NP Inc.,
19 APPENDIX A : SG21 FBW INDICATIONS
an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report 1.0     180-DAY REPORT Calvert Cliffs Nuclear Power Plant Unit 2 U2R19 Spring 2011 Steam Generator Inspection During the Calvert Cliffs Nuclear Power Plant Unit 2 (CCNPP2) spring 2011 refueling outage (designated as U2R19), both of the steam generators (i.e., SG21 and SG22) were inspected in accordance with CCNPP Technical Specification (TS) 5.5.9. This was the third in-service inspection of the replacement steam generators (SGs), and the SGs had been operated for 7.45 effective full power years (EFPY) at the time of the inspection.
............................................................................................................
20 APPENDIX B1 : SG22 FBW INDICATIONS
......................................................................................................
23 Page 4 A AR EVA Document No.: 51-9156712-000 Calvert Cliffs Unit 2 -- U2R19 180-Day Report List of Tables Page TABLE 1 -NDE TECHNIQUES UTILIZED FOR IDENTIFIED DEGRADATION
................................
9 TABLE 2 -FOREIGN OBJECT W EAR ............................................................................................
14 TABLE 3 -LIST OF TUBES PLUGGED DURING U2R19 .................................................................
15 TABLE 4 -TUBE PLUGG ING SUM MARY .........................................................................................
15 Page 5 A AREVA Document No.: 51-9156712-000 Calvert Cliffs Unit 2 -- U2R19 180-Day Report List of Figures Page FIGURE 1 -FAN BAR WEAR THROUGHWALL DEPTH DISTRIBUTION
.......................................
10 FIGURE 2 -SG21 FAN BAR W EAR LOCATIONS
............................................................................
11 FIGURE 3 -SG22 FAN BAR W EAR LOCATIONS
............................................................................
12 FIGURE 4 -SG21 FAN BAR WEAR CONDITION MONITORING
....................................................
17 FIGURE 5 -SG22 FAN BAR WEAR CONDITION MONITORING
....................................................
17 FIGURE 6 -SG21 AND SG22 LP WEAR CONDITION MONITORING
............................................
18 Page 6 A ARE VA Document No.: 51-9156712-000 AREVA NP Inc., an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report 1.0 180-DAY REPORT Calvert Cliffs Nuclear Power Plant Unit 2 U2R19 Spring 2011 Steam Generator Inspection During the Calvert Cliffs Nuclear Power Plant Unit 2 (CCNPP2) spring 2011 refueling outage (designated as U2R19), both of the steam generators (i.e., SG21 and SG22) were inspected in accordance with CCNPP Technical Specification (TS) 5.5.9. This was the third in-service inspection of the replacement steam generators (SGs), and the SGs had been operated for 7.45 effective full power years (EFPY) at the time of the inspection.
The discussion below summarizes the results of the inspection in accordance with the 180-day reporting requirements of Technical Specification (TS) 5.6.9. Bold wording restates the TS requirement, followed immediately by the required CCNPP2 information.
The discussion below summarizes the results of the inspection in accordance with the 180-day reporting requirements of Technical Specification (TS) 5.6.9. Bold wording restates the TS requirement, followed immediately by the required CCNPP2 information.
A report shall be submitted within 180 days after the initial entry into Mode 4 following completion of an inspection performed in accordance with the Specification 5.5.9, Steam Generator (SG) Program.Initial entry into Mode 4 occurred on March 12, 2011; therefore, this report is required to be submitted by September 7, 2011.The report shall include: a. The scope of inspections performed on each SG" Eddy Current Bobbin probe examinations (both SGs): o 100% of all inservice tubes, full length, tube-end to tube-end.o During the bobbin probe examination, in-service tubes bounding plugged tubes were examined for signs of tube-to-tube proximity or contact (resulting from severance of a plugged tube)." Eddy Current Array probe examinations (both SGs): o 100% of all inservice tubes, tube end to 1st lattice-support (both H/L and C/L).o Since all of the in-service tubes were examined with Array probe from the tube-end to the 1 st lattice support, the following examinations were also satisfied by the Array probe examination: (Note that any loose parts or loose part indications outside of the Array probe examination range were examined using RPC. Additionally, any wear detected during the Array probe examination was also examined using RPC for characterization.)
A report shall be submitted within 180 days after the initial entry into Mode 4 following completion of an inspection performed in accordance with the Specification 5.5.9, Steam Generator (SG) Program.
Page 7 A AR EVA Document No.: 51-9156712-000 AREVA NP Inc., an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report" Inspection of a one-tube border region around all tubes previously plugged due to foreign object wear and/or object remaining in the SG. This included 30 tubes plugged in SG21 during U2R18, and 29 tubes plugged in SG22 during U2R16." Inspection of all previous PLPs (part not removed) plus a one tube bounding examination of such tubes at the elevation of interest.
Initial entry into Mode 4 occurred on March 12, 2011; therefore, this report is required to be submitted by September 7, 2011.
This included 59 PLP tubes (plus the bounding tubes) returned to service in SG21 during U2R18, and 27 PLP tubes (plus the bounding tubes) returned to service in SG22 during U2R18." Inspection of all in-service tubes reported during the previous outage as NDD or LPS that were associated with foreign objects not retrieved during that outage, plus a one tube bounding examination of such tubes at the elevation of interest.
The report shall include:
This included 25 tubes (plus the bounding tubes) reported in SG21 during U2R18, and 30 tubes (plus bounding tubes) reported in SG22 during U2R18.o The Array probe inspection data was also analyzed for expansion transition cracking at the hot and cold leg top of tubesheet (TTS)Rotating eddy current probe examination (RPC) (both SGs): " Pre-planned:
: a. The scope of inspections performed on each SG
Inspection of all in-service tube locations containing previously identified foreign object wear. This included 5 tubes in SG21 (all reported for the first time during U2R18) and, 6 tubes in SG22 (4 reported for the first time during U2R16 and 2 reported for the first time during U2R18).o Special interest examinations:
    "   Eddy Current Bobbin probe examinations (both SGs):
* All bobbin probe and/or Array probe I-Codes.* All newly-identified foreign object wear indications.
o   100% of all inservice tubes, full length, tube-end to tube-end.
* All bobbin probe loose part indications plus a one tube bounding examination of such tubes that fall outside of the Array probe examination range.* All bobbin probe lattice-support wear indications.
o   During the bobbin probe examination, in-service tubes bounding plugged tubes were examined for signs of tube-to-tube proximity or contact (resulting from severance of a plugged tube).
    " Eddy Current Array probe examinations (both SGs):
o   100% of all inservice tubes, tube end to 1st lattice-support (both H/L and C/L).
o   Since all of the in-service tubes were examined with Array probe from the tube-end to the 1 st lattice support, the following examinations were also satisfied by the Array probe examination: (Note that any loose parts or loose part indications outside of the Array probe examination range were examined using RPC. Additionally, any wear detected during the Array probe examination was also examined using RPC for characterization.)
Page 7
 
A AR EVA                                                                           Document No.: 51-9156712-000 AREVA NP Inc.,
an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report
            " Inspection of a one-tube border region around all tubes previously plugged due to foreign object wear and/or object remaining in the SG. This included 30 tubes plugged in SG21 during U2R18, and 29 tubes plugged in SG22 during U2R16.
            " Inspection of all previous PLPs (part not removed) plus a one tube bounding examination of such tubes at the elevation of interest. This included 59 PLP tubes (plus the bounding tubes) returned to service in SG21 during U2R18, and 27 PLP tubes (plus the bounding tubes) returned to service in SG22 during U2R18.
            " Inspection of all in-service tubes reported during the previous outage as NDD or LPS that were associated with foreign objects not retrieved during that outage, plus a one tube bounding examination of such tubes at the elevation of interest. This included 25 tubes (plus the bounding tubes) reported in SG21 during U2R18, and 30 tubes (plus bounding tubes) reported in SG22 during U2R18.
o   The Array probe inspection data was also analyzed for expansion transition cracking at the hot and cold leg top of tubesheet (TTS)
Rotating eddy current probe examination (RPC) (both SGs):
        "   Pre-planned: Inspection of all in-service tube locations containing previously identified foreign object wear. This included 5 tubes in SG21 (all reported for the first time during U2R18) and, 6 tubes in SG22 (4 reported for the first time during U2R16 and 2 reported for the first time during U2R18).
o   Special interest examinations:
* All bobbin probe and/or Array probe I-Codes.
* All newly-identified foreign object wear indications.
* All bobbin probe loose part indications plus a one tube bounding examination of such tubes that fall outside of the Array probe examination range.
* All bobbin probe lattice-support wear indications.
* Additional indications (e.g., fan bar wear, dents, dings) as needed to meet operational assessment requirements for tube integrity.
* Additional indications (e.g., fan bar wear, dents, dings) as needed to meet operational assessment requirements for tube integrity.
* Visual inspection of all installed tube plugs in both SGs in accordance with section 6.9 of the EPRI PWR Steam Generator Examination Guidelines, Rev 7. This included both welded and mechanical plugs.* The following secondary side inspections were performed (both SGs): o Secondary side visual inspections of tubesheet, including the inner bundle passes, the annulus, and the no-tube lane regions o Secondary side visual inspection of the 1 st lattice grid support o Targeted inspection of locations identified as PLP (Possible Loose Part) by ECT. See the latter part of Section "d" for an explanation of targeted inspections.
* Visual inspection of all installed tube plugs in both SGs in accordance with section 6.9 of the EPRI PWR Steam Generator Examination Guidelines, Rev 7. This included both welded and mechanical plugs.
Page 8 A AR EVA Document No.: 51-9156712-000 AREVA NP Inc., an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report b. Active degradation mechanisms found Two degradation mechanisms were identified during this examination:
* The following secondary side inspections were performed (both SGs):
: 1) fan bar wear, and 2) foreign object wear. No evidence of corrosion degradation processes, cracking, or lattice support wear was identified and no tubes were identified as being in close proximity to one another.c. Nondestructive examination techniques utilized for each degradation mechanism The table below identifies NDE examination techniques utilized for each identified degradation mechanism.
o   Secondary side visual inspections of tubesheet, including the inner bundle passes, the annulus, and the no-tube lane regions o   Secondary side visual inspection of the 1 st lattice grid support o   Targeted inspection of locations identified as PLP (Possible Loose Part) by ECT. See the latter part of Section "d" for an explanation of targeted inspections.
Table I -NDE Techniques Utilized for Identified Degradation Degradation Inspection Type EPRI ETSS Mechanism Bobbin 96004.1 (Rev. 13)Fan bar wear+PointTM 96910.1 (Rev. 10)Foreign Object +Point T M  27901.1 (Rev. 0) **Wear* (circ groove)The Array probe was the primary means of detecting foreign objects and foreign+ *TM object wear during the inspection.
Page 8
However, the +Point probe was used for sizing wear.** There are other EPRI techniques qualified for sizing of foreign object wear depending on the shape of the flaw. ETSS 27901.1 was selected based on the circumferential groove appearance of the foreign object wear indications detected during the U2R1 9 inspection.
 
: d. Location, orientation (if linear), and measured sizes (if available) of service induced indications Fan bar wear (FBW) is a mechanical degradation process which produces volumetric tube wear at the interface between the U-bend anti-vibration supports (fan bars) and the tubes. In total, 358 fan bar wear (FBW) indications in 274 tubes were identified in the CCNPP2 steam generators during the U2R19 inspection.
A AR EVA                                                                             Document No.: 51-9156712-000 AREVA NP Inc.,
Although none of the reported indications exceeded the Technical Specification plugging limit of 40%TW, the three largest FBW indications (all in SG22) were preventatively stabilized with full-length stabilizers, and the tubes were plugged. Although the full length stabilizer is not required to span the entire tube length, it is required to span the tube length on the insertion leg side (hot leg) from the top of the plug over the u-bend and past the 5 th support on the opposite leg for the largest tube row (row 138) in the bundle.Thirty-one of the 358 indications were newly reported during U2R19. This represents an increase of about 10% since the last inservice inspection in 2009 (U2R18). The maximum depth reported was a 32%TW indication in SG22. The largest newly-reported indication was an 18%TW indication in SG22.Figure 1 provides the distribution of fan bar wear depths for both steam generators as reported with the Page 9 A AREVA AREVA NP Inc., an AREVA and Siemens company Document No.: 51-9156712-000 Calvert Cliffs Unit 2 -- U2R19 180-Day Report bobbin coil probe. As shown in the figure, SG22 contained more indications and also contained the majority of indications that were greater than 20%TW.Figures 2 and 3 provide tube map locations of the reported FBW. Although the tube maps shown in Figures 2 and 3 provide a view of the tubesheet primary face from the hot leg side, both the hot leg and cold leg FBW indications are included on each map. Most of the wear continues to occur in longer tubes (i.e., larger ubend radius), clustered towards the center-most tube columns.Figure 1 -Fan Bar Wear Throughwall Depth Distribution Page 10 A AREVA AREVA NP Inc., an AREVA and Siemens company Document No.: 51-9156712-000 Calvert Cliffs Unit 2 -- U2R19 180-Day Report Figure 2 -SG21 Fan Bar Wear Locations GRWOP NOES Calvert Cliffs Unit 2 .Bw~o,. 9 2R19- FEB 2011 Fan Bar Wear Indications (9 Et " tu b e s w ith n e w F &W 6 tu b e s vw th o u t p n or F BW
an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report
* 3 tu b e s w i l n eO w F W a n d p 7 1 0 0 F B W at d d t e n , l o ct w S C A L E 0 OO3I8)$10 21 TOTAL 8471 " 073I NOT 2 SELECTED TUBES 91 PRMAYOAC OJT OF SERV1E (0) 37 NOZZLE ifi ilto.. ..... .. .. 40+'ofo 040 130 120 110 Go so .0 30 20 10 MANWAY Page 11 A AREVA AREVA NP Inc., an AREVA and Siemens company Document No.: 51-9156712-000 Calvert Cliffs Unit 2 -- U2R1 9 180-Day Report Figure 3 -SG22 Fan Bar Wear Locations Calvert Cliffs Unit 2 2R19- FEB 2011 60Oup'nFOW 2D1I now;fFfBW 2V1 1132 20 172 Fan Bar Wear Indications (20 ttat tubes with new FBW 13 tubes wthout pnm F5W 7 tubes with new FPW and now FOW at ddent location)TOTAL TLOE:S 8471 SAE0OM SELECTED TUBES 186 Won May Oa 14 26 25 2011 OUT OF SER~VCE (0) 32 SG 22 HOT PROMA~y FACE NOZZLE ISO I20~ 120 4~K2.~;&&~
: b. Active degradation mechanisms found Two degradation mechanisms were identified during this examination: 1) fan bar wear, and 2) foreign object wear. No evidence of corrosion degradation processes, cracking, or lattice support wear was identified and no tubes were identified as being in close proximity to one another.
ItO II. lie* "a U too , IV so U U M~K.*0'0 in y?a 40........7 2~7~> -7~~& '~7 A17 7--4----------
: c. Nondestructive examination techniques utilized for each degradation mechanism The table below identifies NDE examination techniques utilized for each identified degradation mechanism.
to U U20 20 Z772>~77v
Table I - NDE Techniques Utilized for Identified Degradation Degradation                   Inspection Type                   EPRI ETSS Mechanism Fan bar wear                      Bobbin                   96004.1 (Rev. 13)
~,~'2>2> ...... -'0 10 ,041 00 Ila Wo 130 120 Ila In tO 10 12 20 I060 SO 40 20 20 to MANWAY Page 12 A AR EVA Document No.: 51-9156712-000 AREVA NP Inc., an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report During the U2R19 inspection, 17 indications of foreign object wear were detected in 14 tubes within the two SGs (see Table 2). These indications were reported as LPW (Loose Part Wear) in the eddy current database.
                                                    +PointTM                   96910.1 (Rev. 10)
Five (5) indications in three tubes were newly-detected in SG21 during U2R19. The remaining indications in SG21, and all indications in SG22, were identified during prior inspections, and were pre-planned for re-inspection during U2R19. All LPW indications were sized below the site plugging limit. None of the foreign objects that caused the newly-detected LPW in 2011 was present at the LPW tube location.
Foreign Object                     +PointTM                  27901.1 (Rev. 0) **
Nor were objects present at non-plugged LPW tube locations from previous outages. Since no objects were present to cause further wear and all LPW %TWs were less than the 40% tech spec plugging limit, all 14 tubes were returned to service.Due to the large number of LPW indications and foreign objects detected at CCNPP2 in-the past, a concerted effort was undertaken during U2R19 to detect and remove as many foreign objects as possible.
Wear*                                                       (circ groove)
A 100% examination of both SGs was performed with the Array probe from the tube end to the first support in each leg. This provided the most thorough inspection possible for detection of foreign objects from the tubesheet up to the first support in both legs. As a result, 343 Potential Loose Part (PLP) indications were reported in SG21, and 203 were recorded in SG22. It should be noted that these quantities represent the initial number of PLP indications in the ECT database.
The Array probe was the primary means of detecting foreign objects and foreign
Upon inspecting a location, the indication code was subsequently changed to LPS (Loose Parts Signal) if no loose part was found by visual inspection, or LPR (Loose Part Removed) if any object (including a sludge rock)was found and removed from the SG. Thus the stated quantities are actually the sum of PLP, LPS and LPR calls remaining in the database.With certain justified exceptions (Refs. I and 2), all PLP indications were visually investigated by secondary side inspection personnel.
                                                                    + *TM object wear during the inspection. However, the +Point probe was used for sizing wear.
This included loose parts left in service from the previous (2009)inspection.
            ** There are other EPRI techniques qualified for sizing of foreign object wear depending on the shape of the flaw. ETSS 27901.1 was selected based on the circumferential groove appearance of the foreign object wear indications detected during the U2R1 9 inspection.
PLP locations that were not visually inspected were justified by a separate engineering evaluation.
: d. Location, orientation (if linear), and measured sizes (if available) of service induced indications Fan bar wear (FBW) is a mechanical degradation process which produces volumetric tube wear at the interface between the U-bend anti-vibration supports (fan bars) and the tubes. In total, 358 fan bar wear (FBW) indications in 274 tubes were identified in the CCNPP2 steam generators during the U2R19 inspection. Although none of the reported indications exceeded the Technical Specification plugging limit of 40%TW, the three largest FBW indications (all in SG22) were preventatively stabilized with full-length stabilizers, and the tubes were plugged. Although the full length stabilizer is not required to span the entire tube length, it is required to span the tube length on the insertion leg side (hot leg) from the top of the plug over the u-bend and past the 5 th support on the opposite leg for the largest tube row (row 138) in the bundle.
The evaluation divided the bundle into two parts: the 12-tube periphery ring and all tubes bounded by the periphery ring, (i.e., the inner bundle region). PLP indications located within the inner bundle region were further divided into two classifications, IBS (inner bundle single) and all other. IBS indications are defined as PLP indications located in a single tube without a PLP indication in an adjacent bounding tube. Since IBS indications were judged to be less of a concern regarding tube integrity, (compared to two or more adjacent PLP tubes), visual inspection of IBS tubes was not required.
Thirty-one of the 358 indications were newly reported during U2R19. This represents an increase of about 10% since the last inservice inspection in 2009 (U2R18). The maximum depth reported was a 32%TW indication in SG22. The largest newly-reported indication was an 18%TW indication in SG22.
Of the 343 PLP indications detected in SG21, 92 of them were classified as IBS indications.
Figure 1 provides the distribution of fan bar wear depths for both steam generators as reported with the Page 9
Accordingly, of the 203 PLP indications detected in SG22, 69 of them were classified as IBS indications.
 
