ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV4516 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves inm*nt r)Plqrrintinn" 91 Rr FW IRO'I ILIVIWV-rIfIj w-P-IILwVj 251
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV4516 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves F:niinmant NzA.rintinn- 71 Rr R I5qrfI 252
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV4517 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
22 SG FW ISOL Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 27.00 ft, CAL-AB-309 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
253
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV4517 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
22 SG FW ISOL Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes Flex conduit is connected to rigid conduit that is mounted to nearby concrete column. Flex conduit has adequate flexibility therefore not a seismic concern.
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments 4 / -
Evaluated by: 4/ ~4~2- A. Karavoussianis Date: 11/09/2012
~zT C. Figliolini 11/09/2012 Photos 254
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV4517 Equipment Class: (8) Motor-Opera ted and Solenoid-Operated Valves iinmant frlaarinfinn. '799*r' PVUf 1_AI 255
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV4517 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Fnilinmant 1"zQnrintinn- 22 SG FW ISOL 256
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV4517 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Eauinment Descrintion: 22 SG FW ISOL 257
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV4517 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Fnri linmant Il*anrrintinn" 99 qr FW I~nI 258
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV508 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
22 BAST GRAVITY FD Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 5.00 ft, CAL-AB-215 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
259
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: F] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV508 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
22 BAST GRAVITY FD Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: '9/41ýýý A. Karavoussianis Date: 11/09/2012
~z7 C. Figliolini 11/09/2012 Photos 260
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: T] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV508 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves PFi inmant fnlmrrinfinn" '99 RA.QT ('*RA\IITV IMf 261 I
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: MI N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV508 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
22 BAST GRAVITY FD 262
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV508 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Einuinm~nt DAqrintion: 22 RAST GRAVITY Fn 2MOV508 8-6-12 073 263
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV509 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
21 BAST GRAVITY FD Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 5.00 ft, CAL-AB-215 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
264
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV509 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
21 BAST GRAVITY FD Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes Operatoris in close proximity to pipe, i.e. touching insulation. The pipe is part of valve's piping system, therefore minimal differential motion expected.
Judged not a seismic concern.
Also, a unistrut frame is touching the top of a horizontal valve component, the condition may cause some scrapping, but judged not a seismic concern.
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: A. Karavoussianis Date: 11/09/2012
~zT C. Figliolini 11/09/2012 Photos 265
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: F-Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV509 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
21 BAST GRAVITY FD 2MOV509 8-6-12 075 e 0 266
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV509 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves FnufinmAnt Fnanrintinn" 91 RAqT r.RAVITY Fn' I
267
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV514 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
BAPP'S TO CHG PP SUCT DIR Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 5.00 ft, CAL-AB-215 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable 3, Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable 4, Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6, Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
268
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: F-Y- N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MAV514 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
BAPP'S TO CHG PP SUCT DIR Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
The pipe is laterallysupported near the valve, judged not to be a concern.
Comments Evaluated by: /ý "14ýýý' A. Karavoussianis Date: 11/09/2012 C. Figliolini 11/09/2012 Photos 269
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV514 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Fni iinmant nowr-rintinn" RAPP'5Q Tn (WI-4( PP qI IC.T flIP 270
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV514 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves 271
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV514 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves
- ntiinmtant now-rintinn. RAPP'5Q Tr) Ci.4( PP .QI Ir.T li*P 272
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV514 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
BAPPS TO CHG PP SUCT DIR 273
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV615 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
21B LPSI OUTLET MOV Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 5.00 ft, CAL-AB-206 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
274
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: V] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV615 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
21B LPSI OUTLET MOV Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
Valve's hand wheel is approximately 1" from flexible hose, judged not a seismic concern.
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: A. Karavoussianis Date: 11/09/2012 C. Figliolini 11/09/2012 Photos 275
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV615 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves ioment DescriDotion: 21 B LPSI OUTLET MOV 276
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV615 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves 277
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV615 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Eauinment Descrintion: 21B LPSI OUTLFT MOV 278
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: MZ N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV625 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
21A LPSI LOOP ISOL Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 5.00 ft, CAL-AB-206 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
279
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2M1V625 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
21A LPSI LOOP ISOL Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes Flexible hose is behind the pipe and in direct contact with the isolationjacket.