The majority of PLPs were caused by sludge rocks and/or scale. Numerous metallic objects were removed, and three small pieces of wire were left in SG22 secondary side.Page 13 A AREVA AREVA NP Inc., an AREVA and Siemens company Document No.: 51-9156712-000 Calvert Cliffs Unit 2 -- U2R19 180-Day Report Table 2 -Foreign Object Wear Eddy Measured New Loose Current Length (in.) in Part SG Row Col Ind %TW Supp Elevation Technique Axial XCirc 2011 Detected 21 12 66 LPW 29 TSH +0.12 27901.1 0.21 x 0.33 Yes No 21 12 66 LPW 23 TSH +0.42 27901.1 0.18 x 0.31 Yes No 21 12 162 LPW 27 TSH +0.04 27901.1 0.18 x 0.33 No No 21 13 65 LPW 28 TSH +0.01 27901.1 0.21 x0.23 Yes No 21 14 66 LPW 18 TSH +0.50 27901.1 0.15 x 0.25 Yes No 21 14 66 LPW 18 TSH +0.60 27901.1 0.12 x 0.27 Yes No 21 72 146 LPW 34 TSH +0.15 27901.1 0.13 x 0.35 No No 21 75 147 LPW 19 TSH +18.07 27901.1 0.25 x 0.25 No No 21 77 147 LPW 22 TSH +17.70 27901.1 0.24 x 0.29 No No 21 77 149 LPW 21 TSH +20.71 27901.1 0.21 x 0.39 No No 22 14 4 LPW 24 TSC +0.47 27901.1 0.20 x 0.35 No No 22 17 1 LPW 24 TSC -0.02 27901.1 0.20 x 0.27 No No 22 18 2 LPW 25 TSC +0.10 27901.1 0.24 x 0.31 No No 22 112 82 LPW 24 05H -4.02 27901.1 0.31 x 0.35 No No 22 124 116 LPW 17 01C -11.40 27901.1 0.27x0.27 No No 22 126 116 LPW 37 01C -11.27 27901.1 0.27 x 0.27 No No 22 126 116 LPW 23 01C -11.54 27901.1 0.24 x 0.27 No No Page 14 A AREVA AREVA NP Inc., an AREVA and Siemens company Document No.: 51-9156712-000 Calvert Cliffs Unit 2 -- U2R19 180-Day Report e. Number of tubes plugged during the inspection outage for each active degradation mechanism Three tubes in SG22 were plugged during U2R19 (see Table 3). All of the tubes were preventatively stabilized and plugged due to Fan Bar wear. The tubes are labeled as PTP (Preventive Tube Plug) in the ECT database.
A AREVA                                                                         Document No.: 51-9156712-000 AREVA NP Inc.,
No tubes were plugged in SG21 during the 2011 refueling outage.Table 3 -List of Tubes Plugged During U2R19 SG Row Col Hot Leg Cold Leg Reason for Tube Repair SG22 109 73 ROLLSTAB ROLLED PTP@F06-1.35 SG22 99 83 ROLLSTAB ROLLED PTP@F06+0.02 SG22 101 83 ROLLSTAB ROLLED PTP@F06-0.02 PTP = Preventative Tube Plug ROLLSTAB=Stabilizer and Rolled Plug f. Total number and percentage of tubes plugged to date Table 4 provides the post-U2R19 tube plugging status of the CCNPP2 SGs. There are currently 37 tubes plugged in SG21 and 32 tubes plugged in SG22.Table 4 -Tube Plugging Summary SG Tubes Installed Tubes Plugged To-Date SG21 8,471 37 (0.437%)SG22 8,471 32 (0.378%)Total 16,942 69 (0.407%)Page 15 A AR EVA Document No.: 51-9156712-000 AREVA NP Inc., an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R1 9 180-Day Report g. The results of condition monitoring, including the results of tube pulls and in-situ testing The condition monitoring assessment is summarized in Figures 4 through 6. These figures provide the condition monitoring limit curves corresponding to the NDE technique employed for each degradation type. All reported degradation falls below the applicable condition monitoring curve and therefore satisfies the Technical Specification structural performance criteria.Note that Figures 4 and 5 display the U2R1 9 FBW depths at a bounding 1.8 inch length for SGs 21 and 22 respectively.
an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report bobbin coil probe. As shown in the figure, SG22 contained more indications and also contained the majority of indications that were greater than 20%TW.
Also presented in each figure are the five deepest FBW indications sized using RPC.The five deepest were selected since larger axial lengths are typically associated with deeper FBW.The measured RPC length for these indications is plotted to demonstrate that the 1.8 inch length remains bounding.
Figures 2 and 3 provide tube map locations of the reported FBW. Although the tube maps shown in Figures 2 and 3 provide a view of the tubesheet primary face from the hot leg side, both the hot leg and cold leg FBW indications are included on each map. Most of the wear continues to occur in longer tubes (i.e., larger ubend radius), clustered towards the center-most tube columns.
Because the RPC length measurements were not adjusted to compensate for rotating coil field spread effects, the indicated length values are considered to be overestimates of the actual lengths, thus adding to the conservatism for the 1.8 inch bounding length.For volumetric indications, meeting the structural performance criteria also provides reasonable assurance that the accident leakage performance criteria would be satisfied at the steam line break pressure differential which is less challenging than the pressure differential required to demonstrate compliance with the structural performance criteria.
Figure 1 - Fan Bar Wear Throughwall Depth Distribution Page 10
Since this conclusion could be reached analytically using NDE inspection results with a full accounting of significant uncertainties, no in-situ pressure testing was required to demonstrate structural and leakage integrity, and no tubes were removed from the SGs for destructive examination.
 
During the past operating cycle, no measurable primary-to-secondary leakage was observed, therefore the operational leakage performance criteria was satisfied.
A AREVA                                                                                                                                 Document No.: 51-9156712-000 AREVA NP Inc.,
The results of the 2011 inspection and the condition monitoring assessment confirm that the 2009 operational assessment was appropriately bounding.h. The effective plugging percentage for all plugging in each SG There are no sleeves installed in the CCNPP2 steam generators, therefore the effective plugging percentage is the same as stated in (f) above.Page 16 A AR EVA AREVA NP Inc., an AREVA and Siemens company Document No.: 51-9156712-000 Calvert Cliffs Unit 2 -- U2R19 180-Day Report Figure 4 -SG21 Fan Bar Wear Condition Monitoring 100 90 80 I 70 60 50 40 30 CM Limit -ETSS 96004.1 Wear Depth -1.8 in. Bounding Length A Wear Depth -Measured Length AA A& A* I 20 10 00 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1,3 1.4 1.5 1.6 1.7 Axial Length (in)Figure 5 -SG22 Fan Bar Wear Condition Monitoring 1.8 1.9 2.0 I 100 90 80 70 60 50 40 30 10 0-CM Limit -ETSS 96004.1* Wear Depth -Assumed Bounding Length A Wear Depth -Measured Length 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2.0 Axial Length (in)Page 17 A AR EVA AREVA NP Inc., an AREVA and Siemens company Document No.: 51-9156712-000 Calvert Cliffs Unit 2 -- U2R19 180-Day Report Figure 6 -SG21 and SG22 LP Wear Condition Monitoring 80 70 60 5o x1 40 30 20 10 0 S CM Limit ETSS 27901.1* SG21 Loose Part Wear A SG22 Loose Part Wear A A A 0 0A 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 Axial Length (in)Page 18 A AREVA AREVA NP Inc., an AREVA and Siemens company Document No.: 51-9156712-000 Calvert Cliffs Unit 2 -- U2R19 180-Day Report
an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report Figure 2 - SG21 Fan Bar Wear Locations GRWOP                   NOES Calvert Cliffs Unit 2                                                                           . Bw~o,.                   9 2R19- FEB 2011 Fan Bar Wear Indications (9 Et " tube s w ithne wF &W6 tubes vw   th out p n orF BW* 3 tubes wi l nweOF  Wan d p7100 FB W atddt e  ln, o ct   w                         S C ALE 0 OO3I8)
$10 21                                                                                                                           TOTAL T*SES 8471 "
* 073I NOT2                                                                                                                            SELECTED TUBES 91 PRMAYOAC                                                                                                                   OJT OFSERV1E (0) 37 NOZZLE ifi ilto
                                        .. . . ...                                                                                               ....                 40+
                                                                                                  'ofo 040     130         120         110                                                 Go           so       .0     30       20       10 MANWAY Page 11
 
A AREVA                                                                                                                     Document No.: 51-9156712-000 AREVA NP Inc.,
an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R1 9 180-Day Report Figure 3 - SG22 Fan Bar Wear Locations 60Oup
                                                                                                                                              'nFOW2D1I now                      20 Calvert Cliffs Unit 2                                                                   ;fFfBW 2V1 1132                   172 2R19- FEB 2011 Fan Bar Wear Indications (20 ttat tubes with new FBW 13 tubes wthout pnm F5W 7 tubes with new FPW and nowFOW at ddent location)
SG 22                                                                                                                TOTAL TLOE:S 8471                 SAE0OM HOT                                                                                                              SELECTED TUBES 186               Won May Oa 14 26 25 2011 PROMA~y FACE OUT OF SER~VCE (0) 32 NOZZLE ISO I20~                                           t*D 120 ItO II.
4~K2.~;&&~
* lie I*1)
                                                                                                                                        "a U                                                                                                               too so
                                                                                ,IV U                                                                           M U
                '0
                                                                                            ~K.                                                               in y                                                       ?a
            *0 40                                                               ........                                                                                     4 2~7~>       -7~
7
                                                                                                                      ~& '~7     A17               --
                                                                                                            ----------
r*                                                    20 7
U U                                          ~,~'2>2>
Z772>~77v                ......       -       20 to
                                                                                                    '0                                                                     10
                                                                      ,041 00         Ila       Wo         130   120       Ila                                       In tO10 12 20 SOI060  40       20           20         to MANWAY Page 12
 
A AR EVA                                                                         Document No.: 51-9156712-000 AREVA NP Inc.,
an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report During the U2R19 inspection, 17 indications of foreign object wear were detected in 14 tubes within the two SGs (see Table 2). These indications were reported as LPW (Loose Part Wear) in the eddy current database. Five (5) indications in three tubes were newly-detected in SG21 during U2R19. The remaining indications in SG21, and all indications in SG22, were identified during prior inspections, and were pre-planned for re-inspection during U2R19. All LPW indications were sized below the site plugging limit. None of the foreign objects that caused the newly-detected LPW in 2011 was present at the LPW tube location. Nor were objects present at non-plugged LPW tube locations from previous outages. Since no objects were present to cause further wear and all LPW %TWs were less than the 40% tech spec plugging limit, all 14 tubes were returned to service.
Due to the large number of LPW indications and foreign objects detected at CCNPP2 in-the past, a concerted effort was undertaken during U2R19 to detect and remove as many foreign objects as possible. A 100% examination of both SGs was performed with the Array probe from the tube end to the first support in each leg. This provided the most thorough inspection possible for detection of foreign objects from the tubesheet up to the first support in both legs. As a result, 343 Potential Loose Part (PLP) indications were reported in SG21, and 203 were recorded in SG22. It should be noted that these quantities represent the initial number of PLP indications in the ECT database. Upon inspecting a location, the indication code was subsequently changed to LPS (Loose Parts Signal) if no loose part was found by visual inspection, or LPR (Loose Part Removed) if any object (including a sludge rock) was found and removed from the SG. Thus the stated quantities are actually the sum of PLP, LPS and LPR calls remaining in the database.
With certain justified exceptions (Refs. I and 2), all PLP indications were visually investigated by secondary side inspection personnel. This included loose parts left in service from the previous (2009) inspection. PLP locations that were not visually inspected were justified by a separate engineering evaluation. The evaluation divided the bundle into two parts: the 12-tube periphery ring and all tubes bounded by the periphery ring, (i.e., the inner bundle region). PLP indications located within the inner bundle region were further divided into two classifications, IBS (inner bundle single) and all other. IBS indications are defined as PLP indications located in a single tube without a PLP indication in an adjacent bounding tube. Since IBS indications were judged to be less of a concern regarding tube integrity, (compared to two or more adjacent PLP tubes), visual inspection of IBS tubes was not required. Of the 343 PLP indications detected in SG21, 92 of them were classified as IBS indications.
Accordingly, of the 203 PLP indications detected in SG22, 69 of them were classified as IBS indications. The majority of PLPs were caused by sludge rocks and/or scale. Numerous metallic objects were removed, and three small pieces of wire were left in SG22 secondary side.
Page 13
 
A AREVA                                                                         Document No.: 51-9156712-000 AREVA NP Inc.,
an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report Table 2 - Foreign Object Wear Eddy       Measured     New       Loose Current     Length (in.)     in       Part SG     Row     Col   Ind   %TW     Supp       Elevation   Technique     Axial XCirc   2011   Detected 21     12     66   LPW   29     TSH         +0.12       27901.1     0.21 x 0.33   Yes         No 21     12     66   LPW     23     TSH         +0.42       27901.1     0.18 x 0.31   Yes         No 21     12     162   LPW     27     TSH         +0.04       27901.1     0.18 x 0.33     No       No 21     13     65   LPW     28     TSH         +0.01       27901.1     0.21 x0.23     Yes         No 21     14     66   LPW     18     TSH         +0.50       27901.1     0.15 x 0.25   Yes         No 21     14     66   LPW     18     TSH         +0.60       27901.1     0.12 x 0.27   Yes         No 21     72     146   LPW     34     TSH         +0.15       27901.1     0.13 x 0.35     No       No 21     75     147   LPW     19     TSH       +18.07       27901.1     0.25 x 0.25     No       No 21     77     147   LPW     22     TSH       +17.70       27901.1     0.24 x 0.29     No       No 21     77     149   LPW     21     TSH       +20.71       27901.1     0.21 x 0.39     No       No 22     14     4   LPW     24     TSC         +0.47       27901.1     0.20 x 0.35     No       No 22     17       1   LPW     24     TSC         -0.02       27901.1     0.20 x 0.27     No       No 22     18       2   LPW     25     TSC         +0.10       27901.1     0.24 x 0.31     No       No 22     112     82   LPW     24     05H         -4.02       27901.1     0.31 x 0.35     No       No 22     124     116   LPW     17     01C         -11.40       27901.1     0.27x0.27       No       No 22     126     116   LPW     37     01C         -11.27       27901.1     0.27 x 0.27     No       No 22     126     116   LPW     23     01C         -11.54       27901.1     0.24 x 0.27     No       No Page 14
 
A AREVA                                                                         Document No.: 51-9156712-000 AREVA NP Inc.,
an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report
: e. Number of tubes plugged during the inspection outage for each active degradation mechanism Three tubes in SG22 were plugged during U2R19 (see Table 3). All of the tubes were preventatively stabilized and plugged due to Fan Bar wear. The tubes are labeled as PTP (Preventive Tube Plug) in the ECT database. No tubes were plugged in SG21 during the 2011 refueling outage.
Table 3 - List of Tubes Plugged During U2R19 SG       Row   Col     Hot Leg         Cold Leg     Reason for Tube Repair SG22     109   73   ROLLSTAB           ROLLED           PTP@F06-1.35 SG22       99   83   ROLLSTAB           ROLLED           PTP@F06+0.02 SG22     101   83   ROLLSTAB           ROLLED           PTP@F06-0.02 PTP = Preventative Tube Plug         ROLLSTAB=Stabilizer and Rolled Plug
: f. Total number and percentage of tubes plugged to date Table 4 provides the post-U2R19 tube plugging status of the CCNPP2 SGs. There are currently 37 tubes plugged in SG21 and 32 tubes plugged in SG22.
Table 4 - Tube Plugging Summary SG               Tubes Installed           Tubes Plugged To-Date SG21                     8,471                   37 (0.437%)
SG22                     8,471                   32 (0.378%)
Total                   16,942                   69 (0.407%)
Page 15
 
A AR EVA                                                                           Document No.: 51-9156712-000 AREVA NP Inc.,
an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R1 9 180-Day Report
: g. The results of condition monitoring, including the results of tube pulls and in-situ testing The condition monitoring assessment is summarized in Figures 4 through 6. These figures provide the condition monitoring limit curves corresponding to the NDE technique employed for each degradation type. All reported degradation falls below the applicable condition monitoring curve and therefore satisfies the Technical Specification structural performance criteria.
Note that Figures 4 and 5 display the U2R1 9 FBW depths at a bounding 1.8 inch length for SGs 21 and 22 respectively. Also presented in each figure are the five deepest FBW indications sized using RPC.
The five deepest were selected since larger axial lengths are typically associated with deeper FBW.
The measured RPC length for these indications is plotted to demonstrate that the 1.8 inch length remains bounding. Because the RPC length measurements were not adjusted to compensate for rotating coil field spread effects, the indicated length values are considered to be overestimates of the actual lengths, thus adding to the conservatism for the 1.8 inch bounding length.
For volumetric indications, meeting the structural performance criteria also provides reasonable assurance that the accident leakage performance criteria would be satisfied at the steam line break pressure differential which is less challenging than the pressure differential required to demonstrate compliance with the structural performance criteria. Since this conclusion could be reached analytically using NDE inspection results with a full accounting of significant uncertainties, no in-situ pressure testing was required to demonstrate structural and leakage integrity, and no tubes were removed from the SGs for destructive examination. During the past operating cycle, no measurable primary-to-secondary leakage was observed, therefore the operational leakage performance criteria was satisfied.
The results of the 2011 inspection and the condition monitoring assessment confirm that the 2009 operational assessment was appropriately bounding.
: h. The effective plugging percentage for all plugging in each SG There are no sleeves installed in the CCNPP2 steam generators, therefore the effective plugging percentage is the same as stated in (f) above.
Page 16
 
A AR EVA                                                                                           Document No.: 51-9156712-000 AREVA NP Inc.,
an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report Figure 4 - SG21 Fan Bar Wear Condition Monitoring 100 90                                                         CM Limit - ETSS 96004.1 Wear Depth - 1.8 in. Bounding Length 80                                                      A Wear Depth - Measured Length 70 60 50 I
40 30 20 10 A
                                                                                      &
AA A
* I 00 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9   1.0   1.1   1.2   1,3   1.4 1.5 1.6 1.7 1.8  1.9 2.0 Axial Length (in)
Figure 5 - SG22 Fan Bar Wear Condition Monitoring 100 90                                                  -      CM Limit - ETSS 96004.1
* Wear Depth - Assumed Bounding Length 80                                                    A   Wear Depth - Measured Length 70 60 50 I  40 30 -
20 -
10 0
0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9   1.0   1.1   1.2   1.3   1.4 1.5 1.6 1.7 1.8 1.9 2.0 Axial Length (in)
Page 17


==2.0 REFERENCES==
A AR EVA                                                                                  Document No.: 51-9156712-000 AREVA NP Inc.,
an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report Figure 6 - SG21 and SG22 LP Wear Condition Monitoring 80 70 60 5o S    CMLimit ETSS 27901.1
* SG21 Loose Part Wear x1 40                                                                A    SG22 Loose Part Wear A
30 AA 20            0 0A 10 0
0.0    0.2      0.4      0.6      0.8          1.0      1.2  1.4        1.6      1.8 2.0 Axial Length (in)
Page 18
 
A AREVA                                                                      Document No.: 51-9156712-000 AREVA NP Inc.,
an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report
 