Pipingis restrainedfrom movement by lugs, therefore judged not a seismic concern.
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: A. Karavoussianis Date: 11/09/2012
~z7 C. Figliolini 11/09/2012 Photos 280
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV625 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Eauinment Descdntion: 21A LPSI LOOP ISOL 281
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: F N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV625 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Fnuinm*nt nt-qArintinn" 71A I PRI I OlOP IRC5I 282
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV625 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves FnIlinmnt 1*_qrrintinn- 91A I PRI I r(OP IqrfI 283
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV627 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
21A AUX HPSI LOOP ISOL Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 27.00 ft, CAL-AB-31 0 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
284
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV627 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
21A AUX HPSI LOOP ISOL Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
Nearby scaffold is adequately braced and does not pose a seismic hazard.
- 9. Do attached lines have adequate flexibility to avoid damage? Yes There is flex conduit from the operatorconnected to rigidconduit that is supportedon a nearby frame, judged to have adequate flexibility.
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: /ý'4 A. Karavoussianis Date: 11/09/2012
~z7 C. Figliolini 11/09/2012 Photos 285
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: V N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV627 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2MOV627 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Enuinm~nt flArrintinn- IA AUJX HPRI ILCP I.R(I 287
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y j-J U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2NB102 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
CNTMT COOL FAN 21 CONTROLLER Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 45.00 ft, CAL-AB-409 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
288
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: YZ U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2NB102 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
CNTMT COOL FAN 21 CONTROLLER Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes There is less than a 1/8" gap to concrete wall.
Evaluated using 8 Hz frequency for cabinets 2% Damping Ratio, 1.5 PF Response Spectrum ABO45D2N.dat A=0.30g D= (1.5-0.30"386)/(8x2x3.14)A2 = 0.07" < 1/8" OK
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could No adversely affect the safety functions of the equipment?
Cabinetis inaccessiblefor internalinspection.
Comments Evaluated by: /9 A. Karavoussianis Date: 11/09/2012 C. Figliolini 11109/2012 289
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: YF'-] U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2NB102 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
CNTMT COOL FAN 21 CONTROLLER Photos 290
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: YEE u Seismic Walkdown Checklist (SWC)
Equipment IDNo.: 2NB102 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
CNTMT COOL FAN 21 CONTROLLER 291
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PCV3938A Equipment Class: (0) Other Equipment
Description:
21/P3938 IA SUPPLY Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 45.00 ft, CAL-AB-408 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
Device is mounted the same as PCV3939A.
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Mounted same as PCV3939A 292
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PCV3938A Equipment Class: (0) Other Equipment
Description:
21/P3938 IA SUPPLY Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes Tubing and flex conduit are mounted on the same wall that supports the PCV.
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: /ý /Zý-ý ý' ý A. Karavoussianis Date: 11/09/2012 7~ZT C. Figliolini 11/09/2012 Photos 293
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PCV3938A Equipment Class: (0) Other Equipment
Description:
21/P3938 IA SUPPLY 294
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PCV3938A Equipment Class: (0) Other FnifinmAnt fr*rrintinn" 91/P'IR IA 5AIIPPI V 295
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y E U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PCV3939A Equipment Class: (0) Other Equipment
Description:
21/P3939 IA SUPPLY Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 45.00 ft, CAL-AB-408 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: No This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
PCV is bolted to unistrut by 2-7/16 F-F bolts head (i.e. 3/8" bolt). Unistrut mounted to wall by 2-1/2" CEA.
Need plant documentation to determine if anchorageis consistentwith as-built sketch. CR-2012-009779
- 6. Based on the above anchorage evaluations, is the anchorage free of No potentially adverse seismic conditions?
296
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y [] U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PCV3939A Equipment Class: (0) Other Equipment
Description:
21/P3939 IA SUPPLY Need plant documentationto determine if anchorageis consistent with as-built sketch.