==2.0     REFERENCES==
: 1. AREVACR2011-1545
: 1. AREVACR2011-1545
: 2. AREVA CR 2011-1547 3. AREVA, "Calvert Cliffs Unit-2 Condition Monitoring at 2R19 (Spring 2011) and Preliminary Operational Assessment for Cycles 19 and 20," 51-9156699-000, March 8, 2011 4. AREVA, "Technical Summary Calvert Cliffs Unit#2 2R19 Eddy Current Examination," 51-9157178-000, May 10, 2011 5. AREVA, "Calvert Cliffs Nuclear Power Plant Unit 2, SG Degradation Assessment, Spring 2011 /2R19," 51-9153318-000, February 15, 2011 Page 19 A AR EVA Document No.: 51-9156712-000 AREVA NP Inc., an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report APPENDIX A: SG21 FBW INDICATIONS SG21 34 6 TWD 9 F06 -1.4 SG21 45 79 TWD 5 F07 0.92 SG21 57 107 TWD 19 F08 1.69 SG21 58 98 TWD 5 F05 -1.82 SG21 63 69 TWD 9 F09 2.16 SG21 69 115 TWD 9 F04 -1.9 SG21 75 75 TWD 6 F08 0.75 SG21 77 75 TWD 6 F08 0.71 SG21 77 79 TWD 18 F08 0.75 SG21 77 83 TWD 10 F08 0.78 SG21 80 74 TWD 4 F08 2.03 SG21 80 76 TWD 14 F07 -0.81 SG21 80 78 TWD 9 F08 1.99 SG21 81 75 TWD 13 F08 0.77 SG21 81 79 TWD 13 F08 0.92 SG21 82 94 TWD 7 F08 0.81 SG21 83 67 TWD 11 F08 0.77 SG21 83 79 TWD 10 F08 0.92 SG21 83 97 TWD 6 F08 2 SG21 84 76 TWD 14 F07 -0.81 SG21 85 75 TWD 7 F08 0.83 SG21 85 75 TWD 5 F07 1.79 SG21 85 79 TWD 13 F08 0.94 SG21 85 93 TWD 11 F08 1.91 SG21 86 84 TWD 12 F06 -0.72 SG21 86 94 TWD 8 F08 0.74 SG21 87 75 TWD 16 F08 0.81 SG21 87 75 TWD 9 F07 1.75 SG21 87 79 TWD 9 F08 0.76 SG21 87 83 TWD 14 F06 0.48 SG21 87 87 TWD 8 F08 1.97 SG21 87 93 TWD 10 F08 2.02 SG21 87 97 TWD 7 F08 1.93 SG21 88 78 TWD 9 F06 1.24 SG21 89 75 TWD 13 F06 -0.59 SG21 89 87 TWD 10 F08 1.33 SG21 89 87 TWD 7 F07 0.72 SG21 90 74 TWD 7 F08 2.02 SG21 91 75 TWD 9 F08 0.81 SG21 92 78 TWD 11 F08 1.99 SG21 93 73 TWD 14 F08 0.74 SG21 93 83 TWD 9 F06 -0.62 SG21 94 74 TWD 9 F06 -1.83 Page 20 A ARE VA Document No.: 51-9156712-000 AREVA NP Inc., an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report SG Row Cdf AM :d TW 'SgUpp. 1InchI SG21 94 78 TWD 14 F08 1.94 SG21 94 82 TWD 9 F06 -1.49 SG21 95 83 TWD 15 F08 -0.59 SG21 95 83 TWD 13 F07 -0.57 SG21 95 87 TWD 16 F08 1.92 SG21 95 87 TWD 8 F09 0.74 SG21 95 99 TWD 6 F05 -1.3 SG21 96 78 TWD 7 F08 1.58 SG21 97 73 TWD 10 F08 0.66 SG21 97 75 TWD 9 F06 -0.61 SG21 97 75 TWD 8 F07 1.82 SG21 97 83 TWD 9 F08 0.5 SG21 97 83 TWD 6 F07 -0.07 SG21 98 74 TWD 9 F06 -1.55 SG21 98 74 TWD 6 F08 1.99 SG21 98 82 TWD 7 F06 -1.81 SG21 98 82 TWD 7 F08 1.99 SG21 98 88 TWD 6 F08 0.66 SG21 99 75 TWD 12 F07 1.73 SG21 99 83 TWD 14 F06 -0.52 SG21 99 83 TWD 14 F08 -0.63 SG21 99 83 TWD 11 F07 -0.61 SG21 99 87 TWD 13 F06 -1.38 SG21 100 80 TWD 6 F06 -1.33 SG21 101 75 TWD 16 F06 -0.7 SG21 101 75 TWD 12 F07 1.64 SG21 101 75 TWD 6 F09 -1.49 SG21 101 79 TWD 8 F06 -0.46 SG21 101 79 TWD 8 F08 0.74 SG21 101 79 TWD 7 F02 -1.6 SG21 101 79 TWD 6 F07 1.6 SG21 101 83 TWD 10 F07 -0.48 SG21 101 83 TWD 9 F08 -0.39 SG21 101 87 TWD 10 F07 0.66 SG21 101 87 TWD 7 F06 -1.53 SG21 102 82 TWD 5 F07 -1.43 SG21 102 88 TWD 6 F06 -0.55 SG21 102 90 TWD 7 F06 -0.61 SG21 103 83 TWD 12 F06 0.46 SG21 103 87 TWD 12 F07 0.92 SG21 104 78 TWD 7 F08 1.88 SG21 104 78 TWD 6 F07 0.79 SG21 104 84 TWD 7 F06 -0.48 SG21 104 86 TWD 4 F06 -0.52 SG21 104 88 TWD 20 F05 -1.5 SG21 104 88 TWD 19 F06 -1.1 SG21 104 88 TWD 6 F07 1.77 Page 21 A AR EVA Document No.: 51-9156712-000 AREVA NP Inc., an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report SG21 105 79 TWD 6 F07 1.96 SG21 105 83 TWD 12 F07 0.02 SG21 105 87 TWD 7 F07 0.66 SG21 106 76 TWD 22 F06 1.34 SG21 106 76 TWD 8 F07 -0.72 SG21 106 78 TWD 6 F07 0.7 SG21 106 90 TWD 7 F06 -0.55 SG21 107 75 TWD 9 F07 1.71 SG21 107 83 TWD 14 F06 0.46 SG21 107 83 TWD 10 F07 -0.11 SG21 107 87 TWD 16 F07 0.99 SG21 108 76 TWD 24 F06 1.01 SG21 108 90 TWD 16 F06 -0.81 SG21 110 76 TWD 7 F06 0.72 SG21 110 88 TWD 7 F06 -0.63 SG21 110 90 TWD 8 F06 -0.24 SG21 111 75 TWD 19 F06 -0.72 SG21 112 90 TWD 18 F06 -0.79 SG21 113 87 TWD 7 F07 0.74 SG21 114 76 TWD 12 F06 -0.72 SG21 117 89 TWD 15 F06 -1.62 LSG21 119 87 TWD 14 F07 0.81 Page 22 A AREVA AREVA NP Inc., an AREVA and Siemens company Document No.: 51-9156712-000 Calvert Cliffs Unit 2 -- U2R19 180-Day Report APPENDIX B: SG22 FBW INDICATIONS SG SG22 SG22 SG22 SG22 SG22 SG22 SG22 SG 22 SG22 SG22 Row 37 49 57 69 70 70 72 72 73 73 35.-2-9-127.83 82 82 72 92 81 91 TWd TWD TWD TWD TWD TWD TWD TWD TWD TWD TWD%Tw.4 7 5 7 11 9 9 13 7 14 F06p F07 F07 F08 F06 F07 F08 F08 F07 F08.Inchi 1.85 1.88-1.95-0.56-1.92 0.86 1.99 0.81-1.25 1.93 SG22 74 82 TWD 7 F06 -1.72 SG22 74 82 TWD 6 F08 2.03 SG22 74 82 TWD 5 F07 0.74 SG22 74 94 TWD 9 F08 0.89 SG22 75 73 TWD 8 F08 0.82 SG22 76 72 TWD 17 F08 1.95 SG22 76 72 TWD 10 F06 -1.84 SG22 76 82 TWD 12 F06 -1.33 SG22 76 82 TWD 11 F08 2.02 SG22 76 82 TWD 8 F07 0.85 SG22 76 98 TWD 10 F08 0.86 SG22 77 65 TWD 10 F08 0.78 SG22 77 73 TWD 8 F08 0.98 SG22 77 81 TWD 6 F07 -0.81 SG22 78 64 TWD 7 F08 1.95 SG22 78 82 TWD 11 F06 -1.84 SG22 79 81 TWD 14 F07 -0.78 SG22 79 93 TWD 26 F08 1.44 SG22 80 64 TWD 12 F09 -1.94 SG22 80 80 TWD 9 F06 -1.61 SG22 80 82 TWD 9 F06 -1.95 SG22 80 82 TWD 8 F05 -0.63 SG22 81 91 TWD 8 F08 2.07 SG22 82 82 TWD 10 F07 1.29 SG22 82 82 TWD 7 F06 -1.83 SG22 82 84 TWD 9 F08 1.29 SG22 82 84 TWD 8 F06 1.44 SG22 82 94 TWD 7 F08 0.79 SG22 83 73 TWD 21 F08 0.83 SG22 83 75 TWD 12 F02 1.03 SG22 83 81 TWD 19 F07 -1.17 SG22 83 91 TWD 14 F08 1.99 SG22 84 80 TWD 11 F06 -1.81 Page 23 A ARE VA Document No.: 51-9156712-000 AREVA NP Inc., an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report SG22 _84 92 .TWD 17 F08 0.8 SG22 84 94 TWD 18 0.83-SG22 79 TWD- 9 F08 0.94 SG22 86 72 TWD 11 F06 -1.59 SG22 72 TWD _9 F05- -0.76 SG22 86 TWD 9 F06 -1.56 SG22 86 92 TWD- 9 F08 0.83 SG22f 86 94 TWD 13 FOB _ 0.87 SG22 87 TWD 16 F08 0.78 SG22 87 83 TWD 22 F07 -0.02 SG22 87 83 TWD _ 15 F08 0.02 SG22 87 83-- 8 _TWD 7 7F06 0.5 SG22 88 76 TWD-_ 9 F06 1.94 SG22 88 78_.. TWD 10 F06 -1.29 SG22 88 82 TWD -12 F06 1.3 SG22 88 82 TWD 11 F0 5 1.83 SG22 88 84 TWO 6 F07 -0.72 SG22 88 -_92 TWD 11 -F08 0.85 SG22 89 65 TWD -14 F08 1.07_SG22 89 --69 TWD 11 F08 1 SG22 89 73 TWD 18 F0 -0.91 SG22 89 83 TWOD- -__ -10.25 SG22 89 83 TWD FO6 -0.55 SG22 89 83 TWOD 7 F05 -0.39 SG22 89 83 7 TWD 6. 6 F07 0.57 SG22 89 89 TWD 5 FOB -1.27 SG22 90 821 TWD 6 F06 -1.83 SG22 91 65 TWD 20 FOB 0.87 SG22 91 83 TWD 7 F07 -0.46 SG22 92 76 TWD 11 F06 1.88 SG22 93 73 TWD 7 6 F06 -0.7 SG22 93 79 TWD 17 F06 -10.68 SG22 93 81 TWD F05 -0.74 SG22 934_ 83 TWD 10 F07 0.5 SG22 93 83 TWD 91 F06 0.48 SG22 94 76 TWD 7 7 F06 -1.58-SG22 -.94 80 -TWO F06 -1.73 SG22 94 82 TWO -14 F06 -1.81 SG22 94 82 TWD 6 F07 0.87 SG22 94 86 TWD 8 F06 0.85 SG22 94 92 TWO 10 F08 0.89 SG22 95 81 TWO 8 F07 -1.22 SG22 95 83 TWO 10 F07 _ -0.52 SG22 95 83 TWO 7 F06 0.59 SG22 96 80 TWD 10 F06 -1.79 SG22 96 82 TWD 9 F06 1.3 Page 24 A AREVA AREVA NP Inc., an AREVA and Siemens company Document No.: 51-9156712-000 Calvert Cliffs Unit 2 -- U2R1 9 180-Day Report S -G SG22 SG22-SGi22-SG22 SG22 SG22 SG22 SG22 SG22 SG22 SG22 SG22 SG22 SG22 SG22 SG22 SG22 SG22 SG22 SG22 SG22 SG22 SG22 SG22.Row 96 96 96 96 97 97 97 97-97 97 97 82 84 86 90 73 75 77 79 81 81 81 ITWD TWD TWD TWD TWD TWD TWD%TW-17 9--14 8 7 7 F07 -1.49 F07 1.35 F06 -1.05 F08 -1.31 F06 -0.72 F06 -0.5 F06 -0.72 TWD TWD TWD TWD 7 8 3 3 F06 F07 F06 F08-0.61-1.27 1.38-1.53 98 98 98 98 99 99 99 99 99 100 100 100 100 100 72 76 78 82 71 73 77 83 83 76 78 78 82 82 TWD 6 F08 1.92 TWD 7 F06 1.71 TWD 10 F08 2.08 TWD 7 F07 0.9 TWD TWD TWD TWD TWD TWD TWD TWD TWD TWD 13 7 18 28 15 8 11 6 23 16 F08 F07 F06 F06 F05 F06 F08_F06 F06 F07-0.81 1.93-1.02 0.07 0-1.79-1.85-1.51-1.21 0.91 SG22 100 82 TWD 9 F08 1.8 SG22 100 84 TWD _ 8 F07 1.95 SG22 100 88 TWD _ 11 F07 1.86 SG22 101 77 TWD 9 F06 -0.67 SG22 101 79 TWD 7 F07 1.84 SG22 101 83 TWD 30 F06 0.09 SG22 101 83 TWD 23 F07 0.09 SG22 101 83 TWD 9 F05 0.04 SG22 101 85 TWD 6 F09 1.42 SG22 101 87 TWD 7 F07 0.76 SG22 101 87 TWD 6 F04 0.7_SG22 102 76 TWD 12 F07 -1.27 SG22 102 76 TWD 7 F06 1.77 SG22 102 82 TWD 8 F09 0.85 SG22 102 82 TWD 7 F06 -1.77 SG22 102 84 TWD 5 F07 1.94 SG22 102 86 TWD 6 F02 0.9 SG22 103 77 TWD 16 F06 -0.61 SG22 103 79 TWD 10 F06 -0.62 SG22 103 79 TWD 9 F07 1.96 SG22 1 1031 811 TWD 1 9 1F08 [ -1.31 Page 25 A AR EVA Document No.: 51-9156712-000 AREVA NP Inc., an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report SG22 103 83 TWD 17 F06 -0.06 SG22 103 83 TWD-I 7 F05 -0.52 SG22 103 83 TWD 7 FO7 -0.13 SG22 103 85 TWD 10 F08 1.4 SG22 103 87 TWD 12 F07 0.7_SG22 104 82 _TWD V F06 -1.76 SG22 104 82 TWD 11 F07 0.74 SG22 104 84 TWD 12 F07 1.84 SG22 104 94 TWD 14F06 -1.15 SG22 105 67 TWD 9 F07 -1.31 SG22 105 75 TWD 9 F06 -0.74 SSG22 105 77= TWD_ 11 F06 -0.74 SG22 105 79j TWD 17 F06 -0.59 SG22 105 79 TWD 11 F07- 1.75 SG22 105 81 TWD 14 F08 1.35 SG22 105 81 TWD 9 F06 -0.74 SG22 105 81 TWD 6 F07 1.81 SG22 105 83 TWD 15 F07 _ 0.57 SG22 -105-5 83 TWD 13 FO5 -0 SG22 105 83 TWD 8 F06 _ 0.04 SG22 105 87 TWD 7 F01 0.61 SG22 106 80 TWD 8 F07 1.44 SG22 106 82 TWD 17 F07 0.79 SG22 106 82 TWD 11 F06 -1.72 SG22 106 84 TWD _ 6 F08 -1.42 SG22- 106 ----90 TWD 18 F07 1.39 SG22 107 75 TWD _ 14 F06 -0.79 SG22 107 --77 TWD _ 14 F-06 --0.76.SG22 107 79 TWD 9 F06 -0.75 SG22 107 81 TWD 22 F06 -0.74 SG22 107 81 TWD 12 F08 -1.26 SG22 107 83 TWD F07 0.07 SG22 107 83 TWD 5 F06 _ 0.02 SG22 107 83 TWD 4 EQS 0.12 SG22 107 85 TWD 18 F09 0.7 SG22 107 93 TWD 11 F07 0.81 SG22 108 74 TWD 7 F06 -1.9 SG22 108 76 TWD 14 F08 1.72 SG22 108 82 TWD 21 F07 0.81 SG22 108 82 TWD 16 F09 0.87 SG22 108 82 TWD 10 F08 1.68 SG22 108 84 TWD 14 F07 1.82 SG22 108 84 TWD 13 F06 -0.61 SG22 108 86 TWD 23 F06 -1.03 SG22 108 86 TVD 15 F07 1.25 SG22 108 86 TWD 6 F08 1.33 Page 26 A AREVA AREVA NP Inc., an AREVA and Siemens company Document No.: 51-9156712-000 Calvert Cliffs Unit 2 -- U2R1 9 180-Day Report 9G- IJ-Row SG22 108 SG22 _ 109 SG22 109 SG22 10 9 SG22 109-SG22 _109 SG22 109 90 73 75 77 79 81 81 mld.TWD TWD TWD TWD TWD TWD TWD%TW 7 32 13 18 21 14 12 F06 -0.7 F06 -1.2 F06 -0.83 F06 -0.66 F06 -0.72 F08 -1.46 F06 -0.74 SG22 SG22 SG22-SG22 SG22 SG22 109 109 109 109 110 111 81 83 85 87 78 73 TWD 6 1F07-1.18 TWD TWD TWD TWD TWD 5 17 11 9 27 F06 F07 F07 F07 F06 0.56-1.33 0.87 0.72-1.25 SG22 SG22 SG22 SG22 SG22 SG22 SG22 SG22 SG22 SG22 SG22 111 111 111 111 112 112 113 113 113 75 77 79 79 81 72 78 75 77 81 83 TWD TWD TWD TWD TWD TWD TWD TWD TWD TWD TWD 22 27 19 11 14 10 12 8 26 19 9 F06 F06 F06 F07 F06 F08 F07 F06 F06 F06 F07-0.7-0.85-0.69 1.83-0.74 1.88 0.79-0.81-1.22-1.16 0.61 SG22 113 83 TWD 7 F06 0.5 SG22 113 91 TWD 18 F02 -1.91 SG22 114 76 TWD 5 F06 1.32 SG22 114 78 TWD 12 F07 0.75 SG22 114 82 TWD 8 F06 1.33 SG22 114 84 TWD 12 F06 -1.18 SG22 114 88 TWD 15 F05 1.28 SG22 115 73 TWD 9 F06 -0.68 SG22 115 77 TWD 9 F06 -0.68 SG22 115 81 TWD 7 F06 1.28 SG22 115 81 TWD 6 F07 -1.22 SG22 115 83 TWD 6 F06 0.57 SG22 115 83 TWD 6 F07 0.63 SG22 115 93 TWD 12 F07 0.88 SG22 116 82 TWD 22 F07 1.25 SG22 116 84 TWD 9 F08 -1.66 SG22 117 83 TWD 18 F06 0.13 SG22 117 83 TWD 6 F05 -0.42 SG22 117 83 TWD 5 F08 0.09 SG22 117 91 TWD 15 F07 1.33 SG22 119 81 TWD 14 F06 -0.61 SG22 120 82 TWD 6 F08 1.24 Page 27 A AR EVA Document No.: 51-9156712-000 AREVA NP Inc., an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report SG22 120 I 88 -TWD_ 9 F08__-1.27 SG2.2 121 75 TWD _1_1_ F06 -0.79 SG22 -123 77 -TWD 6 F06_ -0.61 SG22 123 81 TWD 11 F07 1.53 SG22 123 83 TWD 25 F07 0.33 SG22 123 83 -TWD- 8 F06 0.59 SG22 123 83 TWD 6 F05 0.28 SG22 124 76 TWD _ 8 F06 0.76 SG22_ 124 82 TWD 13 F06 -1.29_SG22 124 82 __TWD 9 F08 -1.37 SG22 124 82 TWDO 7 F09 _ -1.4-SG22 J-125 91- -TWD --9-9 F03 -.. 1-.95 SG22 1..26 82 TWD ---- 15 F07 1.16 S7G2-2 F-127 83 TWD -13 F07 0.22 SG22 128 92 TWD ...7 F08 --1.25 SG22 130 92 TWD 10 F06 1.78 SG22 131 75 TWD 9 F06 -1.29 SG22 131- 83T-"WD 8 1 F08 0 SG22j 135_[ 83_LtrWDL_
: 2. AREVA CR 2011-1547
81 :F07 _ 0.18]Page 28}}
: 3. AREVA, "Calvert Cliffs Unit-2 Condition Monitoring at 2R19 (Spring 2011) and Preliminary Operational Assessment for Cycles 19 and 20," 51-9156699-000, March 8, 2011
: 4. AREVA, "Technical Summary Calvert Cliffs Unit#2 2R19 Eddy Current Examination," 51-9157178-000, May 10, 2011
: 5. AREVA, "Calvert Cliffs Nuclear Power Plant Unit 2, SG Degradation Assessment, Spring 2011 /2R19," 51-9153318-000, February 15, 2011 Page 19
 
A AR EVA                                                                       Document No.: 51-9156712-000 AREVA NP Inc.,
an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report APPENDIX A:         SG21 FBW INDICATIONS SG21     34     6 TWD           9 F06     -1.4 SG21     45     79 TWD           5 F07     0.92 SG21     57   107 TWD         19 F08     1.69 SG21     58     98 TWD           5 F05   -1.82 SG21     63     69 TWD           9 F09     2.16 SG21     69   115 TWD           9 F04     -1.9 SG21     75     75 TWD           6 F08     0.75 SG21     77     75 TWD           6 F08     0.71 SG21     77     79 TWD         18 F08     0.75 SG21     77     83 TWD         10 F08     0.78 SG21     80     74 TWD           4 F08     2.03 SG21     80     76 TWD         14 F07   -0.81 SG21     80     78 TWD           9 F08     1.99 SG21     81     75 TWD         13 F08     0.77 SG21     81     79 TWD         13 F08     0.92 SG21     82     94 TWD           7 F08     0.81 SG21     83     67 TWD         11 F08     0.77 SG21     83     79 TWD         10 F08     0.92 SG21     83     97 TWD           6 F08         2 SG21     84     76 TWD         14 F07   -0.81 SG21     85     75 TWD           7 F08     0.83 SG21     85     75 TWD           5 F07     1.79 SG21     85     79 TWD         13 F08     0.94 SG21     85     93 TWD         11 F08     1.91 SG21     86     84 TWD         12 F06   -0.72 SG21     86     94 TWD           8 F08     0.74 SG21     87     75 TWD         16 F08     0.81 SG21     87     75 TWD           9 F07     1.75 SG21     87     79 TWD           9 F08     0.76 SG21     87     83 TWD         14 F06     0.48 SG21     87     87 TWD           8 F08     1.97 SG21     87     93 TWD         10   F08     2.02 SG21     87     97 TWD           7 F08     1.93 SG21     88     78 TWD           9 F06     1.24 SG21     89     75 TWD         13   F06   -0.59 SG21     89     87 TWD         10   F08     1.33 SG21     89     87 TWD           7 F07     0.72 SG21     90     74 TWD           7 F08     2.02 SG21     91     75 TWD           9 F08     0.81 SG21     92     78 TWD         11   F08     1.99 SG21     93     73 TWD         14   F08     0.74 SG21     93     83 TWD           9 F06   -0.62 SG21     94     74 TWD           9 F06   -1.83 Page 20
 
A ARE VA                                                                         Document No.: 51-9156712-000 AREVA NP Inc.,
an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report SG   Row     Cdf   :d AM      TW 'SgUpp. 1InchI SG21     94     78   TWD       14 F08       1.94 SG21     94     82   TWD       9 F06     -1.49 SG21     95     83   TWD       15 F08     -0.59 SG21     95     83   TWD       13 F07     -0.57 SG21     95     87   TWD       16 F08       1.92 SG21     95     87   TWD       8 F09       0.74 SG21     95     99   TWD       6 F05       -1.3 SG21     96     78   TWD       7 F08       1.58 SG21     97     73   TWD       10 F08       0.66 SG21     97     75   TWD       9 F06     -0.61 SG21     97     75   TWD       8 F07       1.82 SG21     97     83   TWD       9 F08         0.5 SG21     97     83   TWD       6 F07     -0.07 SG21     98     74   TWD       9 F06     -1.55 SG21     98     74   TWD       6 F08       1.99 SG21     98     82   TWD       7 F06     -1.81 SG21     98     82   TWD       7 F08       1.99 SG21     98     88   TWD       6 F08       0.66 SG21     99     75   TWD       12 F07       1.73 SG21     99     83   TWD       14 F06     -0.52 SG21     99     83   TWD       14 F08     -0.63 SG21     99     83   TWD       11 F07     -0.61 SG21     99     87   TWD       13 F06     -1.38 SG21     100     80   TWD       6 F06     -1.33 SG21     101     75   TWD       16 F06       -0.7 SG21     101     75   TWD       12 F07       1.64 SG21     101     75   TWD       6 F09     -1.49 SG21     101     79   TWD       8 F06     -0.46 SG21     101     79   TWD       8 F08       0.74 SG21     101     79   TWD       7 F02       -1.6 SG21     101     79   TWD       6 F07         1.6 SG21     101     83   TWD       10 F07     -0.48 SG21     101     83   TWD       9 F08     -0.39 SG21     101     87   TWD       10 F07       0.66 SG21     101     87   TWD       7 F06     -1.53 SG21     102     82   TWD       5 F07     -1.43 SG21     102     88   TWD       6 F06     -0.55 SG21     102     90   TWD       7 F06     -0.61 SG21     103     83   TWD       12 F06       0.46 SG21     103     87     TWD     12 F07       0.92 SG21     104     78   TWD       7 F08       1.88 SG21     104     78   TWD       6 F07       0.79 SG21     104     84   TWD       7 F06     -0.48 SG21     104     86   TWD       4 F06     -0.52 SG21     104     88   TWD       20 F05       -1.5 SG21     104     88     TWD     19 F06       -1.1 SG21     104     88     TWD       6 F07       1.77 Page 21
 
A AR EVA                                                                         Document No.: 51-9156712-000 AREVA NP Inc.,
an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report SG21   105     79   TWD       6 F07     1.96 SG21   105     83   TWD       12 F07     0.02 SG21   105     87   TWD       7 F07     0.66 SG21   106     76   TWD       22 F06     1.34 SG21   106     76   TWD       8 F07   -0.72 SG21   106     78   TWD       6 F07       0.7 SG21   106     90   TWD       7 F06   -0.55 SG21   107     75   TWD       9 F07     1.71 SG21   107     83   TWD       14 F06     0.46 SG21   107     83   TWD       10 F07   -0.11 SG21   107     87   TWD       16 F07     0.99 SG21   108     76   TWD       24 F06     1.01 SG21   108     90   TWD       16 F06   -0.81 SG21   110     76   TWD       7 F06     0.72 SG21   110     88   TWD       7 F06   -0.63 SG21   110     90   TWD       8 F06   -0.24 SG21   111     75   TWD       19 F06   -0.72 SG21   112     90   TWD       18 F06   -0.79 SG21   113     87   TWD       7 F07     0.74 SG21   114     76   TWD       12 F06   -0.72 SG21   117     89   TWD       15 F06   -1.62 LSG21   119     87   TWD       14 F07     0.81 Page 22
 
A AREVA                                                                         Document No.: 51-9156712-000 AREVA NP Inc.,
an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report APPENDIX B:         SG22 FBW INDICATIONS SG   Row              TWd  %Tw. F06p  .Inchi SG22     37 35. TWD              4  F07      1.85 SG22      49 9 TWD             7 F07     1.88 SG22      57 -127. TWD            5          -1.95 SG22      69    83 TWD          7  F08    -0.56 SG22      70    82 TWD          11  F06    -1.92 SG22      70    82 TWD          9  F07      0.86 SG22      72    72 TWD          9  F08      1.99 SG 22    72    92 TWD          13  F08      0.81 SG22      73    81 TWD          7  F07    -1.25 SG22      73    91 TWD          14  F08      1.93 SG22     74     82 TWD           7 F06     -1.72 SG22     74     82 TWD           6 F08     2.03 SG22     74     82 TWD           5 F07     0.74 SG22     74     94 TWD           9 F08     0.89 SG22     75     73 TWD           8 F08     0.82 SG22     76     72 TWD         17 F08     1.95 SG22     76     72 TWD         10 F06     -1.84 SG22     76     82 TWD         12 F06     -1.33 SG22     76     82 TWD         11 F08     2.02 SG22     76     82 TWD           8 F07     0.85 SG22     76     98 TWD         10 F08     0.86 SG22     77     65 TWD         10 F08     0.78 SG22     77     73 TWD           8 F08     0.98 SG22     77     81 TWD           6 F07     -0.81 SG22     78     64 TWD           7 F08     1.95 SG22     78     82 TWD         11 F06     -1.84 SG22     79     81 TWD         14 F07     -0.78 SG22     79     93 TWD         26 F08     1.44 SG22     80     64 TWD         12 F09     -1.94 SG22     80     80 TWD           9 F06     -1.61 SG22     80     82 TWD           9 F06     -1.95 SG22     80     82 TWD           8 F05     -0.63 SG22     81     91 TWD           8 F08     2.07 SG22     82     82 TWD         10 F07     1.29 SG22     82     82 TWD           7 F06     -1.83 SG22     82     84 TWD           9 F08     1.29 SG22     82     84 TWD           8 F06     1.44 SG22     82     94 TWD           7 F08     0.79 SG22     83     73 TWD         21 F08     0.83 SG22     83     75 TWD         12 F02     1.03 SG22     83     81 TWD         19 F07     -1.17 SG22     83     91 TWD         14 F08     1.99 SG22     84     80 TWD         11 F06     -1.81 Page 23
 
A ARE VA                                                                                 Document No.: 51-9156712-000 AREVA NP Inc.,
an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report SG22   _84       92 . TWD       17     F08       0.8 SG22       84     94 TWD         18     F*8      0.83
                              -SG22     -85  -79     TWD-         9 F08         0.94 SG22       86     72 TWD         11     F06     -1.59 SG22         72 TWD       _9         F05-   -0.76 SG22       86   TWD             9   F06     -1.56 SG22       86     92 TWD-           9   F08     0.83 SG22f     86     94   TWD       13     FOB   _0.87 SG22       87 TWD             16 F08           0.78 SG22       87     83 TWD         22 F07         -0.02 SG22       87     83 TWD       _ 15       F08     0.02 SG22       87     83--
8     _TWD         77F06          0.5 SG22       88     76 TWD-_ 9 F06                   1.94 SG22       88     78_.. TWD       10 F06         -1.29 SG22       88     82 TWD - 12 F06                   1.3 SG22       88     82 TWD         11 F0 5           1.83 SG22       88     84 TWO             6 F07       -0.72 SG22       88 -_92 TWD             11 - F08         0.85 SG22       89     65 TWD         -14 F08           1.07_
SG22      89 -- 69 TWD           11 F08                 1 SG22       89     73 TWD         18 F0           -0.91 SG22       89     83   TWOD-         - FO6 __-10.25 SG22       89     83   TWD                       -0.55 SG22       89     83   TWOD         7 F05       -0.39 SG22       89     783    TWD           6
: 6. F07       0.57 SG22       89     89   TWD           5 FOB       -1.27 SG22       90     821   TWD           6 F06       -1.83 SG22       91     65   TWD       20 FOB           0.87 SG22       91     83   TWD           7 F07       -0.46 SG22       92     76   TWD       11 F06           1.88 SG22       93     73   TWD         67 F06         -0.7 SG22       93     79   TWD       17 F06         -10.68 SG22       93     81   TWD               F05     -0.74 SG22       934_   83   TWD       10 F07             0.5 SG22       93     83   TWD           91 F06       0.48 SG22       94     76   TWD       7 7 F06       -1.58
                            -SG22 -. 94         80 -TWO     -7        -F06     -1.73 SG22       94     82 TWO     -14         F06     -1.81 SG22       94     82 TWD           6 F07         0.87 SG22       94     86 TWD             8 F06       0.85 SG22       94     92 TWO         10 F08           0.89 SG22       95     81 TWO           8 F07         -1.22 SG22       95     83 TWO         10 F07       _-0.52 SG22       95     83 TWO           7 F06         0.59 SG22       96     80 TWD         10 F06         -1.79 SG22       96     82 TWD             9 F06         1.3 Page 24
 
A AREVA                                                                               Document No.: 51-9156712-000 AREVA NP Inc.,
an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R1 9 180-Day Report S -G .Row                      %TW SG22       96    82  ITWD                F07  -1.49 SG22       96    84    TWD -         17 F07      1.35
                            -SGi22-    96     86    TWD            9 F06    -1.05 SG22      96     90    TWD        --14 F08    -1.31 SG22      97    73    TWD            8 F06     -0.72 TWD SG22      97    75                  7 F06       -0.5 TWD SG22      97    77                  7 F06     -0.72 SG22      97    79    TWD           7 F06     -0.61 SG22 -97          81    TWD            8 F07    -1.27 SG22      97    81    TWD            3 F06      1.38 SG22      97    81    TWD            3 F08    -1.53 SG22      98     72    TWD            6 F08      1.92 SG22      98     76    TWD            7 F06      1.71 SG22      98     78    TWD          10 F08     2.08 SG22      98    82    TWD           7 F07       0.9 SG22      99    71    TWD           13 F08     -0.81 99    73    TWD            7 F07      1.93 SG22      99    77    TWD          18 F06    -1.02 SG22      99    83    TWD          28 F06      0.07 SG22      99    83    TWD          15 F05          0 SG22      100    76    TWD            8 F06    -1.79 SG22 100    78    TWD          11 F08_    -1.85 SG22 100    78    TWD            6 F06    -1.51 SG22 100    82    TWD          23 F06      -1.21 SG22 100    82    TWD          16 F07      0.91 SG22     100     82   TWD           9 F08       1.8 SG22     100     84   TWD     _     8 F07     1.95 SG22     100     88   TWD       _   11 F07     1.86 SG22     101     77   TWD           9 F06     -0.67 SG22     101     79   TWD           7 F07     1.84 SG22     101     83   TWD         30 F06       0.09 SG22     101     83   TWD         23 F07       0.09 SG22     101     83   TWD           9 F05     0.04 SG22     101     85   TWD           6 F09     1.42 SG22     101     87   TWD           7 F07     0.76 SG22     101     87   TWD           6 F04       0.7
_SG22      102     76   TWD           12 F07     -1.27 SG22     102     76   TWD           7 F06     1.77 SG22     102     82   TWD           8 F09     0.85 SG22     102     82   TWD           7 F06     -1.77 SG22     102     84   TWD           5 F07     1.94 SG22     102     86   TWD           6 F02       0.9 SG22     103     77   TWD           16 F06     -0.61 SG22     103     79   TWD           10 F06     -0.62 SG22     103     79   TWD           9 F07     1.96 SG22 1 1031       811   TWD   1       9 1F08 [ -1.31 Page 25
 
A AR EVA                                                                         Document No.: 51-9156712-000 AREVA NP Inc.,
an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report SG22     103     83   TWD       17 F06     -0.06 SG22     103     83   TWD-I       7 F05     -0.52 SG22     103     83   TWD         7 FO7     -0.13 SG22     103     85 TWD         10 F08         1.4 SG22     103     87 TWD         12 F07       0.7
_SG22    104     82 _TWD V         F06     -1.76 SG22     104     82 TWD         11 F07       0.74 SG22     104     84 TWD         12 F07       1.84 SG22     104     94 TWD         14F06       -1.15 SG22     105     67 TWD           9 F07     -1.31 SG22     105     75 TWD           9 F06     -0.74 SSG22     105     77= TWD_ 11 F06           -0.74 SG22     105     79j TWD         17 F06     -0.59 SG22     105     79 TWD         11 F07-     1.75 SG22     105     81 TWD         14 F08       1.35 SG22     105     81 TWD           9 F06     -0.74 SG22     105     81 TWD           6 F07       1.81 SG22     105     83 TWD         15 F07 _     0.57 SG22 -105-5     83 TWD         13 FO5       -0 SG22     105     83 TWD           8 F06 _   0.04 SG22     105     87 TWD           7 F01       0.61 SG22     106     80 TWD           8 F07       1.44 SG22     106     82 TWD         17 F07       0.79 SG22     106     82 TWD         11 F06     -1.72 SG22     106     84 TWD       _   6 F08   -1.42 SG22-   106 ----90 TWD         18 F07       1.39 SG22     107     75 TWD       _ 14 F06     -0.79 SG22     107   -- 77 TWD       _ 14 F-06   --0.76.
SG22     107     79 TWD           9 F06 -0.75 SG22     107     81 TWD         22 F06     -0.74 SG22     107     81 TWD         12 F08     -1.26 SG22     107     83 TWD             F07       0.07 SG22     107     83 TWD           5 F06 _     0.02 SG22     107     83 TWD           4 EQS       0.12 SG22     107     85 TWD         18 F09       0.7 SG22     107     93 TWD         11 F07       0.81 SG22     108     74 TWD           7 F06       -1.9 SG22     108     76 TWD         14 F08       1.72 SG22     108     82   TWD       21 F07       0.81 SG22     108     82   TWD       16 F09       0.87 SG22     108     82   TWD       10 F08       1.68 SG22     108     84   TWD       14 F07       1.82 SG22     108     84   TWD       13 F06     -0.61 SG22     108     86   TWD       23 F06     -1.03 SG22     108     86   TVD       15 F07       1.25 SG22     108     86   TWD         6 F08       1.33 Page 26
 