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes All tubing and flex conduit are mounted on same wall.
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: A. Karavoussianis Date: 11/09/2012
~z7 C. Figliolini 11/09/2012 297
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y UN-U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PCV3939A Equipment Class: (0) Other Equipment
Description:
21/P3939 IA SUPPLY Photos 298
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y - U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PCV3939A Equipment Class: (0) Other 299
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PCV3939B Equipment Class: (0) Other Equipment
Description:
2CV3939 VLV POS SUPPLY Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 45.00 ft, CAL-AB-408 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoraqge
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
Device is mounted to unistrut by 2-7/16 F-F bolts head and the unistrut stitch-welded to steel pipe support.
300
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: T] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PCV3939B Equipment Class: (0) Other Equipment
Description:
2CV3939 VLV POS SUPPLY Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes There is a 1/2" tube that spans 25" between pipe support and wall mounted support. Judged that the tube has adequateflexibility, therefore not a concern.
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: A. Karavoussianis Date: 11/09/2012 C. Figliolini 11/09/2012 Photos 301
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PCV3939B Equipment Class: (0) Other iment Descrwtion: 2cV3g3g VLV POS 0 LIPP[Y 302
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: T N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2CO8 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
ENGINEERING SAFEGUARDS CONTROL Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 45.00 ft, CAL-AB-405 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: No This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage used details that are not shown on the drawing, but arejudged to be equivalent. See as-built on drawing G1992 SHOO04 Rev. 9. CR-2012-9752
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
The anchoragedetail deviations do not adversely affect the cabinet's anchorage,therefore there is no potentialseismic concern. This is simple a documentation issue.
303
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: F--] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2C08 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
ENGINEERING SAFEGUARDS CONTROL Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
Observed a drop ceiling and light diffuser ceiling.
10/3/12 - The control room ceiling has been previously evaluated by CCNPP and was determined to not be a credible seismic concern.
Observed a masonry block wall behind the panels. The block wall, identified as AA on drawing A-259, is safety-related and thus seismically rated per IE Bulletin 80-11.
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Comments Evaluated by: &4~~A2i A. Karavoussianis Date: 11/09/2012
~zT C. Figliolini 11/09/2012 304
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2CO8 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
ENGINEERING SAFEGUARDS CONTROL Photos IF -1W 2PNL2CO8 8-14-12 165 305
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2CO8 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
ENGINEERING SAFEGUARDS CONTROL 2PNL2CO8 8-14-12 167 2PNL2CO8 8-14-12 168 I'NI.LZUAO 0-14-IL1I fU 306
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Ml N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2C08 Equipment Class: (20) Instrumentation and Control Panels and Cabinets "RING SAFFGUARDn CONTROL 307
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2CO8 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
ENGINEERING SAFEGUARDS CONTROL 308
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2C08 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
ENGINEERING SAFEGUARDS CONTROL 2PNL2CO8 8-14-12 178 309
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2CO9 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
ENGINEERING SAFEGUARDS CONTROL Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 45.00 ft, CAL-AB-405 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
310
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2CO9 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
ENGINEERING SAFEGUARDS CONTROL Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
Observed a drop ceiling and light diffuser ceiling.
10/3/12 - The control room ceiling has been previously evaluated by CCNPP and was determined to not be a credible seismic concern.
Observed a masonry block wall behind the panels. The block wall, identified as AA on drawing A-259, is safety-related and thus seismically ratedper IE Bulletin 80-11.