A AREVA                                                                           Document No.: 51-9156712-000 AREVA NP Inc.,
an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R1 9 180-Day Report 9G- IJ-Row               mld.  %TW SG22     108     90    TWD        7 F06      -0.7 SG22 _ 109       73    TWD      32 F06        -1.2 SG22     109     75   TWD       13 F06     -0.83 SG22    109    77    TWD        18 F06     -0.66 SG22    109    79    TWD      21 F06     -0.72
                            -SG22  _109      81    TWD        14 F08     -1.46 SG22    109    81    TWD        12 F06     -0.74 SG22     109    81    TWD        6 1F07    -1.18 SG22     109     83   TWD         5 F06     0.56 SG22    109    85    TWD        17 F07    -1.33
                            -SG22    109    87   TWD        11 F07      0.87 SG22    110    78    TWD        9 F07      0.72 SG22    111    73    TWD      27 F06      -1.25 SG22     111    75    TWD      22 F06        -0.7 SG22             77    TWD      27 F06      -0.85 111 SG22             79    TWD        19 F06    -0.69 111 SG22     111    79    TWD        11 F07      1.83 SG22             81    TWD        14 F06    -0.74 SG22     112     72   TWD        10 F08      1.88 SG22    112    78    TWD        12 F07      0.79 SG22            75   TWD        8 F06    -0.81 113 SG22            77   TWD      26 F06      -1.22 113 SG22            81   TWD       19 F06     -1.16 113 SG22            83   TWD        9 F07      0.61 SG22     113     83   TWD         7 F06       0.5 SG22     113     91   TWD       18 F02     -1.91 SG22     114     76   TWD         5 F06     1.32 SG22     114     78   TWD       12 F07     0.75 SG22     114     82   TWD         8 F06     1.33 SG22     114     84   TWD       12 F06     -1.18 SG22     114     88   TWD       15 F05     1.28 SG22     115     73   TWD         9 F06     -0.68 SG22     115     77   TWD         9 F06     -0.68 SG22     115     81   TWD         7 F06     1.28 SG22     115     81   TWD         6 F07     -1.22 SG22     115     83   TWD         6 F06     0.57 SG22     115     83   TWD         6 F07     0.63 SG22     115     93   TWD       12 F07     0.88 SG22     116     82   TWD       22 F07       1.25 SG22     116     84   TWD         9 F08     -1.66 SG22     117     83   TWD       18 F06     0.13 SG22     117     83   TWD         6 F05     -0.42 SG22     117     83   TWD         5 F08     0.09 SG22     117     91   TWD       15 F07     1.33 SG22     119     81   TWD       14 F06     -0.61 SG22     120     82   TWD         6 F08     1.24 Page 27
 
A AR EVA                                                                           Document No.: 51-9156712-000 AREVA NP Inc.,
an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report SG22   120   I 88 -TWD_         9 F08__-1.27 SG2.2   121     75 TWD         _1_1_F06    -0.79 SG22 -123       77 -TWD           6 F06_     -0.61 SG22   123     81 TWD         11 F07       1.53 SG22   123     83 TWD         25 F07       0.33 SG22   123     83     -TWD-     8 F06       0.59 SG22 123         83 TWD           6 F05       0.28 SG22   124     76 TWD _         8 F06       0.76 SG22_ 124       82 TWD         13 F06     -1.29
_SG22    124     82 __TWD         9 F08     -1.37 SG22   124     82 TWDO         7 F09   _   -1.4
                            -SG22 J-125       91- -TWD --     9-9 F03 -.. 1-.95 SG22 1..26       82 TWD ----15 F07           1.16 S7G2-2 F-127     83 TWD - 13 F07             0.22 SG22     128     92 TWD ... 7 F08 - -1.25 SG22     130     92 TWD         10 F06       1.78 SG22     131     75 TWD           9 F06     -1.29 SG22     131- 83T-"WD             8 1 F08         0 SG22j 135_[ 83_LtrWDL_ 81 :F07 _ 0.18]
Page 28}}

Revision as of 17:55, 12 November 2019

Spring 2011 - 180 Day Steam Generator Report
ML111822717
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 06/30/2011
From: John Stanley
Calvert Cliffs 3 Nuclear Project, Constellation Energy Group, EDF Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
20004-018 51-9156712-000
Download: ML111822717 (30)


Text

Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 CENG.

a joint venture of 0Constellation Ener*y, 4"#, eDF CALVERT CLIFFS NUCLEAR POWER PLANT June 30, 2011 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit No. 2; Docket No. 50-318 Spring 2011 - 180 Day Steam Generator Report

REFERENCE:

(a) Calvert Cliffs Nuclear Power Plant Units 1 and 2 Technical Specification 5.6.9 In accordance with Reference (a), Attachment (1) provides the results of the steam generator tube inspection conducted on Calvert Cliffs Unit 2 in 2011. This report includes the number and extent of tubes examined and indications identified.

Should you have questions regarding this matter, please contact Mr. Douglas E. Lauver at (410) 495-5219.

- Engineering Services JJS/PSF/bjd

Attachment:

(1) Calvert Cliffs Unit 2, Spring 2011 - 180 Day Steam Generator Report cc: D. V. Pickett, NRC Resident Inspector, NRC W. M. Dean, NRC S. Gray, DNR AwlI

ATTACHMENT (1)

CALVERT CLIFFS UNIT 2, SPRING 2011 -

180 DAY STEAM GENERATOR REPORT Calvert Cliffs Nuclear Power Plant, LLC June 30, 2011

A 20004-018 (10/18/2010)

AREVA AREVA NP Inc.

ENGINEERING INFORMATION RECORD Document No.: 51 - 9156712 - 000 Calvert Cliffs Unit 2 -- U2R19 180-Day Report Page 1 of 28

A 20004-018 (10/18/2010)

Document No.: 51-9156712-000 AREVA Calvert Cliffs Unit 2 -- U2R19 180-Day Report Safety Related? [:] YES ONO Does this document contain assumptions requiring verification? [-] YES E NO Does this document contain Customer Required Format? -- YES 0 NO Signature Block Note: P/LP designates Preparer (P), Lead Preparer (LP)

R/LR designates Reviewer (R), Lead Reviewer (LR)

A/A-CRF designates Approver (A), Approver of Customer Requested Format (A-CRF)

A/A-CRI designates Approver (A), Approver - Confirming Reviewer Independence (A-CRI)

Page 2

A 20004-018 (10/18/2010)

Document No.: 51-9156712-000 AREVA Calvert Cliffs Unit 2 -- U2R19 180-Day Report Record of Revision Page 3

A Document No.: 51-9156712-000 AR EVA Calvert Cliffs Unit 2 -- U2R19 180-Day Report Table of Contents Page SIG NATURE BLOCK ................................................................................................................................ 2 RECO RD O F REVISIO N .......................................................................................................................... 3 LIST O F TABLES ..................................................................................................................................... 5 LIST O F FIG URES ................................................................................................................................... 6 1.0 180-DAY REPO RT ........................................................................................................................ 7

2.0 REFERENCES

............................................................................................................................ 19 APPENDIX A : SG21 FBW INDICATIONS ............................................................................................................ 20 APPENDIX B1: SG22 FBW INDICATIONS ...................................................................................................... 23 Page 4

A Document No.: 51-9156712-000 AR EVA Calvert Cliffs Unit 2 -- U2R19 180-Day Report List of Tables Page TABLE 1 - NDE TECHNIQUES UTILIZED FOR IDENTIFIED DEGRADATION ................................ 9 TABLE 2 - FOREIGN OBJECT W EAR ............................................................................................ 14 TABLE 3 - LIST OF TUBES PLUGGED DURING U2R19 ................................................................. 15 TABLE 4 - TUBE PLUGG ING SUM MARY ......................................................................................... 15 Page 5

A Document No.: 51-9156712-000 AREVA Calvert Cliffs Unit 2 -- U2R19 180-Day Report List of Figures Page FIGURE 1 - FAN BAR WEAR THROUGHWALL DEPTH DISTRIBUTION ....................................... 10 FIGURE 2 - SG21 FAN BAR WEAR LOCATIONS ............................................................................ 11 FIGURE 3 - SG22 FAN BAR WEAR LOCATIONS ............................................................................ 12 FIGURE 4 - SG21 FAN BAR WEAR CONDITION MONITORING .................................................... 17 FIGURE 5 - SG22 FAN BAR WEAR CONDITION MONITORING .................................................... 17 FIGURE 6 - SG21 AND SG22 LP WEAR CONDITION MONITORING ............................................ 18 Page 6

A ARE VA Document No.: 51-9156712-000 AREVA NP Inc.,

an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report 1.0 180-DAY REPORT Calvert Cliffs Nuclear Power Plant Unit 2 U2R19 Spring 2011 Steam Generator Inspection During the Calvert Cliffs Nuclear Power Plant Unit 2 (CCNPP2) spring 2011 refueling outage (designated as U2R19), both of the steam generators (i.e., SG21 and SG22) were inspected in accordance with CCNPP Technical Specification (TS) 5.5.9. This was the third in-service inspection of the replacement steam generators (SGs), and the SGs had been operated for 7.45 effective full power years (EFPY) at the time of the inspection.

The discussion below summarizes the results of the inspection in accordance with the 180-day reporting requirements of Technical Specification (TS) 5.6.9. Bold wording restates the TS requirement, followed immediately by the required CCNPP2 information.

A report shall be submitted within 180 days after the initial entry into Mode 4 following completion of an inspection performed in accordance with the Specification 5.5.9, Steam Generator (SG) Program.

Initial entry into Mode 4 occurred on March 12, 2011; therefore, this report is required to be submitted by September 7, 2011.

The report shall include:

a. The scope of inspections performed on each SG

" Eddy Current Bobbin probe examinations (both SGs):

o 100% of all inservice tubes, full length, tube-end to tube-end.

o During the bobbin probe examination, in-service tubes bounding plugged tubes were examined for signs of tube-to-tube proximity or contact (resulting from severance of a plugged tube).

" Eddy Current Array probe examinations (both SGs):

o 100% of all inservice tubes, tube end to 1st lattice-support (both H/L and C/L).

o Since all of the in-service tubes were examined with Array probe from the tube-end to the 1 st lattice support, the following examinations were also satisfied by the Array probe examination: (Note that any loose parts or loose part indications outside of the Array probe examination range were examined using RPC. Additionally, any wear detected during the Array probe examination was also examined using RPC for characterization.)

Page 7

A AR EVA Document No.: 51-9156712-000 AREVA NP Inc.,

an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report

" Inspection of a one-tube border region around all tubes previously plugged due to foreign object wear and/or object remaining in the SG. This included 30 tubes plugged in SG21 during U2R18, and 29 tubes plugged in SG22 during U2R16.

" Inspection of all previous PLPs (part not removed) plus a one tube bounding examination of such tubes at the elevation of interest. This included 59 PLP tubes (plus the bounding tubes) returned to service in SG21 during U2R18, and 27 PLP tubes (plus the bounding tubes) returned to service in SG22 during U2R18.

" Inspection of all in-service tubes reported during the previous outage as NDD or LPS that were associated with foreign objects not retrieved during that outage, plus a one tube bounding examination of such tubes at the elevation of interest. This included 25 tubes (plus the bounding tubes) reported in SG21 during U2R18, and 30 tubes (plus bounding tubes) reported in SG22 during U2R18.

o The Array probe inspection data was also analyzed for expansion transition cracking at the hot and cold leg top of tubesheet (TTS)

Rotating eddy current probe examination (RPC) (both SGs):

" Pre-planned: Inspection of all in-service tube locations containing previously identified foreign object wear. This included 5 tubes in SG21 (all reported for the first time during U2R18) and, 6 tubes in SG22 (4 reported for the first time during U2R16 and 2 reported for the first time during U2R18).

o Special interest examinations:

  • All bobbin probe and/or Array probe I-Codes.
  • All newly-identified foreign object wear indications.
  • All bobbin probe loose part indications plus a one tube bounding examination of such tubes that fall outside of the Array probe examination range.
  • All bobbin probe lattice-support wear indications.
  • Additional indications (e.g., fan bar wear, dents, dings) as needed to meet operational assessment requirements for tube integrity.
  • Visual inspection of all installed tube plugs in both SGs in accordance with section 6.9 of the EPRI PWR Steam Generator Examination Guidelines, Rev 7. This included both welded and mechanical plugs.
  • The following secondary side inspections were performed (both SGs):

o Secondary side visual inspections of tubesheet, including the inner bundle passes, the annulus, and the no-tube lane regions o Secondary side visual inspection of the 1 st lattice grid support o Targeted inspection of locations identified as PLP (Possible Loose Part) by ECT. See the latter part of Section "d" for an explanation of targeted inspections.

Page 8

A AR EVA Document No.: 51-9156712-000 AREVA NP Inc.,

an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report

b. Active degradation mechanisms found Two degradation mechanisms were identified during this examination: 1) fan bar wear, and 2) foreign object wear. No evidence of corrosion degradation processes, cracking, or lattice support wear was identified and no tubes were identified as being in close proximity to one another.
c. Nondestructive examination techniques utilized for each degradation mechanism The table below identifies NDE examination techniques utilized for each identified degradation mechanism.

Table I - NDE Techniques Utilized for Identified Degradation Degradation Inspection Type EPRI ETSS Mechanism Fan bar wear Bobbin 96004.1 (Rev. 13)

+PointTM 96910.1 (Rev. 10)

Foreign Object +PointTM 27901.1 (Rev. 0) **

Wear* (circ groove)

The Array probe was the primary means of detecting foreign objects and foreign

+ *TM object wear during the inspection. However, the +Point probe was used for sizing wear.

    • There are other EPRI techniques qualified for sizing of foreign object wear depending on the shape of the flaw. ETSS 27901.1 was selected based on the circumferential groove appearance of the foreign object wear indications detected during the U2R1 9 inspection.
d. Location, orientation (if linear), and measured sizes (if available) of service induced indications Fan bar wear (FBW) is a mechanical degradation process which produces volumetric tube wear at the interface between the U-bend anti-vibration supports (fan bars) and the tubes. In total, 358 fan bar wear (FBW) indications in 274 tubes were identified in the CCNPP2 steam generators during the U2R19 inspection. Although none of the reported indications exceeded the Technical Specification plugging limit of 40%TW, the three largest FBW indications (all in SG22) were preventatively stabilized with full-length stabilizers, and the tubes were plugged. Although the full length stabilizer is not required to span the entire tube length, it is required to span the tube length on the insertion leg side (hot leg) from the top of the plug over the u-bend and past the 5 th support on the opposite leg for the largest tube row (row 138) in the bundle.

Thirty-one of the 358 indications were newly reported during U2R19. This represents an increase of about 10% since the last inservice inspection in 2009 (U2R18). The maximum depth reported was a 32%TW indication in SG22. The largest newly-reported indication was an 18%TW indication in SG22.

Figure 1 provides the distribution of fan bar wear depths for both steam generators as reported with the Page 9

A AREVA Document No.: 51-9156712-000 AREVA NP Inc.,

an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report bobbin coil probe. As shown in the figure, SG22 contained more indications and also contained the majority of indications that were greater than 20%TW.

Figures 2 and 3 provide tube map locations of the reported FBW. Although the tube maps shown in Figures 2 and 3 provide a view of the tubesheet primary face from the hot leg side, both the hot leg and cold leg FBW indications are included on each map. Most of the wear continues to occur in longer tubes (i.e., larger ubend radius), clustered towards the center-most tube columns.

Figure 1 - Fan Bar Wear Throughwall Depth Distribution Page 10

A AREVA Document No.: 51-9156712-000 AREVA NP Inc.,

an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report Figure 2 - SG21 Fan Bar Wear Locations GRWOP NOES Calvert Cliffs Unit 2 . Bw~o,. 9 2R19- FEB 2011 Fan Bar Wear Indications (9 Et " tube s w ithne wF &W6 tubes vw th out p n orF BW* 3 tubes wi l nweOF Wan d p7100 FB W atddt e ln, o ct w S C ALE 0 OO3I8)

$10 21 TOTAL T*SES 8471 "

  • 073I NOT2 SELECTED TUBES 91 PRMAYOAC OJT OFSERV1E (0) 37 NOZZLE ifi ilto

.. . . ... .... 40+

'ofo 040 130 120 110 Go so .0 30 20 10 MANWAY Page 11

A AREVA Document No.: 51-9156712-000 AREVA NP Inc.,

an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R1 9 180-Day Report Figure 3 - SG22 Fan Bar Wear Locations 60Oup

'nFOW2D1I now 20 Calvert Cliffs Unit 2 ;fFfBW 2V1 1132 172 2R19- FEB 2011 Fan Bar Wear Indications (20 ttat tubes with new FBW 13 tubes wthout pnm F5W 7 tubes with new FPW and nowFOW at ddent location)

SG 22 TOTAL TLOE:S 8471 SAE0OM HOT SELECTED TUBES 186 Won May Oa 14 26 25 2011 PROMA~y FACE OUT OF SER~VCE (0) 32 NOZZLE ISO I20~ t*D 120 ItO II.

4~K2.~;&&~

  • lie I*1)

"a U too so

,IV U M U

'0

~K. in y ?a

  • 0 40 ........ 4 2~7~> -7~

7

~& '~7 A17 --


r* 20 7

U U ~,~'2>2>

Z772>~77v ...... - 20 to

'0 10

,041 00 Ila Wo 130 120 Ila In tO10 12 20 SOI060 40 20 20 to MANWAY Page 12

A AR EVA Document No.: 51-9156712-000 AREVA NP Inc.,

an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report During the U2R19 inspection, 17 indications of foreign object wear were detected in 14 tubes within the two SGs (see Table 2). These indications were reported as LPW (Loose Part Wear) in the eddy current database. Five (5) indications in three tubes were newly-detected in SG21 during U2R19. The remaining indications in SG21, and all indications in SG22, were identified during prior inspections, and were pre-planned for re-inspection during U2R19. All LPW indications were sized below the site plugging limit. None of the foreign objects that caused the newly-detected LPW in 2011 was present at the LPW tube location. Nor were objects present at non-plugged LPW tube locations from previous outages. Since no objects were present to cause further wear and all LPW %TWs were less than the 40% tech spec plugging limit, all 14 tubes were returned to service.

Due to the large number of LPW indications and foreign objects detected at CCNPP2 in-the past, a concerted effort was undertaken during U2R19 to detect and remove as many foreign objects as possible. A 100% examination of both SGs was performed with the Array probe from the tube end to the first support in each leg. This provided the most thorough inspection possible for detection of foreign objects from the tubesheet up to the first support in both legs. As a result, 343 Potential Loose Part (PLP) indications were reported in SG21, and 203 were recorded in SG22. It should be noted that these quantities represent the initial number of PLP indications in the ECT database. Upon inspecting a location, the indication code was subsequently changed to LPS (Loose Parts Signal) if no loose part was found by visual inspection, or LPR (Loose Part Removed) if any object (including a sludge rock) was found and removed from the SG. Thus the stated quantities are actually the sum of PLP, LPS and LPR calls remaining in the database.

With certain justified exceptions (Refs. I and 2), all PLP indications were visually investigated by secondary side inspection personnel. This included loose parts left in service from the previous (2009) inspection. PLP locations that were not visually inspected were justified by a separate engineering evaluation. The evaluation divided the bundle into two parts: the 12-tube periphery ring and all tubes bounded by the periphery ring, (i.e., the inner bundle region). PLP indications located within the inner bundle region were further divided into two classifications, IBS (inner bundle single) and all other. IBS indications are defined as PLP indications located in a single tube without a PLP indication in an adjacent bounding tube. Since IBS indications were judged to be less of a concern regarding tube integrity, (compared to two or more adjacent PLP tubes), visual inspection of IBS tubes was not required. Of the 343 PLP indications detected in SG21, 92 of them were classified as IBS indications.

Accordingly, of the 203 PLP indications detected in SG22, 69 of them were classified as IBS indications. The majority of PLPs were caused by sludge rocks and/or scale. Numerous metallic objects were removed, and three small pieces of wire were left in SG22 secondary side.

Page 13

A AREVA Document No.: 51-9156712-000 AREVA NP Inc.,

an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report Table 2 - Foreign Object Wear Eddy Measured New Loose Current Length (in.) in Part SG Row Col Ind %TW Supp Elevation Technique Axial XCirc 2011 Detected 21 12 66 LPW 29 TSH +0.12 27901.1 0.21 x 0.33 Yes No 21 12 66 LPW 23 TSH +0.42 27901.1 0.18 x 0.31 Yes No 21 12 162 LPW 27 TSH +0.04 27901.1 0.18 x 0.33 No No 21 13 65 LPW 28 TSH +0.01 27901.1 0.21 x0.23 Yes No 21 14 66 LPW 18 TSH +0.50 27901.1 0.15 x 0.25 Yes No 21 14 66 LPW 18 TSH +0.60 27901.1 0.12 x 0.27 Yes No 21 72 146 LPW 34 TSH +0.15 27901.1 0.13 x 0.35 No No 21 75 147 LPW 19 TSH +18.07 27901.1 0.25 x 0.25 No No 21 77 147 LPW 22 TSH +17.70 27901.1 0.24 x 0.29 No No 21 77 149 LPW 21 TSH +20.71 27901.1 0.21 x 0.39 No No 22 14 4 LPW 24 TSC +0.47 27901.1 0.20 x 0.35 No No 22 17 1 LPW 24 TSC -0.02 27901.1 0.20 x 0.27 No No 22 18 2 LPW 25 TSC +0.10 27901.1 0.24 x 0.31 No No 22 112 82 LPW 24 05H -4.02 27901.1 0.31 x 0.35 No No 22 124 116 LPW 17 01C -11.40 27901.1 0.27x0.27 No No 22 126 116 LPW 37 01C -11.27 27901.1 0.27 x 0.27 No No 22 126 116 LPW 23 01C -11.54 27901.1 0.24 x 0.27 No No Page 14

A AREVA Document No.: 51-9156712-000 AREVA NP Inc.,

an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report

e. Number of tubes plugged during the inspection outage for each active degradation mechanism Three tubes in SG22 were plugged during U2R19 (see Table 3). All of the tubes were preventatively stabilized and plugged due to Fan Bar wear. The tubes are labeled as PTP (Preventive Tube Plug) in the ECT database. No tubes were plugged in SG21 during the 2011 refueling outage.

Table 3 - List of Tubes Plugged During U2R19 SG Row Col Hot Leg Cold Leg Reason for Tube Repair SG22 109 73 ROLLSTAB ROLLED PTP@F06-1.35 SG22 99 83 ROLLSTAB ROLLED PTP@F06+0.02 SG22 101 83 ROLLSTAB ROLLED PTP@F06-0.02 PTP = Preventative Tube Plug ROLLSTAB=Stabilizer and Rolled Plug

f. Total number and percentage of tubes plugged to date Table 4 provides the post-U2R19 tube plugging status of the CCNPP2 SGs. There are currently 37 tubes plugged in SG21 and 32 tubes plugged in SG22.

Table 4 - Tube Plugging Summary SG Tubes Installed Tubes Plugged To-Date SG21 8,471 37 (0.437%)

SG22 8,471 32 (0.378%)

Total 16,942 69 (0.407%)

Page 15

A AR EVA Document No.: 51-9156712-000 AREVA NP Inc.,

an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R1 9 180-Day Report

g. The results of condition monitoring, including the results of tube pulls and in-situ testing The condition monitoring assessment is summarized in Figures 4 through 6. These figures provide the condition monitoring limit curves corresponding to the NDE technique employed for each degradation type. All reported degradation falls below the applicable condition monitoring curve and therefore satisfies the Technical Specification structural performance criteria.

Note that Figures 4 and 5 display the U2R1 9 FBW depths at a bounding 1.8 inch length for SGs 21 and 22 respectively. Also presented in each figure are the five deepest FBW indications sized using RPC.

The five deepest were selected since larger axial lengths are typically associated with deeper FBW.

The measured RPC length for these indications is plotted to demonstrate that the 1.8 inch length remains bounding. Because the RPC length measurements were not adjusted to compensate for rotating coil field spread effects, the indicated length values are considered to be overestimates of the actual lengths, thus adding to the conservatism for the 1.8 inch bounding length.

For volumetric indications, meeting the structural performance criteria also provides reasonable assurance that the accident leakage performance criteria would be satisfied at the steam line break pressure differential which is less challenging than the pressure differential required to demonstrate compliance with the structural performance criteria. Since this conclusion could be reached analytically using NDE inspection results with a full accounting of significant uncertainties, no in-situ pressure testing was required to demonstrate structural and leakage integrity, and no tubes were removed from the SGs for destructive examination. During the past operating cycle, no measurable primary-to-secondary leakage was observed, therefore the operational leakage performance criteria was satisfied.

The results of the 2011 inspection and the condition monitoring assessment confirm that the 2009 operational assessment was appropriately bounding.

h. The effective plugging percentage for all plugging in each SG There are no sleeves installed in the CCNPP2 steam generators, therefore the effective plugging percentage is the same as stated in (f) above.

Page 16

A AR EVA Document No.: 51-9156712-000 AREVA NP Inc.,

an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report Figure 4 - SG21 Fan Bar Wear Condition Monitoring 100 90 CM Limit - ETSS 96004.1 Wear Depth - 1.8 in. Bounding Length 80 A Wear Depth - Measured Length 70 60 50 I

40 30 20 10 A

&

AA A

  • I 00 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1,3 1.4 1.5 1.6 1.7 1.8 1.9 2.0 Axial Length (in)

Figure 5 - SG22 Fan Bar Wear Condition Monitoring 100 90 - CM Limit - ETSS 96004.1

  • Wear Depth - Assumed Bounding Length 80 A Wear Depth - Measured Length 70 60 50 I 40 30 -

20 -

10 0

0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2.0 Axial Length (in)

Page 17

A AR EVA Document No.: 51-9156712-000 AREVA NP Inc.,

an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report Figure 6 - SG21 and SG22 LP Wear Condition Monitoring 80 70 60 5o S CMLimit ETSS 27901.1

  • SG21 Loose Part Wear x1 40 A SG22 Loose Part Wear A

30 AA 20 0 0A 10 0

0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 Axial Length (in)

Page 18

A AREVA Document No.: 51-9156712-000 AREVA NP Inc.,

an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report

2.0 REFERENCES

1. AREVACR2011-1545
2. AREVA CR 2011-1547
3. AREVA, "Calvert Cliffs Unit-2 Condition Monitoring at 2R19 (Spring 2011) and Preliminary Operational Assessment for Cycles 19 and 20," 51-9156699-000, March 8, 2011
4. AREVA, "Technical Summary Calvert Cliffs Unit#2 2R19 Eddy Current Examination," 51-9157178-000, May 10, 2011
5. AREVA, "Calvert Cliffs Nuclear Power Plant Unit 2, SG Degradation Assessment, Spring 2011 /2R19," 51-9153318-000, February 15, 2011 Page 19

A AR EVA Document No.: 51-9156712-000 AREVA NP Inc.,

an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report APPENDIX A: SG21 FBW INDICATIONS SG21 34 6 TWD 9 F06 -1.4 SG21 45 79 TWD 5 F07 0.92 SG21 57 107 TWD 19 F08 1.69 SG21 58 98 TWD 5 F05 -1.82 SG21 63 69 TWD 9 F09 2.16 SG21 69 115 TWD 9 F04 -1.9 SG21 75 75 TWD 6 F08 0.75 SG21 77 75 TWD 6 F08 0.71 SG21 77 79 TWD 18 F08 0.75 SG21 77 83 TWD 10 F08 0.78 SG21 80 74 TWD 4 F08 2.03 SG21 80 76 TWD 14 F07 -0.81 SG21 80 78 TWD 9 F08 1.99 SG21 81 75 TWD 13 F08 0.77 SG21 81 79 TWD 13 F08 0.92 SG21 82 94 TWD 7 F08 0.81 SG21 83 67 TWD 11 F08 0.77 SG21 83 79 TWD 10 F08 0.92 SG21 83 97 TWD 6 F08 2 SG21 84 76 TWD 14 F07 -0.81 SG21 85 75 TWD 7 F08 0.83 SG21 85 75 TWD 5 F07 1.79 SG21 85 79 TWD 13 F08 0.94 SG21 85 93 TWD 11 F08 1.91 SG21 86 84 TWD 12 F06 -0.72 SG21 86 94 TWD 8 F08 0.74 SG21 87 75 TWD 16 F08 0.81 SG21 87 75 TWD 9 F07 1.75 SG21 87 79 TWD 9 F08 0.76 SG21 87 83 TWD 14 F06 0.48 SG21 87 87 TWD 8 F08 1.97 SG21 87 93 TWD 10 F08 2.02 SG21 87 97 TWD 7 F08 1.93 SG21 88 78 TWD 9 F06 1.24 SG21 89 75 TWD 13 F06 -0.59 SG21 89 87 TWD 10 F08 1.33 SG21 89 87 TWD 7 F07 0.72 SG21 90 74 TWD 7 F08 2.02 SG21 91 75 TWD 9 F08 0.81 SG21 92 78 TWD 11 F08 1.99 SG21 93 73 TWD 14 F08 0.74 SG21 93 83 TWD 9 F06 -0.62 SG21 94 74 TWD 9 F06 -1.83 Page 20

A ARE VA Document No.: 51-9156712-000 AREVA NP Inc.,

an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report SG Row Cdf :d AM TW 'SgUpp. 1InchI SG21 94 78 TWD 14 F08 1.94 SG21 94 82 TWD 9 F06 -1.49 SG21 95 83 TWD 15 F08 -0.59 SG21 95 83 TWD 13 F07 -0.57 SG21 95 87 TWD 16 F08 1.92 SG21 95 87 TWD 8 F09 0.74 SG21 95 99 TWD 6 F05 -1.3 SG21 96 78 TWD 7 F08 1.58 SG21 97 73 TWD 10 F08 0.66 SG21 97 75 TWD 9 F06 -0.61 SG21 97 75 TWD 8 F07 1.82 SG21 97 83 TWD 9 F08 0.5 SG21 97 83 TWD 6 F07 -0.07 SG21 98 74 TWD 9 F06 -1.55 SG21 98 74 TWD 6 F08 1.99 SG21 98 82 TWD 7 F06 -1.81 SG21 98 82 TWD 7 F08 1.99 SG21 98 88 TWD 6 F08 0.66 SG21 99 75 TWD 12 F07 1.73 SG21 99 83 TWD 14 F06 -0.52 SG21 99 83 TWD 14 F08 -0.63 SG21 99 83 TWD 11 F07 -0.61 SG21 99 87 TWD 13 F06 -1.38 SG21 100 80 TWD 6 F06 -1.33 SG21 101 75 TWD 16 F06 -0.7 SG21 101 75 TWD 12 F07 1.64 SG21 101 75 TWD 6 F09 -1.49 SG21 101 79 TWD 8 F06 -0.46 SG21 101 79 TWD 8 F08 0.74 SG21 101 79 TWD 7 F02 -1.6 SG21 101 79 TWD 6 F07 1.6 SG21 101 83 TWD 10 F07 -0.48 SG21 101 83 TWD 9 F08 -0.39 SG21 101 87 TWD 10 F07 0.66 SG21 101 87 TWD 7 F06 -1.53 SG21 102 82 TWD 5 F07 -1.43 SG21 102 88 TWD 6 F06 -0.55 SG21 102 90 TWD 7 F06 -0.61 SG21 103 83 TWD 12 F06 0.46 SG21 103 87 TWD 12 F07 0.92 SG21 104 78 TWD 7 F08 1.88 SG21 104 78 TWD 6 F07 0.79 SG21 104 84 TWD 7 F06 -0.48 SG21 104 86 TWD 4 F06 -0.52 SG21 104 88 TWD 20 F05 -1.5 SG21 104 88 TWD 19 F06 -1.1 SG21 104 88 TWD 6 F07 1.77 Page 21