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: /ý '44 Date: 11/09/2012 A. Karavoussianis
~zT C. Figliolini 11/09/2012 311
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2CO9 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
ENGINEERING SAFEGUARDS CONTROL Photos 312
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: rY N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2C09 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
ENGINEERING SAFEGUARDS CONTROL 2PNL2CO9 8-14-12 167 2PNL2CO9 8-14-12 168 313
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2C09 Equipment Class: (20) Instrumentation and Control Panels and Cabinets EauiDment DescriDtion: ENGINEERING SAFEGUARDS CONTROL 314
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2C09 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
ENGINEERING SAFEGUARDS CONTROL 315
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2CO9 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
ENGINEERING SAFEGUARDS CONTROL 2PNL2C09 8-14-12 178 316
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2Cl0 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
ENGINEERING SAFEGUARDS CONTROL Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 45.00 ft, CAL-AB-405 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
317
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: V] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2CI0 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
ENGINEERING SAFEGUARDS CONTROL Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
Observed a drop ceiling and light diffuser ceiling.
10/3/12 - The control room ceiling has been previously evaluated by CCNPP and was determined to not be a credible seismic concern.
Observed a masonry block wall behind the panels. The block wall, identified as AA on drawing A-259, is safety-related and thus seismically rated per IE Bulletin 80-11.
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: / A. Karavoussianis Date: 11/09/2012 C. Figliolini 11/09/2012 318
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: MZ N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2C10 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
ENGINEERING SAFEGUARDS CONTROL Photos w i a 319
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2C10 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
ENGINEERING SAFEGUARDS CONTROL 2PNL2C10 8-14-12 167 2PNL2C10 8-14-12 168 (1"INLZ%,.-IUO-1s4-1Z 1/U 320
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: [] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2C1O Equipment Class: (20) Instrumentation and Control Panels and Cabinets Iniiinmanfrflarinfinn" FN(4INFFIM"4 5*AFF('I IARrl- (*AMTPrI 321
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2C10 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
ENGINEERING SAFEGUARDS CONTROL 322
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: r] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2C10 Equipment Class: (20) Instrumentation and Control Panels ancI Cabinets Equipment
Description:
ENGINEERING SAFEGUARDS CONTROL 2PNL2C10 8-14-12 323
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y Uu Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2C61B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
2B DG LOCAL CONTROL PANEL Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 45.00 ft, CAL-AB-416 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such.verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? No Anchorage is inaccessible.
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? No Anchorage is inaccessible.
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? No Anchorage is inaccessible.
- 5. Is the anchorage configuration consistent with plant documentation? (Note: No This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage is inaccessible.
- 6. Based on the above anchorage evaluations, is the anchorage free.of No potentially adverse seismic conditions?
Anchorage is inaccessible.
324
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: YEW U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2C61B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
2B DG LOCAL CONTROL PANEL Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes There is a 1/2" gap between the cabinet and a conduit supported on wall.
Evaluatedusing 8 Hz frequency for cabinets 2% Damping Ratio, 1.5 PF Response Spectrum ABO45D2N.dat A=0.30g D= (1.5*0.30*386) / (8x2x3.14)A2 = 0.07" < 1/2" OK
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
If not Il/I, overhead lights in front of the cabinet may fall and strike relay and switches.
10/3/12 - Overhead lights were deemed not a credible seismic concern due to their lightweight and to typical constructionpractices. Also, they have been previously evaluated by CCNPPand found seismically acceptable.
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: i "" A. Karavoussianis Date: 11/09/2012 C. Figliolini 11/09/2012 325
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y W- U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2C61B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
2B DG LOCAL CONTROL PANEL Photos 326
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y W U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2C61B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
2B DG LOCAL CONTROL PANEL
.1. 1% -? qv-~k.-Y i -1 327
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y - U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2C61B Equipment Class: (20) Instrumentation and Control Panels and Cabinets oment Descrition: 2R DM LOCAL CONTROL PANFI 328
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y [-] U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2C61C Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
2B DG LOCAL CONTROL PANEL Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 45.00 ft, CAL-AB-416 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchoraqe
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? No Anchorage is inaccessible.
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? No Anchorage is inaccessible.
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? No Anchorage is inaccessible.
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of No potentially adverse seismic conditions?
Anchorage is inaccessible.
329
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y [J U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2C61C Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
2B DG LOCAL CONTROL PANEL Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
If not II/I, overhead lights in front of the cabinetmay fall and strike relay and switches.
10/3/12 - Overheadlights were deemed not a credible seismic concern due to their lightweight and to typical constructionpractices. Also, they have been previously evaluated by CCNPPand found seismically acceptable.
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: /ý-/I-ý- ý ý- ý A. Karavoussianis Date: 11/09/2012 C. Figliolini 11/09/2012 Photos 330
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2C61C Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
2B DG LOCAL CONTROL PANEL VŽ~11110-, n :;
I ii 331
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y W U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2C61C Equipment Class: (20) Instrumentation and Control Panels and Cabinets 2PNL2C61C 8-13-12 065 332
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2C67 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
ESFAS ACT LOGIC & RELAY CAB A Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 27.00 ft, CAL-AB-302 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
2, Is the anchorage free of bent, broken, missing or loose hardware? Yes 3, Is the anchorage free of corrosion that is more than mild surface oxidation? Yes 4, Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5, Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage is consistent with calculation CA02066.
6, Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
333
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: r] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2C67 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
ESFAS ACT LOGIC & RELAY CAB A Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: / A'"4 A. Karavoussianis Date: 11/09/2012 C. Figliolini 11/09/2012 Photos 334
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2C67 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Fnifinmdant nlAqrrintinn* F5RFA5R Ar.T I flC.IC X R1FI AV CrAR A 335
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2C67 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Fnijinm*nt nAqrrintinn- F.RFAR A('.T I GIC. A. R=FI AY( AR A 336
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2C67 Equipment Class: (20) Instrumentation and Control Panels and Cabinets 337
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: M-j N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2C67 Equipment Class: (20) Instrumentation and Control Panels and Cabinets inment Descrintion: ESFAS ACT LOGIC & RELAY CAB A
-U 338
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y j-j U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2D11 Equipment Class: (2) Low Voltage Switchgear Equipment
Description:
125VDC PNL DC21 2Dll Project: CCNPP 2 SWEL Location (Bldg, Elev, Room/Area): AUX, 27.00 ft, CAL-AB-302 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
Defer to outage
- 2. Is the anchorage free of bent, broken, missing or loose hardware? No Anchorage is inaccessible.
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? No Anchorage is inaccessible.
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? No Anchorage is inaccessible.
- 5. Is the anchorage configuration consistent with plant documentation? (Note: No This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage is inaccessible.
- 6. Based on the above anchorage evaluations, is the anchorage free of No potentially adverse seismic conditions?
Anchorage is inaccessible.
339
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y 1U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2D11 Equipment Class: (2) Low Voltage Switchgear Equipment
Description:
125VDC PNL DC21 2D11 Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes There is a 3/8" gap between the cabinet and the cabinet behind. Cabinetis 14.5"D x 84"W x 90" High.
Evaluated using 8 Hz frequency for cabinets 2% Damping Ratio, 1.5 PF Response Spectrum ABO27D2N.dat A=0.25g D= 2 * (1.5*0.25*386) /(8x2x3.14)A2 = 0. 11" < 3/8" OK
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
There are block walls nearby. Masonry block walls, identified as T, S, N, AA and BB on drawingA-260, are safety-related and thus seismically ratedperlE Bulletin 80-11.
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could No adversely affect the safety functions of the equipment?
Cabinetis inaccessiblefor internal inspection.
Comments Evaluated by: " A. Karavoussianis Date: 11/09/2012 C. Figliolini 11/09/2012 340
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: YFI-1 U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2DI 1 Equipment Class: (2) Low Voltage Switchgear Equipment
Description:
125VDC PNL DC21 2Dll Photos 341
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y W U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2D11 Equipment Class: (2) Low Voltage Switchgear Equipment
Description:
125VDC Pt 4L DC21 2D1 1 2PNL2D11 8-14-12 039 2PNL2DI1 8-14-12 040 342
ATTACHMENT 3 WALKDOWN CHECKLISTS Status: Y IN] U Seismic Walkdown Checklist (SWC)
Equipment ID No.: 2PNL2D1I Equipment Class: (2) Low Voltage Switchgear ioment Descrntion: 125VDC PNL DC21 2DlI 343