A AR EVA Document No.: 51-9156712-000 AREVA NP Inc.,

an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report SG21 105 79 TWD 6 F07 1.96 SG21 105 83 TWD 12 F07 0.02 SG21 105 87 TWD 7 F07 0.66 SG21 106 76 TWD 22 F06 1.34 SG21 106 76 TWD 8 F07 -0.72 SG21 106 78 TWD 6 F07 0.7 SG21 106 90 TWD 7 F06 -0.55 SG21 107 75 TWD 9 F07 1.71 SG21 107 83 TWD 14 F06 0.46 SG21 107 83 TWD 10 F07 -0.11 SG21 107 87 TWD 16 F07 0.99 SG21 108 76 TWD 24 F06 1.01 SG21 108 90 TWD 16 F06 -0.81 SG21 110 76 TWD 7 F06 0.72 SG21 110 88 TWD 7 F06 -0.63 SG21 110 90 TWD 8 F06 -0.24 SG21 111 75 TWD 19 F06 -0.72 SG21 112 90 TWD 18 F06 -0.79 SG21 113 87 TWD 7 F07 0.74 SG21 114 76 TWD 12 F06 -0.72 SG21 117 89 TWD 15 F06 -1.62 LSG21 119 87 TWD 14 F07 0.81 Page 22

A AREVA Document No.: 51-9156712-000 AREVA NP Inc.,

an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report APPENDIX B: SG22 FBW INDICATIONS SG Row TWd %Tw. F06p .Inchi SG22 37 35. TWD 4 F07 1.85 SG22 49 9 TWD 7 F07 1.88 SG22 57 -127. TWD 5 -1.95 SG22 69 83 TWD 7 F08 -0.56 SG22 70 82 TWD 11 F06 -1.92 SG22 70 82 TWD 9 F07 0.86 SG22 72 72 TWD 9 F08 1.99 SG 22 72 92 TWD 13 F08 0.81 SG22 73 81 TWD 7 F07 -1.25 SG22 73 91 TWD 14 F08 1.93 SG22 74 82 TWD 7 F06 -1.72 SG22 74 82 TWD 6 F08 2.03 SG22 74 82 TWD 5 F07 0.74 SG22 74 94 TWD 9 F08 0.89 SG22 75 73 TWD 8 F08 0.82 SG22 76 72 TWD 17 F08 1.95 SG22 76 72 TWD 10 F06 -1.84 SG22 76 82 TWD 12 F06 -1.33 SG22 76 82 TWD 11 F08 2.02 SG22 76 82 TWD 8 F07 0.85 SG22 76 98 TWD 10 F08 0.86 SG22 77 65 TWD 10 F08 0.78 SG22 77 73 TWD 8 F08 0.98 SG22 77 81 TWD 6 F07 -0.81 SG22 78 64 TWD 7 F08 1.95 SG22 78 82 TWD 11 F06 -1.84 SG22 79 81 TWD 14 F07 -0.78 SG22 79 93 TWD 26 F08 1.44 SG22 80 64 TWD 12 F09 -1.94 SG22 80 80 TWD 9 F06 -1.61 SG22 80 82 TWD 9 F06 -1.95 SG22 80 82 TWD 8 F05 -0.63 SG22 81 91 TWD 8 F08 2.07 SG22 82 82 TWD 10 F07 1.29 SG22 82 82 TWD 7 F06 -1.83 SG22 82 84 TWD 9 F08 1.29 SG22 82 84 TWD 8 F06 1.44 SG22 82 94 TWD 7 F08 0.79 SG22 83 73 TWD 21 F08 0.83 SG22 83 75 TWD 12 F02 1.03 SG22 83 81 TWD 19 F07 -1.17 SG22 83 91 TWD 14 F08 1.99 SG22 84 80 TWD 11 F06 -1.81 Page 23

A ARE VA Document No.: 51-9156712-000 AREVA NP Inc.,

an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report SG22 _84 92 . TWD 17 F08 0.8 SG22 84 94 TWD 18 F*8 0.83

-SG22 -85 -79 TWD- 9 F08 0.94 SG22 86 72 TWD 11 F06 -1.59 SG22 72 TWD _9 F05- -0.76 SG22 86 TWD 9 F06 -1.56 SG22 86 92 TWD- 9 F08 0.83 SG22f 86 94 TWD 13 FOB _0.87 SG22 87 TWD 16 F08 0.78 SG22 87 83 TWD 22 F07 -0.02 SG22 87 83 TWD _ 15 F08 0.02 SG22 87 83--

8 _TWD 77F06 0.5 SG22 88 76 TWD-_ 9 F06 1.94 SG22 88 78_.. TWD 10 F06 -1.29 SG22 88 82 TWD - 12 F06 1.3 SG22 88 82 TWD 11 F0 5 1.83 SG22 88 84 TWO 6 F07 -0.72 SG22 88 -_92 TWD 11 - F08 0.85 SG22 89 65 TWD -14 F08 1.07_

SG22 89 -- 69 TWD 11 F08 1 SG22 89 73 TWD 18 F0 -0.91 SG22 89 83 TWOD- - FO6 __-10.25 SG22 89 83 TWD -0.55 SG22 89 83 TWOD 7 F05 -0.39 SG22 89 783 TWD 6

6. F07 0.57 SG22 89 89 TWD 5 FOB -1.27 SG22 90 821 TWD 6 F06 -1.83 SG22 91 65 TWD 20 FOB 0.87 SG22 91 83 TWD 7 F07 -0.46 SG22 92 76 TWD 11 F06 1.88 SG22 93 73 TWD 67 F06 -0.7 SG22 93 79 TWD 17 F06 -10.68 SG22 93 81 TWD F05 -0.74 SG22 934_ 83 TWD 10 F07 0.5 SG22 93 83 TWD 91 F06 0.48 SG22 94 76 TWD 7 7 F06 -1.58

-SG22 -. 94 80 -TWO -7 -F06 -1.73 SG22 94 82 TWO -14 F06 -1.81 SG22 94 82 TWD 6 F07 0.87 SG22 94 86 TWD 8 F06 0.85 SG22 94 92 TWO 10 F08 0.89 SG22 95 81 TWO 8 F07 -1.22 SG22 95 83 TWO 10 F07 _-0.52 SG22 95 83 TWO 7 F06 0.59 SG22 96 80 TWD 10 F06 -1.79 SG22 96 82 TWD 9 F06 1.3 Page 24

A AREVA Document No.: 51-9156712-000 AREVA NP Inc.,

an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R1 9 180-Day Report S -G .Row %TW SG22 96 82 ITWD F07 -1.49 SG22 96 84 TWD - 17 F07 1.35

-SGi22- 96 86 TWD 9 F06 -1.05 SG22 96 90 TWD --14 F08 -1.31 SG22 97 73 TWD 8 F06 -0.72 TWD SG22 97 75 7 F06 -0.5 TWD SG22 97 77 7 F06 -0.72 SG22 97 79 TWD 7 F06 -0.61 SG22 -97 81 TWD 8 F07 -1.27 SG22 97 81 TWD 3 F06 1.38 SG22 97 81 TWD 3 F08 -1.53 SG22 98 72 TWD 6 F08 1.92 SG22 98 76 TWD 7 F06 1.71 SG22 98 78 TWD 10 F08 2.08 SG22 98 82 TWD 7 F07 0.9 SG22 99 71 TWD 13 F08 -0.81 99 73 TWD 7 F07 1.93 SG22 99 77 TWD 18 F06 -1.02 SG22 99 83 TWD 28 F06 0.07 SG22 99 83 TWD 15 F05 0 SG22 100 76 TWD 8 F06 -1.79 SG22 100 78 TWD 11 F08_ -1.85 SG22 100 78 TWD 6 F06 -1.51 SG22 100 82 TWD 23 F06 -1.21 SG22 100 82 TWD 16 F07 0.91 SG22 100 82 TWD 9 F08 1.8 SG22 100 84 TWD _ 8 F07 1.95 SG22 100 88 TWD _ 11 F07 1.86 SG22 101 77 TWD 9 F06 -0.67 SG22 101 79 TWD 7 F07 1.84 SG22 101 83 TWD 30 F06 0.09 SG22 101 83 TWD 23 F07 0.09 SG22 101 83 TWD 9 F05 0.04 SG22 101 85 TWD 6 F09 1.42 SG22 101 87 TWD 7 F07 0.76 SG22 101 87 TWD 6 F04 0.7

_SG22 102 76 TWD 12 F07 -1.27 SG22 102 76 TWD 7 F06 1.77 SG22 102 82 TWD 8 F09 0.85 SG22 102 82 TWD 7 F06 -1.77 SG22 102 84 TWD 5 F07 1.94 SG22 102 86 TWD 6 F02 0.9 SG22 103 77 TWD 16 F06 -0.61 SG22 103 79 TWD 10 F06 -0.62 SG22 103 79 TWD 9 F07 1.96 SG22 1 1031 811 TWD 1 9 1F08 [ -1.31 Page 25

A AR EVA Document No.: 51-9156712-000 AREVA NP Inc.,

an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report SG22 103 83 TWD 17 F06 -0.06 SG22 103 83 TWD-I 7 F05 -0.52 SG22 103 83 TWD 7 FO7 -0.13 SG22 103 85 TWD 10 F08 1.4 SG22 103 87 TWD 12 F07 0.7

_SG22 104 82 _TWD V F06 -1.76 SG22 104 82 TWD 11 F07 0.74 SG22 104 84 TWD 12 F07 1.84 SG22 104 94 TWD 14F06 -1.15 SG22 105 67 TWD 9 F07 -1.31 SG22 105 75 TWD 9 F06 -0.74 SSG22 105 77= TWD_ 11 F06 -0.74 SG22 105 79j TWD 17 F06 -0.59 SG22 105 79 TWD 11 F07- 1.75 SG22 105 81 TWD 14 F08 1.35 SG22 105 81 TWD 9 F06 -0.74 SG22 105 81 TWD 6 F07 1.81 SG22 105 83 TWD 15 F07 _ 0.57 SG22 -105-5 83 TWD 13 FO5 -0 SG22 105 83 TWD 8 F06 _ 0.04 SG22 105 87 TWD 7 F01 0.61 SG22 106 80 TWD 8 F07 1.44 SG22 106 82 TWD 17 F07 0.79 SG22 106 82 TWD 11 F06 -1.72 SG22 106 84 TWD _ 6 F08 -1.42 SG22- 106 ----90 TWD 18 F07 1.39 SG22 107 75 TWD _ 14 F06 -0.79 SG22 107 -- 77 TWD _ 14 F-06 --0.76.

SG22 107 79 TWD 9 F06 -0.75 SG22 107 81 TWD 22 F06 -0.74 SG22 107 81 TWD 12 F08 -1.26 SG22 107 83 TWD F07 0.07 SG22 107 83 TWD 5 F06 _ 0.02 SG22 107 83 TWD 4 EQS 0.12 SG22 107 85 TWD 18 F09 0.7 SG22 107 93 TWD 11 F07 0.81 SG22 108 74 TWD 7 F06 -1.9 SG22 108 76 TWD 14 F08 1.72 SG22 108 82 TWD 21 F07 0.81 SG22 108 82 TWD 16 F09 0.87 SG22 108 82 TWD 10 F08 1.68 SG22 108 84 TWD 14 F07 1.82 SG22 108 84 TWD 13 F06 -0.61 SG22 108 86 TWD 23 F06 -1.03 SG22 108 86 TVD 15 F07 1.25 SG22 108 86 TWD 6 F08 1.33 Page 26

A AREVA Document No.: 51-9156712-000 AREVA NP Inc.,

an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R1 9 180-Day Report 9G- IJ-Row mld. %TW SG22 108 90 TWD 7 F06 -0.7 SG22 _ 109 73 TWD 32 F06 -1.2 SG22 109 75 TWD 13 F06 -0.83 SG22 109 77 TWD 18 F06 -0.66 SG22 109 79 TWD 21 F06 -0.72

-SG22 _109 81 TWD 14 F08 -1.46 SG22 109 81 TWD 12 F06 -0.74 SG22 109 81 TWD 6 1F07 -1.18 SG22 109 83 TWD 5 F06 0.56 SG22 109 85 TWD 17 F07 -1.33

-SG22 109 87 TWD 11 F07 0.87 SG22 110 78 TWD 9 F07 0.72 SG22 111 73 TWD 27 F06 -1.25 SG22 111 75 TWD 22 F06 -0.7 SG22 77 TWD 27 F06 -0.85 111 SG22 79 TWD 19 F06 -0.69 111 SG22 111 79 TWD 11 F07 1.83 SG22 81 TWD 14 F06 -0.74 SG22 112 72 TWD 10 F08 1.88 SG22 112 78 TWD 12 F07 0.79 SG22 75 TWD 8 F06 -0.81 113 SG22 77 TWD 26 F06 -1.22 113 SG22 81 TWD 19 F06 -1.16 113 SG22 83 TWD 9 F07 0.61 SG22 113 83 TWD 7 F06 0.5 SG22 113 91 TWD 18 F02 -1.91 SG22 114 76 TWD 5 F06 1.32 SG22 114 78 TWD 12 F07 0.75 SG22 114 82 TWD 8 F06 1.33 SG22 114 84 TWD 12 F06 -1.18 SG22 114 88 TWD 15 F05 1.28 SG22 115 73 TWD 9 F06 -0.68 SG22 115 77 TWD 9 F06 -0.68 SG22 115 81 TWD 7 F06 1.28 SG22 115 81 TWD 6 F07 -1.22 SG22 115 83 TWD 6 F06 0.57 SG22 115 83 TWD 6 F07 0.63 SG22 115 93 TWD 12 F07 0.88 SG22 116 82 TWD 22 F07 1.25 SG22 116 84 TWD 9 F08 -1.66 SG22 117 83 TWD 18 F06 0.13 SG22 117 83 TWD 6 F05 -0.42 SG22 117 83 TWD 5 F08 0.09 SG22 117 91 TWD 15 F07 1.33 SG22 119 81 TWD 14 F06 -0.61 SG22 120 82 TWD 6 F08 1.24 Page 27

A AR EVA Document No.: 51-9156712-000 AREVA NP Inc.,

an AREVA and Siemens company Calvert Cliffs Unit 2 -- U2R19 180-Day Report SG22 120 I 88 -TWD_ 9 F08__-1.27 SG2.2 121 75 TWD _1_1_F06 -0.79 SG22 -123 77 -TWD 6 F06_ -0.61 SG22 123 81 TWD 11 F07 1.53 SG22 123 83 TWD 25 F07 0.33 SG22 123 83 -TWD- 8 F06 0.59 SG22 123 83 TWD 6 F05 0.28 SG22 124 76 TWD _ 8 F06 0.76 SG22_ 124 82 TWD 13 F06 -1.29

_SG22 124 82 __TWD 9 F08 -1.37 SG22 124 82 TWDO 7 F09 _ -1.4

-SG22 J-125 91- -TWD -- 9-9 F03 -.. 1-.95 SG22 1..26 82 TWD ----15 F07 1.16 S7G2-2 F-127 83 TWD - 13 F07 0.22 SG22 128 92 TWD ... 7 F08 - -1.25 SG22 130 92 TWD 10 F06 1.78 SG22 131 75 TWD 9 F06 -1.29 SG22 131- 83T-"WD 8 1 F08 0 SG22j 135_[ 83_LtrWDL_ 81 :F07 _ 0.18]

Page 28